Sheet1
| Coast Guard Drawing 750 WMSL-100-530, Rev F, Modifications incidental to the installation of Allied Dual Pont Davit (HAMILTON, JAMES & MUNRO). |
| Coast Guard Drawing 750-WMS-635-002, Rev K, Insulation Arr & Details Thermal, Acoustic, & Fire (ASC635002) |
| Coast Guard Drawing 750-WMSL-097-502; Rev -, Stability Test Report, 23 March 2011; Approved: June 7, 2011 |
| Coast Guard Drawing 750-WMSL-100-045, Rev J, Unit 3330 Structure – Second Deck to Main Deck – Frame 82 to Aft |
| Coast Guard Drawing 750-WMSL-100-051, Rev J, Unit 4310 Structure – 01 Level to 02 Level – Frame 44 to Frame 52 |
| Coast Guard Drawing 750-WMSL-100-052, Rev J, Unit 4320 Structure – 02 Level and Above – Frame 48 to Frame 53 |
| Coast Guard Drawing 750-WMSL-100-053, Rev J, Unit 4420 Structure – 01 Level and above – Frame 52 to Frame 67 |
| Coast Guard Drawing 750-WMSL-100-083 Rev A, General Arrangements NSC5 & Follow |
| Coast Guard Drawing 750-WMSL-100-45, Rev K, 2nd Dk to Main Dk - FR 82 to Aft (ASC100333) |
| Coast Guard Drawing 750-WMSL-100-531, Rev C, Structural Mods IWO New Aft Folding Cranes (HAMILTON, JAMES, AND MUNRO) |
| Coast Guard Drawing 750-WMSL-167-006, Rev -D, Structural Door List, Ship Wide Hull 4913 and Follow (ASC167002) |
| Coast Guard Drawing 750-WMSL-180-035, Rev F, Fdn Arr Dwg Design Unit 3330 Bklt No. 1 |
| Coast Guard Drawing 750-WMSL-202-004, Rev -, Machinery Control & Monitoring System Cables Running Sheets (ASC202004) |
| Coast Guard Drawing 750-WMSL-300-002, Rev C, Electrical Standard Details (ASC300003) |
| Coast Guard Drawing 750-WMSL-300-032, Rev B, Unit 3130 2nd Dk - FR 64 to FR 76 Arrangement of Electrical Equipment (ASC300313) |
| Coast Guard Drawing 750-WMSL-300-036, Rev D, Unit 3230 Second Deck Frame 76 to Frame 88 Arr of Electrical Equipment |
| Coast Guard Drawing 750-WMSL-300-057, Rev B, Unit 2240 - Main Dk FR 44 to FR 52 Arr of Elect Eqpt (AS3300224) |
| Coast Guard Drawing 750-WMSL-300-061, Rev -, Unit 4420 - 01 Lvl - FR 52 FR 67 Arrangement of Electrical Equipment (AS3300442) |
| Coast Guard Drawing 750-WMSL-304-001, Rev E, Wireway Key Plan (ASC304001) |
| Coast Guard Drawing 750-WMSL-320-010, Rev F, Power Sys Deck Plan - Second Dk, Aft of FR 52 |
| Coast Guard Drawing 750-WMSL-320-042, Rev B, Electrical One Line Diagram (NSC 6 SRD) |
| Coast Guard Drawing 750-WMSL-320-578, Rev, Electrical Removal Iwo New Aft Folding Cranes (JAMES Only) |
| Coast Guard Drawing 750-WMSL-320-579, Rev , Electrical Installation Iwo New Aft Folding Cranes (JAMES Only) |
| Coast Guard Drawing 750-WMSL-320-580, Rev -, Electrical Mod Incidental To The Installation of Allied Dual Point Davit (JAMES ONLY) |
| Coast Guard Drawing 750-WMSL-330-503, Rev A, 750-WMSL-Engineering Change Battle Dressing Stations Surgical & Emergency Lights |
| Coast Guard Drawing 750-WMSL-436-004, Rev B, Miscellaneous Alarms System Cable Running Sheets |
| Coast Guard Drawing 750-WMSL-436-11, Rev D, Fire Detection Sys Deck Plan (ASC436009) |
| Coast Guard Drawing 750-WMSL-505-004, Rev A, Piping Material Schedule (ASC505004) |
| Coast Guard Drawing 750-WMSL-512-001, Rev H, HVAC System Diagram |
| Coast Guard Drawing 750-WMSL-512-519, Rev G, HVAC System Diagram |
| Coast Guard Drawing 750-WMSL-512-526, Rev B, HVAC Mods IWO New Aft Folding Cranes |
| Coast Guard Drawing 750-WMSL-516-501, Rev D, Chilled Water Mods IWO New Aft Folding Cranes |
| Coast Guard Drawing 750-WMSL-520-503, Rev B, Seawater Cooling Mods IWO New Aft Folding Cranes |
| Coast Guard Drawing 750-WMSL-520-504, Rev C, Seawater Cooling Piping Mods IWO Dual Point Davit Installation |
| Coast Guard Drawing 750-WMSL-522-001, Rev F, Diagram Machinery Space Water Mist (ASC522001) |
| Coast Guard Drawing 750-WMSL-522-002, Rev -, Machinery Space Water Mist System Description (ASC522001-02) |
| Coast Guard Drawing 750-WMSL-523-503, Rev C, Washdown Countermeasure Mods IWO New Aft Folding Cranes |
| Coast Guard Drawing 750-WMSL-528-041, Rev D, Pluming Fixture Hook-Up Detail Booklet Details |
| Coast Guard Drawing 750-WMSL-540-510, Rev D, Fuel Piping Mods IWO Dual Point Install |
| Coast Guard Drawing 750-WMSL-551-512, Rev C, Compressed Air Mods IWO New Aft Folding Cranes |
| Coast Guard Drawing 750-WMSL-555-011, Rev C, Machinery Space Watermist System Schematic (ASC555049) |
| Coast Guard Drawing 750-WMSL-556-503, Rev F, Hydraulic Piping Mods IWO Aft Folding Crane Installation |
| Coast Guard Drawing 750-WMSL-583-002, Rev D, Small Boat Starboard Handling System Arrangement & Details |
| Coast Guard Drawing 750-WMSL-583-004, Rev H, Stern Launch & Recovery Arrangement & Details (ASC583004) |
| Coast Guard Drawing 750-WMSL-583-505, Rev C, Aft Boat Adjustable Cradle Arr & Det |
| Coast Guard Drawing 750-WMSL-583-506, Rev A, Aft Boat Adjustable Cradle Arr & Det Hull 750 & 751 |
| Coast Guard Drawing 750-WMSL-583-518, Rev D, Hydraulic Piping Mods IWO Dual Point Davit Installation |
| Coast Guard Drawing 750-WMSL-593-505, Rev B, Bilge & Oil Pollution Cont Sys Mods IWO New AFT Folding Cranes. |
| Coast Guard Drawing 750-WMSL-600-036, Rev J, Fab & Install of Hull Outfit Design Unit 3330 |
| Coast Guard Drawing 750-WMSL-612-001, Rev J, Fab & Instl of Exterior Rails, Stanchions, & Lifelines |
| Coast Guard Drawing 750-WMSL-612-003, Rev C, Helo Landing Area Safety Nets & Wheel Stops Arr and Details (ASC612003) |
| Coast Guard Drawing 750-WMSL-621-001, Rev G, Joiner Bulkheads Typical Details |
| Coast Guard Drawing 750-WMSL-621-019, Rev D, Overhead & Bhd Sheathing Mn Dk FR 36-64 (ASC621019) |
| Coast Guard Drawing 750-WMSL-631-002, Rev M, Paint Schedule (ASC631002) |
| Coast Guard Drawing 750-WMSL-634-001, Rev H, Deck Covering Schedule (ASC634001) |
| Coast Guard Drawing 750-WMSL-635-002, Rev K, Insulation Arrangements and Details Thermal, Acoustic and Fire |
| Coast Guard Drawing 750-WMSL-635-2, Rev –H, Insulation Arr & Details Thermal, Acoustic, & Fire (Asc635002) |
| Coast Guard Drawing 750-WMSL-641-500, Rev B, SCIF Shipalt Compartment Conversion, Mission Module to Officer’s Stateroom |
| Coast Guard Drawing WMSL-750-583-514, Rev D, Boat Capture Net With Extension |
| Coast Guard Drawing WMSL-750-583-515, Rev A, Boat Capture Net Carriage Extension |
| NAVSEA Drawing 803-1385866, Rev E, Penetration, Bulkhead and Deck |
| NAVSEA Drawing 804, Acoustic & Thermal Insulation For Compartments Installation Details |
| NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation for Compartments Installation Details |
| NAVSEA Drawing 804-5773932, Rev A, Acoustic & Thermal Insulation for Ducts Installation Details |
| NAVSEA Drawing 804-5959214, Piping Insulation - Installation Details |
| NAVSEA Drawing 804-5959308, Rev -, Lifeline Systems |
| NAVSEA Dwg 2803-980208, Label Plates |
| NAVSEA Dwg 2803-980209, Label Plates |
| NAVSEA Dwg 803-6397268, Doors, WT, Quick Acting Arrangement |
Sheet2
| Coast Guard Technical Publication (TP) 7018, 31-MAY-07, Main Gas Turbine (MGT) - Model |
| 7LM2500-SB-MLG10-Installtion Instructions |
| Coast Guard Technical Publication (TP) 7019, 31-MAY-07, Main Gas Turbine - Model LM2500 |
| ERROR:#NAME? |
| Coast Guard Technical Publication (TP) 7118, Carbon Dioxide Fire Protection System – Series |
| 70 |
| Coast Guard Technical Publication (TP) 7525, Cutter Information Book Auxiliary Machinery |
| (Vol. IV) – Rev. 1 |
| Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, |
| General Requirements |
| Surface Forces Logistics Center Standard Specification |