TECHNICAL SERVICES FOR OVERHAUL of USCGC SMILAX’s DIESEL FIRED PILE DRIVER

1. Background. This requirement is for the overhaul of the USCGC SMILAX’s DIESEL FIRED PILE DRIVER IAW MPC A-C-7182 this MPC is to be completed every 24 months and was last competed in 2014. In order to get the DIESEL FIRED PILE DRIVER (Model D6 Serial number T02) in compliance with MPC, the Government is required to augment their current staff’s efforts with technical services.

2. Scope. The scope of this work is on the USCGC SMILAX DIESEL FIRED PILE DRIVER and consists of an open and inspect of the hammer, replacement of INOP parts and a SAT test run.

3. Objective. The objective of this requirement is to OVERHAUL the ships DIESEL FIRED PILE DRIVER IAW manufactures TECH PUB.

4. Tasks. The contractor shall OVERHAUL the ships DIESEL FIRED PILE DRIVER to include but not limited to:

4.1. Open/ and inspect the DIESEL FIRED PILE DRIVER.

4.2. Repair/Replace any worn or INOP parts IAW manufactures TECH PUBS 1797-589-H Diesel Pile Driver - Operating Instructions. 1797-589-I Diesel Pile Driver - Parts list

4.3. Ensure DIESEL FIRED PILE DRIVER is structurally safe for operation.

4.4. SAT operational test of DIESEL FIRED PILE DRIVER at completion of overhaul.

4.5. Ship back to cutters home port.

5. Delivery. Contractor shall provide a final report within 3 days of contract period of performance.

6. Government furnished property. There is no Government furnished property (GFP) anticipated; however, the Government may in the course of this repair require GFP. If GFP is required, it will be incorporated via contract modification.

7. Security Requirement. N/A.

8. Place of performance- Vendors repair facility

9. Period of performance- 03OCT16-07OCT16 or 10OCT16-14OCT16