FEMA RUGGED TWO BR PARK MODEL SPECS

99 KB Posted

Attached to
2 Bedroom Park Model Procurement Federal contract opportunity
Solicitation number
HSFEHQ-08-R-0078
Issued by
Federal Emergency Management Agency Mitigation Section

About this file

FEMA Rugged Two Bedroom Park Model (RP) Procurement Specifications

Text of this file

FEMA Rugged Two Bedroom Park Model (RP) Procurement Specifications

2 Bedroom Park Model 1 10/18/2007

General

Park model homes being procured under this contract are for the purpose of providing temporary housing during a Presidential declared disaster. The units are subject to continuous road travel, multiple installations and deactivations, and various weather conditions. All units shall be built identical with the same materials.

The standards shall not be considered restrictive in that the supplier may provide “equal or better” units, maintaining all required code compliance, considering that the competitive price and delivery requirements can be met

The construction and outfitting standards identify minimum square footage of living space, floor plan configuration, finishes, furnishing and environmental living conditions necessary to provide emergency housing for disaster relief operations.

All exterior openings such as windows, doors, drain pipes; etc… will be caulked with a clear, non-hardening weatherproof sealant to prevent air and moisture penetration

All units shall emit limited or no detectable levels of formaldehyde. The total air exchange rate of the unit shall be a minimum 0.35. Once constructed, the unit’s formaldehyde emission level shall be less than

0.016 ppm during initial testing period prior to delivery from manufacturing plant. No Luan, MDF, Vinyl Gypsum or products which contain urea-formaldehyde will be allowed. Requests for exceptions will not be approved. An independent third party inspector provided by Manufacturer, approved by the Government, WILL certify and present the Federal Emergency Management Agency with a document demonstrating compliance with this level. Testing WILL be conducted for each unit, following the Indoor Air Quality Statement of Work, at the manufacturing plant prior to leaving the plant or providers staging yard. If the unit fails to meet the standard, the provider is responsible for any expenses, including retesting, to resolve the issue.

2 Bedroom Park Model 2 10/18/2007

Quality of Construction The specifications establish the minimum standards for park model home construction and outfitting to meet FEMA contract requirements.

All units must include new furnishings and appliances. The manufacturer shall design and construct all units under this contract within a commercial grade quality of workmanship.

The park model homes procured under these specifications shall, at a minimum, meet the design and construction requirements established in the latest version of the American National Standards Institute (ANSI) A119.5 Standard for Park Trailers or the appropriate Recreational Park Trailer Industry Association (RPTIA) compliance and inspections.

2 Bedroom Park Model 3 10/18/2007

Zoning Requirements. Structural design to be incorporated into each unit. (HUD requirement) Roof Load Zone: Use as Guidance: RPTIA compliance and inspection or ANSI equivalent to HUD: Middle

Thermal Zone: Use as Guidance: RPTIA compliance and inspection or ANSI equivalent to HUD 3

Wind Zone: Use as Guidance: RPTIA compliance and inspection or ANSI equivalent to HUD 3

Size and Configuration Type FEMA Park Model (No Lofts/Slide Outs) Exterior Length 32 ft (Minimum) Exterior Width 10 ft (Minimum) Electrical System

– AMPS

125 Amp Electrical Service. Shall be hard wired.

Electrical System

– Volts

120/240 V

Furnishing and Storage

Fully - Each living room area will be furnished with one (1) sofa bed.

Furnishings shall be the manufacturers standard for functional quality (provides usability, comfort and minimum maintenance). All furniture shall remain in packaging. All furniture shall be upright and bunched against the front wall of the room or area it services. Tape shall not be used to secure furniture. When put in place, furnishings shall not obstruct accessible routes providing circulation to spaces and rooms within the unit unless they can be folded or retracted to a wall. Outside storage shall lock from the outside and inside. Please note previous emission requirements.

Dining Room Table

A dining table with seating for four people shall be provided. The dining table shall be movable on wheels or casters. Please note previous emission requirements.

Bedrooms 2 Bedrooms (fully furnished) Each unit must sleep 4-6 people. The bedrooms must be furnished with the appropriate bedding. The master bedroom must be furnished with one full-sized bed. The second bedroom must have two twin-sized beds arranged as bunk beds. Bunk Beds Shall follow 16 CFR 1513. Bunk Beds shall follow all safety guidelines and include guard rails. Each bedroom shall have a closet. Please note previous emission requirements.

Bathroom 1 - Including a Shower. Please note previous emission requirements.

Refrigerator Yes -14.5 cu. f. frost-free refrigerators with freezer. 100% of refrigerator and 50% of freezer must be a maximum of 54” above the floor. Must be able to be opened from the inside for safety concerns.

Range and Oven Yes – minimum 20" self cleaning electric cooking range with a thermostatically controlled oven, and a lighted, power-vented range hood (one-piece construction). Locate controls for ranges, burners and vents to avoid reaching across burners. Self cleaning oven with insulation on all

2 Bedroom Park Model 4 10/18/2007 sides to prevent excessive heat exposure.

Washer Capacity Yes (washer not included).

Dryer Capacity Yes (dryer not included).

Air Conditioner Yes, electric, central air. Supply ducts shall be located in the ceiling. Note:

The appropriate A/C unit must be included with the unit, by the park model home by the company the unit is purchased from. Window units are not acceptable. Must be appropriate central air unit for the park model.

Must be usable with furnace and on the same system. (Reference ASHRAE Handbook or appropriate document). Must show testing documentation demonstrating unit can effectively cool unit an average of 70 degrees Fahrenheit in hot/humid climates as well as northern climates.

Furnace The unit will be equipped with an electric furnace capable of maintaining an average of 75 degrees Fahrenheit temperature. The unit must have ceiling ducted heat with a wired thermostat. Must show testing documentation demonstrating unit can effectively heat unit in hot/humid climates as well as northern climates.

Microwave Yes - Each unit will have a minimum 1.2 cu. ft microwave with child lock.

Water Heater Yes, Electric, 20 Gal Exterior Covering Vinyl siding (Color: white or off-white). Unit siding shall be the manufacturer’s standard full vinyl siding materials.

Floor Plan Each home will have the following basic floor plan. The layout shall consist of:

• Bedroom Size: 11’x 7’5” Approximate

• Living Room/Dining Room/Kitchen

• Bathroom

• Bedroom Size: 11’x 7’ 9” Approximate

• Shall have a maximum of 399 square feet.

Note: All interior doors shall provide a 32” clear opening.

Coatings All exposed surfaces of the entire frame, shall be completely coated after welding. This coating must be waterproof. This does not apply to the serial number. The serial number shall be painted with rust resistant black paint.

2 Bedroom Park Model 5 10/18/2007

Exterior Walls The exterior wall framing (studs) shall be a minimal 2”x 4” nominal at 16”o.c. and secured to the top and bottom plate. Side Walls shall be bolted to the Floor with 5/16” x 6 – ½” bolts at each outrigger. The exterior walls shall be insulated with flame retardant insulation.

All exterior openings such as windows, doors, drain pipes; etc… shall be caulked to prevent air and moisture penetration.

Use a minimum R-11 rated insulation. Please note previous emission requirements

Interior Walls All interior walls will be framed (studded) with minimum 2” x 4” nominal lumber spaced on 16” O.C. Use a minimum R-11 rated insulation. Please note previous emission requirements

Floor Decking The floor decking shall be composed of minimum 23/32” plywood thick panels. Long edges of the panel shall be tongue and groove with 2”x 6” 16" O.C. floor joists. The decking should be placed perpendicular to the joist length. All plywood must be installed tongue and groove and secured in such a manner that the plywood ends terminate on structural members for proper securing. Please note previous emission requirements

Floor Joists The floor joists shall be minimum 2” x 6” nominal O.C. and run transverse to the length of the unit. Floor joists shall be spaced sixteen (16”) O.C.

and splicing of the floor joists is not acceptable. A 2” x 6” nominal rim member shall be installed to enclose the floor perimeter.

Floor and ceiling Floor and ceiling cavities will be insulated with flame retardant, insulation having a minimum R rating of 11.

5/8" Tongue & Groove Plywood. The Tongue & Groove Plywood Floor is attached to the Frame and Screwed every 5 Inches.

Roof Trusses Roof trusses shall be installed the entire length of the home on 16” centers and each must align with an exterior wall stud. The roof trusses shall not be cut for the passage of any electrical, plumbing, and/or mechanical system. Exterior roof coverings shall be a minimum wind zone 3.

Axles Shall have a minimum of 3 new axles. No refurbished axles. MUST BE

NEW.

Main Frame The main frame of the unit will be a minimum 8” steel I Beam. The manufacturer shall provide and install tapered outriggers (minimum twelve gauge) with outriggers 9” to 24” nominal O.C. attached to the main frame.

The frame shall be secured to the floor joist system and the frame alignment shall be maintained by installing appropriate steel fasteners and lag bolts at every floor joist. Please note previous emission requirements

Tires and Rims All tires and rims shall be new and free of defects. Tires shall be above industry standard. Rim clamps, bolts, nuts or other related tire-mounting hardware must be new.

2 Bedroom Park Model 6 10/18/2007

Windows (Egress window)

All windows shall have approved child resistant mini-blinds installed. The minimum size will be approximately 30" x 54"and be listed and labeled for use as an egress window with operating instructions affixed to each window. Screens shall be held in place during transit with a removable, reusable, non-corrosive, shipping clip(s). Tape or other temporary securing methods shall not be utilized to secure screens. Maximum U factor 0.36;

no shutters.

Interior Covering Wall and Ceiling Coverings shall be the manufacturer’s standard materials and neutral colors. Please note previous emission requirements.

Floor covering Materials which meet or exceed industry standard, is required in the kitchen, bathroom, utility, and water heater compartments. Openings in floor spaces shall not exceed 1/2” in any direction. Please note pages 1 and

2. Please note previous emission requirements.

Phone and Cable Television Jack: FEMA prefers to have a television jack installed in the living room. Telephone jack: FEMA prefers to have a telephone jack installed in the living room and master bedroom. Cable Jack in Living Room.

Interior Receptacles and Switches/ Interior Lighting Fixtures

Electrical receptacles will be installed at convenient locations throughout the unit. Receptacles located near or in wet areas must be protected with ground fault interrupter protection. Install receptacles and switches 18” min. and 48” max above finish floor. Where receptacles or switches are above obstructions, including countertops, locate them 44” max. above finish floor. In Living room, please provide an electrical receptacle for TTY next to the living room phone jack.

CFL bulb equivalent to 60 watt bulb installed. No Glass is Permitted for lighting fixtures.

Smoke Detectors/NOAA Weather Radio.

Each unit will have hard-wired smoke detectors with a strobe component (with battery back-up included). Smoke detectors shall be equipped with push-button testing devices. Provide a smoke detector in each bedroom and in the living room/kitchen area.

Each home will be equipped NOAA weather radio in each Bedroom. The NOAA radio should be placed on a separate electrical circuit and require the use of a battery as a secondary power source in the event of a power failure. The wiring circuit for the NOAA radio should not include any switches between the overcurrent protection device and the radio and should not be protected by a ground fault circuit interupter. Shall be equipped with a strobe component.

Fire Extinguisher Each home will be equipped with a five-pound A-B-C type fire extinguisher and a mounting bracket. The mounting bracket will be secured to a wall stud in the kitchen area near the cooking range. The bracket shall be mounted 48 in. max. above the finished floor surface.

2 Bedroom Park Model 7 10/18/2007

Hurricane Straps Each unit will include a minimum of three full wrap hurricane straps providing tie-down from at least 6 points. All vertical and diagonal tie straps must be coated with zinc or other approved galvanic protection that provides at least .60 ounces per square foot of surface coating on all exposed sides. The anchor straps shall not be spliced.

Exterior Door Industry standard with R3.5 rated insulation. Shall be constructed to not allow moisture entering the unit. The unit must have two-doors, opening from opposite hinges. Front door shall provide a clear opening of 32”.

The door shall have lever hardware and shall swing outward. The difference in height between the outside landing surface and the top of the threshold shall not exceed ½”. Shall have an easy to grasp with one hand and does not require tight grasping, tight pinching, or twisting of the wrist to operate. Dead-bolt locks on accessible doors must be no higher than 48” above the floor. Dead bolt locks shall use a dedicated key, separate from passage lock. Please note previous emission requirements.

Bathroom The bathroom shall also have the manufacturer’s standard vanity with lavatory, medicine cabinet with mirror and accessories (paper holder, towel bars/hooks). All interior plumbing must be assembled. Please note previous emission requirements.

Lavatory and Kitchen Sink

Lavatories, sinks and countertops supporting them shall be wall-supported.

Provide easily removable base cabinets with finished floors and walls beneath. Please note previous emission requirements

Shower Bathroom shall have a shower unit installed to manufacturer’s standard.

The fixture will be provided with a curtain rod, shower curtain and curtain hooks. The shower must have a non-skid surface. Showers shall be roll-in type. All showers shall have seats. Seats in roll-in showers shall be secured to the short wall perpendicular to the control wall and shall be of a folding type. Seat shall have a height of 17” to 19”.

The seat shall be a folding type and shall be installed on the side wall adjacent to the controls. The top of the seat shall be 17 inches (430 mm) minimum and 19 inches (485 mm) maximum above the bathroom finish floor. Please note previous emission requirements

Plumbing Controls and Faucet Assemblies

All faucet assemblies shall be of the dual shutoff valve type.

Commode

Industry standard.

Pocket Door Hardware

Handle on both sides of door shall extend 2” from door surface. Shall have 1.5” clearance on each side of handle.

2 Bedroom Park Model 8 10/18/2007

Kitchen Appliances

Kitchen appliances must not be obstructed by furnishings. Locate controls for ranges, burners and vents to avoid reaching across burners. Provide a self-cleaning oven with insulation on all sides to prevent excessive heat exposure. Shall be energy star rated.

Miscellaneous

Transport Readiness The manufacturer and/or supplier of park model homes shall ready the units for transport to the designated staging area and/or installation site.

Each unit must be able to be shipped via road or by rail.

Road Ready Condition

The units must be in transportable and road ready condition when received at staging. Units that are not in a transportable and road ready condition (such as flat tires, damaged axles, etc) will not be considered acceptable.

2 Bedroom Park Model 9 10/18/2007

FEMA Acceptance 1. An onsite, inspection may occur at any time during the manufacturing process. In process inspections shall be accomplished in accordance with Clause 52.246-2 Inspection of Supplies—Fixed-Price.

2. Pre-Delivery Inspection –

a. A Pre-Delivery Inspection each unit shall occur prior to delivery of the unit. Final Inspection shall consist of a review of any documentation generated about the unit during the manufacturing process, a physical inspection of the unit and review of all required documentation associated with the unit.

b. The Government shall complete the entire Pre-Delivery

Inspection process before reporting results to the Contractor.

c. The Pre-Delivery Inspection report shall be recorded as either compliant or non-compliant.

d. Compliant units shall be ready for issue, with the exception of very few, easily correctable problems. The Contractor shall have 24 hours to correct these problems.

If the problems are not corrected within 24 hours, the unit shall be deemed non-compliant. Inspection of these minor problems shall be limited to the specific problems noted during the Pre-Delivery Inspection.

e. Non-compliant units shall either be brought into a compliant status within 48 hours of completion of the Pre- Delivery Inspection, or shall be removed from the inspection point by the contractor. Non-compliant units removed from the inspection point may be brought into compliance at another site and re-submitted for full Pre- Delivery Inspection. Any transportation or rework necessary to make the unit compliant shall be accomplished at no additional cost to the Government.

f. Re-inspection of non-compliant units shall consist of the entire Pre-Delivery Inspection procedure.

2 Bedroom Park Model 10 10/18/2007

FEMA Acceptance 3. Indoor Air Quality Testing:

a. Upon completion of the Pre-Delivery Inspection, an Indoor Air Quality test shall be conducted in accordance with the Indoor Air Quality Test procedure.

b. The Contractor shall prepare the unit for the Indoor Air

Quality Test. These reparations shall include all actions for the 14 day pre-test period.

c. The Contractor shall cooperate with Inspector who shall conduct the Indoor Air Quality Test.

d. Upon completion of the Indoor Air Quality test, the Inspector shall provide both the Government and the Contractor a copy of the test results.

4. Final Inspection and Acceptance:

a. Final Inspection and Acceptance shall occur at the point of delivery.

b. Final Inspection may be a comprehensive as needed to verify compliance of the unit, but as a minimum shall consisted of a documentation review and inspection for any damage incurred during shipment.

c. If the shipment from the Contractor’s facility to either a

Staging area or installation area is to be accomplished by other than the Contractor, then the conforming Pre- Delivery Inspection and acceptable Indoor Air Quality Test shall be the basis for the Final Inspection.

d. Units found to be non-compliant during the Final

Inspection shall either be brought into a compliant status within 48 hours of completion of the Final Inspection, or shall be removed from the inspection point by the contractor. Non-compliant units removed from the delivery point may be brought into compliance at another site and re-submitted for full Pre-Delivery Inspection.

Any transportation or rework necessary to make the unit compliant shall be accomplished at no additional cost to the Government.

e. Acceptance shall be after acceptable completion of the

Final Inspection.

5. Documentation: The contractor must provide the government a copy of all shipping documents showing Contractor’s name and Contract number.

2 Bedroom Park Model 11 10/18/2007

Miscellaneous Master Keys The unit manufacturer or supplier shall furnish 3 sets of keys for homes procured. Master keys shall be provided and packaged separately, with an identification number on the key, bar code number or VIN. The master keys must be received with or prior to delivering the first unit.

Warranty The company the unit is purchased from will be FEMA’s point-of-contact (POC) for all warranties; this includes the actual unit, A/C, furnace, water heater, and all furnishings and appliances. The company will supply a POC for normal duty hours and after-hours.

Certificates of Origin

The certificate of origin must be provided for each unit. The certificate of origin must accompany the invoice.

Manufacturer’s Installation Manual

Manufacturer’s installation guideline and technical data for installation of the unit shall be provided in a packet stored in a readily locatable area within the unit and a copy needs to be provided to the FEMA designated address within 48 hours of award of this contract.

Unit Floor Plan The manufacturer shall provide a complete set of floor plans at time of bid to allow adequate/reasonable time for floor plans to be considered for approval by FEMA and other parties involved. The floor plan includes electrical, plumbing and O.C. diagrams. Must be received with bid.

Delivery Schedule The vendor must provide a delivery schedule for the units ordered.

The contractor must at a minimum meet their projected delivery schedule or FEMA may exercise the right to purchase additional units from other sources and subtract that amount or the remaining portion of the order outside the guaranteed minimum. Also, FEMA may exercise the right to collect a per unit/per day penalty.

Company Commitment

The company (vendor and/or manufacturer) must demonstrate the capacity to support this mission and delivery schedules. If the company is supporting other FEMA disasters the company must also demonstrate the plan for continuing to support those disasters as well, include meeting those delivery schedules.

Also, the vendor must have a representative and/or technician at the delivery locations as well as an area to prepare the units for acceptance. FEMA is not obligated to provide an area for this purpose.

Unit Barcode All units must have a UPC bar code on the front left side of the unit and inside the unit under the unit data sheet. Barcode shall end with the letter R.

2 Bedroom Park Model 12 10/18/2007

Unit designated number

All units must have a unit designation number. The “designated number” is:

• Approximately 3 to 4 inches high black colored numbers and should be visible form the street.

• Located on the left front corner of the unit when facing the unit.

• Approximately three feet high from the bottom of the unit.

• Consists of the contract number and the sequence number of the unit on the specific contract. Example 3025-0015 which indicates the contractor number 3025 has delivered the 15th unit on this contract and has been shipped into inventory. (Note:

Confirm the contract number with FEMA prior to using).

• Shall end with the letter R.

Other files for this federal contract opportunity

Other files attached to 2 Bedroom Park Model Procurement, newest first.
File Type Posted
Additional Answers to Questions 2 Bedroom Park Model.doc DOC document
Answers to Questions for 2 bedroom Park Model.doc DOC document
SOLICITATION HSFEHQ08R0078 2BRPKMD.PDF PDF
2BR IAQ SCREENING —

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .