Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
HSCG8716QPJT617
USCG CEU JUNEAU
PO BOX 25517
JUNEAU, AK 99801
Construction Services to Replace Fire Panels at USCG Homer Housing in accordance with attached Scope of Work (SOW) and Drawings.
TOTAL SMALL BUSINESS SET-ASIDE.
The order of magnitude for this requirement is less than $25,000.
Quote Submission Deadline: 1300 (1:00PM) PACIFIC on September 15, 2016.
All quotes submitted after this time are LATE and may NOT be considered.
ALL QUOTES MUST BE SUBMITTED VIA EMAIL: venita.e.orcutt@uscg.mil Quotes submitted via any other method will NOT be considered.
Questions shall be submitted by email to venita.e.orcutt@uscg.mil no later than September 12, 2016. All questions must be submitted by email. Questions will not be answered via phone.
All questions and answers will be posted on FBO.
VeNita Orcutt 907-463-2423
1 309/07/2016
10 20
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
USCG CEU Juneau P.O. Box 25517 Juneau, AK 99802
R. Nicole Butts
PROJECT #8413831 01010 - 1 SUMMARY OF WORK
HOMER HOUSING FIRE PANEL
REPLACEMENT PROJECT
SUMMARY OF WORK
PSN# 8413831
PART 1 - GENERAL
1.1 PROJECT INTENT: Replace 8 EST Firesheild control panels that were damaged during a recent power surge. Provide and install surge suppressors and batteries for each affected panel. These Fire panels are located in the garages of units 1A, 1D, 2A, 2D, 4A, 4D, 5A and 5B of the U. S. Coast Guard housing complex at 4105 White Alder Court, Homer, Alaska.
The units are currently occupied and the garages will still have personal property in them while the work is underway. The contractor shall coordinate work schedule with USCG CEU Juneau prior to any construction work. The Contractor shall complete all work within 20 calendar days from the notice to proceed. All work shall be performed during normal CG work days between the hours of 0830 to 1600, no Federal Holidays. Coordinate with CEU Juneau for any proposed alternate work times for approval if needed.
1.2 SUMMARY OF WORK: The Contractor shall provide all equipment, materials, labor, supervision, transportation, and other related items for work indicated on the drawings, specified in the specifications, and required for a complete and functional installation. The contractor shall also protect all furnishings, appliances, personal property, etc. from damage during demolition or new work. THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ACTUAL DIMENSIONS AND SITE CONDITIONS.
A. Panels: Provide and install eight (8) EST Fireshield panels.
B. Surge Suppressors: Provide and install eight (8) surge suppressors.
C. Batteries: Provide and install sixteen (16) panel batteries.
D. Test: Test and certify each panel once the installation is complete.
1.3 SITE VISIT
To schedule a site visit, contact the housing maintenance Petty Officer DC1 Aleksander Kay at 907-235-2637
PROJECT #8413831 01010 - 2 SUMMARY OF WORK
PART 2 – DRAWINGS:
PROJECT #8413831 01010 - 3 SUMMARY OF WORK
Building 5
PROJECT #8413831 01010 - 4 SUMMARY OF WORK
PICTURES:
Existing Panel
PROJECT #8413831 01010 - 5 SUMMARY OF WORK
Existing Panel
***END OF SECTION***
HSCG87-16-Q-PJT617
SECTION D - PACKAGING AND MARKING
D.1 PACKAGING AND MARKING
All shipments of materials, equipment and/or supplies by the Contractor to the project shall be addressed to the Contractor and not the U.S. Coast Guard. Preservation, packaging and packing shall be in accordance with standard practices for commercial packaging.
SECTION E - INSPECTION AND ACCEPTANCE CONSTRUCTION
E.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these addresses: http://www.arnet.gov/far/
THE FOLLOWING FEDERAL ACQUISITION REGULATION CLAUSES ARE HEREBY INCORPORATED:
CLAUSE NO. TITLE:
FAR 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
E.2 U.S. COAST GUARD INSPECTION/ACCEPTANCE
Coast Guard inspection and acceptance under this contract will be accomplished by the Contracting Officer's Representative designated in writing by the Contracting Officer.
SECTION F - DELIVERIES/PERFORMANCE
F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these addresses: http://www.arnet.gov/far/
FAR 52.242-14 Suspension of Work (APR 1984)
SECTION F - DELIVERIES/PERFORMANCE
For required period of performance please see the SF1442 cover sheet.
THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 CONTRACT ADMINISTRATION
a. Contracting Officer means a person with the authority to enter into, administer and/or terminate contracts and make related determinations and findings. The Contracting Officer signs all contractual documents, approves and signs all modifications to contracts, processes and approves payment requests, reviews and makes final decisions on contractual discrepancies, and administers the contract. The Contracting Officer is the only individual authorized to make changes to a contract.
b. The Contract Administrator for this procurement action is: R. Nicole Butts, U.S. Coast Guard
c. The Contracting Officers for this procurement action are:
R. Nicole Butts, U.S. Coast Guard
d. All correspondence including modification proposals, extension requests, and contract submittals shall be submitted to the contracting officer via email. The address is as follows: rinalda.n.butts@uscg.mil
Office Hours: 8:00 A.M. to 4:00 P.M. Pacific Standard Time Monday thru Friday (Except Federal Holidays)
NOTE: Include Contract Number on all correspondence.
i. The Contracting Officer's Representative (COR) will be designated at time of award. The specific duties, authority and responsibility of the COR will be furnished to the Contractor after award in accordance with contract clause HSAR 3052.242-72 in Section I.
SECTION G - CONTRACT ADMINISTRATION DATA
G.2 INVOICES
a. Invoices shall be prepared and submitted in accordance with the provisions of FAR Clauses 52.232-5, Payments Under Fixed-Price Construction Contracts (MAY 2014) and FAR 52.232-27, Prompt Payment for Construction Contracts (MAY 2014).
b. Invoices shall be submitted for payment to the U.S. Coast Guard Finance Center website below:
http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm
Electronic submission of invoices is MANDATORY for this contract and/or any orders issued in accordance with this contract.
Contractor must also submit a copy of the invoice and any supporting documentation according to detailed invoicing instructions (supplied at time of award), as well as what is listed below.
Each invoice shall contain the following information:
(1) Contract or Delivery/Task Order Number
(2) Name of the Contracting Officer
(3) Invoice Routing Code (IRC): CEU-JUN
(4) DUNS number
(5) Invoice number
(6) Invoice date
(7) Phone number and email contact for inquiries or issues
(8) Company information (identical to information in SAMS)
(4) Annotate on the invoice indicating that the contractor represents a small business for accelerated payment purposes.
The Coast Guard (IRC) for this contract and all delivery/task orders is: CEU Juneau (CEU-JUN)
Each invoice must be submitted to the designated billing office via one of the following modes, listed in descending order of preference:
(1) FINCEN Website invoice receipt form:
http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm
(2) Fax: (757-523-6900)
(3) Mailed to: Commercial Invoices U.S. Coast Guard Finance Center 1430A Kristina Way Chesapeake, VA 23326
To facilitate processing, all proper invoices with supporting information which are submitted electronically, using the FINCEN web based invoice submission capability, must be submitted as a single Adobe .pdf formatted file.
A courtesy copy of the invoice with supporting documentation shall also be e-mailed to the Contracting Officer (and COR) at the addresse(s) cited below:
(1) Rinalda.N.Butts@uscg.mil Contract Officer
(2) Aleksander.Z.Kay@uscg.mil COR
In accordance with the Prompt Payment Act, for the purposes of determining a payment due date and the date on which interest will begin to accrue if a payment is late, a proper invoice shall be deemed to have been received:
(1) On the later of:
(i) For invoices that are mailed or transmitted via facsimile, the date a proper invoice is actually received by the designated billing office and annotates the invoice with date of receipt at the time of receipt.
(ii) For invoices electronically transmitted by the contractor via web based submission, the date a transmission is received by the designated billing office, and receipt confirmation is provided to the designated recipient; or
(iii) The seventh day after the date on which the property is actually delivered or performance of the services is actually completed; unless—
a) The agency has actually accepted the property or services before the seventh day in which case the acceptance date shall substitute for the seventh day after the delivery date; or
b) A longer acceptance period is specified in the contract, in which case the date of actual acceptance or the date on which such longer acceptance period ends shall substitute for the seventh day after the delivery date;
(2) On the date placed on the invoice by the contractor, when the agency fails to annotate the invoice with date of receipt of the invoice at the time of receipt (such invoice must be determined to be a proper invoice); or
(3) On the date of delivery, when the contract specifies that the delivery ticket may serve as an invoice.
(4) Web based submission by the contractor and receipt confirmation does not reflect Government review or acceptance of the invoice.
(5) Payment inquiries and status may be obtained - at the following website: -https://www.fincen.uscg.mil/secure/payment.htm.
c. The contractor may invoice monthly for progress payments as the work proceeds. All invoices for progress payments shall be accompanied by a Contractor Certification as identified in FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, paragraph (c) and the information required by paragraph (b)(1)(i)-(v).
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 INFORMATION CONCERNING SAFETY AND ENVIRONMENTAL
All contract work shall be performed in accordance with all applicable federal, state, and local safety and environmental laws and regulations.
SECTION I - CONTRACT CLAUSES
I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these addresses:
1. http://www.arnet.gov/far/
2. https://dhsonline.dhs.gov/portal/jhtml/dc/sfi.jhtml?doid=5855
FAR 52.204-7 Systems for Award Management (JUL 2013)
FAR 52.203-5 Covenant Against Contingent Fees (May 2014)
FAR 52.203-7 Anti-Kickback Procedures (May 2014)
FAR 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights (Apr 2014)
FAR 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014)
FAR 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment (AUG 2013)
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984), Alternate I (Apr 1984)
FAR 52.215-8 Order of Precedence – Uniform Contract Format (OCT 1997)
FAR 52.215-22 Limitations on Pass-Through Charges—Identification of Subcontract Effort (Oct 2009)
FAR 52.215-23 Limitations on Pass-Through Charges (Oct 2009), Alternate I (OCT 2009)
FAR 52.219-6 Notice of Total Small Business Set-Aside (Nov 2011)
FAR 52.222-3 Convict Labor (JUN 2003)
FAR 52.222-6
FAR 52.222-7
Construction Wage Rate Requirements (MAY 2014)
Withholding of Funds (MAY 2014)
FAR 52.222-8
FAR 52.222-9
FAR 52.222-10
FAR 52.222-11
Payrolls and Basic Records (MAY 2014)
Apprentices and Trainees (JUL 2005)
Compliance with Copeland Act Requirements (FEB 1988)
Subcontracts (Labor Standards) (MAY 2014)
FAR 52.222-12
FAR 52.222-13
Contract Termination-Debarment (MAY 2014)
Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014)
FAR 52.222-14
FAR 52.222-15
FAR 52.222-26
Disputes Concerning Labor Standards (FEB 1988)
Certification of Eligibility (MAY 2014)
Equal Opportunity (APR 2015)
FAR 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015)
FAR 52.222-35
FAR 52.222-36
Equal Opportunity for Veterans (JUL 2014)
Affirmative Action for Workers With Disabilities (JUL 2014)
FAR 52.222-37
FAR 52.222-50
Employment Reports On Veterans (JUL 2014)
Combating Trafficking in Persons (MAR 2015)
FAR 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013)
FAR 52.223-5
FAR 52.223-18
Pollution Prevention and Right-to-Know Information (MAY 2011) Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011)
FAR 52.225-9 Buy American - Construction Material (MAY 2014)
Note: If the quoter intends to provide foreign made materials, this clause must be completed and submitted with the quote. For the full text of the clause, please contact the Contracting Officer identified in Paragraph G.1 b. or access the full text at the following electronic address: http://www.arnet.gov/far/
FAR 52.225-13
FAR 52.226-1
FAR 52.227-1
FAR 52.227-4
FAR 52.228-2
FAR 52.228-11
FAR 52.228-12
FAR 52.228-13
FAR 52.228-14
FAR 52.232-5
FAR 52.232-8
FAR 52.232-23
FAR 52.232-27
FAR 52.232-33
FAR 52.232
FAR 52.233-1
FAR 52.233-3
FAR 52.233-4
FAR 52.236-2
FAR 52.236-3
FAR 52.236-5
FAR 52.236-6
FAR 52.236-7
FAR 52.236-8
FAR 52.236-9
FAR 52.236-11
FAR 52.236-12
FAR 52.236-13
FAR 52.236-14
FAR 52.236-15
Restrictions on Certain Foreign Purchases (JUN 2008)
Utilization of Indian Organizations and Indian-Owned Economic Enterprises (JUN 2000)
Authorization and Consent (DEC 2007)
Patent Indemnity – Construction Contracts (DEC 2007)
Additional Bond Security (OCT 1997)
Pledges of Assets (JAN 2012)
Prospective Subcontractor Requests for Bonds (MAY 2014)
Alternative Payment Protections (JUL 2000)
Irrevocable Letter of Credit (NOV 2014)
Payments Under Fixed-Price Construction Contracts (MAY 2014)
Discounts for Prompt Payment (FEB 2002)
Assignment of Claims (MAY 2014)
Prompt Payment for Construction Contracts (MAY 2014)
Payment by Electronic Funds Transfer – System for Award Management (JUL 2013)
Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)
Disputes (MAY 2014)
Protest After Award (AUG 1996)
Applicable Law for Breach of Contract Claim (OCT 2004)
Differing Site Conditions (APR 1984)
Site Investigation and Condition Affecting the Work (APR 1984)
Material and Workmanship (APR 1984)
Superintendence by the Contractor (APR 1984)
Permits and Responsibilities (NOV 1991)
Other Contracts (APR 1984)
Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)
Use and Possession Prior to Completion (APR 1984)
Cleaning Up (APR 1984)
Accident Prevention (NOV 1991)
Availability and Use of Utility Services (APR 1984)
Schedules for Construction Contracting (APR 1984)
FAR 52.236-17 Layout of Work (APR 1984)
FAR 52.236-21 Specifications & Drawings For Construction (FEB 1997)
FAR 52.236-21 Specifications & Drawings For Construction, Alternate II (APR 1984)
Upon completing the work under this contract, the Contractor shall furnish 2 sets of prints of all shop drawings as finally approved. These drawings shall show changes and revisions made up to the time the equipment is completed and accepted.
FAR 52.236-26
FAR 52.236-28
FAR 52.243-5
FAR 52.244-6
FAR 52.246-21
FAR 52.249-1
FAR 52.249-10
Preconstruction Conference (FEB 1995)
Preparation of Proposals – Construction (Oct 1997)
Changes and Changed Conditions (APR 1984)
Subcontracts for Commercial Items (APR 2015)
Warranty of Construction (MAR 1994), Alternate I (APR 1984)
Termination for Convenience of the Government (Fixed-Price) (Short Form) (APR 1984)
Default (Fixed-Price Construction) (APR 1984)
THE FOLLOWING DEPARTMENT OF HOMELAND SECURITY ACQUISITION REGULATION CLAUSES
ARE HEREBY INCORPORATED
CLAUSE NO:
3052.209-70
3052.222-70
3052.222-90
3052.223-70
3052.223-90
3052.228-70
3052.242-71
3052.242-72
TITLE:
Prohibition on Contracts with Corporate Expatriates (JUN 2006)
Strikes or Picketing Affecting Timely Completion of the Contract Work (DEC 2003)
Local Hire (JUN 2006)
Removal or Disposal of Hazardous Substances–Applicable Licenses and Permits (JUN 2006)
Accident and Fire Reporting (DEC 2003)
Insurance (DEC 2003)
Dissemination of Contract Information (DEC 2003)
Contracting Officers Technical Representative (DEC 2003)
SECTION I - CONTRACT CLAUSES
I.2 52.233-2 Service of Protest (Sep 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from the USCG Ombudsman via OPAP@uscg.mil and the Contracting Officer or by had delivery to the Contracting Officer. The Ombudsman Hotline telephone number is 202.372.3695.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the
GAO.
I.3 52.236-27 Site Visit (Construction) (Feb 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: ________________________________________
Address:_______________________________________
Telephone:_____________________________________
I.4 52.244-6 Subcontracts for Commercial Items (MAR 2015)
(a) Definitions. As used in this clause---
"Commercial item," as used in this clause, has the meaning contained in the clause at 52.202-1, Definitions.
"Subcontract," includes a transfer of commercial items between divisions, subsidiaries, or affiliates of the Contractor or subcontractor at any tier.
(b) To the maximum extent practicable, the Contractor shall incorporate, and require its subcontractors at all tiers to incorporate, commercial items or nondevelopmental items as components of items to be supplied under this contract.
(c) (1) The Contractor shall insert the following clauses in subcontracts for commercial items.
(i) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and
(3), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $500,000 ($1,000,000 for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(ii) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246);
(iii) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam
Era, and Other Eligible Veterans (JUL 2014) (38 U.S.C. 4212(a);
(iv) 52.222-36, Affirmative Action for Workers with Disabilities (JUL 2014) (29 U.S.C.
793); and
(v) 52.247-64, Preference for Privately Owned U.S.-Flagged Commercial Vessels (FEB
2006) (46 U.S.C. 1241) (flow down not required for subcontracts awarded beginning May 1, 1996).
(2) While not required, the Contractor may flow down to subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(d) The Contractor shall include the terms of this clause, including this paragraph (d), in subcontracts awarded under this contract.
I.5 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/
(End of Provision)
I.5 52.252-2 Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/
(End of Clause)
SECTION J - LIST OF ATTACHMENTS
J.1. Statement of Work J.2. Wage Determination AK160005 07/29/2016 AK5
1.
SECTION K - REPRESENTATION, CERTIFICATIONS AND OTHER STATEMENTS OF
OFFERORS
K.1 Annual Representations and Certifications (DEC 2014)
(a)
(1) If the clause at 52.204-7, Central Contractor Registration, is included in this solicitation, paragraph (b) of this provision applies.
(2) If the clause at 52.204-7 is not included in this solicitation, and the offeror is currently registered in SAM’s, the offeror may choose to use paragraph (b) instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
[ ] (i) Paragraph (b) applies.
[ ] (ii) Paragraph (b) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(b) The offeror has completed the annual representations and certifications electronically via the Systems for Award Management website at http://www.sam.gov. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date].
These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.
(End of provision)
K.2 FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these addresses:
http://www.arnet.gov/far/
THE FOLLOWING FEDERAL ACQUISITION REGULATION PROVISION IS HEREBY INCORPORATED:
CLAUSE NO.
FAR 52.204-3
FAR 52.204-8
FAR 52.222-21
TITLE:
Taxpayer Identification (OCT 1998)
Annual Representations and Certifications (DEC 2014)
Prohibition of Segregated Facilities (APR 2015)
FAR Clause # Title Date Change
FAR 52.222-22 Previous Contracts and Compliance Reports (FEB 1999)
FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999)
FAR 52.223-1 Biobased Product Certification (DEC 2007)
FAR 52.226-3 Disaster or Emergency Area Representations (AUG 2006)
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
L.1 FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these addresses:
1. http://www.arnet.gov/far/
2. https://dhsonline.dhs.gov/portal/jhtml/dc/sfi.jhtml?doid=5855
THE FOLLOWING FEDERAL ACQUISITION REGULATION PROVISION IS HEREBY INCORPORATED:
PROVISION NO. TITLE:
FAR 52.225-12
FAR 52.232-38
Notice of Buy American Act - Construction Materials under Trade Agreements (MAY 2014)
Submission of Electronic Funds Transfer Information With Offer (MAY 1999)
L.2 In accordance with the Provision FAR 52.211-6, Brand Name or Equal (AUG 1999), the following requirements apply:
(a) ) If an item in this solicitation is identified as "brand name or equal," the purchase description reflects the characteristics and level of quality that will satisfy the Government's needs. The salient physical, functional, or performance characteristics that "equal" products must meet are specified in the solicitation.
(b) To be considered for award, offers of "equal" products, including "equal" products of the brand name manufacturer, must--
(1) Meet the salient physical, functional, or performance characteristic specified in this solicitation;
(2) Clearly identify the item by--
(i) Brand name, if any; and
(ii) Make or model number;
(2) Include descriptive literature such as illustrations, drawings, or a clear reference to previously furnished descriptive data or information available to the Contracting Officer; and
(4) Clearly describe any modifications the offeror plans to make in a product to make it conform to the solicitation requirements. Mark any descriptive material to clearly show the modifications.
(c) The Contracting Officer will evaluate "equal" products on the basis of information furnished by the offeror or identified in the offer and reasonably available to the Contracting Officer. The Contracting Officer is not responsible for locating or obtaining any information not identified in the offer.
(d) ) Unless the offeror clearly indicates in its offer that the product being offered is an "equal" product, the offeror shall provide the brand name product referenced in the solicitation.
L.3 SUBMISSION OF BRAND NAME OR EQUAL PRODUCTS
If price quote includes an "equal" product in lieu of brand name referenced in the ***statement / scope of work*** complete Section K.3 and submit with quote. Quoters offering other than brand name items identified herein should furnish adequate information to ensure that a determination can be made as to the equality of the product(s) quoted on.
L.4 INFORMATION CONCERNING SUBMISSION OF PAYMENT BONDS
In accordance with FAR 52.228-13 Alternative Payment Protections (JUL 2000), if payment bonds are submitted, the following requirements apply:
The bonds shall be in the form of a firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register, or may be obtained from the U.S. Department of Treasury, Financial Management Service, Surety Bond Branch, 401 14th Street, NW., 2nd Floor, West Wing, Washington, DC 20227.
L.5 FAR 52.236-27 SITE VISIT (CONSTRUCTION), Alternate I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, (APR 1984) and 52.236-3, Site Investigations and Conditions Affecting the Work (APR 1984), will be included in any contract awarded as a result of this solicitation.
Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
An organized site visit is not scheduled at this time.
L.6 SUBMISSION OF QUOTES AND ACKNOWLEDGING AMENDMENTS
(a) Quoters interested in submitting a quote shall complete the following information:
(1) ) On the Standard Form 1442
(Page 2): Block 14-20 & 30
(2) In the Contract Clauses Section:
****** Section F, F.2 Section K, K.1, K.3 (brand name or equal)
(b) Quoters shall submit Request for Quotations and any amendments shall be submitted on or before 1:00 PM Pacific Time on the required date specified in Block 10 of the Standard Form 1442 or subsequent amendments via the document submission option provided by FBO by clicking the, “Note: This opportunity allows for electronic responses. Click here to log in and submit a response.” on the top of the page.
(c) Only quotations posted via FBO will be considered - no email/facsimile transmissions accepted.
SECTION M - EVALUATION FACTORS FOR AWARD
M.1 LEGAL EFFECT OF QUOTATIONS
(a) A quotation is not an offer and, consequently, cannot be accepted by the Government to form a binding contract. Therefore, issuance by the Government of a purchase order in response to a supplier's quotation does not establish a contract. The purchase order is an offer by the Government to the contractor to purchase construction services upon specified terms and conditions. A contract is established when the contractor accepts the offer or begins performance.
(b) Normally acceptance of the offer is made in writing by the contractor by signing and returning a copy of the purchase order (see section M.2 (b)).
M.2 AWARD
(a) Award may be made without discussion of quotations received. Hence, quotations shall be submitted on the most favored terms from a price and technical standpoint which the quoter can submit to the Government.
Award will be made based on the lowest quoted price - received in writing from a responsible quoter if the Contracting Officer determines that the price is reasonable.
(b) Award shall be made by mailing or otherwise furnishing a properly executed purchase order to the successful awardee. The Coast Guard will require the awardee to accept the purchase order consistent with the provisions of FAR 13.302-3, Obtaining Contractor Acceptance and Modifying Purchase Orders, prior to undertaking performance. The contractor will be required to submit to the Contracting Officer, within seven
(7) days of notice of selection for award, a signed copy of the purchase order form, OF347, accepting the purchase order. The Coast Guard may, by written notice to the awardee, at any time before acceptance occurs, withdraw, amend, or cancel its offer.
M.3 BONDING REQUIREMENTS
The requirements in FAR 52.228-13, Alternative Payment Protections, (JUL 2000) apply to this quotation. The successful quoter shall furnish all bonds or alternative payment protection, including any necessary reinsurance agreements, before being allowed to start work.
General Decision Number: AK160005 07/29/2016 AK5
Superseded General Decision Number: AK20150005
State: Alaska
Construction Type: Residential
Counties: Aleutians East, Aleutians West, Bethel, Bristol Bay, Dillingham, Haines, Juneau, Kenai Peninsula, Ketchikan Gateway, Kodiak Island, Matanuska-Susitna, Peninsula & Lake, Prince Of Wales-Outer Ketchika, Sitka, Skagway-Yakutat-Angoon, Valdez-Cordova, Wade Hampton and Wrangell-Petersburg Counties in Alaska.
Area III (Boroughs of Central/Southern Alaska below 62 degrees North Latitude excluding Anchorage Area)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 01/22/2016 2 04/29/2016 3 06/10/2016 4 06/17/2016 5 07/15/2016 6 07/29/2016
ENGI0302-005 04/01/2016
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 40.03 22.10
GROUP 1A....................$ 41.79 22.10
GROUP 2.....................$ 39.26 22.10
GROUP 3.....................$ 38.54 22.10
GROUP 4.....................$ 32.33 22.10
TUNNEL WORK
GROUP 1....................$ 44.03 22.10
GROUP 1A...................$ 45.97 22.10
GROUP 2....................$ 43.19 22.10
GROUP 3....................$ 42.39 22.10
GROUP 4....................$ 35.56 22.10
9/6/2016http://www.wdol.gov/wdol/scafiles/davisbacon/AK5.dvb?v=6
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Roller: Breakdown, Intermediate, and Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;
Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine; Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;
Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:
Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Scrapers-through 40 yards; Service Oiler/Service Engineer; Sidebooms-under 45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler
GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Clamshells and Draglines (over 3 yards),
(b) Tower cranes; Licensed Water/Waste Water Treatment Operator; Loaders over 5 yds.; Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.
and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sidebooms over 45 tons;
Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;
GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;
Horizontal/Directional Drill Locator;Licensed Grade Technician; Loaders, (i.e., Elevating Grader and Material Transfer Vehicle); Locomotives: rod and geared engines;
Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under
16 inches; Waste/ Waste Water Treatment Operator.
GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;
Bombardier (tack or tow rig); Boring Machine; Brooms-power;
Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor
GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill Helper.
FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.
* LABO0341-008 04/01/2016
*Including Site and Street Work Only
Rates Fringes
Laborers: South of the 63rd Parallel & West of Longitude 138 Degrees
GROUP 1.....................$ 30.00 26.17
GROUP 2.....................$ 31.00 26.17
GROUP 3.....................$ 31.90 26.17
GROUP 3A....................$ 35.18 26.17
GROUP 3B....................$ 38.72 23.46
GROUP 4.....................$ 19.57 26.17
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 33.00 26.17
GROUP 2....................$ 34.10 26.17
GROUP 3....................$ 35.09 26.17
GROUP 3A...................$ 38.70 26.17
GROUP 3B...................$ 42.59 23.46
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
* LABO0942-002 04/01/2016
*Including Site and Street Work Only
Rates Fringes
Laborers: North of the 63rd Parallel & East of Longitude 138 Degrees
GROUP 1.....................$ 30.00 26.17
GROUP 2.....................$ 31.00 26.17
GROUP 3.....................$ 31.90 26.17
GROUP 3A....................$ 35.18 26.17
GROUP 3B....................$ 38.72 23.46
GROUP 4.....................$ 19.57 26.17
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 33.00 26.17
GROUP 2....................$ 34.10 26.17
GROUP 3....................$ 35.09 26.17
GROUP 3A...................$ 38.70 26.17
GROUP 3B...................$ 42.59 23.46
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft…