TECHNICAL SERVICES FOR SHOWER REMOVAL/INSTALLATION ONBOARD

THE USCGC IDA LEWIS

1. Background: This requirement is for the repair of the USCGC IDA LEWIS’s SHOWERS. During the Cutters last Dry Dock the original shower pans were removed and replaced with poured One-Step. The One-Step allows water to intrude behind the shower walls, underneath the One-Step and onto the deck.

2. Scope: The scope of this work is on the USCGC IDA LEWIS and consists of removing the One-Step on 06 showers, removing the old showers and replacing them with Omega Model “S” Square Showers.

3. Objective: Remove and replace 06 showers on board the USCGC IDA LEWIS.

4. Tasks: The contractor shall provide onboard parts and services to remove and replace 06 showers on board the CUTTER include but not limited to:

4.1. Remove the One-Step from 6 shower pans.

4.2. Remove all 6 of the old shower stalls.

4.3. INSTALL 6 new Omega Model “S” Square Showers to include: Shower to be 80” high inside Walls Constructed of Type 304 18 ga. S.S. w/ 14 ga. Tub 2” Brass Drain – with Compression Fitting –on Center Double S.S. Soap Dish – Furnished Loose S.S. Curtain Rod w/Curtain and S.S. Hooks Enclosed S.S. Top w/ light hole Speakman Faucet Model SC-1210-AF w/ exposed mixing valve and chrome supply pipes Shower Head McMaster Carr part #3024K11 12” S.S. Grab Bar Non Slip Strips in Pan 1”x 6” S.S. reinforcing channel mounted on rear and side walls

4.4. Ensure shower stalls are installed IAW with SSHWR-2 manufactures specifications.

4.5. Tie the shower pan into the existing deck using Type III One-Step epoxy.

4.6. Ensure showers are fully operational and leak free.

5. Delivery: Contractor shall provide a final report within 3 days of contract period of performance.

6. Government furnished property: There is no Government furnished property (GFP) anticipated; however, the Government may in the course of this repair require GFP. If GFP is required, it will be incorporated via contract modification.

7. Security Requirement: Base access is required. Vendor shall have a valid driver’s license and show identification. A CG representative from the cutter will sponsor and escort vendor to the cutter.

8. Place of performance: Cutter's home pier, PIER 2 Naval ED & TRNG CNT, Newport, RI, 02841.

9. Period of performance: June 20-30, 2016.