Attachment_17_Building_Operating_Plan_BOP_Template.pdf
PDF 170 KB Posted
- Solicitation number
- HSFE20-17-R-0006
About this file
Attachment 17 Building Operating Plan BOP Template
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Facility Operations and Maintenance
Services – COBRATF
Attachment 17
Building Operating Plan (Template)
Building Operating Plan Template
BUILDING OPERATING PLAN
Insert Building Photo (ABP Photo)
PREPARED FOR:
BUILDING NAME
ADDRESS, CITY & STATE
BUILDING NUMBER
DATE
TABLE OF CONTENTS
1.0 GENERAL GUIDANCE…………………………………………………………………..….…X
2.0 OPERATIONAL PROCEDURES AND SITE PLANS………….…………………………… X
2.1 BOILER PLANT
2.2 CHILLER PLANT
2.3 DOMESTIC HOT WATER PLANT
2.4 HEATING BOILER PLANT
2.5 GENERAL PLUMBING AND DOMESTIC WATER SYSTEMS
2.6 WATER TREATMENT PLAN
2.7 FIRE ALARM SYSTEMS
2.8 FIRE SUPPRESSION SYSTEMS
2.9 SITE PLANS AND DRAWINGS
2.10 EQUIPMENT INVENTORY
3.0 HVAC EQUIPMENT DESCRIPTIONS AND SEQUENCES OF OPERATION…….......... X
3.1 3.2
PENTHOUSE MECHANICAL ROOMS
MAIN AIR HANDLERS
4.0 ELECTRICAL DISTRIBUTION AND SPECIFICATIONS................................................... X
4.1 EMERGENCY GENERATORS
4.2 MAIN ELECTRICAL SUBSTATIONS
4.3 ADDITIONAL SUBSTATIONS
4.4 LIGHTING CONTROL SYSTEMS
4.5 TRANSFORMERS
5.0 ENERGY MANAGEMENT CONTROLS AND SPECIFICATIONS….............................. X
5.1 BUILDING AUTOMATION SYSTEM
5.2 DUAL DUCT VAV TERMINALS
5.3 COOLING VAV TERMINALS
6.0 ARCHITECTURALAND STRUCTURAL SYSTEM MAINTENANCE............................. X 6.1 6.2 6.3 6.4 6.5 6.6
FAÇADE
ROOFS
PARKING
RAIN GUTTERS
DRAINS
WINDOWS
7.0 TOUR PROCEDURES AND MAINTENANCE DOCUMENTATION……………..…....... X
8.1 TOUR PROCEDURES
8.2 DAILY CHECKLIST
8.3 WEEKLY CHECKLIST
8.4 SCHEDULED MAINTENANCE
8.5 CORRECTIVE MAINTENANCE AND REPAIRS
8.6 PLANNED PREVENTIVE MAINTENANCE
8.0 SERVICE CALL, MAINTENANCE AND REPAIR PROCEDURES……………………. X
8.1 TENANT REQUEST AND SERVICE CALLS
9.2 AFTER-HOURS CALLS
8.3 EMERGENCY SERVICE CALLS
9.0 BUILDING SECURITY PROCEDURES................................................................................ X
10.1 ACCESS AND IDENTIFICATIO
10.2 BAGGAGE INSPECTIONS
10.4 LOADING DOCK ACCESS
10.5 PARKING LOT ACCESS
10.6 AFTER HOURS ACCESS
10.7 REPORTING INCIDENTS AND RESPONDING TO EMERGENCIES
10. FIRE INCIDENT INVESTIGATIONS
10. SIGNAGE
10.0 EMERGENCY PLANS AND HAZMAT PROCEDURES AND CONTINGENCY
PLANS………………………………………………………………………………….…….. X
11.1 SHELTER IN PLACE LOCATIONS
11.2 BUILDING EVACUATION ROUTES AND MEETING PLACES
11.3 BOMB AND BIOHAZARD CONDITIONS, SYSTEMS SHUTDOWN PROCEDURES
11.4 ELEVATOR EMERGENCY PROCEDURES
11.5 FIRE EXTINGUISHER, DEFIBRILLATOR AND PULL SWITCH LOCATIONS
11.6 HAZARDOUS MATERIAL AND HAZMAT WASTE MANAGEMENT
11. UNDERGROUND STORAGE TANKS
11. ENERGY LOAD CURTAILMENT PLANS
11. WATER CURTAILMENT PLANS
11.1 LOSS OF PERSONNEL
11.1 EMERGENCY NUMBERS
11.1 DISASTER AND RECOVERY PROCEDURES
11.1 FIRE PUMPS
11.1 SUMP PUMPS
11.1 SEWAGE EJECTOR PUMPS
11.1 BACKFLOW PREVENTOR
11. ALL MAIN SHUT OFF LOCATIONS AND PROTOCOL
1.0 GENERAL GUIDANCE
This document presents the Building Operating Plan for (Enter bldg name and address City, State Zip Code)
This plan documents the procedures for the operation of all the mechanical and electrical equipment in the Building. Equipment is operated to maximize safety and to maintain comfort conditions. Electric, gas, and water usage is kept to a minimum without compromising either safety or comfort. The systems covered by this Building Operating Plan include:
1) Electrical systems and equipment
2) Mechanical systems and equipment
3) Fire Protection systems and equipment
4) Control Systems controlling all systems which themselves are within the scope
5) Architectural and Structural systems, fixtures, structures and equipment within the government owned site.
Excluded from this Building Operating System
1) Security Systems
2) Telecommunication Systems
3) Equipment owned and operated by tenant agencies
4) Furnishings
5) Equipment owned by servicing public utilities
When levels of required services change, when building equipment changes, when operating procedures change, or when Agency requirements change, the plan shall be revised on a timely basis (within 10 working days) and submitted to the CO or designee.
The conservation of energy is not achieved at the expense of maintaining the required environmental or other special conditions described elsewhere in the building operating plan.
Energy conservation is achieved through effective operational and maintenance practices as well as appropriate repairs or alterations to existing equipment or systems which reduce the overall cost of service. Energy conservation is achieved through the employment of good engineering and operating practices using accepted methods and procedures.
It is the tenant Agency’s responsibility to ensure that lights and equipment are turned off when not needed, that ventilation is not blocked or impeded, and that windows and other building accesses are closed during the heating and cooling seasons. The operation of portable heaters, fans and other such devices in Government controlled space is prohibited unless authorized by the GSA Building Manager.
There are no areas in the building authorized to maintain higher room temperatures during the heating season than those authorized by .
Temperature- Heating/Cooling The Contractor shall adhere to the temperature levels and energy conservation practices identified herein.
During normal working hours, temperature controls shall be set to maintain space temperatures in accordance with the latest guidelines issued by the American Society of Heating, Refrigeration and Air-Conditioning Engineers, Inc., (ASHRAE), Thermal Environmental Conditions for Human Occupancy.
During non-working hours heating temperature shall be set no higher than degree Fahrenheit* and air-conditioning will not be provided except as necessary to return space temperatures to a suitable level during working hours and to assure the protection of the building and its systems.
*Minimum setback for temperatures and humidity control may vary from the established ASHRAE standards where it is necessary to maintain a specified set point as established by the architect and the Architectural Woodwork Institute (AWI) in order to maintain and protect the finished woodwork throughout the courtrooms and offices. These perimeters will be established and adjusted as necessary by the CO or their designee in order to maintain the building interior finishes.
There are no night time set-backs for the chilled water, but at night the load is reduced because there is no demand for it. So the demand on the chillers is less.
General Contract Information
Service Provider:
Contract #:
Contact:
Base:
Option 1:
Option 2:
The Contractor shall provide all management, supervision, labor, materials, supplies, repair parts, tools, and equipment. They are also responsible to plan, schedule, coordinate and ensure effective and economical completion of all work and services specified in this Contract.
All mechanical specifications are a statement of the minimum level of work and services that are to be provided in certain areas under this plan. They are not intended to be, nor shall they be construed as, limiting specifications or requirements. At a minimum, the Contractor will be required to take all steps and measures which would be taken by a prudent building owner to maximize the life expectancy of the property, including having a journeyman mechanic/technician(s) .
All mechanical, electrical, utility, interior and exterior architectural and structural systems in the buildings shall be operated and/or maintained at the highest level of efficiency compatible with the current energy conservations requirements, and maintained at an acceptable level, throughout the Contract performance period.
An “acceptable level” of maintenance is defined as the level of maintenance, that will preserve the equipment and structure in unimpaired operating condition; i.e. above the point where deterioration will begin, thereby diminishing the normal life expectancy of the equipment and/or structure. The Contractor is responsible for performing scheduled and unscheduled maintenance and maintenance repairs, as necessary, on a 24-hour a day, 365 days per year basis including emergency call-back service.
The Contractor shall maintain the machinery spaces, shops, and storerooms in a safe, clean, and orderly manner. When work is performed in these areas, the Contractor’s personnel shall clean up all debris and leave the area in a presentable condition. The machinery rooms including floors and the equipment located within the machinery rooms shall be painted as necessary to maintain the appearance of the room and equipment. When painting, the Contractor must comply with the ANSI color coding system outlined in the ASNI A13.1, Scheme for the Identification of Piping Systems, and maintain the identity (identification number) of the equipment. The Contractor must obtain the approval of the CO or before storing anything in machinery spaces.
Utilities
Utility Provider Information:
Utility Type: Electric Utility Provider:
Account# Accounting String:
Contract Period:
Utility Type: Electric (Lights & Plugs) Utility Provider:
Account#:
Accounting String:
Contract Period:
Utility Type: Sewer Service Utility Provider:
Account#:
Meter#:
Accounting String:
Contract Period:
Utility Type: Water Service Utility Provider:
Account#:
Meter#:
Accounting String:
Contract Period:
Utility Type: Fire Protection Utility Provider:
Account#:
Meter#:
Accounting String:
Contract Period:
Utility Type: Gas Utility Provider:
Account#:
Meter#:
Accounting String:
Startup & Shutdown Times & Procedures Normal Operating Hours:
Supervisory Building Manger:
Property Manager:
Engineer Tech:
Assistant Property Manager:
Number of Occupants:
Number of Parking Spaces:
Primary Tenant:
Classifications:
Building Number:
Construction Date:
Accessibility Compliant:
Security Level:
Tier Designation:
Congressional District:
Structure:
Design and Construction:
Gross Square Feet:
Rentable Square Feet:
Useable Square Feet:
Floors:
2.0 OPERATIONAL PROCEDURES AND SITE
PLANS
This Section describes the procedures for operating the building’s HVAC systems.
2.1 BOILER PLANT
As Applicable
2.2 CHILLER PLANT:
As Applicable
2.3 DOMESTIC HOT WATER PLANT
As Applicable
2.4 HEATING BOILER PLANT
As Applicable
2.5 GENERAL PLUMBING AND DOMESTIC WATER SYSTEMS
As Applicable
2.6 WATER TREATMENT PLANS
As Applicable
2.7 FIRE ALARM SYSTEMS
As Applicable
Fire Protection Drawings-
Contractor Information Service Provider:
Contract #:
Contact:
Base:
Option 1:
Option 2:
2.8 FIRE SUPPRESSION SYSTEMS
As Applicable
2.9 SITE PLANS AND DRAWINGS
As Applicable (Note to preparer: You may refer to location of applicable site plans and drawings.)
2.10 EQUIPMENT INVENTORY
As Applicable (Note to preparer: You may refer to location or add as an attachment)
3.0 HVAC EQUIPMENT DESCRIPTIONS AND
SEQUENCES OF OPERATION
3.1 MECHANICAL ROOM
As Applicable
3. MAIN AIRHANDLERS
As Applicable
AFTER HOURS OCCUPANCY:
Air Handling Units:
AHU Floor Serviced Location
Mechanical Drawings-
Indoor Air Quality
4.0 ELECTRICAL DISTRIBUTION AND
SPECIFICATIONS
4.1 EMERGENCY GENERATORS
As Applicable
4.2 MAIN ELECTRICAL SUBSTATIONS
As Applicable
4.3 ADDITIONAL SUBSTATIONS
As Applicable
4.4 LIGHTING CONTROL SYSTEMS
As Applicable
Lighting Settings:
Levels: (FYI: Lighting levels can be found in the FPMR. Please note that these levels are subject to change)
Lighting On/Off Times:
Site Lights:
Elevator Lobby lights:
Tower Lobby Lights:
Courtroom Lights:
Parking Garage Lights:
During the weekends no interior lighting comes on, only site lights come on.
Electrical Lighting Drawings (location):
5.0 ENERGY MANAGEMENT CONTROLS
AND SPECIFICATIONS
5.1 BUILDING AUTOMATION SYSTEM
During normal working hours, ventilation shall be maintained in accordance with the latest guidelines from ASHRAE, Ventilation for Acceptable Indoor Air Quality. The Contractor’s responsibility to comply with these requirements is limited by the capacity of the building’s HVAC equipment, Building Automation System (BAS), and outside environmental conditions.
5.2 DUAL DUCT VAV TERMINALS
As Applicable
5.3 COOLING VAV TERMINALS
As Applicable
6.0 ARCHITECTURAL AND STRUCTURAL
SYSTEMS MAINTENANCE
6.1 FAÇADE
As applicable
6.2 ROOFS
As Applicable
6.3 PARKING
As Applicable
6.4 RAIN GUTTERS
As Applicable
6.5 DRAINS
As Applicable
6.6 WINDOWS
7.0 TOUR PROCEDURES AND
MAINTENANCE DOCUMENTATION
7.1TOUR PROCEDURES
Watches involve performing certain tasks required for the operation of boilers, compressors, and related equipment in a centralized location. Watches include, but are not limited to, starting equipment and loads, and making adjustments at the central control center, and taking water samples, making tests, and adding chemicals as required. A watch does not mean that the operator stays in the same location for an entire shift. The time spent is that required to perform the tasks.
7.2 DAILY CHECKLIST
As Applicable
7.3 WEEKLY CHECKLIST
As Applicable
7.4 SCHEDULED MAINTENANCE
As Applicable
7.5 CORRECTIVE MAINTENANCE AND REPAIRS
As Applicable
7.6 PLANNED PREVENTIVE MAINTENANCE
Preventive maintenance includes, but is not limited to greasing, oiling, adding refrigerant, changing filters, cleaning, adjusting, replacing belts, and replacing of other expendable items. It also includes scheduled work on items of equipment or systems required to provide continuing operation, to preclude unnecessary breakdowns and to prolong the life of equipment or systems.
Such work will be required to be performed without disruption to the building occupants operations during their normal business hours. Disruptive work will be required to be performed during other than normal building hours.
8.0 SERVICE CALL, MAINTENANCE AND
REPAIR PROCEDURES
8.1 TENANT REQUEST AND SERVICE CALLS
As Applicable
8.2 AFTER HOURS CALLS
As Applicable
8.3 EMERGENCY SERVICE CALLS
9. BUILDING SECURITY PROCEDURES
9.1 SIGNAGE
As Applicable
9. BAGGAGE INSPECTIONS
As Applicable
9. PARKING LOT ACCESS
As Applicable
9. AFTER HOURS ACCESS
As Applicable
9. REPORTING INCIDENTS AND RESPONDING
Contract Employee Responsibilities:
The Contractors shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall not hold the Government responsible for any action on its part or that of its employees or subcontractors, which results in illness, injury, accident, or death.
9. FIRE INCIDENT INVESTIGATIONS
10.0 EMERGENCY PLANS AND
HAZMAT PROCEDURES
[[[Note to preparer: It is not necessarily intended that you physically include all emergency plans in the Section, but instead you can indicate their location. For those items that have no separate plans they should be included here]]]
10.1 SHELTER IN PLACE LOCATIONS
As Applicable
10.2 BUILDING EVACUATIONS ROUTES & MEETING PLACES
As Applicable
10.3 BOMB OR BIOHAZARD CONDITIONS AND SYSTEM
SHUTDOWN PROCEDURES
As Applicable
10. FIRE EXTINGUISHER, DEFIBRILLATOR, AND PULL SWITCH
LOCATIONS
As Applicable
10. HAZARDOUS MATERIAL AND HAZMAT WASTE MANAGE-
MENT
As Applicable
10. UNDERGROUND STORAGE TANKS
As Applicable
10. ENERGY LOAD CURTAILMENT PLANS
As Applicable
10. WATER CURTAILMENT PLANS
As Applicable
10. LOSS OF PERSONNEL
10.13 EMERGENCY NUMBERS
10.14 DISASTER AND RECOVERY PROCEDURES
As Applicable
10.15 FIRE PUMPS
As Applicable
10.16 SUMP PUMPS
As Applicable
10.17 SEWAGE EJECTORS
As Applicable
10.18 PRESSURE BOOSTERS
As Applicable
10.19 PRESSURE REDUCING STATIONS
As Applicable
10.20 BACKFLOW PREVENTORS
As Applicable
10.21 ALL MAIN SHUT OFF LOCATIONS & PROTOCOL
Blank Page
File details come from the government source that posted it. Updated .