HSCG85-17-Q-P45023

USCGC HARRY CLAIBORNE DRYDOCK REPAIRS

Amendment 2

3. QUESTION: Item 21, Para No 1.1: It is mentioned, contractor to renew (port/starboard) Z-drive propulsion unit(s). Though the spec in items 3.5 & 3.6 only make reference to starboard unit. Will contractor quote to renew just the starboard side? 1 unit?

ANSWER: Contractor should bid on replacing both port and starboard units. A revision has been made to the Attachment 2-Work Specification to reference both port and starboard.