Summary: HSR25-29 OCS Components Questions and Responses, Round 1
This document is a Questions and Responses record from the California High-Speed Rail Authority regarding Invitation for Bids (IFB) No. HSR25-29 for Overhead Contact System (OCS) Components. The procurement seeks OCS components including cantilevers, hangers, droppers, clamps, fasteners, wires, cables, and related assemblies, excluding OCS poles, foundations, and main conductors. The scope encompasses approximately 3,600 pole locations under the first Notice to Proceed (NTP 1), with deliveries scheduled across four quarters from Q1 2027 through Q4 2028, split between Wasco and Fresno railheads in California. Bids are due November 18, 2026, at 12:00 PM PST. The contract term is three years with no fourth-year option currently contemplated. Minor Variance proposals were due October 28, 2026, with Authority approval targeted for November 5, 2026. First Article Inspection and physical qualification testing are conducted post-award, with no physical samples required at bid. The Authority anticipates accepting or rejecting materials within seven days of delivery.
Bidders must comply with Buy America domestic content requirements and certify compliance at bid. All components must be substantially manufactured in the United States; mere assembly or imported finished components do not satisfy domestic content obligations. Bidders are required to meet specified experience criteria or demonstrate equivalent capability, with preference for systems capable of exceeding 125 mph operation. The pricing structure includes quarterly deliveries with price adjustments based on commodity indices (hot-rolled coil, resin, copper, aluminum, and transportation). Approximate quantities are estimates; actual orders are placed via Delivery Order subject to a Delivery Plan developed post-award. No single-bid set-aside programs are indicated in this document. Bidders must establish and document their supply chain, manufacturing locations, and quality control plans in accordance with detailed technical specifications referenced to SNCF design standards and drawings. The Authority will issue an updated Price Escalation form by Addendum 2, anticipated October 23, 2026, and a standardized catalog of pre-approved ASTM/imperial equivalent substitutions by November 5, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Invitation for Bids No. HSR25-29
OCS Components
Questions and Responses
Round Date
1 10/22/2026
California High-Speed Rail Authority
Invitation for Bids
Questions and Responses, Round 1
HSR25-29
No. Bidder Question Authority Response
Is it mandatory to have experience with high-speed rail?
Bidders are tor refer to the IFB requirements (i.e. Section 4.12, IFB). Experience with similar OCS equipment may be sufficient. Experience with systems capable of >125mph operation is preferred.
Is it mandatory to have a previous project reference worth $20M+
Bidders are to refer to the IFB requirements (Section 4.12, IFB). The Authority will review Bid Packages from Bidders who can meet all requirements listed in the IFB. Bidders are to fill out the Form E questions to the best of their ability.
If these are mandatory and someone with these requirements used us as a subcontractor, would we need to meet the same requirements as the prime bidder?
Please see above responses. Generally, it is the prime bidder or prime bidding team that must meet requirements listed to be responsive.
Does the prime bidder need to be the manufacturer for the products or can they can source through other vendors?
No, the Authority does not require the Prime Bidder to be the manufacturer. However, all Bid Packages submitted must comply with the requirements stated in the IFB.
Handling Proprietary Drawings & CAD Recreation for Sub-Vendor RFQs IFB Reference: Instructions to Bidders, Section
4.2.1 (Box Account Access Instructions, page 13) and Form K (Non-Disclosure Agreement, page 44).
a. To solicit competitive Request for Quotes
(RFQs) from domestic manufacturers, is a bidder permitted under Form K to recreate or digitize 2D/3D CAD models of individual component drawings internally, provided these recreated files are marked confidential and used strictly for estimating and quoting purposes under IFB HSR25-29?
a. This is acceptable, provided that the Bidder, and each subcontractor, strictly follows the rules of the NDA and the instructions listed in the IFB (Section 4.2).
b. Bidders and any member of their team (including Subcontractors) who require access to the confidential documents to prepare the final Bid Package are required to provide a signed NDA (Form K, IFB) to the Authority, prior to receiving access. Instructions on how to access these files after execution of the Contract, will be discussed with the awarded contractor.
Questions and Responses, Round 1
HSR25-29
b. When sharing specific drawing excerpts or CAD models with prospective sub-tier hardware suppliers for quoting purposes, does each sub-vendor require an individually executed Form K submitted directly to the Authority, or may the prime bidder manage sub-tier confidentiality via a binding sub-contractor non-disclosure agreement flowing down Form K’s terms?
Metric to Imperial Measurement & Material Standard Conversions IFB Reference: Exhibit A (Technical Specifications), Section 1.2 (Standards, pages 3–
6) and Section 1.3.P (Use of Equivalent Test Standards, page 8).
a. The S220 catenary component drawings specify metric dimensions (e.g., metric tube diameters, M-series bolt threads, and EN steel plate thicknesses). Given that domestic U.S.
steel mills and hardware manufacturers standardly produce in imperial units, will the Authority permit soft/hard conversions to equivalent or superior U.S. imperial sizes (e.g., standard ASTM hardware or U.S. customary steel tube wall thicknesses)?
b. Does converting a metric drawing dimension to a functionally equivalent or superior U.S.
imperial standard require a formal Minor Variance Proposal under Section 4.19, or is the substitution of equivalent ASTM/U.S. standard components permitted directly under Section 1.3.P?
a. This request should be submitted using the variance process (Section 4.19, IFB). Variances will be evaluated on a case-by-case basis.
b. Yes, this would require a minor variance proposal.
Questions and Responses, Round 1
HSR25-29
Minor Variance Submission & Pricing Schedule Alignment IFB Reference: Instructions to Bidders, Section
4.19 (Minor Variance Submission Proposal Process, pages 27–28) and Procurement Schedule Table 1 (page 11).
a. The deadline for Minor Variance Proposals is
Friday, October 23, 2026, with Authority responses targeted for October 30, 2026. If a bidder submits a variance for an equivalent imperial component or alternative manufacturing method, how should the bidder complete Form B (Pricing Schedule) if the Authority’s variance decision is pending at the time of final vendor pricing assembly?
b. Will the Authority issue a standardized catalog of pre-approved ASTM / imperial equivalent substitutions following bidder one-on-one meetings?
a. Bidders are to complete Form B (Bid Form) along with the required Bid Documents by the Bid Deadline (Procurement Schedule, Table 1, IFB). Bids are due on November 18, 2026, at 12:00 PM PST.
b. Yes, by November 5th.
Addendum 1 has been posted to reflect changes to the procurement schedule. An additional Addendum 2 is anticipated to be posted on or around October 23 (Table 1, Addendum 1).
First Article Inspection (FAI) vs. Pre-Bid Testing Requirements IFB Reference: Exhibit B (General Provisions), Section 17.c.ii (First Article Inspection, pages 11–
12) and Exhibit A, Section 2 (Qualifications, page 9).
Can the Authority confirm that all First Article Inspections (FAI) and physical qualification testing are conducted post-award prior to mass production, and that no physical component samples are required to be submitted with the initial November 17, 2026 Bid Package?
Yes, this is correct.
Questions and Responses, Round 1
HSR25-29
Reference: Instructions to Bidders, Section 3.1 (Definitions, “OCS Components”), page 8; Exhibit B, Section 1.l, page 2 of 43; Form B, OCS Components List Pricing (Appendix A), Part Item Nos. P-140, P-141 and P-142.
The IFB states that OCS poles, foundations and conductors are excluded from this Contract.
However, bidder sees that poles are included on the OCS Components List Pricing as Part Item Nos. P-140, P-141 and P-142. Please confirm whether this is an error, or whether bidder is to provide the poles referenced on that list.
Poles are not included in this procurement. Bidders do not need to price or provide Poles.
Reference: Instructions to Bidders, Section 2.A.1, page 2; Form B, Bid Form, Section 1.0 Price Adjustment, page 2 of 4; Exhibit B, Section 2.c, Table 1, page 4 of 43.
Section 2.A.1 describes a three to four year term by reference to Exhibit B, Table 1, which does not state a term. Form B provides prices for Years 1 to 3 only, while the price adjustment provisions refer to a Year Four. Please confirm the contract term and, if a fourth year is contemplated, how goods ordered in that year are priced.
The term of this contract is three (3) years. Currently, a fourth year is not contemplated. Please refer to Table 1 for the anticipated delivery schedule (Section 2, General Provisions) and price your bids accordingly on the Bid Form.
Reference: Instructions to Bidders, Section 4.18.1 (Buy America Requirements), pages 25 to 26;
Exhibit C, Federal Terms and Conditions, Section 13, pages 7 to 8 of 19.
FRA guidance on the Buy America requirements at 49 U.S.C. section 22905(a) provides that, for a
Bidders are to refer to the Buy America requirements in the IFB at Section 4.18.1, as well as the requirements in the Federal Terms (Section 13, Exhibit C).
Bidders are to certify that they can meet these requirements as part of the Bid Package (Certification 7, IFB).
Questions and Responses, Round 1
HSR25-29
manufactured product to comply with Buy America, all of the components of the end product must be of United States origin, and that a component is of United States origin if it is manufactured in the United States regardless of the origin of its subcomponents. FRA defines a component as an article, material or supply directly incorporated into the end product at the final assembly location, and a subcomponent as an article one step removed and incorporated into a component. FRA further provides that, for manufactured goods other than rolling stock, manufacturing requires processes that alter the form or function of materials and produce a functionally different article, and states that mere assembly of the subcomponents does not constitute substantial transformation.
Bidder is building its supply chain and its price on the understanding that an article cast, forged, extruded, drawn, stamped, machined or otherwise brought to substantially final form outside the United States, and then incorporated into an OCS component or assembly within the United States, is a foreign component and does not satisfy the Buy America domestic content requirements. Please confirm this understanding is correct.
Reference: Instructions to Bidders, Section 2.C.2, page 4; Exhibit A, Sections 1.1.G to 1.1.I, page 3 of 12, and Section 1.3.C, page 7 of 12; Exhibit B, Section 2.c.i.2, page 4 of 43; Form B, Bid Item B1.
Bidders are to refer to the Buy America requirements (Section 4.18, IFB), as well as the requirements in the Federal Terms (Section 13, Exhibit C).
Questions and Responses, Round 1
HSR25-29
Exhibit A Sections 1.1.G to 1.1.I and Section 1.3.C, Instructions to Bidders Section 2.C.2, and Exhibit B Section 2.c.i.2 require the supplier to assemble components into cantilevers and sub-assemblies before shipment in accordance with the Appendix C cross-section drawings, with each box marked for the pole location it serves. Bid Item B1 prices that assembly and packaging separately, per pole location.
Bidder wishes to confirm how that assembly operation is treated for Buy America domestic content purposes. FRA guidance on the Buy America requirements at 49 U.S.C. section 22905(a) provides that a component is an article directly incorporated into the end product at the final assembly location, that all components of a manufactured product must be of United States origin, and that mere assembly of subcomponents does not constitute substantial transformation. FRA applies a final assembly standard to the rolling stock end product, and OCS components are not rolling stock.
Bidder understands, and has priced on the basis, that:
(a) the pre-assembly of cantilevers and sub-assemblies required by Exhibit A is an assembly operation and not a manufacturing process, and does not confer United States origin on any article incorporated into the assembly;
(b) each article listed in Appendix A that is incorporated into an Appendix C assembly
Bidders are to certify that they can meet these requirements as part of the Bid Package (Certification 7, IFB).
Questions and Responses, Round 1
HSR25-29
is itself subject to the domestic content requirements and must be of United States origin; and
(c) a bidder that imports finished or substantially finished components and performs only the Exhibit A pre-assembly operation within the United States does not thereby satisfy the domestic content requirements of this Contract.
Please confirm each of (a), (b) and (c), or state the Authority’s position with respect to any item not confirmed.
Reference: Exhibit A, Section 1.3.A, page 7 of 12;
Section 1.2.A, items 20 to 26, pages 4 to 5 of 12;
Appendix B, SNCF drawings.
Domestically produced hot-rolled shapes, plate and tube are supplied in imperial dimensions.
European rolled sections and metric plate and tube sizes are not generally produced in the United States and are available only as import, or as a custom mill run at minimum quantity and extended lead time. Where an Appendix B drawing states a fixed metric dimension for a structural member or weldment, please confirm whether bidder may use the nearest domestically available stock size and grade, supported by calculations demonstrating that the specified structural and dimensional performance is met or exceeded and holding all interface and assembly geometry exactly as specified, and confirm the mechanism by which such a substitution should be proposed.
Minor variances can be proposed and will be evaluated on a case-by-case basis (Section 4.19, IFB).
No variances will be considered for any components that could alter the dynamic performance of the system.
Questions and Responses, Round 1
HSR25-29
Reference: Exhibit A, Section 1.2.A.18, page 4 of 12; Section 1.2.C.7, page 5 of 12; Section 1.2.E.1, page 6 of 12.
Exhibit A lists ASTM A354 among the applicable fastener standards, while SNCF-design overhead line hardware is generally built around ISO metric threads and ISO 898-1 property classes.
Availability of domestically manufactured high-strength metric fasteners in the required property classes, diameters, coatings and volumes is materially narrower, and materially more costly, than the imperial equivalents, with longer lead times. Please confirm whether metric fastenings are required throughout, or whether imperial fastenings are acceptable where the connection meets the specified structural and electrical performance.
Please also confirm whether the Authority or the maintainer has a system-wide fastener and spares standard bidder should manufacture to, and whether any distinction is drawn between fasteners internal to a supplied assembly and fasteners at joints the construction contractor or maintainer will open in the field.
Bidder shall demonstrate that any proposed alternative meets or exceeds initial specifications via the Minor Variance request process (Section 4.19, IFB).
No variances will be considered for any components that could alter the dynamic performance of the system.
Ideally, the number and type of fasteners should be standardized and kept to a minimum.
Reference: Instructions to Bidders, Section 4.19 (Minor Variance Submission Proposal Process), pages 26 to 27; Exhibit A, Section 1.3.P, page 8 of 12.
These items would require a variance.
Questions and Responses, Round 1
HSR25-29
Section 4.19 provides that a Minor Variance is permitted only where there is no effect on performance or interfaces and no additional cost, schedule impact or increased risk to the Authority, with proposals due 23 October 2026 and an approved variance to be included in the bid.
Please confirm whether the following require a Minor Variance, or are instead resolved through the equivalent test standards provision at Exhibit A Section 1.3.P or in design development after award: substitution of an equivalent ASTM material grade for an EN grade called on a drawing; use of the nearest domestically available stock size where the specified performance is met; and use of imperial rather than metric fastenings.
Reference: Instructions to Bidders, Section 4.19, page 27; Section 6.3 (Disposition of Bids), page 40.
Please confirm whether an approved Minor Variance is specific to the bidder that proposed it, or whether approved variances are published or otherwise made available to all bidders by addendum.
Bidders are to follow the requirements of the IFB for their proposed variances (Section 4.19, IFB). Variances are not intended to be published. It is up to each Bidder to submit their own proposed variance(s) under the IFB procedure, if needed.
Reference: Instructions to Bidders, Section 4.19, page 27; Section 5.1.3, page 30; Section 6.2, page 38; Section 7.3, page 41; Section 4, Table 1, page 11.
Section 5.1.3 provides that any deviation from the specifications will be considered non-responsive, The Deadline to submit Minor Variances for Approval is Wednesday, October 28, 2026. The Authority will review proposed submissions and approve or reject variances by Thursday, November 5, 2026. Extension requests must be approved by the Authority. The deadline to submit final Bid Packages (including any approved variances) is Wednesday, November 18, 2026, at 12:00 PM PST, as
Questions and Responses, Round 1
HSR25-29
Section 6.2 provides that bids containing alternate contract language will be treated as conditional and rejected, and Section 7.3 commits each bidder to the form of Contract without negotiation or variation. Please confirm that an approved Minor Variance included in the Bid Package in accordance with Section 4.19 is not treated as a deviation or qualification for these purposes, confirm the form in which an approved variance should be identified in the Bid Package, and confirm the Authority’s anticipated turnaround for decisions on proposed Minor Variances, noting that approvals are scheduled for 30 October 2026 and bids are due 17 November 2026.
identified in the procurement schedule (Section 4, Table 1, IFB).
Unless a specific variance is approved in writing by the Authority, all OCS Components shall conform to the solicitation specifications and approved project standards.
If a Bidder’s variance is approved by the Authority, and the Bidder chooses to include the variance in their Bid, the Bidder must include their proposed variance(s) and written approval(s) by the Authority as part of their Bid Package.
(Section 4.19, IFB).
The Bid Package should include the same form used by the Bidder in its proposed variance, along with the corresponding written approval by the Authority.
Reference: Exhibit B, Section 19.c.ii (First Article Inspection), pages 11 to 12 of 43; Exhibit A, Section 2, page 9 of 12.
Exhibit B Section 19.c.ii requires First Article Inspection on a representative production lot with fourteen days’ written notice, and provides that no materials may be shipped without prior written approval. Please confirm whether First Article Inspection applies to completed cantilever assemblies as well as to individual components, and whether a single First Article Inspection covers all cantilever configurations or an inspection is required for each configuration.
A single typical cantilever configuration is acceptable for First Article Inspection, after all included components have already passed their First Article inspections.
Reference: Exhibit A, Section 1.3.E, page 7 of 12;
Exhibit B, Section 20.k and 20.l, pages 14 to 15 of
Bidders should anticipate that materials will be stored outdoors in Kern and/or Fresno counties for a period of up to 2 years.
Questions and Responses, Round 1
HSR25-29
43; Section 23, pages 15 to 16 of 43; Section 66, page 39 of 43.
Exhibit A Section 1.3.E requires packaging to permit stacking in outdoor storage until installation.
Please confirm the design storage duration and the environmental exposure the packaging is to be designed for and confirm whether the supplier’s responsibility for the condition of packaged goods ends at acceptance at the railhead.
Bidder also wishes to confirm the timing of the Authority’s review and acceptance of each shipment under Exhibit B Section 23, given that Section 66 provides that time is of the essence.
Please confirm the Authority’s anticipated turnaround time for review and acceptance of materials upon delivery.
The Authority anticipates that materials will be accepted or rejected within 7 days of delivery.
Reference: Instructions to Bidders, Section 4.12 (Technical Criteria Statement), page 22; Form J, page 1 of 1; Section 5.3.2, Certification 7, page 35.
Form J requires the bidder to state where and by which entity the goods will be manufactured.
Please confirm the level of detail expected, whether by Appendix A line item, by article type or by facility, and confirm whether this disclosure is the Authority’s intended vehicle for demonstrating Buy America compliance at bid, or whether separate documentation is required in support of Certification 7.
Bidders are to provide, where the Goods will be produced (Form J, IFB). Please see definition of Goods in the General Provisions for further guidance.
Bidders are to sign Certification 7 indicating their compliance with the Buy America requirements. Separate documentation is not currently required prior to award.
Questions and Responses, Round 1
HSR25-29
Reference: Form B, Bid Form, Section 1.1 (Price Adjustment Weighting), page 3 of 4; Instructions to Bidders, Section 5.2, page 31.
Form B Section 1.1 provides indices for CRU Midwest hot-rolled coil, ICIS/CDI resin, COMEX copper, Platts Midwest aluminum, and BLS PPI truck and rail transportation, with the bidder setting the weights to total one hundred percent. Please confirm whether a single set of weights applies to the entire Contract, or whether weights may be set separately by bid item or by article type, given that the material composition of the 244 line items varies considerably.
All components in Table A1 (Form B, IFB) are to be allocated to the indices provided. The Bidder can determine the weights per the IFB.
The Authority anticipates releasing an updated Price Escalation form. Addendum 2 is anticipated to be posted on or around October 23 (Table 1, Addendum 1).
Reference: Instructions to Bidders, Section 2.E.1.i, page 4; Exhibit B, Section 20.h, page 14 of 43, and Section 2.c, Table 1, page 4 of 43.
The IFB indicates an approximate forty percent Wasco and sixty percent Fresno split. Please confirm that the Q1 2027 and Q2 2028 deliveries are to the Wasco railhead in Kern County and the Q3 2028 and Q4 2028 deliveries are to the Fresno railhead, consistent with Exhibit B, Table 1.
Yes, anticipated quantities and delivery schedule are listed in Exhibit B (Section 2(c), Table 1, General Provisions).
Reference: Exhibit B, Section 2.c.iii and Section 2.c.v, pages 4 to 5 of 43; Section 5.c, page 6 of 43.
Exhibit B provides that quantities are estimates and that the Contract is not exclusive. Please confirm whether the Authority will apply a quantity variation threshold beyond which unit prices are subject to adjustment, or whether significant
Bidders are to price their Bid Forms according to the quantities provided in Table 1 of the General Provisions and the Bid Form itself. The Authority anticipates releasing an updated Price Escalation form. Addendum 2 is anticipated to be posted on or around October 23 (Table 1, Addendum 1).
Actual orders will be placed via Delivery Order and will be subject to the Delivery Plan that will be developed between
Questions and Responses, Round 1
HSR25-29
variances will be reviewed case by case as on prior materials procurements.
the winning bidder and the Authority post-execution (Section 20,General Provisions).
Reference: Instructions to Bidders, Section 5.2.B, page 33; Exhibit B, Section 2.c.iv, page 4 of 43.
Exhibit B Section 2.c.iv and Instructions to Bidders Section 5.2.B provide that, if no Delivery Order is issued in the first Fiscal Year, that Fiscal Year’s unit price carries forward and each later Fiscal Year’s pricing shifts forward by one year. Please confirm whether a price carried forward in this way is subject to the Form B price adjustment for the intervening period or is held at the bid price for the Fiscal Year in which it was originally offered.
In this instance, the pricing is held at the bid price for the Fiscal Year which originally offered.
Reference: Form B, OCS Components List Pricing (Appendix A); Instructions to Bidders, Section 5.2.B.2, page 32; Section 6.2.1, pages 38 to 39.
The quantities stated in the OCS Components List Pricing at Appendix A are decimal values that are formatted in Excel to display as whole numbers, so that a displayed quantity does not equal the underlying value used in the extension. Bidder understands that the Total Cost for each line item, and the Bid Item A1 total, will therefore not equal the displayed quantity multiplied by the unit price.
Please confirm that bidders are to leave the quantity cells and their underlying values unaltered, that the extended totals produced by the workbook govern for the purpose of calculating the
Addendum 2 is anticipated to be posted on or around October 23 (Table 1, Addendum 1) to provide consistency between the underlying value and the displayed value to avoid any potential arithmetic discrepancy.
Bidders shall continue to follow instructions listed in the IFB (Section 5.2 and 6.2.1, IFB).
Bidders should provide the Unit and Total Values identified.
Underlying value of quantities have been updated to reflect actual displayed values. Total Prices should be calculated without error and will be subject to review by the Authority.
Questions and Responses, Round 1
HSR25-29
Total Contract Bid Price, and that a bid will not be treated as non-responsive on the basis of an apparent arithmetic discrepancy between a displayed quantity and an extended total.
Reference: Form B, OCS Components List Pricing (Appendix A); Exhibit B, Section 2.c, Table 1, page 4 of 43; Instructions to Bidders, Section 5.2.B, page 33.
Please advise whether the delivery dates stated on the OCS Components List Pricing are given on a standard calendar basis or on the Authority’s Fiscal Year basis. For a delivery due in the first quarter of a given year, does that quarter begin on 1 January on a standard calendar basis, or on 1 July on the Authority’s Fiscal Year basis?
The Bid Form contemplates Fiscal Years that match the delivery schedule set forth, via Calendar Year, in Table 1 of the General Provisions. Table 1 provides quarterly estimates for each Calendar Year. Quarters provided in Table 1 of the General Provisions refer to calendar years.
The Bid Form uses three fiscal years to capture all the anticipated quarterly deliveries.
Reference: Exhibit A, Section 1.1.D and Section 1.1.F, page 3 of 12, and Section 1.3.A, page 7 of 12; Form B, OCS Components List Pricing (Appendix A); Appendix B, SNCF Components and SNCF Design drawing sets.
Exhibit A Section 1.1.D provides that the complete list of components and the quantities for each, together with the associated SNCF drawings for each component, are given in the table at Appendix A. Section 1.3.A requires that all components be fabricated to the SNCF specifications and drawings supplied in Appendix B.
The twenty-five Part Item Nos. listed below appear on the OCS Components List Pricing but do not
Addendum 2 is anticipated to be posted on or around October 23 (Table 1, Addendum 1) with updated information.
Poles are excluded from the procurement (items 140, 141 & 142). This will be reflected in the Addendum to be posted on or around October 23, 2026.
Questions and Responses, Round 1
HSR25-29
appear in the SNCF Components or SNCF Design drawing sets released through the Box account, nor in the IFB technical specifications or the exhibits package. Without a drawing or an equivalent technical reference, bidder is unable to determine material, dimensions, finish or tolerances, and therefore cannot price or manufacture these items.
See Table 1 attachment at the end of this document.
* For these three items the drawing sets contain a near-identical part number. See the request at the end of this question.
Please provide the SNCF drawing or equivalent technical reference for each Part Item No. listed above, or confirm the specification to which each item is to be manufactured. Where an item is a commercially available catalog product, please confirm the manufacturer and catalog reference the Authority intends to be supplied.
Bidder further asks the Authority to confirm whether the following Appendix A entries are typographical errors, since the drawing sets contain a near-identical part number in each case:
(a) P-177 is listed at Appendix A as 0.460.1761;
the drawings show 0.160.1761, which is already listed at P-153;
(b) P-188 is listed at Appendix A as 7.189.4551;
the drawings show 7.189.4541; and
Questions and Responses, Round 1
HSR25-29
(c) P-196 is listed at Appendix A as 0.167.04062; the drawings show 0.167.0462.
Bidder notes that Part Item Nos. P-140, P-141 and P-142 are poles, and that OCS poles are excluded from the scope of this Contract under the definition of OCS Components at Section 3.1 of the Instructions to Bidders. Bidder asks the Authority to confirm whether these three items are within the scope of this Contract and, if so, to provide the drawings or specifications for them.
Reference: Exhibit B, Section 2.c.i.2, page 4 of 43;
Exhibit A, Section 1.1.G and Section 1.1.H, page 3 of 12; Form B, Bid Item B1; Appendix C, cross-section drawings.
Exhibit B Section 2.c.i.2 provides that the OCS Components are to be delivered assembled for each pole location. Bid Item B1 on Form B prices assembly and packaging per pole location by reference to the Appendix C cross sections, which appear to address cantilever assemblies. Please confirm whether hangers, balance weight assemblies, downguy assemblies, termination assemblies and any other sub-assemblies are also to be prefabricated by the supplier, and please identify the documents that define each such assembly.
Assemblies for terminations, balance weights etc. shall be packaged together and pre-assembled to the level required to avoid the need for specialized tools in the field. For example, if a bearing is required in balance weight wheels that should be pre-assembled to sub-component level as a minimum, and ideally to a completed component level.
The Authority expects assembly to a level that makes the finished products suitable for transport.
Reference: Exhibit A, Section 1.1.G to Section 1.1.I, page 3 of 12, and Section 1.3.C, page 7 of 12; Appendix C, cross-section drawings.
Droppers are to be fully prefabricated.
Questions and Responses, Round 1
HSR25-29
Hangers and droppers commonly require adjustment in the field to set contact wire height against as-built conditions. Please confirm whether hangers are to be fully prefabricated to a fixed length, or prefabricated with one end left adjustable so that the Authority’s Track and Systems Construction Contractor can make final adjustment in the field.
Reference: Exhibit A, Section 1.1.I, page 3 of 12, and Section 1.3.D, page 7 of 12; Appendix B, SNCF cut-length tables.
Bidder assumes that fabricated hangers are to be packaged and labeled by span and wire run, consistent with the requirement at Exhibit A Section 1.1.I that each box be marked with the pole it serves. Please confirm.
Please also confirm whether the SNCF cut-length tables provided in Appendix B are to be applied as issued, or whether a project-specific cut-length schedule will be provided for the hangers to be supplied under this Contract.
Hanger lengths are included in the detailed design provided by the Authority (Appendix C)
Reference: Exhibit A, Section 1.3.C, page 7 of 12, and Section 4.2, Quality Control Plan, pages 10 to 11 of 12; Appendix C, cross-section drawings.
Exhibit A Section 1.3.C requires individual components to be assembled into cantilever assemblies in accordance with the Appendix C drawings. Please confirm whether torque marking or torque seal is required on bolted connections of the assembled cantilevers, and
Checklist to be developed by the Contractor.
Torque marking is not required but confirmation from Contractor is required in the checklist.
Torque values are as follows
Questions and Responses, Round 1
HSR25-29
please provide any inspection checklist or other verification record the Authority will expect in order to validate that assemblies have been built in accordance with the cross sections.
Reference: Exhibit A, Section 1.3.C, page 7 of 12, and Section 3.2, Certificates of Compliance, pages 9 to 10 of 12; Exhibit B, Section 19.b, page 11 of 43.
Please confirm whether as-built shop drawings showing cut lengths, clamp positions and other assembly dimensions for each prefabricated cantilever are to be produced and shipped with the materials, consistent with United States high-speed rail practice, and whether such drawings are to accompany the Certificate of Compliance required under Exhibit A Section 3.2.
This is not a requirement. The supplied components and/or prefabricated assemblies will be verified against the design drawings provided.
The Contractor may produce other drawings as necessary, after execution, to support their works.
Reference: Exhibit A, Section 1.1.D and Section 1.1.H, page 3 of 12, and Section 1.3.A and Section 1.3.C, page 7 of 12; Appendix B and Appendix C.
The Contractor is free to develop other drawings at their own cost/risk from the Authority provided information, as is necessary for their processes. The Authority will validate the supplied assemblies for compliance against the provided design drawings.
Questions and Responses, Round 1
HSR25-29
Determining the dimensions of a single assembly appears to require reference to a number of separate SNCF drawings. Please confirm whether the awarded Contractor will be required to develop a consolidated assembly drawing for each cantilever type, bringing that information onto a single sheet for verification and quality validation, and whether such drawings would be subject to Authority review and approval.
Reference: Exhibit A, Section 1.3.C, page 7 of 12, and Section 1.2.A.33, page 5 of 12; Appendix C, cross-section drawings.
The Appendix C cross sections provide limited dimensional information for assembling the cantilevers. Please confirm whether pipe clamp location dimensions will be provided for each pole location, or whether the Contractor is expected to derive clamp positions from the SNCF documents.
Please also confirm the installation tolerance applicable to pipe clamp locations.
To be derived from the supplied SNCF drawings.
Tolerances In accordance with IGTE 21400/300360, installation tolerances shall be as follows:
▪ 0 m; +0.025 m (-0 inches; +0.98 inches) on the height of the contact wire at the suspensions, provided that the requirement of a height variation of less than or equal to 0.012m (between two consecutive suspensions is also met,
▪ -0.01 m; +0.01 m (-0.39 inches; +0.39inches) on the vertical difference in height between the underside of the contact wires (whether in running, i.e. in contact with the pantograph, or out of running), ▪ -0.01 m; +0.01 m (-0.39 inches; +0.39inches) on the contact wire stagger,
▪ -0.01 m; +0.01 m (-0.39 inches; +0.39inches) on the catenary wire stagger in relation to the vertical position of the contact wire,
▪ -0.01 m; +0.01 m (-0.39 inch; +0.39 inch) on the vertical distance between the horizontal axis of rotation of the steady arm and the underside of the contact wire,
▪ -0.03 m; +0.03 m (-1.18 inches; +1.18 inches) on the support structure position selected in relation to temperature.
Questions and Responses, Round 1
HSR25-29
▪ The center line to center line distances between conductors are calculated to the nearest mm, whereas the dropper lengths are rounded off to the nearest cm.
▪ The tolerance on the dropper length shall be ±0.0015 m (±0.06 inches)
Reference: Exhibit B, Section 2.b, pages 3 to 4 of 43, and Section 20.a.ii, page 13 of 43; Instructions to Bidders, Section 2.C.2, page 4.
Please confirm whether the supplier will be required to provide field support during installation or during field verification by the Authority’s Track and Systems Construction
No, that is not presently required.
Reference: Exhibit A, Section 1.1.H, page 3 of 12;
Appendix C, cross-section drawings; Exhibit B, Section 41, Contract Modification, page 29 of 43.
Please confirm the process by which the Authority will address field conditions that differ from the design conditions shown on the Appendix C cross sections, and confirm whether the Authority will issue updated cross sections to the supplier where such differences require a change to an assembly.
Any modifications to the design will be discussed and likely handed via a modification or change request to the Contractor.
Reference: Exhibit B, Section 20.a and Section 20.b, page 13 of 43; Exhibit A, Section 1.3.D and Section 1.3.E, page 7 of 12.
Please confirm whether cantilever assemblies are required to be delivered in sequential order by installation location, and please provide any requirements governing how assemblies are to be stacked, nested or combined for shipment.
Delivery for CP4 should be from South to North, i.e.
decreasing chainage. Delivery sequency for future sections to be provided at a later date.
Assemblies are to be stacked, packed, and shipped in a way that does not cause damage to the product.
All assemblies and sub-assemblies required for each pole location shall be shipped together.
Questions and Responses, Round 1
HSR25-29
Reference: Appendix C, cross-section drawings;
Exhibit B, Section 2.c, Table 1, page 4 of 43; Form B, Bid Item B1.
Appendix C contains cross sections for Segment CP 4, approximately 780 sheets, while Exhibit B Table 1 anticipates 3,600 pole locations under NTP
1. Please confirm the anticipated number of unique cantilever assembly configurations and pole-location-specific variants required under NTP 1.
Please also confirm whether cross sections for the remaining NTP 1 pole locations will be issued before the Bidding Deadline, and if they will not, the basis on which bidders are to price Bid Item B1 for those locations.
Cross sections for remaining pole locations are not yet designed.
Cantilever types will be as per CP4 cross sections, with some minor variation in quantities.
Bids are to be based on the estimated quantities in Table 1 of the General Provisions and the Bid Forms.
Reference: Exhibit B, Section 20.a.iii, page 13 of 43, and Section 20.h, page 14 of 43; Section 18.c, page 11 of 43.
Exhibit B Section 20.a.iii requires the Contractor to state in its Delivery Plan the advance notice the Authority must give, through a Delivery Order, before the actual delivery date. Please confirm the minimum planning assumption bidders should use for the Authority’s anticipated lead time between issuance of a Delivery Order and the required shipment date.
The Contractor shall provide the required minimum delivery notification, subject to Authority concurrence.
Reference: Exhibit A, Section 3.1, page 9 of 12, and Section 4.2.B.3, page 10 of 12; Exhibit B, Section 23, pages 15 to 16 of 43.
Yes, the Authority acceptance criteria and validation process will be based on finally approved Contractor’s
Questions and Responses, Round 1
Please confirm the quality acceptance criteria and the validation process by which the Authority will determine that fabricated assemblies are within tolerance, and confirm whether those criteria are to be established in the Contractor’s Quality Control Plan under Exhibit A Section 4.2 or will be issued by the Authority.
quality control plan pursuant to section 4.2 of the General Provisions.
Reference: Exhibit A, Section 1.3.A, page 7 of 12;
Form B, OCS Components List Pricing (Appendix A); Appendix B, SNCF drawings; Instructions to Bidders, Section 4.19, pages 26 to 27.
Appendix A and the Appendix B drawings reference SNCF part numbers. Please confirm whether commercially available rail industry components that are equivalent in form, fit and function are acceptable where they meet the specified performance requirements, and whether such a substitution is to be proposed through the Minor Variance process under Section 4.19.
Minor variances will be considered on a case-by-case basis where they can be demonstrated to meet or exceed the initial specifications. See IFB Section 4.19.
Reference: Form B, Bid Form, Section 1.0 Price Adjustment, pages 2 to 3 of 4; Exhibit B, Section 4.a.i.1, page 5 of 43, and Section 2.c, Table 1, page 4 of 43.
Form B Section 1.0 defines the Price Adjust Date as, for each Deliverable in connection with an Order, the date that the Authority issues the Order to the Contractor. Exhibit B Section 4.a.i.1 provides that NTP 1 may be separated into individual Delivery Orders issued at different stages at the
The Authority anticipates that each Delivery Order will correlate to the estimated quantities and schedule set forth in Table 1 of the General Provisions.
Escalation is to be applied, pursuant to the IFB, at the date the Authority issues the order to the Contractor.
Questions and Responses, Round 1
HSR25-29
Authority’s discretion, and Exhibit B Table 1 anticipates deliveries in Q1 2027, Q2 2028, Q3 2028 and Q4 2028.
Please confirm how the Price Adjust Date is determined where a single Delivery Order covers deliveries scheduled in more than one quarter or Fiscal Year. Specifically, please confirm whether the Price Adjust Date is determined separately for each scheduled delivery under that Order, by reference to the month and year in which that delivery is scheduled, or whether a single Price Adjust Date applies to the entire Order.
If a single Price Adjust Date applies to the entire Order, please confirm the mechanism by which movement in the stated indices between issuance of the Order and the later scheduled deliveries is addressed.
Reference: Form B, Bid Form, Price Adjustment, page 2 of 4.
Form B provides that, in the event any of the indices set forth therein are discontinued from publication or deemed no longer applicable for the purposes of adjustment, the Contractor shall submit alternative indices for approval by the Authority, and that the Authority has sole approval right over the use of an alternative index proposed by the Contractor.
Please confirm the following:
Per the language in the index provided with the Bid Form in the IFB, if an index is discontinued, a new one can be proposed by the Contractor to be discussed and approved by the Authority, at its discretion.
Questions and Responses, Round 1
HSR25-29
(a) who determines that an index has become no longer applicable for the purposes of adjustment, and on what basis;
(b) that approval of a reasonable alternative index proposed by the Contractor will not be unreasonably withheld; and
(c) the mechanism that applies if no alternative index proposed by the Contractor is approved, so that the affected cost category is not left without a basis for adjustment for the balance of the Contract term.
Reference: Form B, Bid Form, Sections 1.0 and 1.1, pages 2 to 3 of 4; Exhibit B, Section 20, pages 13 to 15 of 43, and Section 23, pages 15 to 16 of 43.
The Price Adjustment formula at Form B Section
1.0 is composed of six raw material and transportation indices. Please confirm that the Price Adjustment is intended to be the sole mechanism for adjustment of the Contract price, and that no separate adjustment is contemplated for labor, overhead or other cost categories over the Contract term.
Please also confirm the treatment where delivery of goods already manufactured is deferred beyond the scheduled delivery date at the Authority’s direction, or because the Authority is not able to receive the goods. Specifically, please confirm whether the Contractor may recover storage, handling and insurance costs incurred during the
See Addendum for revisions to price adjustment formula.
Addendum 2 is anticipated to be posted on or around October 23 (Table 1, Addendum 1).
Questions and Responses, Round 1
HSR25-29
period of deferral, and whether the Price Adjust Date applicable to the affected goods is revised.
Reference: Form B, OCS Components List Pricing (Appendix A); Instructions to Bidders, Section 3.1 (Definitions, “OCS Components”), page 8, and Section 5.2.B.2, page 32.
The OCS Components List Pricing at Appendix A states the unit of measure for every line item as “each.” A number of line items are wires or cables, for which no length is stated on the list and for which a unit of “each” does not identify a quantity that can be priced.
Please confirm the unit of measure that applies to the wire and cable line items — whether the stated quantity is expressed in feet, meters or another unit — or, if the stated quantity is a count of discrete cut lengths, please provide the length applicable to each. Please also confirm whether any other line item on Appendix A is stated in a unit other than a discrete piece count.
Bidder further notes that OCS conductors are excluded from the scope of this Contract under the definition of OCS Components at Section 3.1 of the Instructions to Bidders, and asks the Authority to confirm whether the wire and cable line items appearing on Appendix A are within the scope of this Contract.
All wires and cables included in the Components List is part of this procurement. Main conductors (contact, catenary, feeder, and static wire) are excluded from this procurement.
All quantities for wire/cables/conductors included in the Components List are in meters (m).
Questions and Responses, Round 1
Table 1 Attachment – Question 27
Part Item No. Part / Symbol No. Part Name
P-138 5.500.1001 A563 GR. A Heavy Hex Nuts
P-139 5.500.1002 F436 Washer
P-140 5.500.5001 Pole – W10x8x33, L = 7.65 m
P-141 5.500.6001 Pole – W12x12x72, L = 8.6 m
P-142 5.500.3001 Pole – W12x12x72, L = 11.4 m
P-169 PWD_OC_F55004 OCS Anchor Baseplate
P-177 * 0.460.1761 H Bolt M18-90/42, 1 H Nut, Drilled
P-187 0.160.4453 Screw H, M12-50/50T Steel-Inox
P-188 * 7.189.4551 Washer CS 10-22-1.6
P-189 0.160.4454 Screw H, M12-60/30T Steel-Inox
P-190 9.090.0590 Designation Plaque
P-191 21474-214716 Designation Plaque Bracket
P-192 0.163.4087 Screw H, M10-25/25T
P-194 PWD_OC_F55013 Support Bracket for Voltage Transformer
P-196 * 0.167.04062 Nut M16
P-207 PWD_OC_F55012 Bracket for Cable Tray UPN 80x45x6
P-209 66824 UNEX Junction with Insulating Bolts 60 mm
Questions and Responses, Round 1
HSR25-29
P-210 PVCM855A Screw PVC M8x55 Domed Head, Square Neck
P-211 ECRPVCM8 Nut PVC HM8
P-212 RONPVCM8 Washer PVC M8
P-223 410_OC_F15001-1 Egic VSV Type Disconnector
P-224 8.090.0037 Designation Plaque
P-228 223641 Bracket
P-229 0.882.1180 Numbering Plate Holder
P-243 PWD_OC_F55011 Bracket for One Insulator
* For these three items the drawing sets contain a near-identical part number. See the request at the end of this question.