2017_DHS_outage.pdf
PDF 796 KB Posted
- Solicitation number
- HSHQDC-17-R-B0002
About this file
2017 DHS Outage
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2017_DHS_ST_CSD_5-Yr_BAA-Amendment_000002.pdf | ||
| BAA_Call_PARADINE_000002_20Jun17.docx | DOCX document | |
| PARIDINE_-_Industry_Day_Final.pdf | ||
| PARIDINE_Industry_Day_Q+A.pdf | ||
| BAA_Call_PARADINE_00001_05Jun17.docx | DOCX document | |
| BAA_Call_PARADINE.docx | DOCX document | |
| BAA_Call_PARADINE.docx | DOCX document | |
| PARADINE_Industry_Day.docx | DOCX document | |
| 2017_DHS_ST_CSD_5-Yr_BAA-Amendment_000001.docx | DOCX document | |
| 2017_DHS_ST_CSD_5-Yr_BAA_03Feb17.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tracking Network Outages
Henning Schulzrinne
FCC
The views and opinions expressed in this presentation are those of the author and do not necessarily reflect the official policy or position of any agency of the U.S. government. Any resemblance to actual policies, living or dead, or actual events is purely coincidental.
The FCC tool kit
Disclosure Industry best practices
Rules Outreach
CSRIC
47 CFR Part 4 communications 9-1-1
MBA
9-1-1 post-incident reports
FCC measurement history FCC has acquired and analyzed data on legacy PSTN More recent and evolving broadband interest
Section 706 of 1996 Telecommunications Act annual report on availability of advanced telecommunications services to all Americans Resulted in information on deployment of broadband technology
(“Form 477”) but not its performance
FCC’s National Broadband Plan – March 2010 Proposed performance measurements of broadband services delivered to consumer households Work plan evolved from recommendations of National Broadband
Plan
The role of network measurements
Measurement infrastructure
ISP
diagnostics
“my Interwebs are just beach balls”
User diagnostics & validation hard failures soft failures
Public policy
• BB evolution?
• Informed consumer choice
• Universal service
Measuring Broadband America:
Measurement architecture
Lucid broadband Internet access provider (ISP) backbone
ISP
Measuring Broadband America 2011 through today
Measuring Broadband America future?
MBA: What is measured Download speed Voice over IP (loss, jitter, RTT) Upload speed DNS resolution
Web browsing ICMP latency UDP latency ICMP packet loss UDP packet loss Latency under load Video streaming Consumption (up, down) data gathered continuously annual report for one month (September/October) https://www.fcc.gov/reports-research/reports/measuring-broadband-america
The MBA project - logistics Cooperative:
13 largest ISPs covering 86% of US subscribers DSL, HFC, FTTH, satellite vendors, trade groups, universities and consumer groups
Initially, enrolled roughly 9,000 consumers as participants 6,241 participants for 2016 report (measured Sep./Oct. 2015) 4,165 reporting ”white boxes”
Measurements weighted by tier population
MBA example: packet loss
0.0%
0.1%
0.2%
0.3%
0.4%
0.5%
0.6%
0.7%
0.8%
AT
&T
D
SL
AT
&T
IP
BB
C en tu ry
Li nk
Fr on tie r D
SL
Ve riz on D
SL
W in ds tre am
O pt im um
C ha rte r
C om ca st
C ox
M ed ia co m
TW
C
Fr on tie r F ib er
Ve riz on F ib er
H ug he s
Vi aS at /E xe de
DSL Cable Fiber Satellite
Pe rc en ta ge P ac ke t L os s
MBA: from wireline to mobile Smartphone app runs in background on volunteers phone Runs automatically at random times performing measurements Only gathers network related data and anonymizes results to protect privacy Client software provided as open source
4 major carriers (AT&T, Sprint, T-Mobile, Verizon)
Gathering data since August 2013, but data not yet public 9
Using MBA for reliability assessment?
Data currently not available in real time During disasters, need to distinguish power from broadband outages Limited geographic resolution
Example: AT&T 9-1-1 outage on March 8, 2017
Overview of NORS and DIRS
Cybersecurity and Communications Reliability Division
Public Safety & Homeland Security Bureau
Jeffery Goldthorp
Purpose of Outage Reporting Improve response to a crisis provide real-time information on major communications outages during a crisis Improve communications networks reliability & security (patterns) Improve disaster recovery (lessons learned) Individual reports are confidential NORS: “normal” outages, extensive reports DIRS: large-scale disasters, brief reports
What’s Reportable* >= 30 minutes & 900,000 user minutes Mobile Switching
Center outage e.g., 30,000 subscribers for 30 minutes
Voice & data failures
SS7
Special facilities airports military, nuclear, etc.
Satellite providers 9-1-1 service providers Submarine cables
14* simplified
Reporting Process
Within 2 hours or 30 minutes (9-1-1 service provider)
For VoIP: 4 Hours (911) and 24 hours (all others)
Within 3 Days
Within 30 Days
File Notification
Outage Occurs
Submit Initial Report
Submit Final
Report
DHS Notified of Outage
Step 1
Step 2
Step 3
File Notification
Outage Occurs
Submit Initial Report
Submit Final
Report
DHS Notified of Outage
Step 1
Step 2
Step 3
NORS for Situational Awareness:
Example Notification
Disaster Information Reporting System
Information input to DIRS
Contact information Information on network status
Switches Cell Site by County AM, FM, TV Stations
CATV
PSAPS
DIRS: Web-based system which collects Information on status of communications assets during disasters Daily updates Consistent data
Output
Maps
Charts
Cell Sites Operational
0%
20%
40%
60%
80%
100%
6/2 3/2
6/2 4/2
6/2 5/2
6/2 6/2
6/2 7/2
Disaster Recovery & Reporting Department of Homeland Secusity:
Overall Coordination: Coordinate the planning for and provision of national security and emergency preparedness communications for the Federal government during disasters and emergencies.
Federal Communications Commission (FCC):
Situation Awareness Data Collection: Collect network status and restoration data. Develop charts, tables and maps summarizing the information.
Disaster Reporting Process
Company Activity
FCC Activity
Disaster Data Collection Activated
Companies Access DIRS
Companies Input Data
FCC Generates Tables & Input for SitRep
Generate Charts, Maps
DHS Writes SitRep
Send inputs to White House/JTRB
Disaster Data Collection Activated
FCC Notifies CompaniesFCC Notifies Companies
DHS Activity
Done Daily
Chart from Sitrep - Sandy
Number of PSAPs Affected by Sandy
0 0 0 0 0 0
4 4
3 3
15 14
23 23
16 16
10/30 10/31 11/1 11/2 11/3 11/4 11/5
911 Calls Lost
Rerouted W/O ALI
Rerouted With ALI
Operational - No ALI
DIRS – Mapping Examples (Sandy)
Conclusion FCC key federal agency for network reliability in cooperation with state utility commissions
MBA: currently, for “science” analysis not real time, limited geographic coverage public data
NORS & DIRS situational awareness + FCC long-term analysis mostly confidential
| Tracking Network Outages |
| The FCC tool kit |
| FCC measurement history |
| The role of network measurements |
| Measuring Broadband America: Measurement architecture |
| MBA: What is measured |
| The MBA project - logistics |
| MBA example: packet loss |
| MBA: from wireline to mobile |
| Using MBA for reliability assessment? |
| Example: AT&T 9-1-1 outage on March 8, 2017 |
| Overview of NORS and DIRS |
| Purpose of Outage Reporting |
| What’s Reportable* |
| Reporting Process |
| NORS for Situational Awareness: Example Notification |
| Disaster Information Reporting System |
| Disaster Recovery & Reporting |
| Disaster Reporting Process |
| Chart from Sitrep - Sandy |
| Slide Number 21 |
| Conclusion |
File details come from the government source that posted it. Updated .