Amend_0005_Humboldt_Bay_Dredging.pdf
PDF 275 KB Posted
- Attached to
- Maintenance Dredging at Station Humboldt Bay, CA
- Solicitation number
- HSCG88-17-B-PQQ146
About this file
Amendment # 5
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract.pdf | ||
| EFH_DredgeProgrammatic.07.14.2010.final_Appendix_3.pdf | ||
| Amend_0004_Humboldt_Bay_Dredging.pdf | ||
| Amend_0003_Humboldt_Bay_Dredging.pdf | ||
| Amend_0001_Humboldt_Bay_Dredging.pdf | ||
| Invitation_For_Bid_PQQ146.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0005 8 June 2017 21-17-887PQQ146 2496866
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
Contracting Officer
USCG CEU Oakland
1301 Clay Street 7 th
Floor, Suite 700N
Oakland, CA 94612-5203
Same as Block 6
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) 9A AMENDMENT OF SOLICITATION NO.
ALL PROSPECTIVE OFFERORS
X HSCG88-17-B-PQQ146
9B. DATE (SEE ITEM 11)
10 May 2017
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
U.S. COAST GUARD STATION HUMBOLDT BAY DREDGING PROJECT, SAMOA, CALIFORNIA
The purpose of this amendment is to provide responses to questions from prospective offerors.
1. Question: Can a barge mounted excavator with a standard excavator bucket be utilized for this project?
Answer: Yes.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
LILIAN LIBRODO
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.
Request For Proposal Number: HSCG88-16-B-PQQ146
Amendment 0005
08 June 2017
2. QUESTION: Will the floating dock adjacent to the boat house be moved prior to dredging? If not, is the contractor allowed to remove the floating dock?
Answer: The Contractor may temporarily remove the floating dock with the condition that it be properly reinstalled upon completion of dredging activities within that immediate area. Note that there are boats moored at this dock on a daily basis which will require mooring within the boathouse if the dock is removed. Once the floating dock is reinstalled, the boats will be moved from the boat house back to the floating dock. Coordination with the Station Point of Contact, Contracting Officer Representative
(COR), and Construction Manager will be required prior to removing the floating dock.
3. QUESTION: Please clarify the in-water work window. SF1442 indicates 1 August 2017 to 15 October 2017.
General Requirements- Section 010100-1.01.1 Scope of Work indicates August 1 to September 30.
ANSWER: The Coast Guard received approval from the permitting agencies to extend the in-water work window from August 1 through October 15.
4. QUESTION: Can a dragging apparatus be utilized to drag the material from underneath the boathouse out to an accessible area?
ANSWER: Yes. A drag device may be used to drag the material from underneath the boat house to an accessible area.
5. QUESTION: Is the contractor permitted to re-handle the dredge material from a storage bin on a barge into a bottom dump scow?
ANSWER: Yes. The Contractor may re-handle the material from a storage bin on a barge into a bottom dump scow.
6. QUESTION: The hydrographic survey is from October 2011. This is a lump-sum contract and the variation in quantities clause does not apply. Will the owner consider providing a more recent survey, or capping the expected quantity at 2,000 cy?
ANSWER: A more recent hydrographic survey of the dredge footprint is not available at this time. The scope of work requires the Contractor to conduct a hydrographic survey to confirm the existing conditions and quantities, which are expected at 2,000 cy. The environmental permits do not allow dredging in excess of 2,000 cy for this episode. Therefore, the project is capped at 2,000 cy.
7. QUESTION: Is any 3rd party water quality monitoring required?
ANSWER: The environmental permits may require light monitoring. However, the monitoring is not required to be completed by a 3 rd party. The Corps permit and NMFS
Letter of Concurrence require installation of a silt/turbidity curtain to protect the eelgrass beds adjacent to the project footprint. If a silt curtain cannot be deployed, light monitoring shall be conducted per the Corps
San Francisco District and NMFS’ Programmatic Consultation (Corps 2009; Revised 2010). The
Contractor shall follow the light monitoring protocol found in Appendix 3 of the Programmatic
Consultation, enclosed. The objective of the light monitoring is to determine increased light attenuation associated with project activities by measuring the photo synthetically active radiation
(PAR) during daylight activities. Measurements at regular intervals can be accomplished via automated equipment.
Army Corps of Engineers
National Marine Fisheries Service
Request For Proposal Number: HSCG88-16-B-PQQ146
Amendment 0005
08 June 2017
8. QUESTION: The specs and drawings indicate a dredging depth in the entrance of the basin of -10’. The permits indicate the basin is authorized to -8’ +2’ overdepth. Can the owner please clarify the dredging depths, including overdepth for the project? If the entrance is expected to be dredge to the -10’ this will result in permit violations.
ANSWER: The permits allow maximum depth of -10ft. within the boat basin. The scope of work includes dredging to a minimum depth of -8 ft. plus 2 ft. over depth below the boathouse and berthing area, and up to -10ft. in the area between the boathouse and channel, as to create a slight sedimentation basin.
9. QUESTION: Will the owner change the bid schedule to include a unit price for dredging on a cubic yard basis? Additionally, will the owner provide a more recent hydrographic survey?
ANSWER: A more recent hydrographic survey of the dredge footprint is not available at this time. The scope of work requires the Contractor to conduct a hydrographic survey to confirm the existing conditions and quantities, which are expected at 2,000 cy. The bid schedule will remain a lump- sum.