Attachment_8_List_of_Deliverables.pdf
PDF 59 KB Posted
- Solicitation number
- HSFE20-17-R-0006
About this file
Attachment 8 List of Deliverables
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Facilities Operations and Maintenance Services
COBRATF
Section J Attachment 8
List of Deliverables
Attachment 8, Facility Operation and Maintenance Services (COBRATF): Schedule of Deliverables
Deliverable Frequenc Other Comments Lock and key Control Plan (shall become part of the Quality Control Plan)
I 30 days 4.1.1.5
Loss or unauthorized duplication of access control items
AS 2 hours 1.4.7.1
Technical Progress Report M Report due on the 10th of each month 2.3.2.1.1
Financial Report M Report due on the 10th of each month 2.3.2.1.2
Monthly Progress Report M 5th working day of subsequent month
Progress meeting minutes AS 5 days 1.9.1 Performance evaluation meetings minutes AS 5 days 1.9.2 Government Furnished Property / Equipment Report A When receipts and transfers warrant an update 4.3.5, 4.3.2, 4.3.5.4
Government Vehicle Accident Reports AS Within 24 hours 4.1.2.5, 4.3.3.5 Government Equipment Loss or Damage Report AS Within 24 hours 4.3, 4.3.5.5 Corrective Action Report AS 5 days 6.1 Non-compliance notification AS Within 24 hours 6.1 Quality Control Program I 30 days 2.3.4.1.1 Work control reports AS Upon request 6.2.2 Unscheduled Work Accomplished W 6.2.2.2 Preventive/Predictive Maintenance Plan/Schedule I Within 30 days of contract award 2.3.1.4.4, 2.3.1.4.1
Energy Conservation Program I Within 30 days of contract award
6.2.8
Daily Accountability
D By 8:30 a.m. 6.3.1 Continuity of Operations Line of Succession Plan I Within 30 days of contract award 6.7
Scheduled Outages AS 7.1.1.10 Unscheduled Outages AS 7.1.1.11 Air Quality Analysis Q Within 5 days of receipt 7.1.1.14.1 Roof Inspection Report A 7.1.8.3 Fire Protection Discrepancies M Include in Monthly Technical
Progress Report 3.1.9.1
Quarterly Fire Suppression and Sprinkler System Inspection/test
Q Maintain in Log Book 3.1.9.1
Fire Alarm Testing AS 1 day prior 7.1.9.8 Fire Alarm Testing Schedule I Within 30 days of contract award 7.1.9.8 (as part of the Preventive
Maintenance Schedule) Initial Pest Control Inspection I Within 30 days of contract award 7.1.10.6 Pest Control Application Report M Include in Monthly Technical
Progress Report 3.1.10.2
Termite Inspection A 3.1.10.8 Wastewater Samples SA 7.1.12.6.2 Water Treatment Samples AS 7.1.13.3 Waste Water Inspection D Maintain daily log 3.1.12.2 Water Treatment Log D Maintain daily log 3.1.13.1 Water Treatment System Recommendations AS 3.1.13.3 Sewer System Inspection Log D Maintain daily log 3.1.16.1
Ash and Scrubber Brine Samples SA 7.1.14.9 Water Storage System Sample Q Maintain Log and provide results within 1 hour to COR 3.1.17.4
QC Program I Within 30 days of contract award 7.3.2 Quality Control Inspections M Include in Monthly Progress Report 2.3.4.1.1
Safety Plan I Within 30 days of contract award 3.2.1.2, 4.1.2.1 Safety Reporting – Accident/Incident AS Within 24 hours 3.2.1.7.1 Safety Personnel Changes AS 3.2.1.7.3 Hazardous Materials/Substances AS 10 days prior 3.1.10.4, 3.2.1.8.3, 4.1.2.7 Autoclave and Incinerator Log D Maintain daily log 3.1.14.2 Characterization and Disposal Records AS Maintain Record 3.1.14.8 Shipment Manifest AS Maintain Record 3.1.14.9 Ash Analysis Results I Results within 24 hours 3.1.14.12 Filter Exhaust System Procurement Request AS 3.1.15.4 Freon Challenge A 3.1.15.5 Gaseous Cylinders AS Maintain Records with receipts 3.1.20.1.3 Recycling Report M Report due on the 10th of each month 3.1.22.2
Recycling Credits M Include in monthly invoice 3.1.22.3 Monthly Personnel Report M Report due on the 10th of each month 2.3.2.1.3
Engineering Documents AS Within 10 working days of task 3.1.1.5
Replacement Parts/Component Report W Report due on 1st day of work week 3.1.1.1
Existing Deficiency Inspection/Initial Deficiency List AS Report due no later than 30 days after award of contract
4.2.1.2.2
Startup/Transition Phase Staffing Plan/ Schedule AS 10 Days prior to Contract start date 4.2.1
Phase out plan AS Within 10 days of startup phase 4.2.1
Initial Inspection I To be completed during transition i d
4.2.1.2.1
List of key personnel AS Within 10 days of contract award 2.3.1.1 Quarterly Race Nationality Origin (RNO) Report Q Report due 1st day of each quarter 2.3.2.1.4
Performance Evaluation Meeting (PEM) M Monthly meeting. Minutes due within 5 working days
2.3.2.2.3
Regular Periodic Status Meeting W Weekly meeting. Minutes due within 5 working days
2.3.2.2.1
Additional Reports AS As requested by the COR 2.3.2.1.5
Building/Facility Operation Plan (Initial) AS 30 days after award 4.7.1, 4.7.2
Building/Facility Operation Plan (Final) AS By the end of the startup/transition phase
4.7.1, 4.7.2
Equipment Assessment Report AS Within 5 working days of request 4.3.5
Reference Library AS Establish and maintain throughout the contract
4.6.2.3.1
Review of Design Documents AS When requested by the COR 4.6.3
Emergency Shut Down Instruction AS Within 30 days after phase-in/transition 4.6.6
Tour Inspection Checklists AS Within 30 days after phase-in/transition
4.6.6
Labeling of Electrical Circuits AS When additions or modifications occur
4.6.7
BAS Report M Report due on the 5th of each month
Tour Logs AS As required: D,W, Bi M, M 2.3.1.12, 2.3.1.12.1, 2.3.1.12.2
Refrigerant Control Log AS Include in Monthly Progress Report 2.3.2.1.1, 3.2.1.17
Fuel Levels Report M Include in Monthly Progress Report 2.3.2.1.1
UPS Test Report M Monthly Technical Progress Report 3.1.5.12
Spill Plan I
Welding/Hot Work Permit AS 3.2.1.1.1 Excavation Permit AS Confined Space Entry Permit AS 4.7.2 Employee Training Records AS 3.2.1.6, 3.2.1.6.1 Inspection, Testing and Calibration Records I Within 30 days of contract award 3.2.1.8.1
Lockout/ Tag out Program I Within 30 days of contract award 3.2.1.12
Boiler/Pressure Vessel Inspection Report A due within 15 days of Inspection 3.2.1.13
Backflow Preventer A Within 15 days of inspection 3.2.1.14
Potable Water Systems AS Within 5 days of test 3.2.1.15
Labeling and Signage AS 3.2.1.16
Refrigerant Monitor, Alarm, and Purge Ventilation System tests
AS due within 5 days of Inspection 3.2.1.17
Scheduling and Record Keeping AS 3.2.1.18
Safety Training Record AS Establish and maintain throughout the contract
4.1.2.2
Risk Assessment AS Establish and maintain throughout the contract
4.1.2.3
Standard Operating Procedures AS Establish and maintain throughout the contract
4.1.2.4
Blood-Borne Pathogens Exposure Plan I Within 30 days of contract award 4.1.2.5 Completion Inventory AS Within 30 days of contract completion 4.3.2.1
Facility Changes AS Establish and maintain throughout the contract
4.3.4.1
Warranty Log AS Establish and maintain throughout the contract
4.3.5.8
New and Additional Utility Requirements AS 4.3.6
Reference Library AS Establish and maintain throughout the contract
4.6.2.3.1
Facility Escort Hours M Include in Monthly Progress Report 4.6.4
Curtailment Program I 4.7.3
Qualifications of Technicians AS 10 days prior to person beginning work
2.5.2.5
Loss of Contractor Personnel Contingency Plan
(LCPCP)
I, AS 5 calendar days prior to contract start date
Frequency:
I = Immediate D = Daily W = Weekly M = Monthly Q = Quarterly SA = Semi-annual A = Annually AS = When changes occur/on occurrence
| Deliverables Worksheet.pdf |
| Table 1 |
File details come from the government source that posted it. Updated .