Attachment_35_Safe_Handling_Storage_and_Use_of_Gas_Cylinders.pdf

PDF 335 KB Posted

Attached to
CDP COBRATF Facility Operations and Maintenance Support
Solicitation number
HSFE20-17-R-0006
Issued by

About this file

Attachment 35 Safe Handling Storage and Use of Gas Cylinders

View the file

Other files

File Type Posted
Attachment_1_FOMS_Performance_Work_Statement_06-14-17.pdf PDF
HSFE20-17-R-0006_A00007.pdf PDF
Attachment_1_Performance_Work_Statement_-_Track_Changes_6.14.17.doc DOC document
Attachment_1_FOMS_Performance_Work_Statement_06-12-17.pdf PDF
HSFE20-17-R-0006_A00006_Questions_and_Answers_4.pdf PDF
HSFE20-17-R-0006_A00006.pdf PDF
Attachment_1_Performance_Work_Statement_-_Track_Changes_6.12.17.doc DOC document
HSFE20-17-R-0006_A00005.pdf PDF
Attachment_11_Government_Furnished_Equipment_6-8-17.pdf PDF
HSFE20-17-R-0006_A00004.pdf PDF
HSFE20-17-R-0006_A00003.pdf PDF
Attachment_1_FOMS_Performance_Work_Statement_06-07-17.pdf PDF
HSFE20-17-R-0006_A00003_Questions_and_Answers_3.pdf PDF
Attachment_1_Performance_Work_Statement_-_Track_Changes_6.7.17.doc DOC document
Attachment_1_Performance_Work_Statement_-_Track_Changes_6.6.17.doc DOC document
HSFE20-17-R-0006_A00001_Questions_and_Answers_2.pdf PDF
HSFE20-17-R-0006_A00002.pdf PDF
Attachment_1_FOMS_Performance_Work_Statement_06-06-17.pdf PDF
Site_Visit_Vendor_List.pdf PDF
Attachment_8_List_of_Deliverables_05-24-17.pdf PDF
Attachment_11_Government_Furnished_Equipment_5-31-17.pdf PDF
Attachment_25_Work_Load_Data_Exhibit_5-31-2017.pdf PDF
HSFE20-17-R-0006_A00001_Questions_and_Answers_1.pdf PDF
Attachment_1_FOMS_Performance_Work_Statement_6-05-17.pdf PDF
Attachment_14_Preventive_Maintenance_Exhibit_5-31-17.pdf PDF
HSFE20-17-R-0006_A00001.pdf PDF
Attachment_16_Chemicals_Management.pdf PDF
Attachment_1_FOMS_Performance_Work_Statement_03-30-17.pdf PDF
Attachment_24_CDP_Safety_Plan_(COBRATF).pdf PDF
Attachment_28_Workplace_Safety_and_Health_Policy.pdf PDF
Attachment_12_Vehicle_Management_Procedures.pdf PDF
Attachment_2_QASP.pdf PDF
Attachment_29_Accident-Incident_Reporting_Procedures.pdf PDF
Attachment_9_EOP_COOP_Plan.pdf PDF
Attachment_21Technical_Library_Index.pdf PDF
Attachment_33_COBRATF_Quality_Management_Procedure.pdf PDF
Attachment_6_Workplace_Attire_Policy.pdf PDF
HSFE20-17-R-0006.pdf PDF
Attachment_4_COBRATF_Toxic_Agent_Exposure_Control_Plan.pdf PDF
Attachment_5_Visitor_Access_Policy.pdf PDF
Attachment_17_Building_Operating_Plan_BOP_Template.pdf PDF
Attachment_10_COBRATF_Incident_Management_Manual.pdf PDF
Attachment_30_CDP_Radiation_Safety_Program.pdf PDF
Attachment_27_CDP_Heat_and_Cold_Stress_Plan.pdf PDF
Attachment_7_Electrical_Qualifications_ETT.pdf PDF
Attachment_20_COBRATF_Student_Load_Exhibit.pdf PDF
Attachment_14_Preventive_Maintenance_Exhibit.pdf PDF
Attachment_25_Work_Load_Data_Exhibit.pdf PDF
Attachment_37_Collective_Bargaining_Agreement.pdf PDF
Attachment_11_Government_Furnished_Equipment.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Facility Operations and Maintenance

Services – COBRATF

Attachment 35

Safe Handling Storage and Use of Gas Cylinders

FOR OFFICIAL USE ONLY

STANDARD OPERATING PROCEDURE

Organization: Center for Domestic Preparedness Date: June 24, 2013

Title: Safe Handling, Storage and Use of Compressed Gas Cylinders

CDP-COBRATF-8.2.5

I. Purpose

This operation establishes the procedures for the safe handling, storage and use of compressed gas cylinders

II. Supersession

This SOP supersedes:

SOP 8.2.4, Safe Handling, Storage and Use of Gas Cylinders, Effective 10/28/2011

III. Authority

COBRATF Standards Document

IV. References

None noted

V. Definitions

A. GC – Gas Chromatograph

B. MINICAMS – Miniature Continuous Air Monitoring Systems

C. psi – Pounds Per Square Inch

VI. Responsible Office

Air Monitoring

VII. Standard Operating Procedures

NOTE 1: See attached hazard assessment (Appendix A)

NOTE 2: Access to and use of compressed gas cylinders are limited to authorized personnel only through a locked gate.

A. Monitor Compressed Gas Cylinder Residual Pressure

1. Daily – check residual pressure on all four compressed gas cylinder systems

a. Training Building – Hydrogen (H2) – 10 cylinders on manifold

b. Training Building – Helium (He) – 10 cylinders on manifold

c. Incinerator – Hydrogen (H2) – 1 cylinder

d. Incinerator – Helium (He) – 1 cylinder

2. IF pressure is less than or equal to 200 psi in any system THEN proceed with change out of cyclinders as outlined below; IF pressure is greater than 200 psi, no further action required.

CDP-COBRATF-8.2.5

FOR OFFICIAL USE ONLY 2

3. Recheck all tank pressures daily.

B. Prepare for Compressed Gas Cylinder Changout

1. Gather required tools and supplies

a. Brass crescent wrench

b. Hand trucks with security chain

c. Safety shoes

d. Hand protection

e. Leak detection solution (soap bubble solution)

2. Review compressed gas cylinder key safety precautions below

a. When storing or moving a compressed gas cylinder, ensure that the cylinder cap is securely in place at all times when not secured with safety chains.

b. Do not expose compressed gas cylinders to temperatures higher than 50 o C (122 o F).

c. Never use a compressed gas cylinder that cannot be positively identified with the proper labeling.

d. Never lubricate, modify, force, or tamper with a compressed gas cylinder valve.

e. Straps, chains, or a suitable stand that will prevent them from falling must restrain compressed gas cylinders at all times.

f. Use the main valve to turn off compressed gas cylinders (rather than the regulator valve) when gas is not needed.

g. Always ensure all protective caps are connected to each compressed gas cylinder whenever they are not properly chained and in use at the manifolded compressed gas cylinder banks.

h. Always ensure all compressed gas cylinders are properly secured at all times with the chains used to secure the compressed gas cylinders while they are not being moved.

i. In the event a wrench is needed to connect compressed gas lines, always use a brass wrench.

j. All faulty compressed gas cylinders should have a tag attached stating the problem with the cylinders. Place the faulty cylinder(s) in the empty cylinder storage area after tagging.

C. Changeout of Compressed Gas Cylinders 1- 9 at Training Building Area (H2 or He)

1. Fully close nine of the ten manifolded compressed gas cylinder bank valves and the corresponding compressed gas cylinder valves.

2. Slowly bleed the line pressure on the nine closed compressed gas cylinders by loosening the line connection to the compressed gas cylinder valves.

3. Completely disconnect the compressed gas cylinder lines from the nine closed compressed gas cylinders.

FOR OFFICIAL USE ONLY 3

4. Install the protective caps on all nine disconnected compressed gas cylinders and remove the chain securing those nine compressed gas cylinders.

5. Secure each compressed gas cylinder to a hand truck with a chain and move the used compressed gas cylinders to the proper empty storage area.

6. Secure the empty compressed gas cylinders with the chains in the proper empty storage area.

7. Replace the nine empty compressed gas cylinders with nine new charged compressed gas cylinders, secure with the appropriate chains and reconnect the lines.

8. Slowly open the compressed gas cylinder valves on the compressed gas cylinders.

Check the connections on each compressed gas cylinder with soap bubble solution to verify that no leaking of compressed gas is occurring at the connection points and regulator fittings.

D. Changeout of Compressed Gas Cylinder 10 at Training Building Area (H2 or He)

1. Fully close manifolded compressed gas cylinder bank valve on the tenth compressed gas cylinder and the corresponding compressed gas cylinder valve.

2. Slowly open the closed nine manifolded valves.

3. Replace gas cylinder ten per section VII.C.2 – 8.

E. Changeout of Compressed Gas Cylinder at Incinerator Stack (H2 or He)

1. Close compressed gas cylinder valve of the compressed gas cylinder (H2 or He) to be replaced.

2. Slowly bleed the line pressure on compressed gas cylinder by loosening the line connection to the compressed gas cylinder valve.

3. Completely disconnect the compressed gas cylinder lines from the compressed gas cylinders.

4. Install the protective caps on the disconnected compressed gas cylinder and remove the chain securing the compressed gas cylinders.

5. Secure the compressed gas cylinder to a hand truck with a chain and move the used compressed gas cylinder to the proper empty storage area.

6. Secure the empty compressed gas cylinder with chain in the proper empty storage area.

7. Replace the empty compressed gas cylinder with full compressed gas cylinder, secure with chain, remove the protective cap and reconnect the supply lines.

8. Open the compressed gas cylinder valve. Check the connections on the compressed gas cylinder with soap bubble solution to verify that no leaking of compressed gases is occurring at the connection points and regulator fittings.

F. Verify that the psi reading is greater than 200 psi and there are no signs of leakage.

FOR OFFICIAL USE ONLY 4

VIII. Forms Prescribed

None noted

APPROVED BY:

Gary L. Milner Date

Assistant Director, COBRATF

Center for Domestic Preparedness

Quality Review Date Chemical Hygiene Review Date

(John Blandamer)

File details come from the government source that posted it. Updated .