Amendment0001_17-B-PRV123.pdf
PDF 188 KB Posted
- Solicitation number
- HSCGG1-17-B-PRV123
About this file
Amendment 0001 - Questions & Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract_17-B-PRV123.pdf | ||
| P6466811DWG.pdf | ||
| SF24_Bid_Bond.pdf | ||
| IFB_HSCGG117BPRV123.pdf | ||
| General_Decision_Number_ME170010.pdf | ||
| P6466811SPEC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 5
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
04/17/2017
4. REQUISITION/PURCHASE REQ. NO.
2117G17PRV123
5. PROJECT NO. (If applicable)
PSN 6466811
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
Contracting Officer USCG Civil Engineering Unit Providence 475 Kilvert ST STE 100 Warwick, RI 02886
Same as Block 6 Attn: Daniel B. Walker, Contracting Officer
(401) 736-1764
(401) 736-1704 (fax)
8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)
THIS AMENDMENT MUST BE ACKNOWLEDGED
See Block 11 below
9A. AMENDMENT OF SOLICITATION NO.
HSCGG1-17-B-PRV123
9B. DATED (SEE ITEM 11)
03/28/2017
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such Change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET
FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The solicitation referenced in block #9A to Repair the Waterfront at Coast Guard Station Rockland, ME (Knox County) is amended as follows:
1. The Due Date for receipt of questions was April 14, 2017 by 2:00 pm local time, Warwick, RI. The following pages document questions received during this period along with the associated answers.
2. The Due Date for Bids has not changed and is 04/27/2017, AT 2:00 PM LOCAL TIME, WARWICK, RI
Continued…
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or Print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
DANIEL B. WALKER, Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
04/17/2017
NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53
2 5
1. The drawing sheet C-101 shows removing three catch basins. The drawing sheet S-101 shows new drainage system to be installed, but highlights a single catch basin. The detail sheet shows replace detail (TYP) for the new catch basin, but does not provide pipe invert in and pipe invert out elevations. Are we tying into the existing drainage system? If tying into the existing drainage pipe, what are the material, size and locations?
Sheet C-101 does show removing three existing catch basins. Sheet S-101 labels one new catch basin and calls it typical (three are needed). The Detail Sheet C-501 shows the typical new catch basin. All of these basins both old and new are leaching basins where runoff exits the basin into the ground. No pipes are required.
2. What is the size of the pipe pile to be quoted?
Assuming the intended question was to ask the size of the pipe piles to be "coated" - the piles supporting the wharfs are 12" nominal concrete filled pipe piles as shown on S-301 thru S-302. The guide piles for the floating docks are 14" nominal concrete filled pipe piles.
3. What is the size of the angle iron to be coated?
The angle bracing varies from 2 x 3 to 4 x 4 angles typically.
4. Is all the work associated with Bid Option #1 detailed on sheet 17 of 28?
All of the optional and some base work are detailed on sheet 17 of 28.
5. Please provide a detail of the existing Aluminum Ramp to be replaced.
The aluminum ramp construction is detailed on sheet 17 of 28 and in specification Section 35 51 13.00 20 part 1.5.2.
6. Is the contractor responsible for replacing the four fenders shown on the drawing for the North Float? If so please provide details of the required fenders.
The existing fenders should be reset on the new float.
3 5
7. May we request a waiver of the CP-1 Coating Certification to be replaced by NACE
Certified Coating Inspectors?
a. Our suppliers have indicated that in the past the USCG has permitted such a request.
The equivalent NACE Certification will be acceptable providing that the contractor can demonstrate that the requirements for the NACE certification are equal to the CP-1 requirements.
8. Does the USCG have existing plans for the current gangways as well as the floating docks in order to quote on the replacement of “the same” units? If so, would you please provide a copy so we may quote like-for-like.
No plans are available for the gangways.
9. The dock specifications call for a freeboard of 24” to 30” tall with an 80 PSF load. Since the plan calls for an 8’ wide dock the recommended freeboard should not exceed 20”.
One option would be to reduce the height of the freeboard and another would be to increase the dock width to 10’. Could this be reviewed by the designer?
The dock width and required freeboard will not be changed. The Coast Guard has existing docks where these requirements have been successfully achieved.
10. The in state precast vender that we would like to use for the precast structures and planks is not currently PCI certified. Is this certification requirement negotiable to the contract?
No, the PCI certification is required.
11. On the Water Meter Vault Hatch- What is the hatch's size of the clear opening?
The intent is to match the existing hatch. The clear opening should be field verified.
12. It has been brought to my attention by my hardware suppliers that they do not make A490 threaded Rod which is in the specs for the pins for the precast planks. Are the nuts and washers for these items galvanized?
The pins for the connection of the precast plank should be epoxy coated 150 ksi all thread bar, the nuts and washers should be galvanized and typically from the same manufacturer.
4 5
13. The two existing double bit bollards that have to be removed, stored, and reinstalled.
What size anchor bolts should we carry in the bid? Are we required to blast and paint the two bollards?
The original plans for the bollards indicate 1” bolts. As with all dimensions the bolt size must be field verified by the contractor. Blasting and recoating is required per Specification 05 30 00.01 Section 2.1.6.
14. The specs call for mooring hardware to be ASTM A490 Galvanized, ASTM A 490 Bolts cannot be galvanized. Please advise what we should carry for hardware?
The connections should be ASTM A449 Type 1 galvanized.
15. In regards to the paving, seeing that it would probably be done in 2018, is there an escalator for the liquid asphalt? Maine DOT does this on all their paving bids it protects the contractor as well as the owner. If the price of the liquid goes up the owner pays the difference, if the price goes down the contractor issues a credit.
There is not an economic adjustment clause in the contract.
16. Please provide the diameter of the bolts used on the steel x bracing which connects the bracing to the steel pipe piles
The original plans for the braces indicate 1” bolts. As with all dimensions the bolt size must be field verified by the contractor.
17. Can Type III cement be used in lieu of Type II? (Type III is widely used in precast industry)
Type III is acceptable.
18. Can NPCA cert be waived if the more rigorous PCI plant certification is met? (Sec 03 42
13.00 10 Pg. 4)
The plant should be NPCA or dual NPCA / PCI certified
19. Are the 10" steel plates embedded into the concrete planks galvanized or plain steel?
The 10" steel plates should be galvanized as with all carbon steel.
5 5
20. What is the Wage rate for a Painter? (This is supplemented by question #2 as the answer to question 2 should answer this)
For bidding purposes utilize the following rate excerpted from General Decision Number:
ME170026 01/20/2017 ME26:
Rates Fringes PAINTER (Brush and Roller).......$ 25.55 13.11
21. Is this site considered an industrial site from a Wage standpoint?
Yes.
22. Is the intended surface preparation for the piles to be coated UHP WJ1 or grit blasting?
The specifications discuss both.
The intention is to use UHP water jetting to remove the coating. As these surfaces were already cleaned and recoated it is anticipated that there will be a 1-2mil surface profile that already exists and a further profile will not need to be established. However if there is not a suitable profile then further abrasive blasting may be required to establish a profile acceptable to the manufacturers standards.
END