AmendTwoWesthamptonBeach Housing.doc
DOC document 67 KB Posted
- Solicitation number
- HSCGG1-09-B-3WK122
About this file
Solicitation Amendment Two
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AmendOneWesthamptonBeach Housing.doc | DOC document | |
| WesthamptonBeachDWGS.pdf | ||
| BidBond.pdf | ||
| WageRateWesthamptonBeach.doc | DOC document | |
| WesthamptonBeachSpec.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
A0002 (TWO)
3. EFFECTIVE DATE
05/29/09
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
| 6. ISSUED BY CODE |
| 7. ADMINISTERED BY (If other than Item 6) CODE |
Contracting Officer
USCG Civil Engineering Unit Providence
Ft. Wadsworth Office
311 Battery Road
Staten Island, NY 10305
8. name and address of contractor (No., street, county, state and ZIP Code)
FORMCHECKBOX
9a. amendment of solicitation no.
IFB HSCGG1-09-B-3WK122
9b. dated (see item 11)
24 APRIL 2009
FORMCHECKBOX
10a. modification of contract/order no.
10b. dated (see item 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning one copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF
OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such
Change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
FORMCHECKBOX
A.
THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
FORMCHECKBOX
B.
THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
FORMCHECKBOX
C.
THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
FORMCHECKBOX
D.
OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return copies to the issuing office.
14. description of amendment/modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The subject solicitation for renovations to Two USCG Westhampton Beach Housing Units is hereby amended to incorporate the following responses to inquiries from potential bidders:
1. The fire rating for the door between the house and the garage shall be 45 minutes in lieu of the 20 minute rating shown.
2. Refer to Drawing Sheet #3 and be advised that removal plan key note #9 refers to the entry landing and steps to be removed which are on the left when viewed from the street for both buildings.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. name and title of signer (Type or Print) 16a. name and title of contracting officer (Type or print) JOHN O'BOYLE, Contract Specialist
15b. contractor/offeror
(Signature of person authorized to sign) 15c. date signed
16b united states of america
BY
(Signature of Contracting Officer) 16c. date signed
NSN 7540-01-152-8070
STANDARD FORM 30 (Rev. 10-83)
PREVIOUS EDITION UNUSABLE
Prescribed by GSA
FAR (48 CFR) 53.243
IFB HSCGG1-09-B-3WK122 Page 2 of 2
AMENDMENT A0002 DATED 29 MAY 2009
USCG WESTHAMPTON BEACH HOUSING RENOVATIONS
3. The hardwood floor patches shall match the existing flooring. If necessary to achieve conformance, the entire floors shall be refinished at the contractor’s expense.
4. An assessment of Asbestos Containing Material was performed in 1996. It indicated that asbestos content was found in Gypsum Wallboard Joint Compound and in Resilient Flooring Material. The assessment also indicated that lead-based paint was found on door frames, the garage wall and garage columns.
5. The Kitchen Appliances indicated in the Specifications are included in the contract and are to be supplied and installed by the Contractor except for the Garbage Disposal which is to be deleted from the project.
6. The existing tubs and enclosures are to remain.
7. The interiors of both buildings are to be entirely repainted. The wall paint selected will be a single color, consistent with unit standards. Color shall be selected by the Coast Guard after the award as part of the submittal process.
8. Refer to Specification Section 08 71 00. paragraph 3.6 and include the attached Revised Hardware Specification.
9. The contractor shall be permitted to re-use recently installed existing wiring provided that it meets the requirements of the 2007 NEC.
10. The Bid Opening Date is hereby extended to 9 JUNE 2009 at 1 PM.
Encl: (1) REVISED HARDWARE SPECIFICATION (One Sheet)
File details come from the government source that posted it. Updated .