Project 536949 Bid Specifications 10-5-09 .pdf
PDF 2 MB Posted
- Attached to
- NEW LONDON, CT - FIRE ALARM REPLACEMENT AND MASS NOTIFICATION SYSTEM, PHASE II AT USCG ACADEMY
- Solicitation number
- HSCGG1-10-B-PFA001
About this file
Specification - Fire Alarm Replacement and Mass Notification System Phase II USCG Academy New London CT
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ABSTRACT HSCGG1-10-B-PFA001.pdf | ||
| AMENDMENT A0002.pdf | ||
| Amendment A0001.pdf | ||
| CC-1117-part-3.pdf | ||
| CC-1117-part-2.pdf | ||
| CC-1117-part-4.pdf | ||
| CC-1117-part-1.pdf | ||
| IFB-10-PFA001.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE ALARM REPLACEMENT &
MASS NOTIFICATION SYSTEM
PHASE 2
Bid Submission September 14, 2009
U.S. COAST GUARD ACADEMY
NEW LONDON, CT 06320
CONSTRUCTION PROJECT
536949
GJ CARABINE
Date:
US COAST GUARD ACADEMY Project No. 536949
FIRE ALARM REPLACEMENT AND MASS NOTIFICATION SYSTEM PHASE 2
TABLE OF CONTENTS TOC - 1/2
TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS
01 01 00 SUMMARY OF WORK
01 02 00 SPECIAL CONDITIONS (OSHA & ENVIRONMENTAL PROTECTION)
01 04 00 PROJECT COORDINATION
01 04 50 CUTTING AND PATCHING
01 33 00 SUBMITTALS
01 70 00 PROJECT CLOSEOUT
01 73 20 SELECTIVE DEMOLITION
DIVISION 7
07 84 00 FIRE STOPPING
DIVISION 26 – ELECTRICAL
26 00 00 BASIC ELECTRICAL MATERIALS AND METHODS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
DIVISION 28 - SAFETY AND SECURITY
28 31 33 MASS NOTIFICATION SYSTEM, RADIO TYPE, WITH FIRE REPORTING
28 31 63 ANALOG /ADDRESSABLE INTERIOR FIRE ALARM SYSTEM
END OF TABLE OF CONTENTS
TABLE OF CONTENTS TOC - 2/2
THIS PAGE BLANK
SECTION 01 01 00 – SUMMARY OF WORK
PART 1 – GENERAL
1.1 RELATED DOCUMENTS
Drawings, terms and conditions of this contract, including the general requirements and other division specification sections, apply to this section.
1.2 PROJECT DESCRIPTION
The project consists of replacement of the Grinell Autocall building fire alarm systems in various buildings on campus to fully addressable fire alarm systems with integral mass notification. Mass notification and fire reporting will be via existing transceivers or installation of government furnished transceivers which will report to the central Mass Notification and reporting system located in each of the two Emergency Operations Centers (EOC). The central Mass notification system is a vision 21system from Signal Communications, Woburn Ma.
B. The work includes the following activities:
1. Replacement of the existing Grinell Autocall hardwired building Fire Alarm (FA) systems with fully addressable Notifier 640 or 3030 fire alarm systems integrated with a Mass Notification System (MNS). Fire alarm system interfaces to existing systems such as mechanical, fire protection, elevators and other systems.
2. Finial design and installation of complete building Mass Notification System integrated with intelligent analog/addressable fire alarm systems for all buildings listed on the system schedule. Integrated building fire alarm and mass notification shall report to the campus wide mass notification command and control System located in the emergency operations centers. The existing mass notification and command control system is a Signal Communications Vision 21. Notification is by common speakers and strobes providing voice (prerecorded or live) messages, visual strobes and text message signs to operational requirements of UFC 4-021-01 Mass Notification Systems for integrated navy systems and as modified herein.
3. Reprogramming of two Signal Communications Vision 21 mass notification and command control system with location and alarm type of every addressable device and building mass notification operation and control. Revise programming and graphical interfaces to show the replacement system layout.
SUMMARY OF WORK 01 01 00 - 1/4
4. Painting and patching of walls and ceilings due to device, conduit and system equipment removals.
1.3 WORK SEQUENCE
A. The work shall be conducted by the contractor to provide the least possible interference to the activities of the government’s personnel.
B. Existing utility systems shall not be interrupted except for scheduled outages for utility tie-ins, unless approved by the Chief, Construction and Engineering.
1.4 CONTRACTOR USE OF PREMISES
A. General: Material storage and work areas shall be as designated by the Contracting Officer’s Technical Representative (COTR).
B. Keep roadways serving the premises clear and available to the government and the government’s employees at all times. Do not use these areas for parking or storage of materials. Submit request to the Contracting Officer at least 72 hours in advance for permission to block access to roads adjacent to building for unloading and placement of building of materials.
C. Use of the Existing Buildings:
1. Toilet Rooms designated for use by the contractor’s personnel shall be specified by the COTR.
2. Occupancy: Allow for building occupancy and use by the government.
All floors of all buildings will be occupied throughout the construction period. Care shall be taken by the contractor to prevent the spread of construction dust to occupied areas of the building, as well as to maintain government access to all floors, by erecting appropriate dust containment barriers and/or temporary rigid partitions as required to adequately isolate the construction area(s).
3. Building Integrity: Maintain the building work-site in a weather-tight condition throughout the construction period. Repair damage caused by construction operations. Take all precautions necessary to protect the building and its occupants during the construction period.
D. All construction operations shall be performed between the hours of 7:30 a.m. and 4:00 p.m. local time, Monday through Friday. Submit request to the Contracting Officer at least 72 hours in advance for permission to work outside the normal working hours or on Saturdays, Sundays, or Federal holidays.
1.5 SAFETY PRECAUTIONS
SUMMARY OF WORK 01 01 00 - 2/4
A. These construction documents and the construction work hereby contemplated shall be governed at all times by applicable provisions of Federal Regulations, including, but not limited to, the current edition, with the latest amendment(s) of the following:
1. William-Steiger Occupational Safety and Health Act of 1970, Public Law 91-596; Part 1926 – Occupational Safety and Health Standards, Chapter XVII of Title 29, Code of Federal Regulations (29 CFR Part 1926).
B. The contractor shall notify the Fire Marshal via the COTR prior to the start of any construction practices which may affect or impair any fire protection system or which may present a fire hazard (i.e., sanding, welding, grinding, applying hot tar, burning and utilizing of any flame producing device).
C. Coordinate all necessary exterior signage and barriers with the Coast Guard.
Where activities warrant the need to keep base personnel away from a site for safety reasons and construction activities, all barricades, cones, etc. shall be approved by the Coast Guard. The following items are not acceptable:
1. Caution Tape
2. Orange construction fencing.
D. Heavy Weather Plan - Contractor shall be responsible for following the CGA heavy weather policies. The contractor may be asked to remove dumpsters, secure all items stored outside, and comply with base closures as deemed necessary by CG personnel.
1.6 GOVERNMENT OCCUPANCY
A. The government shall occupy the site and existing buildings during the entire construction period. The contractor shall schedule and perform the work so as not to interfere with the government’s operations and shall cooperate with the government during construction operations to minimize conflicts and facilitate government usage.
1.7 COORDINATION OF INSPECTION
A. The contractor shall contact the COTR prior to the start of any work.
1.8 CONTRACTOR PARKING AND STORAGE OF MATERIAL
A. The contractor will not be permitted to park adjacent to each building requiring work but parking will be assigned centrally located to groups of buildings. The contractor will be assigned an area on the Academy campus for a storage trailer to remain during the length of construction contract.
1.9 SITE MAINTENANCE
SUMMARY OF WORK 01 01 00 - 3/4
SUMMARY OF WORK 01 01 00 - 4/4
A. The contractor shall perform daily cleanup of work site, dumpster and storage area. All dumpsters shall have watertight covers.
PART 2 – PRODUCTS (Not applicable.)
PART 3 − EXECUTION (Not applicable.)
END OF SECTION 01 01 00
SECTION 01 02 00 - SPECIAL CONDITIONS (OSHA & ENVIRONMENTAL
PROTECTION)
PART 1 - GENERAL
1.1 SUMMARY
A. The contractor is responsible for complying with all Federal, State, and local environmental laws and requirements in the execution of this contract.
B. The contractor shall use the Contractor's Waste Management Guide to assist in the management of all regulated waste (hazardous waste and Connecticut regulated waste) generated at the Academy. This guide will be furnished at the preconstruction meeting.
1.2 HAZARDOUS WASTE OPERATIONS
A. Contractors whose employees are exposed to hazardous waste, respond to emergencies involving hazardous materials, or participate in any cleanup or investigation of a government identified uncontrolled waste site, must follow all the requirements of 29 CFR 1910.120 which includes Site Safety and Health Plans, Emergency Contingency Plans and proper employee training. The contractor, if required by 29 CFR 1910.120, shall submit to the government prior to the preconstruction meeting, the Site Safety and Health Plans, Emergency Contingency Plans and proof of adequate worker training.
1.3 HAZARDOUS MATERIALS
A. The contractor shall submit to the Chief, Construction & Engineering a copy of the contractor's OSHA-approved hazardous communication program as required by 29 CFR 1910.1200. This copy of the contractor's program shall be submitted one week prior to the preconstruction meeting.
B. The contractor shall submit to the Chief, Construction & Engineering a copy of all Material Safety Data Sheets (MSDSs) for each chemical or hazardous material to be used in the execution of this contract. The MSDSs shall be submitted one week prior to the preconstruction meeting. The government shall provide the contractor a copy of MSDSs for Academy hazardous materials that the contractor may be exposed to during the course of the project.
C. The government, upon review of the contractor's MSDSs, has the right to deny the contractor the use of chemicals or products which, in the government's judgment, pose an undue health risk, cause the generation or potential generation of hazardous waste, or result in the generation of other regulated wastes including wastewaters and air emissions.
SPECIAL CONDITIONS (OSHA & ENVIROMENTAL PROTECTION) 01 02 00 - 1/4
D. The contractor shall have proper secondary containment for storage of all liquid hazardous materials at the work site. This secondary containment shall be capable of containing 10% of the volume of all containers or 100% of the volume of the largest container whichever volume is the greater.
1.4 WASTE GENERATION
A. The contractor shall be responsible for the proper management and collection of all wastes generated. No wastes generated by the contractor shall be placed in any waste collection device located at the Academy.
B. The contractor shall provide waste collection containers for all wastes generated that include unregulated trash, regulated wastes (e.g., construction debris, unusable excavated materials, recyclable used oil), hazardous wastes, and wastewaters that cannot be discharged. The COTR shall designate to the contractor the sites for waste storage.
C. All regulated waste generated by the contractor shall be managed in accordance with all Connecticut Department of Environmental Protection (CTDEP) requirements (RSCA Title 22A, Environmental Protection). The contractor is responsible for properly collecting, managing and paying for the disposal of all regulated waste. The contractor shall submit to the government copies of all weight tickets from the disposal of regulated waste. All regulated waste shall be disposed of in permitted landfills, recycling, or treatment facilities. Procedures for the management of regulated waste will be reviewed at the preconstruction meeting.
D. All hazardous waste or potentially hazardous waste generated by the contractor shall be managed in accordance with all Resource Conservation and Recovery Act (RCRA 40 CFR 260 - 266, 268 and 270), and CTDEP requirements (RSCA 22a-449(c)-100 through 110 and 22a-449(c)-11). The contractor shall be responsible for the proper collection and management of all hazardous waste.
The contractor shall provide DOT approved shippable containers compatible for storing and for disposal of the collected contaminated material. The government will pay the cost for disposal of all hazardous waste. The contractor shall turn over custody of all hazardous waste to the government. The government reserves the option of either transferring hazardous waste to the Less-Than-90-Day- Accumulation Building at the Academy, or providing the services of a licensed hazardous waste transporter to pick-up the waste at the construction site for transport to a permitted Treatment, Storage, or Disposal Facility (TSDF). All hazardous waste will be manifested using the Academy's EPA hazardous waste generator identification number. Only the government shall sign all hazardous waste manifests and manifests for asbestos material. Procedures for the proper management of hazardous waste will be given to the contractor by the government at the preconstruction meeting.
SPECIAL CONDITIONS (OSHA & ENVIROMENTAL PROTECTION) 01 02 00 - 2/4
E. The contractor shall not discharge wastewater to any sewer, sanitary or storm, without a permit or permission from the government. The contractor shall not discharge any wastewater to any building floor, grass area, sidewalk, or street without the permission of the government. Regulated wastewater (hazardous or Connecticut-regulated waste) that is collected shall be managed according to the requirements of this section.
1.5 SPILLS AND RELEASES
A. The contractor shall be responsible for, and shall pay all costs for the cleanup and the disposal of wastes from any spills or releases of any hazardous materials (including all wastes) to the environment. All non-incidental spills and releases shall be reported immediately to the Academy's Fire and Emergency at extension 8555 (444-8555, if using a portable phone). Refer to the Contractor's Waste Management Guide for spill notification procedures.
B. If the contractor is performing a spill cleanup, the contractor shall perform the cleanup in a manner that complies with applicable federal, state, and local laws and requirements.
1.6 ABATEMENT OF AIR POLLUTION
A. The contractor shall comply with all federal, state, and local air pollution regulations, which include all CTDEP requirements of RSCA 22a-174.
B. The contractor shall not release any chlorofluorocarbons (CFCs) to the environment when executing this contract.
1. 7 BACK FLOW PREVENTORS
A. The contractor shall install back flow preventors on any connection made to public water utilities.
1.8 SARA TITLE III
A. The contractor shall report the usage of any SARA (Superfund Amendment Reauthorization Act) Title III Extremely Hazardous Substances (EHSs) (list found in Appendix A of 40 CFR 355) to the COTR at or before the preconstruction meeting.
1.9 USE OF PRIMERS AND PAINTS
A. The contractor shall not use any primers or paint that contain lead, chromium, cadmium, and barium without the written consent of the Environmental Officer.
END OF SECTION 01 02 00
SPECIAL CONDITIONS (OSHA & ENVIROMENTAL PROTECTION) 01 02 00 - 3/4
SPECIAL CONDITIONS (OSHA & ENVIROMENTAL PROTECTION) 01 02 00 - 4/4
SECTION 01 04 00 - PROJECT COORDINATION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings, terms and conditions of this contract, including the general requirements and other division specification sections, apply to this section.
1.2 SUMMARY
A. This section specifies administrative and supervisory requirements necessary for project coordination including but not necessarily limited to:
1. Coordination
2. Administrative and supervisory personnel
3. General installation provisions
4. Cleaning and protection
1.3 CONTRACTOR’S CONSTRUCTION SCHEDULE
A. Software: The contractor shall use Microsoft Project to prepare the construction schedule. The construction schedule shall be submitted within 15 days of NTP.
B. Construction Schedule Chart: Prepare a horizontal time-scaled Gantt chart progress schedule with the total project divided and subdivided into sufficient number of work activities to accurately graphically display the work schedule, sequence in which the work is to be accomplished, activity duration, and interdependence of activities. A bar shall depict the start, finish, and duration of each activity. The bar shall be shaded to indicate progress. In addition to construction activities, procurement times for critical items, including submittal turn-around, shall be shown on the schedule. The diagram shall clearly show the activities of the critical path.
1.4 COORDINATION
A. Coordination: Coordinate construction activities included under various sections of these specifications to assure efficient and orderly installation of each part of the work. Coordinate construction operations included under different sections of the specifications that are dependent upon each other for proper installation, connection, and operation.
1. Where installation of one part of the work is dependent on installation of other components, either before or after its own installation, schedule construction activities in the sequence required to obtain the best results.
PROJECT COORDINATION 01 04 00 - 1/6
2. Where availability of space is limited, coordinate installation of different components to assure maximum accessibility for required maintenance, service and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
B. Where necessary, prepare memoranda for distribution to each party involved outlining special procedures required for coordination. Include such items as required notices, reports, and attendance at meetings.
1. Prepare similar memoranda for the government and separate contractors where coordination of their work is required.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and ensure orderly progress of the work. Such administrative activities include, but are not limited to, the following
1. Preparation of schedules
2. Delivery and processing of submittals
3. Progress meetings
4. Progress close-out activities
D. Supervisory Personnel: Contractor shall be required to have a full-time superintendent on site while contractor personnel or sub-contract personnel conduct work, or to receive material deliveries. Contractor shall identify supervisory personnel on the submittals.
E. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials.
1. Refer to other sections for disposition of salvaged materials that are designated as government's property.
1.5 SUBMITTALS
A. Staff Names with Vehicle Identification: Within 5 working days of Notice to Proceed, submit a list of the contractor's principal staff assignments, including the superintendent and other key personnel in attendance at the site; identify individuals, their duties and responsibilities, vehicle identification and telephone numbers.
PROJECT COORDINATION 01 04 00 - 2/6
B. All submittals referenced in section 01 02 00 and section 01 33 00 shall be provided within 15 calendar days of issuance of NTP.
PART 2 – PRODUCTS (Not applicable.)
PART 3 – EXECUTION
3.1 GENERAL INSTALLATION PROVISIONS
A. Inspection of Conditions: Require the installer of each major component to inspect both the substrate and conditions under which work is to be performed.
Do not proceed until unsatisfactory conditions have been corrected in an acceptable manner.
B. Manufacturer's Instructions: Comply with manufacturer's installation instructions and recommendations, to the extent that those instructions and recommendations are more explicit or stringent than requirements contained in contract documents.
C. Inspect materials or equipment immediately upon delivery and again prior to installation. Reject damaged and defective items.
D. Provide attachment and connection devices and methods necessary for securing work. Secure work true to line and level. Allow for expansion and building movement.
E. Visual Effects: Provide uniform joint widths in exposed work. Arrange joints in exposed work to obtain the best visual effect. Refer questionable choices to the Contracting Officer for final decision.
F. Recheck measurements and dimensions, before starting each installation.
G. Install each component during weather conditions and project status that shall ensure the best possible results. Isolate each part of the completed construction from incompatible material as necessary to prevent deterioration.
H. Coordinate temporary enclosures with required inspections and tests to minimize the necessity of uncovering completed construction for that purpose.
I. Mounting Heights: Where mounting heights are not indicated install individual components at standard mounting heights recognized within the industry for the particular application indicated. Refer questionable mounting height decisions to the Contracting Officer for final decision.
3.2 CLEANING AND PROTECTION
PROJECT COORDINATION 01 04 00 - 3/6
A. During handling and installation, clean and protect construction in progress and adjoining materials in place. Apply protective covering where required to ensure protection from damage or deterioration at substantial completion.
B. Clean and maintain completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.
C. Limiting Exposures: Supervise construction activities to ensure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.
Where applicable, such exposures include, but are not limited to, the following:
1. Excessive static or dynamic loading
2. Excessively high or low temperatures
3. Thermal shock
4. Excessively high or low humidity
5. Air contamination or pollution
6. Water or ice
7. Light
8. Puncture
9. Abrasion
10. Heavy traffic
11. Soiling, staining and corrosion
12. Electrical current
13. Improper lubrication
14. Unusual wear or other misuse
15. Contact between incompatible materials
16. Misalignment
17. Excessive weathering
18. Unprotected storage
19. Improper shipping or handling
PROJECT COORDINATION 01 04 00 - 4/6
20. Theft
21. Vandalism
END OF SECTION 01 04 00
PROJECT COORDINATION 01 04 00 - 5/6
PROJECT COORDINATION 01 04 00 - 6/6
SECTION 01 04 50 − CUTTING AND PATCHING
PART 1 − GENERAL
1.1 RELATED DOCUMENTS
A. Drawings, terms and conditions of the contract, including general requirements and other Division 1 specification sections, apply to this section.
1.2 SUMMARY
A. This section includes administrative and procedural requirements for cutting and patching.
B. Refer to other sections for specific requirements and limitations applicable to cutting and patching individual parts of the work.
1. Requirements of this section apply to all Electrical and Safety and Security installations. Refer to Division 26 and 28 sections for other requirements and limitations applicable to cutting and patching mechanical and electrical installations.
1.3 SUBMITTALS
A. Cutting and Patching Proposal: Submit a proposal describing procedures well in advance of the time cutting and patching will be performed if the government requires approval of these procedures before proceeding. Request approval to proceed. Include the following information, as applicable, in the proposal:
1. Describe the extent of cutting and patching required. Show how it will be performed and indicate why it cannot be avoided.
2. List products to be used and firms or entities that will perform work.
3. Indicate dates when cutting and patching will be performed.
4. List utilities that cutting and patching procedures will disturb or affect.
List utilities that will be relocated and those that will be temporarily out-of-service. Indicate how long service will be disrupted.
5. Approval to proceed with cutting and patching does not waive the right to later require complete removal and replacement of unsatisfactory work.
1.4 QUALITY ASSURANCE
A. Requirements for Structural Work: Do not cut and patch structural elements in a manner that would change their load-carrying capacity or load-deflection ratio.
CUTTING AND PATCHING 01 04 50 − 1/4
B. Operational Limitations: Do not cut and patch operating elements or related components in a manner that would result in reducing their capacity to perform as intended. Do not cut and patch operating elements or related components in a manner that would result in increased maintenance or decreased operational life or safety.
C. Visual Requirements: Do not cut and patch construction exposed on the exterior or in occupied spaces in a manner that would reduce the building's aesthetic qualities. Do not cut and patch construction in a manner that would result in visual evidence of cutting and patching. Remove and replace construction cut and patched in a visually unsatisfactory manner.
PART 2 − PRODUCTS
2.1 MATERIALS, GENERAL
A. Use materials identical to existing materials. For exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible if identical materials are unavailable or cannot be used. Use materials whose installed performance will equal or surpass that of existing materials.
Use Institutional low odor/low VOC latex paint (MPI 147) for concrete, plaster or gypsum board substrates. Use high performance architectural latex paint (MPI
141) for metal surfaces. For high humidity areas use waterborne light industrial coating (MPI 153)
PART 3 − EXECUTION
3.1 INSPECTION
A. Examine surfaces to be cut and patched and conditions under which cutting and patching is to be performed before cutting. If unsafe or unsatisfactory conditions are encountered, take corrective action before proceeding.
1. Before proceeding, meet at the project site with parties involved in cutting and patching, including mechanical and electrical trades. Review areas of potential interference and conflict. Coordinate procedures and resolve potential conflicts before proceeding.
3.2 PREPARATION
A. Temporary Support: Provide temporary support of work to be cut.
B. Protection: Protect existing construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of the project that might be exposed during cutting and patching operations.
CUTTING AND PATCHING 01 04 50 − 2/4
C. Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.
D. Avoid cutting existing pipe, conduit, or ductwork serving the building but scheduled to be removed or relocated until provisions have been made to bypass them.
3.3 PERFORMANCE
A. General: Employ skilled workmen to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time and complete without delay.
1. Cut existing construction to provide for installation of other components or performance of other construction activities and the subsequent fitting and patching required to restore surfaces to their original condition.
B. Cutting: Cut existing construction using methods least likely to damage elements retained or adjoining construction. Where possible, review proposed procedures with the original installer; comply with the original installers recommendations.
1. In general, where cutting, use hand or small power tools designed for sawing or grinding, not hammering and chopping. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.
2. To avoid marring existing finished surfaces, cut or drill from the exposed or finished side into concealed surfaces.
3. Cut through concrete and masonry using a cutting machine, such as a Carborundum saw or a diamond-core drill.
4. Comply with requirements of applicable sections where cutting and patching requires excavating and backfilling.
5. Where services are required to be removed, relocated, or abandoned, bypass utility services, such as pipe or conduit, before cutting. Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal the remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after bypassing and cutting.
C. Patching: Patch with durable seams that are as invisible as possible. Comply with specified tolerances.
1. Sand, spackle, and treat minor defects to render them smooth.Where feasible, inspect and test patched areas to demonstrate integrity of the installation.
CUTTING AND PATCHING 01 04 50 − 3/4
CUTTING AND PATCHING 01 04 50 − 4/4
2. Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing. Match existing paint color and sheen.
3. Where removing walls or partitions extends one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform color and appearance. Remove existing floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance.
a. Where patching occurs in a smooth painted surface, extend final paint coat over entire unbroken surface containing the patch after the area has received primer and second coat.
4. Patch, repair, or re-hang existing ceilings as necessary to provide an even plane surface of uniform appearance.
3.4 CLEANING
A. Clean areas and spaces where cutting and patching are performed. Completely remove paint, mortar, oils, putty, and similar items. Thoroughly clean piping, conduit, and similar features before applying paint or other finishing materials.
Restore damaged pipe covering to its original condition.
END OF SECTION 01 04 50
SECTION 01 33 00 − SUBMITTALS
1.1 DESCRIPTION
A. Wherever possible throughout the contract documents the minimum acceptable quality of workmanship and materials has been defined either by manufacturers name and catalog number with the salient characteristics or by reference to recognized industry standards.
B. To ensure that the specified products are furnished and installed in accordance with design intent, procedures have been established for advance submittal of design data and for its review and approval or rejection by the Chief, Construction & Engineering. Submittals shall be submitted using government furnished Coast Guard submittal forms.
1.2 PRODUCT HANDLING
A. Make all submittals of shop drawings, samples, request for substitutions and other items, in strict accordance with the provisions of this section of these specifications.
1.3 SHOP DRAWINGS
A. Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
B. Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
C. Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
D. Make all shop drawings accurately to a scale sufficiently large to show all pertinent features of the item and its method of connection to the work.
1.4 PRODUCT DATA
A. Modify manufacturer's standard schematic drawings as necessary to provide additional information applicable to project.
B. Manufacturers catalog sheets, brochures, diagrams, schedules, performance charts, illustrations and other standard descriptive data shall be clearly marked to identify pertinent materials, products, or models.
SUBMITTALS 01 33 00 − 1/10
C. Samples of warranty language when the contract requires extended product warranties.
1.5 SAMPLES
A. Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
B. Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
C. Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
D Samples shall be of sufficient size and quantity to illustrate the functional characteristics of products or material, and a full range of color choices.
1.6 CERTIFICATE OF COMPLIANCE
A. Certificates of compliance for a material or product to be incorporated in the work shall be notarized, originate from the manufacturer, and shall include:
1. Reference to the project for which the material or product is intended
2. Where in the work the material or product is to be used
3. Reference to the paragraph with which the material or product complies
4. Must be dated after award of project contract
1.7 TEST REPORTS
A. Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)
B. Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
C. Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
1.8 MANUFACTURER’S FIELD REPORTS
SUBMITTALS 01 33 00 − 2/10
A. Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and must state the test results; and indicate whether the material, product, or system has passed or failed the test.
1. Factory test reports.
1.9 MANUFACTURER’S INSTRUCTIONS
A. Preprinted material describing installation of a product, system or material, including special notices and Material Safety Data sheets concerning impedances, hazards and safety precautions.
1.10 OPERATION AND MAINTENANCE DATA
A. Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment.
This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
B. This data is intended to be incorporated in an operations and maintenance manual or control system.
1.11 ASBUILT DRAWINGS
A. All drawings shall be to Coast Guard Academy CAD Drawing Standards B. United States Coast Guard requires delivery of CAD data to be in compliance with the National CAD Standard (NCS) published by the National Institute of Building Sciences (NIBS). The current version of the published standard can be obtained from the following web site: http://www.buildingsmartalliance.org/ncs/ U.S. Coast Guard supports the use of the National Cad Standard. The U.S. Coast Guard Academy provides the following implementation guidelines for deliverables. Guidelines will address implementing the NCS in what is considered critical areas.
1. CAD files to be provided in AutoCAD .DWG file format, version 2005.
2. File naming format: CAD files will be named and delivered using U.S. Coast Guard plan and project numbers provided by the U.S. Coast Guard Academy Facilities
Engineering Division.
SUBMITTALS 01 33 00 − 3/10
http://www.buildingsmartalliance.org/ncs/
3. Template files: Template files will be provided by the U.S. Coast Guard Academy Facilities Engineering Division and contracted delivered CAD files will use only title blocks that are included in the USCG CAD template files. Title blocks include fields with attributes. Double clicking an attribute entry in field will allow editing of that field. Cover sheet may be modified to add contractor logos and seals.
4. General text shall be set to plot at a 0.125 inch text height when plotted at contract document intended scale.
5. All text should use the standard AutoCAD provided fonts, preferably ROMANS.
6. Line-weights shall be stored in the entity or layer definition (line, point, arc etc.)
and not require the use of external files to achieve desired results. (Example AutoCAD drawings cannot use PLT or Plot style references on delivered sheet CAD files.)
7. Layer names should follow the AIA naming convention, see i.e., http://www.caddee.com/layerlist.html and as follows:
Layer Name Formatting
As recommended by the 1997 AIA CAD Layer Guidelines, layer names may be as short as six characters (discipline code + major group) or as long as sixteen characters (discipline code + major group + minor group + status). Here are the four examples of acceptable formula variations, with explanations of formula variables found below:
# 1 A-WALL = discipline code + major group
# 2 A-WALL-FULL = discipline code + major group + minor group
# 3 A-WALL-DEMO = discipline code + major group + status code
# 4 A-WALL-FULL-DEMO = discipline code + major group + minor group + status
Discipline Code:
The discipline code is a two-character field with the second character either a hyphen or a user-defined modifier. The predefined discipline codes are the same for both layer names and file names. For a complete list of discipline codes, see Naming Construction Drawings under File Name Conventions. Major Group: The major group designation is a four-character field that identifies the building system, such as doors, walls, windows, etc. Although most major groups are logically associated with specific discipline codes, it is possible to combine major group codes with any of the discipline codes. For example, AWALL or I-WALL.
Minor Group: This is an optional, four-character field for further differentiation of
SUBMITTALS 01 33 00 − 4/10
major groups. For example, partial height walls (A-WALL-PART) might be differentiated from full height walls (A-WALL-FULL). The following common modifiers defined by the AIA can also be used in the minor group field: IDEN identification tags example: A-DOOR-IDEN PATT cross hatching, poche example: A-WALL-PATT If necessary, the minor group field may also be defined by the user, allowing additional layers to be added to accommodate special project requirements. However, this should only be done after checking the Master Layer List in the 1997 AIA CAD Layer Guidelines to see if any of the predefined layer names in that list would meet the special project requirements.
Status Field: The status field is an optional four-character designator that differentiates new construction from remodeling and existing to remain. It is only needed when phases of work must be differentiated, and can be used in place of or in addition to a minor group designation, such as A-WALL-NEWW or AWALLFULL- NEWW. In either case, the status field is always the last four-characters of the layer name. Defined values for this field as defined by the AIA are as follows: NEWW new work
EXST existing to remain DEMO existing to demolish FUTR future work TEMP temporary work MOVE items to be moved RELO relocated items NICN not in contract PHS1-9 phase numbers (1-9)
8. All sheets, details and viewports should include a graphic scale.
9. All external references should be bound to drawing before delivering to U.S.
Coast Guard Academy.
10. All attached image files are to be provided with the AutoCAD drawings and named systematically; i.e., if the drawing number is CC-0102 and 2 images are used on sheet 12 of the drawing set, the image files would be named CC-0102-12- 1.jpg and CC-0102-12- 2.jpg
11. Avoid using Layer “0”, except in the creation of blocks, and “Defpoints’, which iscreated automatically with dimensions.
12. There is to be one drawing for each sheet of the drawing set.
13. On final submittal and as-built versions, PDF files are to also be provided for each sheet of the drawing set.
1.12 COLORS
A. Unless the precise color and pattern is specifically described in the contract documents, whenever a choice of color or pattern is available in a specified
SUBMITTALS 01 33 00 − 5/10
product, submit accurate color charts and pattern charts to the Chief, Construction & Engineering for his review and selection.
1.13 CONTRACTOR'S RESPONSIBILITIES
A. Review shop drawings, product data and samples prior to submission.
B. Verify field measurements, field construction criteria, catalog numbers and similar data.
C. Coordinate each submittal with requirements of work and/or contract documents.
D. Contractor's responsibility for errors and omissions in submittals is not relieved by Chief, Construction Engineering review of submittals.
E. Contractors responsibility for deviations in submittals from requirements of contract is not relieved by review of submittals unless Chief, Construction & Engineering gives written acceptance of specific deviation.
F. Begin no work that requires submittals until return of submittals with Chief, Construction & Engineering approval and initials or signature indicating review.
1.14 SUBMISSION REQUIREMENTS
A. Submit sufficient copies of shop drawings and product data which contractor requires for distribution plus four copies which will be retained by Chief, Construction and Engineering.
B. Submit number of samples listed in each of the specification sections, or as specified herein.
C. Accompany submittals with letter, in duplicate, containing date, project title and number, contractor's name and address, the number of each submittal, and notification of deviations from contract documents.
D. The submittals shall include data and revision dates, project title and number, the names of the Contracting Officer, contractor, supplier, and manufacturer, product identification to adjacent structure or materials, field dimensions, specification section number, applicable standards, identification of deviations from contract documents, and contractor’s submittal, verification of field measurements and compliance with contract documents.
1.15 RESUBMISSION REQUIREMENTS
A. Revise initial drawings as required and resubmit as specified for initial submittal.
B. Indicate on drawings any changes that have been made.
1.16 SUBMITTALS
SUBMITTALS 01 33 00 − 6/10
A. Submittals are required for the following items: (refer to individual sections for specific submittal requirements.)
SECTION ITEM
0102 00 Site Safety and Health Plans, Emergency Contingency Plans Proof of adequate worker training OSHA-approved hazardous communication program Material Safety Data Sheets (MSDSs)
01 04 00 Construction schedule Qualifications of Site Superintendent Staff Names with Vehicle Identification
01 04 50 Cutting and Patching Proposal:
01 70 00 Closeout Record Drawings:
Miscellaneous Record Submittals:
Maintenance Manuals:
01 73 20 Qualification Data Proposed Dust-Control Measures Schedule of Selective Demolition Activities Landfill Records:
07 84 00 Shop Drawings Firestopping Materials.
Certificates Firestopping Materials Installer Qualifications.
inspections
26 00 00 Shop Drawings Wiring diagrams and installation details of equipment
SUBMITTALS 01 33 00 − 7/10
26 20 00 Shop Drawings Wireways
28 31 33 Preconstruction submittals Shop Drawings (per building) System layout drawings Wiring diagrams Mounting details Product Data Emergency Power Source/Batteries Lightning Arresters For Transmitter Antennas Surge Suppression
Design data (per building) Alarm system power calculations Transmitter identity code
Test reports Tests during installation ( NFPA 72 "inspection and test form") Additional tests Final acceptance test (per building) Final Acceptance Test Intelligibility Results Certificates Fire alarm system UL or FM listing List of prior installations (per system) Qualifications of installer Manufacturer's technical representative Qualification of system technician
Closeout submittals Instruction to Operating personnel Instruction of maintenance personnel Training Video, Recording Of Class Instruction System Record Of Completion
Operation and maintenance data Radio fire alarm system
SUBMITTALS 01 33 00 − 8/10
As-Built (per building) Plan Drawings One-line Drawings Wiring Diagrams System Matrix Listing Software / Programming
28 31 63 Shop Drawings (per building) oneline diagrams Wiring diagrams point to point System layout drawings System description matrix format list of device with address decorative message sign enclosures Battery calculations
Product Data (Per system shop, O&M per building) Fire alarm control panel (FACP) Surge protection Terminal cabinets/assemblies Manual stations Batteries Battery chargers Smoke sensors Smoke sensors Duct Thermal sensors Wiring and cable Notification appliances Text Message signs and displays Addressable interface devices Amplifiers Water flow detectors Tamper switches Electromagnetic door holders Smoke sensor testing procedures
Test Reports (per building) Tests during installation ( NFPA 72 "inspection and test form")
SUBMITTALS 01 33 00 − 9/10
SUBMITTALS 01 33 00 − 10/10
Certificates Qualifications of installer
Operation and maintenance data Interior Fire alarm Data package Software / Programming
Closeout Submittals NFPA 72 System Record Of Completion As-Built (per building) Plan Drawings One-line Drawings Wiring Diagrams System Matrix Listing Instruction
Hardware Spare Parts Kits (per building) Keys (per building)
1.17 SUBMITTAL SCHEDULE
A. All submittals shall be provided to Chief, Construction Engineering within 15 calendar days of NTP. For scheduling purposes, the contractor shall assume the government review time of submittals to average three weeks.
END OF SECTION 01 33 00
SECTION 01 70 00 − PROJECT CLOSEOUT
1.1 RELATED DOCUMENTS
A. Drawings, terms & conditions of this contract, including the general requirements and other division specification sections, apply to this section.
1.2 SUMMARY
A. This section specifies administrative and procedural requirements for project close out, including but not limited to:
1. Inspection procedures
2. Project record document submittal
3. Operating and maintenance manual submittal
4. Submittal of warranties.
5. Final cleaning
B. Closeout requirements for specific construction activities are included in the appropriate sections in Division 26 and 28.
1.3 SUBSTANTIAL COMPLETION
A. Preliminary Procedures: Before requesting inspection for certification of substantial completion, complete the following. List exceptions in the request.
1. Submit specific warranties, workmanship bonds, maintenance agreements, final certifications and similar documents.
2. Submit record drawings and maintenance manuals.
3. Deliver tools unique to equipment and systems installed, spare parts, extra stock, and similar items.
4. Complete start-up testing of systems, and instructions of the government's operating and maintenance personnel. Discontinue or change over and remove temporary facilities from the site, along with construction tools, mock-ups, and similar elements.
5. Complete final clean up requirements, including touch-up painting.
Touch-up and otherwise repair and restore marred exposed finishes.
CONTRACT CLOSEOUT 01 70 00 − 1/4
B. Inspection Procedures: On receipt of a request for inspection, the COTR will either proceed with inspection or advise the contractor of unfilled requirements.
The Contracting Officer will prepare the Certificate of Substantial Completion following inspection, or advise the contractor of construction that must be completed or corrected before the certificate will be issued.
1. The COTR will repeat inspection when requested and assured that the work has been substantially completed.
2. Results of the completed inspection will form the basis of requirements for final acceptance.
1.4 FINAL ACCEPTANCE
A. Preliminary Procedures: Before requesting final inspection for certification of final acceptance, complete the following. List exceptions in the request.
1. Submit releases and supporting documentation not previously submitted and accepted. Include certificates of insurance for products and completed operations where required.
2. Submit a certified copy of the Contracting Officer's final inspection list of items to be completed or corrected, stating that each item has been completed or otherwise resolved for acceptance, and the list has been endorsed and dated by the Contracting Officer.
3. Submit consent of surety to final payment.
B. Re-inspection Procedure: The COTR will reinspect the work upon receipt of notice that the work, including inspection list items from earlier inspections, has been completed, except items whose completion has been delayed because of circumstances acceptable to the Contracting Officer.
1. Upon completion of reinspection, the Contracting officer will prepare a certificate of final acceptance, or advise the contractor of work that is incomplete or of obligations that have not been fulfilled but are required for final acceptance.
2. If necessary, reinspection will be repeated.
1.5 RECORD DOCUMENT SUBMITTALS
A. General: Do not use record documents for construction purposes; protect from deterioration and loss in a secure, fire-resistive location; provide access to record documents for the COTR's reference during normal working hours.
B. Record Drawings: Maintain a clean, undamaged set of blue- or black-line white-prints of contract drawings and shop drawings. Mark the set to show the
CONTRACT CLOSEOUT 01 70 00 − 2/4
actual installation where the installation varies substantially from the work as originally shown. Mark whichever drawing is most capable of showing conditions fully and accurately; where shop drawings are used, record a cross-reference at the corresponding location on the contract drawings.