Amendment_0002.pdf
PDF 39 KB Posted
- Solicitation number
- HSCG85-16-R-P45949
About this file
Amendment 0002
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0002 24 JUN 2016 2116856P45949
6. ISSUED BY CODE HSCG85 7. ADMINISTERED BY (If other than Item 6) CODE
COMMANDER, USCG
Surface Forces Logistics Center (CPD-C&P2)) 1301 Clay Street, Suite 807N Oakland, CA 94612
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.
TO ALL PROSPECTIVE OFFERORS
HSCG85-16-R-P45949
X 9B. DATE (SEE ITEM 11)
02 JUN 2016
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SUBJECT: USCGC DOUGLAS MUNRO (WHEC 724) Drydock & Repairs FY16 FQ4
SEE CONTINUATION PAGES
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
Solicitation No. HSCG85-16-R-P45949 CGC MUNRO (WHEC 724) Drydock Repairs FY16 FQ3 Amendment No. 0001
The purpose of this amendment is as follows:
1. To address the following clarification questions
Specifications Q: Contractor received disc of references on June 16, 2016. After review, we note that 72 of the references listed for the specifications were not included (see attached Excel spreadsheet).
Request that references listed on the atachment be provided.
A: Understood will provide. Please see filtered list of items the CG will not provide.
D-01, Para 3.3.2.1 (Drydocking) Q: In 2. References USCG Drawings states a docking plan will be supplied. But in 3.3.2.1 it states to provide a docking plan with initial bid. Contractor requests removal of 3.3.2.1 from the spec.
A: 3.3.2.1 of Work Item 1 shall be changed to read as follows: Contractor shall provide all documentation and information in accordance with Surface Force Logistics Center Standard Specification 8634.
D-21, Para 3.8 (Tank Manhole Ring Renew) Q: 1) All of the referenced tanks are Diesel Oil tanks, under paragraph 3.8 there is a note discussing disinfecting and treating a potable water tank, should this note be removed from the specification? 2) Item 11 specifies cleaning and inspection of tank 5-136-1-F while item 21 specifies replacement of the manhole ring to tank 5-136-2-F, is the tank number specified under item in error?
A: 1) USCG concurs, statement under paragraph 3.8 Tank Cleaning regarding disinfecting and treatment of water tanks is not required. 2) Cleaning of tank 5-136-2-F is designated under Work Item 19- Tanks (Dirty Oil, Waste, and Clean), Clean and Inspect.
The solicitation closing date is extended due to this amendment. Receipt of proposals are now due no later than 19JUL16 @ 1100 Pacific time.
In addition, as a result and in effect the performance period has now shifted right three weeks. The new performance period will be 30AUG16-07NOV16.
| SF 30 (0002) |
| Page 2 - 0002 |
File details come from the government source that posted it. Updated .