Amendment (SF30) 0003 to include Questions Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HSFE10-14-Q-0001_AMD_0003.pdf | ||
| HSFE10-14-Q-0001_AMD_0002.pdf | ||
| HSFE10-14-Q-0001_0001.pdf | ||
| Attachments.pdf | ||
| Wage_Determination.pdf | ||
| HSFE10-14-Q-0001_AMD.pdf | ||
| HSFE10-14-Q-0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NO.
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NO.
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED
PAGE OF
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC- KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 10-83)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY 10/21/2013
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(No., street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(If applicable)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
(X)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0003 10-21-2013 DR-4122-AK
Department of Homeland Security Federal Emergency Management Agency DR-4122-AK Contracting Office 1901 South Bragaw Street Anchorage AK 00508
FEDERAL EMERGENCY MANAGEMENT AGENCY
REGION 10
ATTN: CONTRACTING OFFICER
130-228TH ST SW
BOTHELL WA 98021
To all Offerors/Bidders HSFE10-14-Q-0001
X x
Not Applicable x 1
This is Amendment 0003 to solicitation HSFE10-14-Q-0001. The attached solicitation is replaced in its entirety.
Offerors must acknowledge receipt, sign, date, and return the SF30 along with all required submittals located in the solicitation. Offerors' proposals may be rejected if all requested documents are not included on the due date.
The due date for HSFE10-14-Q-0001 and SF30s remain unchanged- 10/24/2013 at 2:00 p.m. Alaska
Interested parties must include with submittals acknowledgement of Amendments 0001, 0002,& 0003.
Daisy Joseph Contracting Officer
CONTINUATION PAGE
Questions & Answers
1.BPA Item 12 asks for pricing for weekly chartered flights from PANC to PAGA.
Will this be a drop off, with the vendor getting released from Galena, or is this a round trip back to PANC with standby in PAGA then releasing the vendor in PANC.
Answer: Drop off or standby will be based on Government’s need.
2.Could we get a sample PWS and a sample Task Order?
Answer: A post award conference will be conduct along with example documentation.
3. Pilot approval (page 8). Will the Pilots become "Carded", or how will the pilot approval process be structured?
Answer: Review FAA Certification located in the Performance Work Statement (PWS).
4. How will supporting invoices (Landing fees, deicing etc) be submitted to the CO?
Answer: Supporting documentation will be provided to the Contracting Officer via electronic mail.
5.Page 10 asks for aircraft capabilities, specifically "Minimum Rwy length required at maximum gross weight".
Airport elevation and temperature are required to determine this number. Did you have a baseline elevation and temperature you wanted to use to obtain this number from the aircraft performance data?
Answer: Contractor must provide the aircraft capability.
6.Iridium Satellite Flight following is required. Are the vendors that are currently providing equipment for www.aff.gov acceptable for this requirement, or is there a specific model of iridium flight following required?
Answer: Unaware of aff.gov requirements.
7. Are the "standby rate" line item(s) in the BPA designed to cover costs when the government orders the vendor, holds the vendor on standby status on the ground, with no flight time actually commencing? Similar to "Availability" paid on USFS/DOI contracts?
As an example to this question, the government calls and says "We would like the crew at the airport, the airplane made ready to fly in short order, but do not take off until we (the CO) says so.". In the the example we don't actually fly, and just ended up only standing by for flight at the government's discretion.
Answer: Please review PWS.
| 2013-10-21T14:09:31-0800 | |
| DAISY JOSEPH |