PFA007_AMENDMENT_0002.pdf

PDF 270 KB Posted

Attached to
REPAVE ROADS AND PARKING LOTS, USCG ACADEMY, NEW LONDON, CT PROJECT #5644683
Solicitation number
HSCGG1-15-B-PFA007
Issued by

About this file

Solicitation Amendment 0002 - Must be acknowledged

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

01/07/2015

4. REQUISITION/PURCHASE REQ.

2415G15PFA007

5. PROJECT NO. (If applicable)

5644683

6. ISSUED BY CODE 51283 7. ADMINISTERED BY (If other than Item 6) CODE 51283

Contracting Officer USCG Civil Engineering Unit Providence 475 Kilvert St., Suite 100 Warwick, RI 02886

Same as block 6

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

THIS AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR BID AND

MUST BE RECEIVED ON OR BEFORE THE DATE AND TIME SET FOR

BID OPENING

SEE BLOCK 11 BELOW.

9A. AMENDMENT OF SOLICITATION NO.

HSCGG1-15-B-PFA007

9B. DATED (SEE ITEM 11)

12/09/2014

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE 834953036 FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. (Bid opening extended)

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET

FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return _1_ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The solicitation referenced in block 9a for Repaving Roads & Parking Lots at the USCG Academy, New London, CT is hereby amended as follows:

a) Key note #21 on drawing sheet C-101-- Delete: “Mexican Red beach Pebbles from CT Stone of

Milford, CT.” Add: “Provide 1” – 2” diameter, decorative roundish stone of a variety consisting of grey, brown, blue and red earth tones (e.g. river jack stone) available in bulk.”

b) Key note #11 on drawing sheet C101— Delete: “#8 THHN wiring may be reused.” Add:

“Provide new #8 THHN wiring within the new 2” RGS conduit, between the two light poles to remain, per detail A4/C-102.”

-continued-

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or Print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Jean Bretz

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16B UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

01/07/2015

NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.243

HSCGG1-15-B-PFA007

Amendment 0002 Dated 1/06/2015

c) Solicitation Section J, List of Attachments:

Delete Wage Determination CT140002 mod 8, dated 7/11/2014 in its entirety and replace with the attached Wage Determination CT150002, mod 0, dated 1/02/2015.

d) The bid opening date is hereby extended to 20 January 2015, 2:00 pm.

e) All other terms and conditions remain unchanged.

-End-

General Decision Number: CT150002 01/02/2015 CT2 Superseded General Decision Number: CT20140002

State: Connecticut Construction Type: Highway

County: New London County in Connecticut.

HIGHWAY CONSTRUCTION PROJECTS

Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/02/2015

BRCT0001-003 12/30/2013

Rates Fringes

BRICKLAYER

BRICKLAYERS, CEMENT

MASONS, CEMENT FINISHERS,

PLASTERERS, STONE MASONS....$ 32.50 27.06

CARP0024-002 05/05/2014

Rates Fringes Carpenters:

CARPENTERS, PILEDRIVERS.....$ 31.00 22.50

DIVER TENDERS...............$ 31.00 22.50

DIVERS......................$ 39.46 22.50

MILLWRIGHTS.................$ 31.60 22.75

ELEC0035-003 06/01/2014

Rates Fringes Electricians:

Bozrah, Colchester, Franklin, Griswold, Lebanon, Ledyard, Lisbon, Montville, North Stonington, Norwich, Preston, Salem, Sprague, Stonington and Voluntown....$ 38.10 23.86

ELEC0090-003 06/01/2014

East Lyme, Groton, New London, Old Lyme, Waterford, plus the part of Ledyard wherein the property of the Submarine Base is located

Rates Fringes

ELECTRICIAN......................$ 37.05 24.37

ENGI0478-002 04/06/2014

Rates Fringes Power equipment operators:

GROUP 1....................$ 36.80 22.30

GROUP 2....................$ 36.48 22.30

GROUP 3....................$ 35.74 22.30

GROUP 4....................$ 35.35 22.30

GROUP 5....................$ 34.76 22.30

GROUP 6....................$ 34.45 22.30

GROUP 7....................$ 34.11 22.30

GROUP 8....................$ 33.71 22.30

GROUP 9....................$ 33.28 22.30

GROUP 10....................$ 31.24 22.30

GROUP 11....................$ 31.24 22.30

GROUP 12....................$ 31.18 22.30

GROUP 13....................$ 32.71 22.30

GROUP 14....................$ 30.60 22.30

GROUP 15....................$ 30.29 22.30

GROUP 16....................$ 29.46 22.30

GROUP 17....................$ 29.05 22.30

GROUP 18....................$ 28.40 22.30

Hazardous waste premium $3.00 per hour over classified rate.

Crane with 150 ft. boom (including jib): $1.50 extra.

Crane with 200 ft. boom (including jib): $2.50 extra.

Crane with 250 ft. boom (including jib): $5.00 extra.

Crane with 300 ft. boom (including jib): $7.00 extra.

Crane with 400 ft. boom (including jib); $10.00 extra.

All Cranes: When crane operator is operating equipment that requires a fully licensed crane operator to operate he receives an extra $1.00 premium in addition to the hourly wage rate and benefit contributions:

1) Crane handling or erecting structural steel or stone, hoisting engineer(2 drums or over)

2) Cranes(100 ton rated capacity and over) Bauer Drill/Caisson

3) Cranes(under 100 ton rated capacity)

a. PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday.

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Crane Handling or Erecting Structural Steel or tone; Hoisting Engineer (2 drums or over); Front End Loader (7 cubic yards or over) Work Boat 26 ft. & over.

GROUP 2: Cranes (100 ton rated capacity and over); Excavator over 2 cubic yards; Piledriver ($3.00 premium when operator controls hammer); Bauer Drill/Caisson

GROUP 3: Excavator; Cranes (under 100 ton rated capacity), Gradall; Master Mechanic; Hoisting Engineer (all types of equipment where a drum and cable are used to hoist or drag material regardless of motive power of operation), Rubber tire Excavator (Drott-1085 or similar); Grader Operator; Bulldozer Fine Grade (slopes. shaping, laser or GPS, etc.)

GROUP 4: Trenching machines; Lighter Derrick; Concrete Finishing Machine, cmi Machine or Similar; Koehring Loader Skooper).

GROUP 5: Specialty Railroad Equipment; Asphalt Spreader; Asphalt Reclaiming achine; Line Grinder; Concrete Pumps; Drills with Self Contained Power Units; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;

Milling Machine (over 24" Mandrell); Side Boom; Combination Hoe and Loader; Directional Driller.

GROUP 6: Front End Loader (3 cu. yds. up to 7 cubic yards); Bulldozer (Rough grade dozer).

GROUP 7: Asphalt Roller; Concrete Saws and Cutters (Ride on Types); Vermeer Concrete Cutter; Stump Grinder;

Scraper; Snooper; Skidder; Milling Machine (24" and Under Mandrel).

GROUP 8: Mechanic; Grease Truck Operator; Hydroblaster; Barrier Mover; Power Stone Spreader; Welder; Work Boat Under 26 ft.; Transfer Machine.

GROUP 9: Front End Loader (under 3 cubic yards); Skid Steer Loader (regardless of attachments); (Bobcat or similar); Fork Lift; Power Chipper; Landscape Equipment (including Hydroseeder).

GROUP 10: Vibratory Hammer, Ice Machine, Diesel and Air Hammer, etc.

GROUP 11: Conveyor; Earth Roller; Power Pavement Breaker (Whiphammer); Robot Demolition Equipment.

GROUP 12: Wellpoint Operator.

GROUP 13: Portable Asphalt Plant Operator; Portable Concrete Plant Operator; Portable Crusher Plant Operator.

GROUP 14: Compressor Battery Operator.

GROUP 15: Power Safety Boat; Vacuum Truck; Zim Mixer; Sweeper; (Minimum for any job requiring a CDL License)

GROUP 16: Elevator Operator; Tow Motor Operator (Solid Tire No Rough Terrain).

GROUP 17: Generator Operator; Compressor Operator; Pump Operator; Welding Machine Operator; Heater operator.

GROUP 18: Maintenance Engineer.

* IRON0015-003 06/30/2014

Rates Fringes Ironworkers: (Reinforcing & Structural)......................$ 34.47 29.74

a. PAID HOLIDAY: Labor Day provided employee has been on the payroll for the 5 consecutive work days prior to Labor Day.

LABO0056-003 04/06/2014

Rates Fringes Laborers:

GROUP 1.....................$ 27.05 17.80

GROUP 2.....................$ 27.30 17.80

GROUP 3.....................$ 27.55 17.80

GROUP 4.....................$ 28.05 17.80

GROUP 5.....................$ 28.80 17.80

GROUP 6.....................$ 29.05 17.80

GROUP 7.....................$ 16.00 17.80

LABORERS CLASSIFICATIONS

GROUP 1: Laborers (Unskilled), acetylene burner, concrete specialist

GROUP 2: Chain saw operators, fence and guard rail erectors, pneumatic tool operators and powdermen.

GROUP 3: Pipelayers, Jackhammer/Pavement breaker (handheld), mason tenders/catch basin builders, asphalt rakers, air track operators, block paver and curb setter

GROUP 4: Asbestos/lead removal

GROUP 5: Blasters

GROUP 6: Toxic waste remover

GROUP 7: Traffic control signalman

LABO0056-004 04/06/2014

Rates Fringes Laborers: (TUNNEL

CONSTRUCTION)

CLEANING, CONCRETE AND

CAULKING TUNNEL:

Concrete Workers, Form Movers and Strippers.......$ 30.37 17.80 Form Erectors..............$ 30.68 17.80

ROCK SHAFT, CONCRETE,

LINING OF SAME AND TUNNEL

IN FREE AIR:

Brakemen, Trackmen, Tunnel Laborers, Shaft Laborers...................$ 30.37 17.80 Laborers Topside, Cage Tenders, Bellman...........$ 30.26 17.80 Miners.....................$ 31.28 17.80

SHIELD DRIVE AND LINER

PLATE TUNNELS IN FREE AIR:

Brakemen and Trackmen......$ 30.37 17.80 Miners, Motormen, Mucking Machine Operators, Nozzlemen, Grout Men, Shaft and Tunnel, Steel and Rodmen, Shield and Erector, Arm Operator, Cable Tenders..............$ 31.28 17.80

TUNNELS, CAISSON AND

CYLINDER WORK IN

COMPRESSED AIR:

Blaster....................$ 37.41 17.80 Brakemen, Trackmen, Groutman, Laborers, Outside Lock Tender, Gauge Tenders..............$ 37.22 17.80 Change House Attendants, Powder Watchmen, Top on Iron Bolts.................$ 35.35 17.80 Mucking Machine Operator...$ 37.97 17.80

a. PAID HOLIDAYS: On tunnel work only: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.

No employee shall be eligible for holiday pay when he fails, without cause, to work the regular work day preceding the holiday or the regular work day following the holiday.

PAIN0011-002 06/01/2014

Rates Fringes Painters:

Blast and Spray.............$ 34.02 18.55 Brush and Roll..............$ 31.02 18.55 Tanks, Towers, Swing........$ 33.02 18.55

PAIN0011-003 06/01/2014

Rates Fringes Painters: (BRIDGE

CONSTRUCTION)

Brush, Roller, Blasting (Sand, Water, etc.) Spray...$ 45.10 18.55

TEAM0064-003 04/06/2014

Rates Fringes Truck drivers:

2 Axle Ready Mix............$ 28.43 19.14 2 Axle......................$ 28.33 19.14 3 Axle Ready Mix............$ 28.48 19.14 3 Axle......................$ 28.43 19.14 4 Axle Ready Mix............$ 28.58 19.14 4 Axle......................$ 28.53 19.14 Heavy Duty Trailer 40 tons and over....................$ 28.78 19.14 Heavy Duty Trailer up to 40 tons.....................$ 28.53 19.14 Specialized (Earth moving equipment other than conventional type on-the-road trucks and semi-trailers, including Euclids)....................$ 28.58 19.14

Hazardous waste removal work receives additional $1.25 per hour.

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day and Good Friday, provided the employee has at least 31 calendar days of service and works the last scheduled day before and the first scheduled day after the holiday, unless excused.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey.

Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the Survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates.

LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based.

The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

2015-01-07T11:14:56-0500
BRETZ.JEAN.M.1040201749

File details come from the government source that posted it. Updated .