CC-1280-6699023.pdf
PDF 4 MB Posted
- Solicitation number
- HSCGG1-17-Q-PFA016
About this file
Drawings CC-1280=6699023
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specs_6699023.pdf | ||
| RFQ_HSCGG1-17-Q-PFA016.pdf | ||
| Wage_Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAIN
GATE
DESHON ST
GATE
GENERAL NOTES
(GENERAL NOTES APPLY TO DRAWINGS ME-100 TO ME-103)
1. THE PLANS WERE DERIVED FROM EXISTING DRAWINGS. IT WILL BE THE CONTRACTOR'S
RESPONSIBILITIES TO FIELD VERIFY EXISTING SITE CONDITIONS TO IMPLEMENT INTENT
OF SCOPE OF WORK PER PLANS AND SPECIFICATIONS.
2. EQUIPMENT SHALL BE INSTALLED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.
REFER TO MANUFACTURER CERTIFIED DRAWINGS FOR EQUIPMENT DIMENSIONS AND
MAINTAIN RECOMMENDED CLEARANCES.
3. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR) FOR TEMPORARY STEAM SHUTDOWN AS NECESSARY TO
REMOVE AND RECONNECT CONDENSATE RETURN UNIT. SHUTDOWN AS NECESSARY
SHALL BE SCHEDULED IN WRITING AND APPROVED BY THE COR. CONTRACTOR IS
REQUIRED TO FIELD VERIFY PIPE ROUTING AND IDENTIFY STEAM SHUTOFF VALVES
REQUIRED TO ISOLATE PROPOSED SYSTEM. TEMPORARY CONDENSATE DISCHARGE TO
FLOOR DRAIN WILL BE PERMITTED, FLOOR DRAIN IS LOCATED WITHIN THE
MECHANICAL ROOM.
4. CONTRACTOR SHALL PROVIDE CONSTRUCTION COORDINATION AND AS-BUILT MARK-UP
PLANS REQUIRED FOR MECHANICAL AND ELECTRICAL SYSTEMS.
5. CONTRACTOR SHALL LEAVE THE ENTIRE MECHANICAL AND ELECTRICAL SYSTEMS
UNDER THIS CONTRACT IN PROPER WORKING ORDER AND SHALL REPLACE, WITHOUT
ADDITIONAL CHARGE, ALL WORK OR MATERIAL WHICH MAY DEVELOPED EFFECTS,
ORDINARY WEAR AND TEAR OR DAMAGE RESULTING FROM IMPROPER HANDLING,
WITHIN A PERIOD OF ONE YEAR FROM THE DATE OF INITIAL TESTING AND ACCEPTANCE
BY USCGA.
6. COMMISSION ALL NEW EQUIPMENT AND SYSTEMS. ALL COMMISSIONING REPORTS
SHALL BE SUBMITTED TO USCGA FOR APPROVAL. REPORT SHALL INCLUDE ALL
COMPLETED TEST FORMS, EQUIPMENT CHECKLISTS, AND MANUFACTURER STARTUP
FORMS.
7. CONTRACTOR SHALL PROVIDE A FACTORY CERTIFIED TECHNICIAN FOR THE STARTUP OF
ALL INSTALLED EQUIPMENT. ALL EQUIPMENT MANUFACTURER'S RECOMMENDED
STARTUP AND CHECK-OUT PROCEDURES SHALL BE COMPLETED BY AN AUTHORIZED
TECHNICIAN AND DOCUMENTED ON THE MANUFACTURER'S FORMS.
ELECTRICAL GENERAL NOTES:
8. ALL ELECTRICAL WORK SHALL BE PERFORMED BY LICENSED ELECTRICIANS AND IN
ACCORDANCE WITH THE 2011 EDITION OF THE NATIONAL ELECTRICAL CODE (NEC).
9. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL BENDS, FITTINGS, BOXES ETC.
PROVIDE ALL MATERIALS AND LABOR REQUIRED FOR A COMPLETE AND FULLY
OPERATIONAL SYSTEM.
10. WHEN SECURING POWER TO CIRCUITS AND EQUIPMENT AS PART OF THIS PROJECT,
CONTRACTOR SHALL FOLLOW OSHA GUIDELINES AS RELATED TO LOCKOUT/TAGOUT
PROCEDURES. ALL POWER OUTAGES REQUIRE A MINIMUM 72 HOUR NOTICE PRIOR TO
DE-ENERGIZING. COORDINATE ALL POWER OUTAGES WITH THE USCGA CONTRACTING
OFFICER'S REPRESENTATIVE (COR).
LEGEND & ABBREVIATIONS
NEW PIPING / EQUIPMENT (HEAVY LINE)
EXISTING PIPING / EQUIPMENT TO REMAIN (THIN LINE)
DIRECTION OF FLOW IN PIPE
POINT OF CONNECTION
PROPOSED DEMO AND NEW WORK
REVISION TAG
FEET
GLYCOL MAKE-UP UNIT
ROOM
CODES AND STANDARDS
CONTRACTOR SHALL COMPLY WITH USCGA REQUIREMENTS, THE MOST CURRENT LOCALLY ADOPTED EDITIONS OF
FOLLOWING CODES AND STANDARDS:
1. INTERNATIONAL BUILDING CODE
2. INTERNATIONAL MECHANICAL CODE
3. INTERNATIONAL PLUMBING CODE
4. LIFE SAFETY CODE (NFPA 101)
5. NATIONAL ELECTRICAL CODE (NFPA 70 & 70E)
6. FIRE CODE (NFPA 1)
7. INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
8. NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA).
9. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI).
10. AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME).
11. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM).
12. INTERNATIONAL ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE).
13. AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS (ASHRAE).
14. U.S. DEPARTMENT OF LABOR - OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
15. UNDERWRITERS LABORATORY (UL).
16. AIR CONDITIONING AND REFRIGERATION INSTITUTE (ARI).
NOTE: THE MORE STRINGENT CODE/STANDARD SHALL GOVERN IN CASES WHERE THE LAW AND REGULATIONS
REFERENCED HEREIN CONFLICT.
PROJECT DESCRIPTION
THE PROJECT CONSISTS OF ALL WORK, INCLUDING LABOR AND MATERIALS NECESSARY TO REPLACE
AND INSTALL FOLLOWING SCOPE OF WORK:
1. REMOVE EXISTING CONDENSATE RETURN UNIT, FURNISH AND INSTALL NEW CONDENSATE
RETURN UNIT, PIPING, FITTINGS AND INSULATION AS PER PLANS.
2. REMOVE EXISTING ROOF EXHAUST FAN CURRENTLY SERVING BATHROOM. FURNISH AND
INSTALL NEW ROOF EXHAUST FAN TO SERVE BOTH BATHROOM AND GREASE TRAP
ROOM. PROVIDE NEW DUCTWORK, FITTINGS, AND ACCESSORIES. MODIFY
MECHANICAL ROOM DOOR WITH NEW TRANSFER LOUVER AS PER PLANS.
3. FURNISH AND INSTALL GLYCOL MAKE-UP UNIT. UNIT SHALL BE CONNECTED TO CENTRAL
CHILLED WATER SYSTEM AS PER PLANS.
KEY CONSTRUCTION SCHEDULE
CONTRACTOR IS REQUIRED TO COMPLY WITH FOLLOWING ONSITE CONSTRUCTION SCHEDULE
NECESSARY TO SUPPORT USCGA ACADEMIC CALENDAR:
1. PROJECT PERIOD OF PERFORMANCE: 3-1/2 MONTHS (AWARD TO CLOSING)
2. ONSITE CONSTRUCTION: THREE WEEKS, REQUIRE COORDINATION AND APPROVAL BY COR
3. KITCHEN APPLIANCES SHUTDOWN (KETTLES, DISHWASHER ETC.) AS NECESSARY TO REMOVE
AND INSTALL CONDENSATE RETURN UNIT: TWO DAYS, 4 HOURS PER SHUTDOWN, REQUIRE
COORDINATION AND APPROVAL BY COR
WALL BETWEEN CONDENSATE
RETURN UNIT MECHANICAL
ROOM AND GREASE TRAP
ROOM. SEE ADDITIONAL PLANS
2 3 4 5 6 7
PRESSURE POWERED CONDENSATE PUMP PACKAGE SCHEDULE
DEMOLITION & NEW WORK
REMOVE EXISTING CONDENSATE REMOVAL UNIT, PIPING,
FITTINGS AND ACCESSORIES NECESSARY TO FACILITATE
PROPOSED UNIT AS PER PLAN AND DETAIL.
FURNISH AND INSTALL NEW PRESSURE POWERED PUMP PACKAGE
WITH RECEIVER, PIPING, FITTINGS AND SKID MOUNTING. UNIT
SHALL BE SECURELY ANCHORED TO THE FLOOR.
ALL PIPING SHALL BE SIZED TO MATCH PUMP AND RECEIVER
CONNECTIONS. PROVIDE UNIONS, REDUCER, INCREASER AND
OTHER FITTINGS NECESSARY TO FACILITATE NEW
INSTALLATIONS PER UNIT MANUFACTURER RECOMMENDATIONS.
FURNISH AND INSTALL INSULATION TO ALL NEW PIPING (EXCEPT
VENT). PROVIDE MINIMUM 1" FIBERGLASS INSULATION WITH FSK
JACKETING.
KITCHEN OR PARTIAL BUILDING STEAM SHUTDOWN AS
NECESSARY TO FACILITATE NEW UNIT INSTALLATIONS SHALL BE
COORDINATED WITH COR.
INSTALLATIONS AND START-UP SHALL BE COMPLETED AS PER
MANUFACTURER RECOMMENDATIONS FOR A FUNCTIONAL
SYSTEM OPERATION. CONTRACTOR IS REQUIRED TO PROVIDE
ADDITIONAL PIPING,VALVES, FITTINGS AND ACCESSORIES
NECESSARY PER MANUFACTURER RECOMMENDATIONS.
PIPING SPECIFICATIONS:
STEAM:
MATERIAL: STEEL
TYPE: BLACK
WEIGHT: SCHEDULE 40
CONDENSATE:
MATERIAL: STEEL
TYPE: BLACK
WEIGHT: SCHEDULE 80
VENT:
MATERIAL: STEEL
TYPE: BLACK
WEIGHT: SCHEDULE 40 (OR MATCH EXISTING)
4 5
ROOF EXHAUST FAN
DEMOLITION & NEW WORK
REMOVE EXISTING ROOF EXHAUST FAN TO FACILITATE NEW FAN.
FURNISH AND INSTALL NEW FAN WITH ROOF CURB ADAPTER &
FITTINGS.
FURNISH AND INSTALL EXHAUST GRILLE, PLENUM, DUCTWORK,
DAMPER, FITTINGS AS PER PLAN. EXHAUST GRILLE LOCATION, DUCT
ROUTING SHALL BE FIELD VERIFIED. ALL DUCTWORK SHALL BE
SUPPORTED FROM CEILING STRUCTURE, DUCT SUPPORT REQUIRED
WITHIN EVERY 10 FEET.
WALL OPENING SHOULD BE CLOSED WITH MASONRY TO MATCH
WALL THICKNESS AND TYPE.
REMOVE AND RESTORE EXISTING GREASE TRAP ROOM DOOR WITH
NEW TRANSFER LOUVER.
FURNISH AND INSTALL ONE (1) DUCT AIRFLOW VOLUME DAMPER
(VD) ON EXISTING BATHROOM EXHAUST PER PLAN. SYSTEM
AIRFLOW BALANCING IS NOT REQUIRED. CONDUCT VISUAL
AIRFLOW TEST WITH COR ASSIGNED PERSONNEL.
ELECTRICAL NEW WORK:
DISCONNECT AND SECURE ELECTRICAL FROM EXISTING ROOF
EXHAUST FAN. EXISTING WIRING AND CONDUIT SHALL BE REUSED
TO NEW FAN, PROVIDE EXTENSION AS NECESSARY.
FAN PANEL BREAKER IS LOCATED IN THE KITCHEN, PANEL# LP1B1,
BREAKER# 24 (20A)
EXISTING EXHAUST FAN (EF-6)
NEW EXHAUST FAN
EXISTING GREASE TRAP ROOM DOOR
CUT EXISTING DOOR
TO INSTALL NEW DOOR
LOUVER.
LOUVER SPECIFICATIONS:
TYPE: DOOR LOUVER
HEIGHT: 10-1/2" (MINIMUM)
WIDTH: 20-1/2" (MINIMUM)
LOUVER DOOR THICKNESS:
1-3/8" TO 2-1/4" (FIELD VERIFY)
PROVIDE NEW ROOF CURB
ADAPTER REQUIRED TO
INSTALL NEW EXHAUST FAN
EXISTING ELECTRICAL
WIRING AND CONDUIT SHALL
BE RE-USED, PROVIDE
EXTENSION AS NECESSARY
EXISTING GREASE TRAP ROOM
STEAM VENT CONNECTION
POINT, SEE DETAIL ON PLAN
ME-101
PROPOSED/ ALTERNATE EXHAUST
GRILLE LOCATION.
1 35
GLYCOL MAKE-UP UNIT
5#10 THHN
3/4" EMT
MCC-19
1 2 3
FIELD INSTALL 3/4"
MATERIAL: STEEL SCHEDULE-40
FILED INSTALL RELIEF
VALVE RATED 30 PSI
CONNECT TO EXISTING CHILLED
WATER RETURN LINE
FIELD INSTALL DRAIN
VALVE WITH HOSE &
CAP
EXISTING CHILLED
WATER RETURN MAIN
EXISTING CHILLED
WATER RETURN MAIN
FIELD INSTALL 3/4"
MATERIAL: STEEL SCHEDULE-40
DEMOLITION & NEW WORK
FURNISH AND INSTALL NEW GLYCOL MAKE-UP UNIT AS PER PLAN
AND EQUIPMENT SCHEDULE. UNIT SHALL BE SECURELY
MOUNTED ON EXISTING CONCRETE PAD.
FURNISH AND INSTALL 25 FT. OF 3/4" PIPING AND FITTINGS TO
CONNECT TO EXISTING CHILLED WATER LINE AS PER DETAIL ON
THIS PLAN.
PROVIDE ADDITIONAL 50 GALLON GLYCOL SOLUTION STORAGE
TANK. CONTRACTOR IS REQUIRED TO FILL BOTH TANKS (TOTAL
100 GALLON) WITH 30% PROPYLENE GLYCOL SOLUTION.
PROPYLENE SOLUTION SHALL BE SAFE-T-THERM HD
MANUFACTURED BY HOUGHTON CHEMICAL CORPORATION.
ELECTRICAL NEW WORK:
PROVIDE 20A SINGLE POLE BREAKER IN PANEL PPSB. PROVIDE
NEW 3/4" RIGID STEEL CONDUIT AND 3 #12 THHN WIRING.
(APPROXIMATE 100 FT. OF RIGID CONDUIT, WIRING AND 5 FT. OF
FLEX CONDUIT WITH NEW JUNCTION BOX IS REQUIRED TO NEW
PUMP). PROVIDE WALL MOUNTED PUMP CONTROL SWITCH.