DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
MAINTENANCE AND LOGISTICS COMMAND
REPAIRS TO HEATING SYSTEM
AT
SATTION BOOTHBAY HARBOR
BOOTHBAY HARBOR, MAINE 04841
(LINCOLN COUNTY)
PSN 01-P04393
PROJECT ENGINEER BRANCH CHIEF
TECHNICAL DIRECTOR
UNITED STATES COAST GUARD
CIVIL ENGINEERING UNIT PROVIDENCE
300 METRO CENTER BLVD
WARWICK, RHODE ISLAND 02886
Charles Kwasny
Repairs to Heating System at STA Boothbay Harbor 01-P04393
TABLE OF CONTENTS
PROJECT TABLE OF CONTENTS
DIVISION 01 GENERAL REQUIREMENTS
01110 SUMMARY OF WORK
01140 WORK RESTRICTIONS
01320 CONSTRUCTION SCHEDULE/SCHEDULE OF VALUES
01330 SUBMITTAL PROCEDURES
01500 TEMPORARY FACILITIES AND CONTROLS
01525 SAFETY REQUIREMENTS
01575 TEMPORARY ENVIRONMENTAL CONTROLS
01770 CLOSEOUT PROCEDURES
01781 OPERATION AND MAINTENANCE DATA
DIVISION 02 DEMOLITION
02220 DEMOLITION
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07920 JOINT SEALANTS
DIVISION 15 MECHANICAL
15050 BASIC MECHANICAL MATERIALS AND METHODS
15080 MECHANICAL INSULATION
15185 LOW TEMPERATURE WATER HEATING SYSTEM
15720 AIR HANDLING UNITS
15810 DUCTWORK AND DUCTWORK ACCESSORIES
15901 SPACE TEMPERATURE CONTROL SYSTEMS
15950 HVAC TESTING/ADJUSTING/BALANCING
DIVISION 16 ELECTRICAL
16050 BASIC ELECTRICAL MATERIALS AND METHODS
16402 INTERIOR DISTRIBUTION SYSTEM
SECTION 01110
SECTION 01110
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work includes the replacement of existing heat recovery ventilation system with a new energy recovery ventilation system. Included to the work are the energy recovery unit (ERV), ductwork, controls, and related incidentals with the removal and installation work herein. Perform a thorough cleaning, testing, adjusting, and balancing of the equipment and ductwork of the heat recovery system, including resealing any air leaks before balancing. Replace damaged insulation on existing ductwork in the mezzanine that remains after new ERV ductwork connections are completed. Provide insulation on all new ductwork. Install booster exhaust fans in the exhaust ductwork of each Bathroom connected to each ERV system.
1.1.2 Location
The work shall be located at the U.S. Coast Guard Station Boothbay Harbor, Maine.
The exact location will be shown by the Contracting Officer.
1.2 EXISTING WORK
"FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements" applies. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.4 SUPERVISION
Have at least one qualified supervisor capable of reading, writing, and conversing fluently in the English language on the job site during working hours. In addition, if a Quality Control (QC) representative is required on the contract, then that individual shall also have fluent English communication skills.
1.5 PRECONSTRUCTION CONFERENCE
After award of the contract and before any work, meet with the Contracting Officer to develop a mutual understanding of the value engineering and safety program, schedule of prices, submittals, scheduling programming, and prosecution of the work. Major subcontractors who will engage in the work shall also attend.
1.6 INSPECTION
The Contractor shall keep the Contracting Officer or duly appointed representative fully informed of contract operations and plans for inspection of work performed.
1.6.1 Contractor's Daily Log
The Contractor shall complete the USCG Daily Log form at the end of each working day and deliver it to the Government Inspector, who will attest to its accuracy.
The Daily Log form will be provided to the Contractor.
--End Of Section--
SECTION 01140
SECTION 01140
WORK RESTRICTIONS
1.1 SPECIAL SCHEDULING REQUIREMENTS
a. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
b. The Communications Center must remain in operation 24 hours per day, 7 days per week during the entire construction period. The Contractor shall cause the least possible interference with operations of the Communications Center.
c. All work in the galley and mess areas shall be performed outside regular hours.
Clean areas daily. Access to areas shall accommodate Coast Guard personnel.
d. Request permission to interrupt any utility service in writing a minimum of 7 calendar days prior to the desired date of interruption.
e. The work requires special attention to the scheduling and conduct in connection with existing Coast Guard operations. Identify work on the construction schedule which constitutes a potential interruption to operations.
1.2 CONTRACTOR ACCESS AND USE OF PREMISES
1.2.1 Activity Regulations
Ensure that Contractor personnel working on site obey Coast Guard regulations including safety, fire, traffic and security. Access is limited to the work site.
Do not enter any restricted areas without Coast Guard clearance.
1.2.2 Working Hours
Regular working hours is an 8 1/2 hour period between 7 a.m. and 5:00 p.m., Monday through Friday, excluding Government holidays. Work outside regular working hours requires 7 calendar days advance notification to the Contracting Officer and approval. Include specific dates, hours, location, work justification, special work requirements, contract number, and project title to the notification for approval.
1.2.3 Occupied and Existing Buildings
The Contractor shall be working in and around a building which is occupied. Do not enter the building without prior approval of the Contracting Officer. Upon request movable furniture items will be removed from work areas by the Government. Provide protective covers or enclosures for items that remain in the work areas.
1.3 SECURITY REQUIREMENTS
1.3.1 Parking
Parking is prohibited on any piers and dry dock/waterfront areas. Do not park on or block the marked fire lanes or crane rail traveling zones (marked in yellow) at any time. Contractor will be allowed up to eight parking spaces as available.
-- End of Section --
SECTION 01320
CONSTRUCTION SCHEDULE/SCHEDULE OF VALUES
1.1 SUBMITTALS
Submit the following in accordance with Section 01330, "Submittal Procedures."
SD-01 Preconstruction Submittals
Construction Schedule and Schedule of Values
1.2 CONSTRUCTION SCHEDULE
At the Pre-Construction Conference, submit a Construction Schedule and Schedule of Values in accordance with FAR Clause 52.236.15. The Schedule of Values shall be based on the actual breakdown of the bid price. The cost of insurance shall not be listed as a separate item but included as part of each item of work. The actual cost of bonds may be paid as the first progress payment when a receipt from the bonding company is presented to the Contracting Officer. In addition, keep the Government Inspector informed daily of the expected delivery dates for major pieces of equipment and materials.
Construction Schedule and Schedule of Values shall be incorporated into one form which clearly indicates the start and completion dates and unit value of all major work components. Construction Schedule/Schedule of Values form shall incorporate at a minimum the following activities:
a. Bonds
b. Mobilization/Demobilization
c. Pre-Construction/In-Progress Submittals
d. Work Activities
e. Final Government Inspection
f. Close-Out Submittals; i.e. Testing Balancing Reports, Warranties, Operation and Maintenance Manuals, Posted Instructions
g. As-Built Drawings
h. Factors which Constitute Potential Interruptions to Station Operations
Pre-Construction Submittals are those activities which encompass the obtaining, submission, review and approval of submittals necessary prior to the start of the related site work. Contractor shall annotate all such activities into the progress schedule with their forecasted time periods. These activity periods shall not be exclusive of the contract performance period. No site work shall commence until the respective submittals have been approved.
The value of all major work components within the project shall be identified on the Construction Schedule/Schedule of Values on a unit quantity and unit cost basis, e.g. number of squares and cost per square of roofing, number of lineal feet and cost per lineal foot of conduit, number of panels and cost per panel etc. Lump sum items shall only be paid for when 100% complete.
The Construction Schedule/Schedule of Values as approved by the Government is not a substitute for quantities conveyed by the specification and drawings and those required for a complete job. Omissions and errors on the Construction Schedule/Schedule of Values are the responsibility of the Contractor.
Payments will not be made until the schedule of prices has been submitted to and approved by the Contracting Officer.
1.3 UPDATED SCHEDULES
Update the construction schedule and equipment delivery schedule at monthly intervals or when schedule has been revised. Reflect any changes occurring since the last update. Submit copies of the purchase orders and confirmation of the delivery dates as directed.
PART 2 PRODUCTS - Not used.
PART 3 EXECUTION
3.1 PROGRESS UPDATES
3.1.1 General
A revised Construction Schedule/Schedule of Values shall be issued by the Contractor on a monthly basis. In addition, any revisions to the Construction Schedule/Schedule of Values such as modifications or delays shall be reflected by Contractor submission of an updated Construction Schedule/Schedule of Values.
3.1.2 Modifications
When a modification is issued by the Government, record the modification as the last activity of the Construction Schedule/Schedule of Values and include the value of the modification. Adjust the Schedule of Values to reflect the inclusion of the modification. Revise the Construction Schedule portion of the form to annotate the progress change. Enter all modifications in this manner in sequential order.
SECTION 01330
SUBMITTAL PROCEDURES
1.1 DEFINITIONS
1.1.1 Submittal
Shop drawings, product data, samples, and administrative submittals presented for review and approval. Contract Clauses "FAR 52.236-5, Material and Workmanship," paragraph (b) and "FAR 52.236-21, Specifications and Drawings for Construction," paragraphs (d), (e), and (f) apply to all "submittals."
1.1.2 Submittal Descriptions (SD)
SD-01 Preconstruction Submittals - Construction Progress Schedule, Submittal Register, Schedule of Values, Health, Safety, Work, Quality Control, and Environmental Protection Plans
SD-02 Shop Drawings - Drawings, diagrams and schedules to illustrate some portion of the work for integrating to the project prepared by or for the contractor.
SD-03 Product Data - Catalog data, illustrations, schedules, diagrams, performance charts, instructions and brochures describing size, appearance, and other characteristics of materials or equipment for some portion of the work.
SD-04 Samples - Physical examples of materials, equipment, or workmanship which illustrate functional, aesthetic characteristics, or standards for judging work.
SD-05 Design Data - Calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports - Reports signed by authorized official of testing laboratory that a material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)
SD-07 Certificates - Statements signed by responsible officials of a manufacturer, supplier, or the contractor attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project. The purpose is to further quality of work progression by documenting procedures, acceptability of methods or personnel qualifications.
SD-08 Manufacturer's Instructions - Instructions describe the installation or use of a product, system or material, including impedances, hazards and safety precautions.
SD-10 Operation and Maintenance Data - Data intended to be incorporated in operations and maintenance manuals.
SD-11 Closeout Submittals - Compliance documentation, as-built drawings, warranties, operating instructions, training plan are some examples.
1.1.3 Approving Authority
Person authorized to approve submittal.
1.1.4 Work
On- and off-site construction required by contract documents, including labor necessary to produce construction and materials, products, equipment, and systems.
1.2 SUBMITTALS
Submit the following in accordance with the requirements of this section.
Submittal Register
1.3 USE OF SUBMITTAL REGISTER
Prepare and maintain submittal register, as the work progresses. Do not change data in columns (c), (d), (e), and (f) as delivered by government. Submit submittal register. Verify that all submittals required for project are listed and add missing submittals. Complete the following on the register:
Column (a) Activity Number: Activity number from the project schedule.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (g) Contractor Submit Date: Date Approving Authority receives submittal.
Column (h) Contractor Approval Date: Date contractor needs submittal approval.
Column (i) Contractor Material: Date contractor has control of material.
1.4 PROCEDURES FOR SUBMITTALS
1.4.1 Reviewing, Certifying, Approving Authority
Government organization shall be responsible for reviewing and certifying that submittals are in compliance with contract requirements. Approving authority on submittals is the Project Manager employed by the Government.
1.4.2 Constraints
a. Submittals required by this contract shall conform to provisions herein.
b. Submittals shall be complete for each item and its components as a system.
c. Submittals dependent on other submittals will be returned without review.
d. Approval of a separate material, product, or component does not imply approval of assembly in which item functions.
1.4.3 Scheduling
Coordinate scheduling submittal preparation and processing so that work will not be delayed. Allow for potential of re-submissions. Allow at least 10 working days for a submittal review period beginning with receipt by Approving Authority. Period of review for each re-submittal is the same as for initial submittal.
1.4.4 Variations
Variations from contract requirements require Government approval pursuant to contract Clause entitled "FAR 52.236-21, Specifications and Drawings for Construction" and will be considered where advantageous to Government. Discussion with Contracting Officer prior to submission will help ensure functional and quality requirements are met when contemplating a variation resulting in lower cost. Consider the variation as a Value Engineering Change Proposal (VECP). Deliver written request to the Contracting Officer with documentation of the nature and features of the variation and why it is desirable and beneficial to government. If lower cost is a benefit then include an estimate of the cost saving. Include the submittals required for the variation and clearly mark all documentation.
Contractor warrants that a variation will be compatible with other elements of work. An additional review period of 5 working days will be allowed for variation submittals.
1.4.5 Contractor's Responsibilities
a. Determine and verify measurements, materials, and construction criteria; review and coordinate each submittal with work requirements in the contract documents.
b. Timely transmit submittals to Contracting Officer in accordance with schedule on approved Submittal Register preventing any work delays.
c. Advise Contracting Officer of any variation per paragraph entitled "Variations."
d. Correct disapproved submittal as directed by Approving Authority. When re-submitting corrected submittal, the contractor shall provide copy of the previously disapproved submittal, including all reviewer comments. Bring specific attention to revisions not requested by Approving Authority on previous submissions.
e. Furnish additional copies of submittal when requested by Contracting Officer.
f. Complete work based submittal in time to allow submittal to occur as scheduled.
g. Ensure no work starts until “approved” submittals for that work have been returned, unless a portion of work must be accomplished as basis of submittal.
1.4.6 Government Responsibilities
a. Note receipt date on each submittal from contractor on each Contract Item Approval Request Form.
b. Review each submittal and coordinate with contract work requirements.
c. Review submittals for compliance with project design and contract documents.
d. Ensure that material is clearly legible.
e. Perform submittal review for approval by specified schedule and only for compliance with project design and contract documents.
f. Identify returned submittals with one of the actions defined in paragraph entitled "Actions Possible" and with markings appropriate for action indicated.
1.4.7 Actions Possible
Submittals will be returned with one of the following notations:
a. Submittals marked "approved as submitted" authorize contractor to proceed with work covered.
b. Submittals marked "approved" "see below" authorize contractor to proceed with work as noted provided contractor takes no exception to the notations.
c. Submittals marked "disapproved" indicate submittal is incomplete or does not comply with design concept or requirements of the contract documents and shall be re-submitted with appropriate changes. No work shall proceed for this item until re-submittal is approved.
1.5 FORMAT OF SUBMITTALS
1.5.1 Transmittal Form
Transmit each submittal, except samples, to the Approving Authority with a transmittal form prescribed by Contracting Officer. The transmittal form shall identify contractor, indicate date of submittal, and include information prescribed by transmittal form and required in paragraph entitled "Identifying Submittals."
Process transmittal forms to record actions regarding samples.
1.5.2 Identifying Submittals
Identify submittals, except samples, with the following information permanently adhered to or noted on each separate component of each submittal and noted on transmittal form. Mark each copy of each submittal identically, with the following:
a. Project title and location.
b. Construction contract number.
c. Section number of the specification section by which submittal is required.
d. Submittal description (SD) number of each component of submittal. Use alphabetic suffix on submittal description, for example, SD-10A, to indicate re-submission.
e. Name, address, and telephone number of subcontractor, supplier, manufacturer and any other second tier contractor associated with submittal.
f. Product identification and location in project.
1.5.3 Format for Product Data
a. Present product data submittals for each section as a complete, bound volume.
Include table of contents, listing page and catalog item numbers for product data.
b. Indicate, by prominent notation, each product which is being submitted; indicate specification section number and paragraph number to which it pertains.
c. Supplement product data with material prepared for project to satisfy submittal requirements for which product data does not exist. Identify this material as developed specifically for project.
1.5.4 Format for Shop Drawings
a. Shall be at least 8 1/2 by 11 inches; yet, not exceed 30 by 42 inches.
b. Present 8 1/2 by 11 inches sized shop drawings bound and larger sizes in sets.
c. Indicate the title, number, date, revision number and date, and other information required in paragraph entitled "Identifying Submittals."
d. Provide dimensions, except on diagrams and schematics; demonstrate interface with other trades to scale. dimensions shall be the same unit of measure as indicated on the contract drawings. Identify materials and products for work shown.
1.5.5 Format of Samples
a. Furnish samples in the approximate sizes below:
(1) Sample of Equipment or Device: Full size.
(2) Sample of Materials: 8 1/2 by 11 inches and adequate to indicate color, texture, and material variations.
(3) Sample of Linear Materials: 10 inch length or supplied length. Examples of linear devices or materials are conduit and handrails.
(4) Sample of Non-Solid Materials: Pint. Examples are sand and paint.
(5) Color Selection Samples: 2 by 4 inches.
b. Samples Showing Range of Variation: Submit sets of samples of not less than three units showing extremes and middle of range.
c. When color, texture or pattern is specified by naming a particular manufacturer and style, include one sample of that manufacturer and style, for comparison.
1.5.6 Format of Administrative Submittals
a. When submittal includes a document which is to be used in project or become part of project record, other than as a submittal, do not apply contractor's approval stamp to document, but to a separate sheet accompanying document.
b. Operation and Maintenance Manual Data: Submit in accordance with Section 01781, "Operation and Maintenance Data."
1.6 QUANTITY OF SUBMITTALS
a. Submit four copies of submittals of product data and shop drawings.
b. Submit two samples, or two sets of samples showing range of variation, of each required item. One approved sample or set of samples will be retained by Approving Authority and one will be returned to contractor.
c. Submit one sample panel. Include components listed in technical section or as directed.
d. Submit one sample installation, where directed.
e. Submit one sample of non-solid materials.
1.6.4 Number of Copies of Administrative Submittals
a. Unless otherwise specified, submit administrative submittals compliance with quantity requirements specified for product data.
b. Submit administrative submittals required under "SD-10 Operation and Maintenance Manuals" to conform to Section 01781, "Operation and Maintenance Data."
Project Number:01-P04393 Project Title: Repairs to Heating System Location: Boothbay Harbor, ME
Spec
Section No.
Or
Item No.
SD No., And Type Of Submittal Material
Product
Para
Planned Submittal
Date
Date Fwd To Appr Auth /
Date Recd From Contr
To Other Reviewer
Date Recd From Oth
Action Code
Of
Mailed To
Contr / Recd From Appr Auth
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j)
SECTION
01320
SD-01, Pre-Construction Submittals
1 Construction Schedule/Schedule of Prices
1.2
SECTION
01330
SD-01, Pre-Construction Submittals
2 Submittal Register 1.3
SECTION
01500
SD-01, Pre-Construction Submittals
3 Construction Site Plan 1.3
SECTION
01525
SD-07, Certificates
4 Accident Prevention Plan (APP) 1.4
SECTION
01575
SD-01, Pre-Construction Submittals
5 Solid Waste Disposal Permit 1.4.1 SD-11, Closeout Submittals 6 Solid Waste Disposal Report 1.4.2 7 Hazardous Waste Manifest(as applicable) 3.3
SECTION
01770
SD-11, Closeout Submittals
8 Equipment/Product Warranties 1.3 9 As-built Drawings 1.2
SECTION
02220
SD-01, Pre-Construction Submittals
10 Work Plan 1.7
SECTION
15185
SD-03, Product Data
11 Valves 2.1.5 12 Water Heating Coil 2.2.1
SECTION
15720
SD-03, Product Data
Project Number:01-P04393 Project Title: Repairs to Heating System Location: Boothbay Harbor, ME
Section
Item No.
SD No., And Type Of Submittal Material
Product
Para
Planned Submittal
To Appr Auth /
Date Recd From Contr
To Other
Date Recd From Oth
Code
Of
Mailed To
Contr / Recd From Appr Auth
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) 13 Air-to-Air ERV 2.1 14 Fans 2.2 SD-10, Operation and Maintenance Data 15 Air-to-Air ERV 2.1 16 Fans 2.2
SECTION
15901
SD-03, Product Data
17 Controls 2.1 18 Sensors 2.2 19 ERV Controller 2.4 20 Remote Indicator Control Panel 2.6 SD-10, Operation and Maintenance Data 21 ERV Controller 2.4 SD-11, Closeout Submittals 22 Qualified Service Organization List 3.4
SECTION
15950
SD-06, Test Reports
23 Design Review Report 1.5.3 24 Certified TAB Report 1.5.4 SD-07, Certificates 25 Independent TAB Agency Personnel
Qualifications 1.5.1
26 Field Calibration and Testing Procedures
1.5.2
SECTION 01500
TEMPORARY FACILITIES AND CONTROLS
1.1 REFERENCES
The current edition of publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 National Electrical Code
NFPA 241 Safeguarding Construction, Alteration, and
Demolition Operations
Submit the following in accordance with Section 01330, "Submittal Procedures."
Construction Site Plan
1.3 CONSTRUCTION SITE PLAN
Prior to the start of work, submit a site plan showing the locations of temporary facilities, including layouts and details, equipment and material storage areas, access routes, safety and construction fences, site trailers, construction entrances, trash dumpsters, and worker parking areas.
1.4 TEMPORARY UTILITIES
Reasonable amounts of electric power and potable water are available to the Contractor without charge in performing the work provided that the existing systems are not overloaded. The Contractor is responsible for installing and removing connections to existing systems in accordance with local codes. The use of electricity shall be limited to tools which can be operated on 60 Hertz, single phase, 20 ampere, 120 volt circuits. Provide temporary wiring in accordance with NFPA 241 and NFPA 70, Article 305-6(b), Assured Equipment Grounding Conductor Program. Program shall include frequent inspection of all equipment and apparatus.
Under no circumstances will taps to base fire hydrants be allowed for obtaining domestic water. Telephone services will not be available for use by the Contractor.
Utility cutovers shall be after normal working hours or on Saturdays, Sundays and Government holidays.
1.5 WEATHER PROTECTION
Take necessary precautions to ensure that roof openings and other critical openings in the building are protected carefully. Immediately seal off such openings when rain or other detrimental weather, as gale force winds, is imminent and at the end of each workday. Minimize danger to persons and property. Precautions shall include, but are not limited to, closing openings; removing loose materials, tools and equipment from exposed locations; and removing or securing scaffolding and other temporary work.
1.6 STORAGE AREAS
Contractor shall be responsible for security of his/her property. The Contract Clause entitled "FAR 52.236-10, Operations and Storage Areas" applies. An open site for storage limited to available space shall be determined at the pre-construction meeting. The Contractor shall be responsible for the security of stored materials.
At the completion of the project, the storage area shall be restored to its original condition as directed and approved by the Contracting Officer. The Contractor shall be working in and around existing buildings and storage of material will not be allowed in the buildings.
1.7 STATION SANITARY FACILITIES
Station sanitary facilities shall be available for use by workers provided the premises are left clean and free from nuisance to the satisfaction of the Contracting Officer.
1.8 TEMPORARY BUILDINGS
Temporary facilities shall be in like new condition and located as directed by the Contracting Officer on the work site. Storage of material/debris under such facilities is prohibited. Suitably paint and maintain the temporary facilities.
Failure to do so will be sufficient reason to require their removal. The trailer or building shall be in good condition, free from damage rust and deterioration, and meet all applicable safety requirements. It shall be roadworthy and comply with all appropriate state and local vehicle requirements. Failure to maintain storage trailer or building to these standards shall result in the removal of non-complying units at the Contractor's expense. A sign not smaller than 24 by 24 inches shall be conspicuously placed on the trailer depicting the company name, business phone number, and emergency phone number. Trailer shall be anchored to resist high winds and must meet applicable state of local standards for anchoring mobile trailers.
PART 2 PRODUCTS: - Not Used.
3.1 TEMPORARY PHYSICAL CONTROLS
Contractor shall provide for barricading around all work areas to prevent public access. Place warning signs at the construction area perimeter designating the presence of construction hazards requiring unauthorized persons to keep out. Signs must be placed on all sides of the project, with at least one sign every 300 feet.
All points of entry shall have signs designating the construction site as a hard hat area.
SECTION 01525
SAFETY REQUIREMENTS
1.1 REFERENCES
The current edition of publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI A10.14 Construction and Demolition Operations - Requirements for Safety Belts, Harnesses, Lanyards and Lifelines for Construction and Demolition Use
CODE OF FEDERAL REGULATIONS (CFR)
29 CFR 1926.502(f) Warning Line Systems
CORPS OF ENGINEERS (COE)
COE EM-385-1-1 Safety and Health Requirements Manual
NFPA 241 Safeguarding Construction, Alteration, and Demolition Operations
SD-07 Certificates
Accident Prevention Plan (APP)
1.3 SAFETY ASSURANCE
The Safety Officer shall attend the pre-construction conference. Subsequent meetings shall address safety topics from the Contractor Quality Control daily report. New employees will be informed of specific site hazards before they begin work. Documentation of this orientation shall be kept on file at the project site.
1.4 ACCIDENT PREVENTION PLAN (APP)
Prepare and submit the APP at least 15 calendar days prior to start of work at the job site in accordance with the required and advisory provisions of COE EM-385-1-1 Table 1-1 including Appendix A, "Minimum Basic Outline for Preparation of Accident Prevention Plan," and as modified herein. Include other specific plans, programs and procedures listed on Pages A-3 and A-4 of COE EM-385-1-1. Make the APP site specific. Notice To Proceed will be given after Government approves the APP.
1.4.1 Contents of the Accident Prevention Plan.
a. Name and safety related qualifications of safety officer (including training and any certifications).
b. Qualifications of competent and qualified persons.
c. Identity of the individual who will complete exposure data (hours worked);
accident investigations, reports and logs; and immediate notification of accidents to include subcontractors.
d. Emergency response plan. Conform to COE EM-385-1-1, paragraph 1.E and include a map denoting the route to the nearest emergency care facility with emergency phone numbers. Contractor may be required to demonstrate emergency response.
e. Hazardous Material Use. Deal with hazardous materials, pursuant to the Contract Clause "FAR 52.223-3, Hazardous Material Identification and Material Safety Data."
Provide an inventory of hazardous materials used at the work site; a plan for protecting personnel and property during the transport, storage and use of the materials; emergency procedures for spill response and disposal; Material Safety Data Sheets for inventoried materials; labeling contents on all containers on-site;
and a plan for communicating health hazards to employees and occupants.
f. Alcohol and Drug Abuse Plan. Describe a plan for random checks and testing with pre-employment screening in accordance with the DFAR Clause subpart 252.223-7004, "Drug Free Work Force." And a description of the on-site prevention program
g. Fall Protection and Prevention (FP&P) Plan. The plan shall be site specific and address all fall hazards in the work place. It shall address how to protect and prevent workers from falling to lower levels when they are exposed to fall hazards above 6 feet. A qualified person shall prepare the plan. The plan shall include FP&P systems, equipment and methods employed, responsibilities, rescue and escape equipment and operations, training requirements, and monitoring methods. FP&P Plan shall be revised for lengthy projects to reflect any new work changes.
h. Demolition Plan. The safety and health aspects prepared in accordance with Section 02220, "Demolition" and referenced sources.
i. Training Records and Requirements. Mandatory training and certifications applicable to this project (e.g. fall protection, crane operation, vehicle operator, personal protective equipment); outline requirements for supervisory and employee safety meetings.
j. Severe Weather Plan. Procedures to cease on-site operations during lightning or upon reaching maximum allowed wind velocities.
PART 2 PRODUCTS - Not Used.
3.1 CONSTRUCTION
Comply with COE EM-385-1-1, NFPA 241, the APP, the activity hazard analysis and other related submittals and activity fire and safety regulations.
3.1.1 Hazardous Material Exclusions
Notwithstanding any other hazardous material used in this contract, radioactive materials or instruments capable of producing ionizing/non-ionizing radiation as well as materials which contain asbestos, mercury or polychlorinated biphenyls, di-isocynates, lead-based paint are prohibited.
3.1.2 Unidentified Hazardous Material
The design should have identified any hazardous materials. Should unidentified hazardous material be encountered during work that may be a danger to human health upon disturbance, then stop work and immediately notify the Contracting Officer.
Within 14 calendar days the Government will determine if the material is hazardous.
If material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If material is hazardous and handling is necessary to accomplish the work, then the Government will issue a modification pursuant to "FAR 52.243-4, Changes" and "FAR 52.236-2, Differing Site Conditions."
3.2 PERSONNEL PROTECTION
3.2.1 Hazardous Noise
Provide hazardous noise signs and hearing protection wherever equipment and work procedures produce sound-pressure levels greater than 85 dBA steady state or 140 dBA impulse, regardless of the duration of the exposure.
3.2.2 Fall Protection
Enforce use of the fall protection device designated for each specific work activity in the FP&P plan all times when an employee is on a surface 6 feet or more above lower levels. Personal fall arrest systems are required when working from an extendible boom, scissor lifts, swing stages, or suspended platform. Fall protection must comply with ANSI A10.14. For work within 6 feet of an edge, on low-slope roofs, personnel shall be protected from falling by use of personal fall arrest systems, guardrails, or safety nets. For greater than 6 feet warning lines shall be erected and installed in accordance with 29 CFR 1926.502(f). Safety monitoring system is not adequate fall protection and is not authorized. The roof area to be accessed shall be evaluated for its structural integrity including weight-bearing capabilities for the projected loading.
3.3 SCAFFOLDING
Scaffolding shall be used for safe access to elevated work above 6 feet. Climbing of any scaffold braces or supports not specifically designed for access is prohibited. Stair towers or ladders built into scaffold systems in accordance with USACE EM 385-1-1 Appendix J are required for work platforms greater than 20 feet in height. Contractor shall ensure that employees that are qualified perform scaffold erection. Do not use scaffold without the capability of supporting at least four times the maximum intended load or without appropriate fall protection as delineated in the accepted fall protection plan. Minimum platform size shall be based on the platform not being greater in height than three times the dimension of the smallest width dimension for rolling scaffold. Stationary scaffolds must be attached to structural building components to safeguard against tipping forward or backward. Outrigger brackets used to extend scaffold platforms for the storage of material is prohibited. The first tie-in shall be at the height equal to 4 times the width of the smallest dimension of the scaffold base.
3.4 DEBRIS CHUTES
Provide fixed debris chutes for the transport of all removed material and scrap from upper floor areas to ground level.
3.5 ELECTRICAL
Portable extension cords shall be sized in accordance with manufacturer ratings for the tool to be powered. Portable extension cords shall be provided with integral ground fault circuit interrupter (GFCI) or shall be plugged into an existing or new GFCI outlet. Pig-tail extension cords are not allowed.
SECTION 01575
TEMPORARY ENVIRONMENTAL CONTROLS
1.1 REFERENCES
The current edition of publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
CODE OF FEDERAL REGULATIONS (CFR)
29 CFR 1910.1200 Hazard Communication
40 CFR 241 Guidelines for Disposal of Solid Waste
40 CFR 243 Guidelines for the Storage and Collection of
Residential, Commercial, and Institutional Solid Waste
40 CFR 258 Subtitle D Landfill Requirements
40 CFR 261 Identification and Listing of Hazardous Waste
40 CFR 262 Generators of Hazardous Waste
40 CFR 263 Transporters of Hazardous Waste
40 CFR 264 Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities
40 CFR 265 Interim Status Standard for Owners and Operators of
Hazardous Waste Treatment, Storage, and Disposal Facilities
40 CFR 266 Management of Specific Hazardous Wastes and Specific
Types of Hazardous Waste Management Facilities
40 CFR 268 Land Disposal Restrictions
40 CFR 279 Used Oil Regulations
40 CFR 300 National Oil and Hazardous Substances Pollution
Contingency Plan
40 CFR 355 Emergency Planning and Notification
40 CFR 372-SUBPART D EPA Toxic Chemical Release Reporting Regulations
49 CFR 173 Shipment and Packaging
49 CFR 178 Packaging
1.2 DEFINITIONS
1.2.1 Sediment
Soil and debris that have eroded and been transported by runoff water or wind.
1.2.2 Solid Waste
Garbage, refuse, debris, sludge, or other discharged material (except hazardous waste or debris), including solid, liquid, semisolid, or contained gaseous materials resulting from domestic, industrial, commercial, mining, or agricultural operations. A mixture of debris and other material such as soil or sludge is also subject to regulation as debris if the mixture is comprised primarily of debris by volume, based on visual inspection.
1.2.3 Hazardous Debris
Debris that exhibits a characteristic of hazardous waste per 40 CFR 261.
1.2.4 Chemical Wastes
Salts, acids, alkalies, herbicides, pesticides, and organic chemicals.
1.2.5 Garbage
Refuse and scraps resulting from preparation, dispensing, and consumption of food.
1.2.6 Hazardous Waste
Hazardous waste as defined in 40 CFR 261 or applicable State and local regulations.
1.2.7 Oily Waste
Petroleum products and bituminous materials.
1.2.8 Regulated Waste
Those wastes that have specific Federal, state, or local controls for handling, storage, or disposal.
1.2.9 Hazardous Materials
Any hazardous material regulated in accordance with 49 CFR 173, requires a Material Safety Data Sheet (MSDS) in accordance with 29 CFR 1910.1200, or defined in accordance with 40 CFR 261.
1.3 SUBMITTALS
Solid Waste Disposal Permit
SD-11 Closeout Submittals
Solid Waste Disposal Report
Hazardous Waste Manifest (as applicable)
1.4 REPORTS
1.4.1 Solid Waste Disposal Permit
Submit one copy of a State and local permit or license.
1.4.2 Solid Waste Disposal Report
The Contractor shall submit a solid waste disposal report to the Contracting Officer at the end of the project. For each waste, state the classification (using the definitions provided in this section), amount, location, and name of the business receiving the solid waste. The Contractor shall submit a statement signed by an officer authorized to legally obligate or bind the business. The sales documentation or Contractor certification shall include the receiver's tax identification number and business, EPA or State registration number, along with the receiver's delivery and business addresses and telephone numbers. No solid waste shall be retained by the Contractor for his own use. Prices paid or received shall not be reported to the Contracting Officer.
1.5 ENVIRONMENTAL PROTECTION REQUIREMENTS
Plan for and provide environmental protective measures to control pollution and correct conditions that develop during normal construction practice. Comply with Federal, State, and local regulations pertaining to the environment, including water, air, solid waste, hazardous waste, oily substances, and noise pollution.
Attend an environmental brief to be included in the preconstruction meeting. Types, quantities, and use of wastes/wastewater that may be generated during the contract shall be provided. Minimize hazardous materials to be brought onto the activity for work purposes. All work conducted within the boundaries of this activity must meet the regulatory requirements of its generator designation. Comply with all regulatory requirements applicable to this generator status regarding training and storage, handling, and disposal of all construction derived wastes. A Government representative will be responsible to sign for generated waste.
1.5.1 Contractor Liabilities for Environmental Protection
The Contractor is advised that this project and the station are subject to Federal, State, and local regulatory agency inspections to review compliance with environmental laws and regulations. The Contractor shall fully cooperate with any representative from any regulatory agency who may visit the job site and shall provide immediate notification to the Contracting Officer, who shall accompany them on any subsequent site inspections. Complete, maintain, and make available to the Contracting Officer, station, or regulatory agency personnel all documentation relating to regulations compliance. Immediately notify the Contracting Officer if a Notice of Violation (NOV) is issued. The Contractor shall be responsible for all damages to persons or property resulting from any contractor or subcontractor fault or negligence, including the payment of any civil fines or penalties assessed by a regulatory agency for violation of any applicable Federal, State or local environmental law or regulation. Should any regulatory agency notice be issued to the Government as facility owner/operator because of such fault or negligence, the Contractor shall fully cooperate with the Government defending against any assessed regulatory liability, civil fines, or penalties.
PART 2 PRODUCTS
Not used.
3.1 PROTECTION OF NATURAL RESOURCES
Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or improved condition upon completion of work. Confine construction activities to within the limits of the work.
3.2 CONTROL AND DISPOSAL OF SOLID WASTES
Pick up solid wastes, and place in covered containers which are regularly emptied.
Do not prepare or cook food on the project site. Prevent contamination of the site or other areas when handling and disposing of wastes. At project completion, leave the areas clean. Recycling is encouraged and can be coordinated with the Contracting Officer and the activity recycling coordinator. Remove all solid waste (including non-hazardous debris) from Government property and dispose off-site at an approved landfill. Disposal off-site must comply with most stringent local, State, and Federal requirements including 40 CFR 241, 40 CFR 243, and 40 CFR 258.
3.3 CONTROL AND DISPOSAL OF HAZARDOUS WASTES (AS APPLICABLE)
The Contractor shall identify all construction activities that will generate hazardous waste, including any chemical constituents listed in 40 CFR 372-SUBPART D. Hazardous waste shall be identified, labeled, handled, stored, and disposed by the Contractor in accordance with all Federal, State, and local regulations including 40 CFR 261, 40 CFR 262, 40 CFR 263, 40 CFR 264, 40 CFR 265, 40 CFR 266, 40 CFR 268, 40 CFR 279, 40 CFR 300, 49 CFR 173 and 49 CFR 178. Hazardous waste shall also be managed in accordance with an approved Environmental Protection Plan.
Hazardous waste generated within the confines of Government facilities shall be identified as being generated by the Government. Prior to removal of any hazardous waste from Government property, submit a hazardous waste manifest that must be signed by activity personnel from the Station Environmental Office. No hazardous waste shall be brought onto Government property. For hazardous wastes spills, verbally notify the Contracting Officer immediately. Spill response shall be in accordance with 40 CFR 300 and applicable State and local regulations. The Contractor is responsible for verbal and written notifications as required by the federal 40 CFR 355, State, local regulations and Coast Guard Instructions
3.4 DUST CONTROL
Keep dust down at all times at the work site and other areas disturbed by the work.
Dry power brooming or air blowing will not be permitted. Use vacuuming, wet mopping, wet sweeping, wet power brooming, or wet cutting as applicable.
3.5 NOISE
Make the maximum use of low-noise emission products certified by the EPA. Blasting or use of explosives will not be permitted without written permission from the Contracting Officer.
3.6 CLEAN-UP
All debris in work areas shall be cleaned up daily or more frequently as necessary.
Construction debris may be temporarily located in an approved location, however garbage accumulation must be removed each day.
SECTION 01770
SECTION 01770
CLOSEOUT PROCEDURES
1.1 SUBMITTALS
SD-11 Closeout Submittals
Equipment/Product Warranties
As-built Drawings
1.2 AS-BUILT DRAWINGS
Maintain one set of full-size as-built drawings at the work site marked to show any deviations from the contract drawings. As-built drawings shall be available for review at all times. Upon completion of the work submit the as-built drawings.
Requests for partial and final payments will not be approved if the as-built drawings are not current and submitted to the Contracting Officer.
1.3 EQUIPMENT/PRODUCT WARRANTIES
Submit a bound and indexed notebook containing written warranties for all equipment/products furnished under the contract. The list shall state the specification section applicable to the equipment/product; duration, start, and ending dates of the warranty; and the point of contact for fulfillment of the warranty. The warranty period shall begin on the same date as project acceptance and shall continue for the full product warranty period. Prepare and submit the full list to the Contracting Officer prior to final acceptance of the work.
1.4 MECHANICAL TESTING AND BALANCING
All requirements of Section 15901, "Space Temperature Control Systems" and Section 15950, "HVAC Testing/Adjusting/Balancing," shall be fully completed prior to contract completion date. The time required to complete all work as prescribed by Sections 15901 and 15950 is included in the allotted calendar days for completion.
1.5 CLEANUP
Leave premises "broom clean." Clean interior and exterior surfaces affected by work to a sanitary condition. Clean filters of operating equipment. Clean debris from work site. Remove waste, surplus materials, and rubbish from the site.
SECTION 01781
OPERATION AND MAINTENANCE DATA
1.1 SUBMISSION OF OPERATION AND MAINTENANCE DATA
Submit Operation and Maintenance (O&M) Data/Manuals which are specifically applicable to this contract and a complete and concise depiction of the provided equipment or product. Organize and present information in sufficient detail to clearly explain O&M requirements at the system, equipment, component, and subassembly level. Include an index preceding each submittal. Submit in accordance with this section and Section 01330, "Submittal Procedures."
1.1.1 Quantity
Submit five sets of the supplier/manufacturers' O&M information specified herein for the components, assemblies, subassemblies, attachments, and accessories. The items for which O&M Data/Manuals are required are listed in the technical sections which specify those particular items.
1.1.2 Package Quality
Documents must be fully legible. Poor quality copies and material with hole punches obliterating the text or drawings will not be accepted.
1.1.3 Package Content
Data package content shall be as shown in the paragraph titled "Schedule of Operation and Maintenance Data Packages." For each product, system, or component piece of equipment requiring submission of O&M Data, submit the Data Package specified in the individual technical section.
1.1.4 Delivery
Submit O&M Data Manuals to the Contracting Officer for review and acceptance; submit data specified for a given item within 30 calendar days after the item is delivered to the contract site.
a. In the event the Contractor fails to deliver O&M Data/Manuals within the time limits set forth above, the Contracting Officer may withhold from progress payments 50 percent of the price of the item with which such O&M Data/Manuals are associated.
1.1.5 Changes to Submittals
Manufacturer-originated changes or revisions to submitted data shall be furnished by the Contractor if a component of an item is so affected subsequent to acceptance of the O&M Data. Changes, additions, or revisions required by the Contracting Officer for final acceptance of submitted data, shall be submitted by the Contractor within 30 calendar days of the notification of this change requirement.
1.2 TYPES OF INFORMATION REQUIRED IN O&M DATA PACKAGES
1.2.1 Operating Instructions
Include specific instructions, procedures, and illustrations for the following phases of operation:
1.2.1.1 Safety Precautions
Provide a list of personnel hazards and equipment or product safety precautions for all operating conditions.
1.2.1.2 Operator Pre-start
Include procedures required to set up and prepare each system for use.
1.2.1.3 Startup, Shutdown, and Post-shutdown Procedures
Provide narrative description for each operating procedure including control sequence for each.
1.2.1.4 Normal Operations
Provide narrative description of normal operating procedures. Include control diagrams with data to explain operation and control of systems and…
This is the start of the file's text. The full file is on GovTribe.