HSFELA-11-R-0505
REQUEST FOR QUOTE TO DHS/FEMA
RE: INTENDED ISSUANCE OF ONE OR MORE
BLANKET PURCHASE AGREEMENTS FOR ARCHAEOLOGICAL, ARCHITECTURAL, HISTORIC PRESERVATIONAND OTHER HISTORIC BUILDINGS SURVEY AND REPORTING PROJECTS
(THE “BPA PROJECTS”)
THIS SOLICITATION IS SUBJECT OF A LOCAL AREA SET-ASIDE
OUTLINE
1. INTRODUCTION
2. SUB-CONTRACTING MAY BE PERMITTED
3. CONTRACTOR REQUIREMENTS
4. FORM AND CONTENT OF QUOTATION
5. POC—FILING DEADLINE—SELECTION
1. INTRODUCTION
There remain a large number of Katrina- and other hurricane-related projects in Louisiana, many still undefined, for which FEMA requires survey, reporting and other services in the archaeological, architectural historic preservation and, in some instances, possibly other related fields. These projects may include private or public structures or facilities, predominantly situated in Southeast Louisiana.
The timing and extent of anticipated projects, and FEMA’s timely response to each, precludes the normal issuance of solicitations for each project, receipt and evaluation of technical and cost proposals, and award thereafter. Because the anticipated volume of work that may be required in the next twelve months exceeds $800,000.00 FEMA wishes to enter into one or more Blanket Purchase Agreements (referred to in the singular as the “BPA”), in order to augment two current BPA’s under which separate project task orders are presently being issued.
NOTE: Funding has been committed for the BPA.
The attached, proposed Scope of Work or “SOW,” gives a general idea of the types of services that may be required and establishes standards of compliance (“Standards”) in conducting the work.
FEMA seeks quotations from local area, small business enterprises which presently are parties to current MOBIS contracts under which they provide a broad range of archeological, architectural and other services (SIN 899-1).
The BPA shall have an initial term of twelve (12) months, and shall have a provision for exercising up to two separate option periods of twelve (12) months each. All BPA’s are scheduled to run concurrently.
In some instances a specific service may be required of one BPA contractor on a given Project and other service(s), on the same Project, required of another contractor. This approach will require flexibility of the contractors. It is also possible that, given political or economic circumstances, another BPA Project may have to be assigned to a contractor and commenced even as the contractor(s) are engaged in providing services under other task orders. For these purposes FEMA will include in each BPA, Clause 52.243-1 “Changes—Fixed Price,” together with related clauses, and will utilize the procedures generally prescribed in the FAR when dealing with changed circumstances and FEMA’s need to react promptly to address new, more pressing concerns.
FEMA intends to secure price quotations from those solicited but will not seek technical proposals. Task orders which issue under the BPA’s may require the prior submission of technical proposals and proposed pricing, but FEMA hopes to keep them to a minimum. In lieu of competing the task orders, FEMA is competing the BPA and seeks the lowest reasonable price for services discounted from the MOBIS contract schedule.
Further in keeping with the desire to avoid the time consumed in competing task orders, FEMA will fund the BPA and, commencing with the first BPA Project, will issue the first task order to the contractor receiving the award.
Awards of Task Orders under the three BPA’s (following award of the BPA that is the subject of this RFQ), will be rotated among the three contractors so that all contractors will, to the extent possible have balanced work assignments and balanced compensation therefor. Government reserves the right to award a Task Order out of sequence in the event, in its sole judgment, another BPA contractor is occupied with a Task Order of higher priority, or of longer period of performance. Depending on overall pricing for the first or second option years (see below), the sequence of awarding may alter from the first twelve month period.
Presently FEMA anticipates funding the MOBIS-related BPA with approximately $200,000. This sum is an estimate and is not final; reference to the amount does not equate to a guarantee that such amount will be placed on the BPA, or if placed, will be obligated.
As noted above, FEMA will provide in the BPA for two twelve (12) month options to extend the period of performance. Price quotations submitted in response to this solicitation should reflect prices for services for the initial year of the contract together with any projected price changes for the second and third twelve-month periods (i.e., the first and second option years). FEMA is not obligated to exercise either option; but if the system established during the first twelve month period proves workable, and the prices quoted for the two option periods are reasonable, additional BPA Projects may be assigned under the BPA’s if the option(s) is (are) exercised.
The timing of this RFQ is to release it to potential contractors no later than 2:00 p.m. CDST, Friday, May 6, 2011, and receive final price quotations from interested parties no later than 12:00 noon, CDST, Tuesday, May 17, 2011. Barring clarifications and possible discussions among potential contractors, notification of award is anticipated to occur no later than close of business Friday, May 20, 2011, with release of task order to follow as soon as possible after defining the initial BPA Project.
2. SUB-CONTRACTING MAY BE PERMITTED
A potential contractor may include in its price quotation an approach for sub-contracting some, but not a substantial portion, of the work to be performed under a BPA Project. To the extent a contractor expects to employ a sub-contractor on some part of a BPA Project, the contractor should identify the work to be sub-contracted and submit an hourly charge for such work confirmed on that firm’s letterhead. In all instances, whether direct or through sub-contracting, all work must be performed, or directed, by those personnel of contractor who meet all of the requirements and Standards as set out in the attached SOW. Sub-contractor personnel need not be MOBIS-listed, but, as set out in the foregoing may only perform work where individually qualified or under the direction of contractor personnel who are qualified to perform the work.
See below for criteria regarding rating of quotation in respect of sub-contracting.
3. PROVIDER REQUIREMENTS
FEMA seeks written price quotations from MOBIS-listed contractors located and primarily doing business within the State of Louisiana. The price quotations, or cover letters enclosing the quotations, shall contain language that the contractor “meets the requirements for local set aside under the provisions of the Stafford Act, as amended.” Contractors who do not comply with this requirement will not be considered.
Each potential contractor must also affirmatively undertake in writing in its price quotation, or cover letter enclosing the quotation, to comply with the Standards, as defined and referred to in the SOW.
FAILURE TO PROVIDE THESE UNDERTAKINGS IN THE QUOTATION OR COVER LETTER SHALL BE REASON TO DISQUALIFY SUCH PROPOSAL.
4. FORM AND CONTENT OF QUOTATION
Price quotations in response to this solicitation may be the form of Microsoft Excel spreadsheet and/or Microsoft Word document. Font type is not restricted but font size should not be less than 12 point. Courier, 12 point is preferred.
FEMA anticipates that price quotations of a contractor with a MOBIS contract will include the current year hourly rates set out for each employee type listed for the present year of its contract with GSA, followed by a column in which are set out the discounted hourly prices stated in dollars and cents rather than a percentage of discount, being offered for the up-coming twelve month period. This information should be followed by columns for those rates stated in dollars and cents rather than a percentage increase or decrease, offered in option years one and two. For ease of production, any rate which does not change from one period to another may be abbreviated as “N/C” for “No change.”
FEMA reserves the right to issue only one BPA rather than multiple BPA’s in connection with this solicitation. To the extent the Program determines that only one BPA will issue, selection will be based on the following criteria in descending order:
A. lowest overall pricing submitted by a contractor who will perform all work itself;
B. lowest overall pricing submitted by a contractor who will perform the majority of the work itself, but will sub-contract some work to a local sub-contractor;
C. lowest overall pricing submitted by a contractor who will perform the majority of the work itself, but will sub-contract some work to other than a local sub-contractor, i.e., a firm with its main office located outside the State of Louisiana.
5. POC—INQUIRIES—FILING DEADLINE—SELECTION
Email inquiries are encouraged rather than phone inquiries and should be forwarded to the Agency POC at richard.roberg@dhs.gov. Phone inquiries will be accepted at 504-762-2268. The deadline for asking questions under either method is 12:00 noon Thursday May 12, 2011.
For written quotations to be considered they must be submitted in writing, in triplicate, not later than 12:00 noon, Tuesday, May 17, 2011, delivered in person, by courier or by US mail to FEMA’s POC at the following address:
Richard M. Roberg Contracting Officer DHS/FEMA Mail Room Contracting 1 Seine Court New Orleans, LA 70113
For email quotations to be considered, they must be directed to the Agency POC email address noted above. To be considered timely, they must be received not later than 10:00 a.m. on Tuesday, May 17, 2011, in order to allow copying and distribution to the evaluation committee.
Any Quotation which is untimely in filing or found to be incomplete shall not be considered.
Final selection of qualified quotations will be made by the evaluation committee. As stated above, the criteria for award of a BPA will be the final overall prices submitted (with emphasis on the initial twelve-month pricing) and reviewed against paragraphs 4. A.-C., above.
Award of the BPA shall be forwarded and executed by contractor and Agency as soon as possible after the Agency reaches its decision.
For purposes of filing at fedbizopps, the terms of the proposed, general Scope of Work are set out immediately below.
Scope of Work is set out at the Next Page for purposes of fedbizopps filing.
SCOPE OF WORK
AS SET OUT IN THE RFQ:
HSFELA-11-R-0505
Overarching Task Order for Architectural History and Archaeological Services
FEMA-DR-1603-LA, FEMA-DR-1607-LA,
New Orleans, Louisiana
This form of Scope of Work is the suggested form for use in connection with the issuance of various task orders under Blanket Purchase Agreements entered into between FEMA and contractor. Depending upon the circumstances of projects in which FEMA engages contractor’s services, not all of the services listed below may be included in each task order’s scope of work. In certain instances additional services or tasks may be identified that expand the services listed in Section III.
I. INTRODUCTION
FEMA Historic Preservation, in response to the above disasters, has responsibilities to identify, evaluate and resolve adverse effects to historic properties in accordance with Section 106 of the National Historic Preservation Act (16 U.S.C. §470f) (NHPA), its implementing regulations (36 CFR Part 800), and the Programmatic Agreement among FEMA, the Louisiana State Historic Preservation Officer (SHPO), the Louisiana Governor’s Office of Homeland Security and Emergency Preparedness (GOHSEP), the Alabama-Coushatta Tribe of Texas, the Caddo Nation, the Chitimacha Tribe of Louisiana, the Choctaw Nation of Oklahoma, the Coushatta Tribe of Louisiana, the Jena Band of Choctaw Indians, the Mississippi Band of Choctaw Indians, the Quapaw Tribe of Oklahoma, the Seminole Nation of Oklahoma, the Seminole Tribe of Florida, the Tunica-Biloxi Tribe of Louisiana, and the Advisory Council on Historic Preservation dated August 17, 2009.
FEMA Historic Preservation is required to respond swiftly and professionally to accomplish specific tasks in support of FEMA’s infrastructure recovery projects at, and adjacent to, public and non-profit facilities, such as educational facilities, historically significant public buildings, and the like. These tasks necessitate architectural historian and archaeological services. It is anticipated that these services, listed below, will be utilized to fulfill FEMA’s Section 106 responsibilities including those in negotiated agreements such as Memoranda of Agreement and Programmatic Agreements.
II. OBJECTIVES
FEMA seeks to procure historical architectural and archaeological services as required during the next twelve to twenty-four months. The period of performance and any option periods will be set out in the Blanket Purchase Agreement. These services will be professionally conducted by, or under the direct supervision of, an individual who qualifies under one or more of the Secretary of the Interior’s Professional Qualification Standards set out at 48 FR 44716, September 29, 1983, for History, Archaeology, Architectural History, Architecture, or Historic Architecture. In utilizing such professional services FEMA’s main objective is to generate a cost-effective result using current best methods of conduct with respect to projects specifically defined by FEMA.
FEMA shall set deadlines or timeframes for each individual project identified in a task order. Following are examples of the architectural historian and/or archaeological services that FEMA may require in those task orders:
· Archaeological Reporting
· Archaeological Monitoring/Report Services
· Archaeological Identification and Testing - Phase I/II
· Archaeological Data Recovery – Phase III
· Archaeological Curation
· Digital Recordation
· National Register Nomination
· Historic Narrative
· Architectural Plan Procurement
· Interpretive Plans
· HABS/HAER Recordation
III. SERVICES
A. For the purposes of establishing quality benchmarks for performance of any of the services set out at Paragraph B., this Section uses the definitions, set forth immediately below. Services provided under any task order shall comply with the requirements of the Standards or Policies as in existence at the time the services are performed. Unless otherwise set out in a task order, all services provided shall be performed by, or under the supervision of, an individual who meets the Professional Standards, as defined below.
“Standards”—shall mean the Secretary of the Interior’s Standards and Guidelines for Archaeology and Historic Preservation (Federal Register 48(190) 1983:44716-44737) and the Louisiana State Historic Preservation Office (SHPO) Division of Archaeology monitoring report standards.
“Professional Standards”—shall mean the Secretary of the Interior’s Professional Qualification Standards set out at 48 FR 44716, September 29, 1983, for History, Archaeology, Architectural History, Architecture or Historic Architecture.
“Digital Photographic Policy”—shall mean the Proposed [has this advanced beyond proposal?] Update Photographic Policy National Register of Historic Places (revised March 2008) including the National Archives and Records Administration’s (NARA’s) guidance to supplement requirements in 36 CFR §1228.270 for transferring permanent electronic records to NARA.
B. To meet FEMA’s objectives, to include the fulfillment of FEMA’s Section 106 responsibilities, contractor, among the necessary services, shall:
Archaeological Reporting Provide report(s) on archaeological activities and associated curation of forms, notes, photos, and artifacts. Reports will be written in accordance with the Standards. The contractor shall, at minimum, conduct background research, synthesize all notes, site forms, literature and records compiled during the monitoring effort, analyze and curate the collected artifacts, edit site forms as necessary and produce required report(s).
Archaeological Monitoring Provide archaeological monitoring, associated report(s), and related curation of forms, notes, photos, and artifacts. Monitoring activities and report(s) will be written in accordance with the Standards. The contractor shall conduct background research, provide archaeological monitors to observe ground disturbing activities at a project site, recommend National Register eligibility of finds, participate in consultations to address effects, synthesize all notes, site forms, literature and records compiled during the monitoring effort, analyze and submit artifacts for curation, edit site forms as necessary and produce required report(s).
Archaeological Identification and Testing – Phase I/II Provide archaeological services for Reconnaissance Surveys, Phase I Surveys, and/or Phase II Archaeological Testing; associated report(s) production; and related curation of forms, notes, photos, and artifacts. Archaeological identification and evaluation investigations and related report(s) will be written in accordance with the Standards. At minimum, the contractor shall conduct background research, field work, recommend National Register eligibility of finds, participate in consultations to address effects, synthesize all notes, site forms, literature and records compiled during the monitoring effort, analyze and submit artifacts for curation, edit site forms as necessary and produce required report(s).
Archaeological Data Recovery – Phase III Provide archaeological services for Phase III Archaeological Data Recovery; associated report(s) production; and related curation of forms, notes, photos, and artifacts. Archaeological data recovery investigations and related report(s) will be written in accordance with the Standards. At minimum, the contractor shall conduct background research, field work, recommend National Register eligibility of finds, participate in consultations to address effects, synthesize all notes, site forms, literature and records compiled during the monitoring effort, analyze and submit artifacts for curation, edit site forms as necessary and produce required report (s).
Archaeological Curation Process and submit artifacts found during archaeological investigations and/or monitoring associated with FEMA-funded projects for curation. All artifacts will be curated in compliance with the Standards. All collected artifacts, notes and photos shall be prepared and submitted to the Louisiana Division of Archaeology for long-term curation.
Digital Recordation Photographically record buildings or structures specified by FEMA. At a minimum, the digital photography must comply with the requirements of the Digital Photographic Policy. The recordation will be professionally conducted by or under the direct supervision of an individual who qualifies under one or more of the Professional Standards. Qualifications of the photographer selected by contractor are subject to prior review and approval by FEMA before work under a task order may commence.
National Register Nomination Create or revise National Register nominations. The nomination forms or amendments will be professionally conducted by or under the direct supervision of an individual who qualifies under one or more of the Professional Standards. The nomination forms or amendments will be consistent with the guidance in the National Register Bulletin #16A, How to Complete the National Register Registration Form.
Historic Narrative Produce a narrative history. This history may include the types of information required in Historic American Building Survey (HABS) Historical Reports: Short Form, Outline Form, or other as specified by FEMA. The narrative history will be professionally conducted by or under the direct supervision of an individual who qualifies under one or more of the Professional Standards.
Architectural Plan Procurement Procure copies of architectural plans or other documentation as specified by FEMA. Contractor will contact the archival or other facility to procure plans or documents required by FEMA, produce a copy of the stipulated plans and/or documents, and deliver to FEMA within the time frame specified by FEMA.
Interpretive Plans Develop and implement interpretive plans as specified by FEMA. Contractor will describe the interpretive plan in general terms. Once these general terms are approved by FEMA, contractor will further develop and implement the plan to FEMA’s specifications. The interpretive plan will be professionally conducted by or under the direct supervision of an individual who qualifies under one or more of the Professional Standards.
HABS/HAER Recordation Record buildings or structures specified by FEMA utilizing, at minimum, HABS or Historic American Engineering Record (HAER) standards and guidelines. At a minimum, recordation must comply with the standards and guidelines set by the Heritage Documentation Program as administered. Documentation may include measured drawings, large-format photography, written histories, and field notes. The recordation will be professionally conducted by or under the direct supervision of an individual who qualifies under one or more of the Professional Standards.