General Decision Number: CT170024 06/30/2017 CT24

Superseded General Decision Number: CT20160024

State: Connecticut

Construction Type: Building

County: New London County in Connecticut.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 1 01/13/2017 2 02/03/2017 3 03/03/2017 4 04/14/2017 5 05/12/2017 6 06/02/2017 7 06/09/2017 8 06/30/2017

BOIL0237-001 01/01/2016

Rates Fringes

BOILERMAKER......................$ 38.34 26.01

BRCT0001-008 01/02/2017

Rates Fringes

TILE SETTER......................$ 34.90 24.69

BRCT0001-013 01/02/2017

Rates Fringes

BRICKLAYER.......................$ 33.48 30.61

PAID HOLIDAY: Employees shall receive 4 hours for Christmas

Eve holiday provided the employee works the regularly scheduled day before and after the holiday. Employers may schedule work on Christmas Eve and employees shall receive pay for actual hours worked on that day in addition to holiday pay.

BRCT0001-014 01/02/2017

Rates Fringes

CEMENT MASON/CONCRETE

FINISHER (Including Caulking)....$ 33.48 30.61

PAID HOLIDAY: Employees shall receive 4 hours for Christmas Eve holiday provided the employee works the regularly scheduled day before and after the holiday. Employers may schedule work on Christmas Eve and employees shall receive pay for actual hours worked on that day in addition to holiday pay.

BRCT0001-016 01/02/2017

Rates Fringes

TILE FINISHER....................$ 26.70 21.02

BRCT0001-021 01/02/2017

Rates Fringes

PLASTERER........................$ 33.48 30.61

CARP0024-012 05/01/2017

Rates Fringes

CARPENTER (Including Drywall Hanging, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, Metal Stud Installation, Form Work and Scaffold Building)...........$ 32.60 25.34

CARP0024-013 05/01/2017

Rates Fringes

MILLWRIGHT.......................$ 33.14 25.74

ELEC0035-010 06/01/2017

Bozrah, Colchester, Franklin, Griswold, Lebanon, Ledyard, Lisbon, Montville, North Stonington, Norwich, Preston, Salem, Sprague, Stonington and Voluntown

Rates Fringes

ELECTRICIAN (Including Low Voltage Wiring)..................$ 39.15 3%+25.17

ELEC0090-009 06/01/2017

East Lyme, Groton, New London, Old Lyme, Waterford, plus the part of Ledyard wherein the property of the Submarine Base is located

ELECTRICIAN (Including Low Voltage Wiring)..................$ 37.50 3%+26.31

ELEV0091-001 01/01/2017

Rates Fringes

ELEVATOR MECHANIC................$ 50.14 31.585+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0478-013 04/02/2017

Rates Fringes

POWER EQUIPMENT OPERATOR:

Asphalt Paver...............$ 37.26 24.05 Asphalt Roller..............$ 36.61 24.05 Backhoe/Excavator 2 cubic yards and over..............$ 38.98 24.05 Backhoe/Excavator under 2 cubic yards; Grader/Blade;

Rubber Tire Backhoe/Excavator...........$ 38.24 24.05 Bobcat/Skid Loader;

Forklift....................$ 35.78 24.05 Bulldozer (Rough Grade Dozer)......................$ 36.95 24.05 Bulldozer Fine Grade(includes slopes, shaping, laser or gps)......$ 38.24 24.05 Concrete Pump...............$ 37.26 24.05 Crane handling or erecting structural steel or stone...$ 39.30 24.05 Cranes (100 ton capacity & over).......................$ 38.98 24.05 Cranes (under 100 ton rated capacity).............$ 38.24 24.05 Earth Roller................$ 33.74 24.05 Front End Loader (3 cubic yards up to 7 cubic yards)..$ 36.95 24.05 Front End Loader (7 cubic yards or over)..............$ 39.30 24.05 Front End Loader (under 3 cubic yards)................$ 35.78 24.05 Maintenance Engineer/Oiler..$ 30.90 24.05 Mechanic....................$ 36.21 24.05 Vibratory Hammer............$ 33.74 24.05

PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday.

Crane with boom, including jib, 150 feet - $1.50 extra.

Crane with boom, including jib, 200 feet- $2.50 extra.

Crane with boom, including jib, 250 feet - $5.00 extra.

Crane with boom, including jib, 300 feet - $7.00 extra.

Crane with boom, including jib, 400 feet - $10.00 extra.

All Cranes: When crane operator is operating equipment that requires a fully licensed crane operator to operate he receives an extra $4.00 premium in addition to the hourly wage rate and benefit contributions:

1) Crane handling or erecting structural steel or stone, hoisting engineer(2 drums or over)

2) Cranes(100 ton rated capacity and over) Bauer Drill/Caisson

3) Cranes(under 100 ton rated capacity)

* IRON0015-006 06/26/2017

Rates Fringes

IRONWORKER, ORNAMENTAL,

REINFORCING AND STRUCTURAL.......$ 35.47 33.39

PAID HOLIDAY: Labor Day provided employee has been on the payroll for the 5 consecutive work days prior to Labor Day.

LABO0056-014 04/02/2017

Rates Fringes

LABORER

Common/General Laborer......$ 29.25 19.50 Mason Tender (Brick/Concrete/Cement).....$ 29.75 19.50

Plaster Tender..............$ 29.50 19.50

PAIN0011-012 06/01/2016

Rates Fringes

GLAZIER..........................$ 35.58 20.15+a

a. PAID HOLIDAYS: Labor Day and Christmas Day.

PAIN0011-019 06/01/2016

Rates Fringes

PAINTER

Brush and Roller............$ 32.02 20.15 Drywall Finishing/Taping....$ 32.77 20.15 Paperhanger.................$ 32.52 20.15 Spray.......................$ 35.02 20.15

PLUM0777-006 06/01/2017

Rates Fringes

PIPEFITTER (Including HVAC Pipe Installation)...............$ 41.62 30.36

PLUM0777-007 06/01/2017

Rates Fringes

PLUMBER (Excluding HVAC Pipe Installation)....................$ 41.62 30.36

ROOF0009-005 01/01/2017

Rates Fringes

ROOFER

Composition.................$ 34.92 19.28 Slate and Tile..............$ 35.42 19.28

SFCT0669-001 04/01/2017

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 43.92 15.84

PAID HOLIDAYS: Memorial Day, July 4th, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has been in the employment of a contractor 20 working days prior to any such paid holiday.

SHEE0040-004 07/01/2016

SHEETMETAL WORKER, Including HVAC Duct Installation...........$ 36.00 34.51

SUCT2009-008 04/15/2009

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 24.25 10.76

LABORER: Airtool Operator.......$ 17.04 6.90

LABORER: Landscape..............$ 19.97 2.70

LABORER: Fence Erector...........$ 20.16 6.13

LINE CONSTRUCTION: Groundman....$ 10.00 2.17

LINE CONSTRUCTION: Lineman......$ 22.09 6.18

OPERATOR: Asphalt Spreader......$ 25.05 8.90

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

TABLE OF CONTENTS

SECTIONS PAGES

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 0101 - PROJECT TITLE PAGE 000101-1 - 000101-1

SECTION 00 0107 - SEALS PAGE 000107-1 - 000107-1

SECTION 00 0115 - LIST OF DRAWING SHEETS 000115-1 - 000115-1

SECTION 00 2600 - PROCUREMENT SUBSTITUTION PROCEDURES 002600-1 - 002600-3

SECTION 00 3119 - EXISTING CONDITION INFORMATION 003119-1 - 003119-1

SECTION 00 4321 - ALLOWANCE FORM 004321-1 – 004321-1

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 0000 - GENERAL REQUIREMENTS 010000-1 - 010000-38

SECTION 01 2100 - ALLOWANCES 012100-1 - 012100-2

DIVISION 02 - EXISTING CONDITIONS

SECTION 02 4119 - SELECTIVE DEMOLITION 024119-1 - 024119-10

DIVISION 03 - CONCRETE

SECTION 03 3000 - CAST-IN-PLACE CONCRETE 033000-1 - 033000-40

DIVISION 04 - MASONRY

NOT APPLICABLE

DIVISION 05 - METALS

SECTION 05 1200 - STRUCTURAL STEEL FRAMING 051200-1 - 051200-15

SECTION 05 1213 - ARCHITECTURALLY EXPOSED STRUCTURAL STEEL FRAMING

051213-1 - 051213-10

SECTION 05 3100 - STEEL DECKING 053100-1 - 053100-14

SECTION 05 4000 - COLD-FORMED METAL FRAMING 054000-1 - 054000-19

SECTION 05 5000 - METAL FABRICATIONS 055000-1 - 055000-24

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

SECTION 06 1000 - ROUGH CARPENTRY 061000-1 - 061000-20

SECTION 06 2013 - EXTERIOR FINISH CARPENTRY 062013-1 - 062013-18

SECTION 06 2023 - INTERIOR FINISH CARPENTRY 062023-1 - 062023-21

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

SECTION 07 1326 - SELF-ADHERING SHEET WATERPROOFING 071326-1 - 071326-19

SECTION 07 2100 - THERMAL INSULATION 072100-1 - 072100-27

SECTION 07 2600 - VAPOR RETARDERS 072600-1 - 072600-4

SECTION 07 4113.16 - STANDING-SEAM METAL ROOF PANELS 074113.16-1 -

074113.16-24

SECTION 07 4213.13 - FORMED METAL WALL PANELS 074213.13-1 - 074213.13-28

SECTION 07 4213.23 - METAL COMPOSITE MATERIAL WALL PANELS 074213.23-1 -

074213.23-12

SECTION 07 4633 - PLASTIC SIDING 074633-1 - 074633-8

SECTION 07 6200 - SHEET METAL FLASHING AND TRIM 076200-1 - 076200-28

SECTION 07 9200 - JOINT SEALANTS 079200-1 - 079200-25

DIVISION 08 - OPENINGS

SECTION 08 4113 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113-1 -

084113-21

SECTION 08 5113 - ALUMINUM WINDOWS 085113-1 - 085113-14

DIVISION 09 - FINISHES

SECTION 09 2216 - NON-STRUCTURAL METAL FRAMING 092216-1 - 092216-9

SECTION 09 2900 - GYPSUM BOARD 092900-1 - 092900-21

SECTION 09 9123 - INTERIOR PAINTING 099123-1 - 099123-75

SECTION 09 9600 - HIGH-PERFORMANCE COATINGS 099600-1 - 099600-28

DIVISION 10 - SPECIALTIES

SECTION 10 1419 - DIMENSIONAL LETTER SIGNAGE 101419-1 - 101419-14

DIVISION 11 - EQUIPMENT

DIVISION 12 - FURNISHINGS

DIVISION 13 - SPECIAL CONSTRUCTION

DIVISION 14 - CONVEYING EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

DIVISION 22 - PLUMBING

DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

DIVISION 25 - INTEGRATED AUTOMATION

DIVISION 26 - ELECTRICAL

DIVISION 27 - COMMUNICATIONS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

DIVISION 31 - EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

DIVISION 33 - UTILITIES

DIVISION 34 - TRANSPORTATION

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

DIVISION 40 - PROCESS INTEGRATION

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT

DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND

STORAGE EQUIPMENT

DIVISION 44 - POLLUTION CONTROL EQUIPMENT

DIVISION 45 - INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT

DIVISION 46 - WATER AND WASTEWATER EQUIPMENT

DIVISION 48 - ELECTRICAL POWER GENERATION

DIVISION 99 - NARRATIVES

USCG Academy Seamanship Center Project No. 581062

Final Submission

ALLOWANCE FORM 00 4321 - 1

DOCUMENT 004321 - ALLOWANCE FORM

PART 1 -

1.1 BID INFORMATION

A. Bidder: ____________________________________________________.

B. Project Name: Repair of Entry and Windows, North Facade Seamanship Center.

C. Project Location: USCG Academy, New London, CT.

D. Owner: USCG Academy.

E. Owner Project Number: 581062.

F. Architect: Ronald Schmidt & Associates, P.A..

G. Architect Project Number: 16013.

1.2 BID FORM SUPPLEMENT

A. This form is required to be attached to the Bid Form.

B. The undersigned Bidder certifies that Base Bid submission to which this Bid

Supplement is attached includes those allowances described in the Contract Documents and scheduled in Section 01 2100 "Allowances."

1.3 SUBMISSION OF BID SUPPLEMENT

A. Respectfully submitted this ____ day of ____________, 2012.

B. Submitted By:_______________________________(Insert name of bidding firm or corporation).

C. Authorized Signature:_______________________________________(Handwritten signature).

D. Signed By:______________________________________________(Type or print name).

E. Title:___________________________________(Owner/Partner/President/Vice

President).

END OF DOCUMENT 004321

ALLOWANCES 01 2100 - 1

SECTION 01 2100 - ALLOWANCES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements governing allowances.

B. Types of allowances include the following:

1. Lump-sum allowances.

1.3 DEFINITIONS

A. Allowance is a quantity of work or dollar amount established in lieu of additional requirements, used to defer selection of actual materials and equipment to a later date when direction will be provided to Contractor. If necessary, additional requirements will be issued by Change Order.

1.4 SELECTION AND PURCHASE

A. At the earliest practical date after award of the Contract, advise Architect of the date when final selection, or purchase and delivery, of each product or system described by an allowance must be completed by the Owner to avoid delaying the Work.

B. At Architect's request, obtain proposals for each allowance for use in making final selections. Include recommendations that are relevant to performing the Work.

C. Purchase products and systems selected by Architect from the designated supplier.

1.5 LUMP-SUM ALLOWANCES

A. Allowance shall include cost to Contractor of specific products and materials ordered by Owner or selected by Architect under allowance and shall include taxes, freight, and delivery to Project site.

ALLOWANCES 01 2100 - 2

B. Unless otherwise indicated, Contractor's costs for receiving and handling at Project site, labor, installation, overhead and profit, and similar costs related to products and materials ordered by Owner or selected by Architect under allowance shall be included as part of the Contract Sum and not part of the allowance.

C. Unused Materials: Return unused materials purchased under an allowance to manufacturer or supplier for credit to Owner, after installation has been completed and accepted.

1. If requested by Architect, retain and prepare unused material for storage by

Owner. Deliver unused material to Owner's storage space as directed.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine products covered by an allowance promptly on delivery for damage or defects. Return damaged or defective products to manufacturer for replacement.

3.2 PREPARATION

A. Coordinate materials and their installation for each allowance with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related work.

3.3 SCHEDULE OF ALLOWANCES

A. Allowance No. 1: Lump Sum Allowance: Include Stud Mounted Letters (Signage) supplied, installed and applied to the facade of the new entrance enclosure, as shown on the drawings. All labor, material and equipment necessary to provide a complete installation.

1. $4,500.00

END OF SECTION 01 2100