Amendment 0005.pdf
PDF 38 KB Posted
- Solicitation number
- HSCG87-10-B-PJT001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID RESULTS HSCG87-10-B-PJT001.PDF | ||
| Amendment 0009.pdf | ||
| Amendment 0008.pdf | ||
| Amendment 0007.pdf | ||
| Amendment 0006.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| HSCG87-10-B-PJT001 IFB Package.pdf | ||
| HSCG87-10-B-PJT001 Bid Documents.doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 1
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
11/10/2009
4. REQUISITION/PURCHASE REQ. NO.
2410870PJT001
5. PROJECT NO. (If applicable)
17J02057
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
COMMANDING OFFICER (ko)
CIVIL ENGINEERING UNIT
FEDERAL BLDG. RM 817, 709 W. 9th ST.
P.O. BOX 21747
JUNEAU, AK 99802-1747
9A. AMENDMENT OF SOLICITATION NO.
HSCG87-10-B-PJT001
9B. DATED (SEE ITEM 11)
09/29/2009
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)
All Prospective Offerors
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET
FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
IFB HSCG87-10-B-PJT001 POTATO POINT AND HINCHINBROOK REPLACEMENT GENERATORS, VALDEZ, ALASKA, IS AMENDED TO ADDRESS TECHNICAL QUESTIONS BROUGHT ABOUT BY THE SPECIFICATIONS IN THE IFB. SEE
ATTACHED 3 PAGES FOR TECHNICAL QUESTIONS AND ANSWERS.
A. THE DATE THAT BIDS ARE DUE IS CHANGED FROM: COB 11/13/2009 TO: COB 11/18/2009.
B. ALL OTHER TERMS AND CONDITIONS OF THE SOLICITATION REMAIN UNCHANGED.
END OF SOLICITATION AMENDMENT 0005
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or Print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
MICHAEL L. BIRKLAND
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
HSCG87-10-B-PJT001 Page 1 of 3 Questions and Answers
Hinchinbrook:
1. What type of roofing is present at Hinchinbrook where the patching is to take place?
ANSWER: The roof is made of 5" reinforced concrete painted red.
2. We are curious if we have to supply a junction box if the existing wires from the floor will not have enough slack to make the new connections?
ANSWER: Yes. This is covered by spec section 1.2.
3. Communications: Scope tells us of phones in both sites. Will we be able to use phones in both locations? Are there any limitations to using the phones? Costs? Do cell phones work at Hinchinbrook?
ANSWER: No cell phone reception at Hinchinbrook. The phone can be used by the contractor, but all calls must be made with a calling card.
Currently, the phone at Hinchinbrook does not ring, so calls can not be received there. Non work related phone use should be minimized.
4. Wall construction details: There is a new supply air fan to be installed in the exterior wall. Please provide wall thickness and what the wall is made of.
ANSWER: The wall is made of 8" reinforced concrete in between 14" thick columns. The former window spaces have been filled in with 8" cement block. Blocked in window areas exist near the house generator and the station generators.
5. What type of breakers are existing? Manufacturer, style, size?
ANSWER: See reference dwg 105-10 sheet 41 for bill of materials that includes breakers (in "Ref Set - BOREAL Dwgs 105-10 [revised 29 Sep].pdf"). Breakers are Square D QOB.
6. Regarding the Maintenance Contract that goes with the work, and how long is the Maintenance Contract for?
ANSWER: This question refers to spec section 5.4 C. This section did not intend to define an annual maintenance contract, rather it was describing a one-time maintenance on the system as per the O & M manual, 'annual maintenance for month 0' section.
Section 5.4 C could be rewritten to clarify this point:
Perform one-time maintenance on the SCADA System as defined in the 'annual maintenance for Month 0' section of the operations and maintenance manual for the SCADA system. This maintenance will include fully testing all sensors and simulating generator failures to show that the system successfully starts and puts on line the backup generators.
HSCG87-10-B-PJT001 Page 2 of 3
Potato Point:
1. Will new generator exhaust fit in existing wall thimble hole?
ANSWER: Yes.
2. What type of breakers are existing? Manufacturer, style, size?
ANSWER: See reference dwg 105-16 sheet 41 for bill of materials that includes breakers. Breakers are Square D QOB.
3. Will old generator fit through existing door?
ANSWER: yes
4. What size is the roof hatch?
ANSWER: Approximately 24" x 30".
5. Existing door size – 36”?
ANSWER: Yes. However actual opening with trim in place is 35".
6. If door does not need to be replaced and all materials fit through the door, does the concrete ramp/landing need to be replaced?
ANSWER: Yes. Ramp is to facilitate heavy equipment handling in and out of building.
7. Communications: Scope tells us of phones in both sites. Will we be able to use phones in both locations? Are there any limitations to using the phones? Costs? Do cell phones work at Potato Point?
ANSWER: No cell phone reception at Potato Point. The phone can be used by the contractor, but all calls must be made with a calling card. Non work related phone use should be minimized.
8. Is it the intent to replace the door to the generator building at Potato Point even if the new generators will fit through the door? The Caterpillar generators Model D30-10 that are called out in the specifications show a overall width of 28.11 inches and height of 55 inches.
ANSWER: yes, replace the door regardless of generator size.
9. At Potato Point, we would like to know what size conductor comes out of the existing house generator. This will clarify whether or not a contractor has to replace the conductors from generator to control panel, which can expensive. If not, it will clarify and save USCG money and we can re-use existing conductor.
ANSWER: The question has a typo. There is no 'house generator' at Potato Point, however there is one at Cape Hinchinbrook. At Hinchinbrook, the conductors from the generator to the switchgear are #1 AWG. The distance from the gen to the switchgear is approximately 10 feet, for the conductor length I'd estimate 25 feet are needed. At Potato Point, the conductors from the generators to the switchgear are
HSCG87-10-B-PJT001 Page 3 of 3
#2 AWG. These details are in the reference drawings 105-10 and 105-16, dwg 8 for both.