Repair Building Envelop and HVAC at USCG Station Montauk, Montauk, NY
Solicitation number
HSCGG1-16-B-PRV047
Issued by

About this file

Amendment 0002 - RFI Question and Answer

View the file

Other files

File Type Posted
Abstract_of_Bids_HSCGG1-16-B-PRV047.pdf PDF
HSCGG1-16-B-PRV047-AMENDMENT_0001.pdf PDF
J A_Roof_Shingles_Redacted.pdf PDF
P6115585DwgB.pdf PDF
IFB_HSCGG1-16-B-PRV047.pdf PDF
P6115585Specs.pdf PDF
P6115585DwgA.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

HSCGG1-16-B-PRV047

PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

02/22/2016

4. REQUISITION/PURCHASE REQ. NO.

21-16-G16PRV047

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

Contracting Officer CEU Providence 475 Kilvert Street, Suite 100 Warwick, RI 02893

Sean E. Waldron Contract Specialist 401-736-1721

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

THIS AMENDMENT MUST BE

ACKNOWLEDGED WITH YOUR BID

9A. AMENDMENT OF SOLICITATION NO.

HSCGG1-16-B-PRV047

9B. DATED (SEE ITEM 11)

01/27/2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET

FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The solicitation referenced in block 9A above is hereby amended as follows:

1. Section I.1 CLAUSES INCORPORATED BY REFERENCE (pg. 10): Remove from IFB, clause 52.222-30 Construction Wage Rate Requirements— Price Adjustment (None or Separately Specified Method) MAY 2014.

2. Page 2 provides a response to questions submitted by interested vendors prior to the deadline established for receipt of inquires.

The bid due date remains unchanged at March 1, 2016 by 2:00 PM local time, Warwick, RI.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or Print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

DANIEL B. WALKER, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16B UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

02/22/2016

NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA

HSCGG1-16-B-PRV047

Amendment 0002 STA Montauk Building Envelop Repairs

02/22/2016

Question 1: There are no existing fixtures or boxes at 2 of the outside light locations on the South wall of the UPH building as shown on Sheet 29. Are we adding additional fixture boxes and if so must the wiring be concealed inside the building or can exposed conduit be run along the exterior?

Response 1:

Provide an outlet box into the exterior wall such that the B fixtures can be supported from the wall sheathing of the exterior wall and mounted with the fixture edges tight to the wall.

Per the “Conduit & Wiring Notes” on sheet E001: As the circuitry is drawn in an arc, and Sheet E001 indicates that circuitry shown in an arc is concealed circuitry. The circuitry and conduit is required to be concealed.

The following routing permits running certain conduits exposed inside the building, and is acceptable: Extend lighting circuit conduit for Type B fixtures up and out of 1st floor electric closet, up on corridor wall on second floor (in alcove of entry doors to bedrooms) to attic, extend across attic floor to south wall of UPH, drop conduit down (exposed and painted) in outside corner of Bedroom 204, and punch through wall to serve Type B fixture. Follow a similar path for conduit in south east corner of Bedroom 218. Provide an outlet box into the exterior wall such that the B fixtures can be supported from the wall sheathing of the exterior wall and mounted with the fixture edges tight to the wall. Support, flash and seal as required to achieve a weatherproof, watertight installation that will withstand hurricane force winds.

2016-02-22T14:15:16-0500
WALKER.DANIEL.B.1033312390
I am approving this document