BISCAYNE_BAY_(WTGB_140)_DS_FQ3_DWF_16R0.pdf
PDF 905 KB Posted
- Attached to
- USCGC BISCAYNE BAY DOCK SIDE
- Solicitation number
- HSCG85-16-Q-P45518
About this file
USCGC BISCAYNE BAY (WTGB 104) Specifications dor dock side repairs Rev-0 November 2015.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0002.pdf | ||
| Amendment_0001_BISCAYNE_BAY_DS.pdf | ||
| BISCAYNE_BAY_SOS_(WTGB_140)_DS_FQ3_DWF_16ER0_BLANK.xls | XLS spreadsheet | |
| BISCAYNE_BAY_(WTGB_140)_DS_FQ3_DWF_16R0.pdf | ||
| BISCAYNE_BAY_SOLICITATION_posted_on_FBO.doc | DOC document | |
| Past_Performance_Questionnaire.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC BISCAYNE BAY (WTGB 104)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2016
Developed By: David W Forrest II
(Rev-0, 30 November 2015)
USCGC BISCAYNE BAY (WTGB-140) DOCKSIDE AVAILABILITY FY2016
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. vi Consolidated List of Critical Inspection Items ........................................................................................... vii Principal Characteristics - Tug, IceBreaking ............................................................................................. viii General Requirements WORK ITEM 1: Chain Lockers, Clean and Inspect WORK ITEM 2: Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean WORK ITEM 3: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean WORK ITEM 4: Boiler Exhaust Stack Uptakes, Commercial Clean WORK ITEM 5: Circuit Breakers (60 Hz), Inspect and Test WORK ITEM 6: Anchor Chain(s) and Ground Tackle, Inspect and Repair WORK ITEM 7: Boat Boom, Inspect and Service WORK ITEM 8: Sewage Holding Tank(s), Clean and Inspect WORK ITEM 9: Sewage Piping, Clean and Flush WORK ITEM 10: Chain Locker, Preserve 100% WORK ITEM 11: Chain Lockers, Preserve - Partial WORK ITEM 12: Tanks (Sewage Vacuum Collection), Preserve “100%” WORK ITEM 13: Tanks (Sewage Vacuum Collection), Preserve “Partial” WORK ITEM 14: Steering Actuators, Overhaul iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
American Welding Society (AWS): http://www.awspubs.com/index.php
ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
NFPA: http://www.nfpa.org
SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 101 WTGB 171-002, Rev T, Mast and Boom
Coast Guard Drawing 101 WTGB 259-001, Rev L, Diesel Exhausts & Steam Generator Exhausts System
A & D
Coast Guard Drawing 101-WTGB-528-001 L Sanitary & Deck Drains Diag
Coast Guard Drawing 101-WTGB-528-002 R Sanitary & Deck Drains A&D-Details Order
Coast Guard Drawing 101-WTGB-528-003 C Grey Water Mods & Tank Transition
Coast Guard Drawing 101 WTGB 561-001, Rev H, Steering System Diag
Coast Guard Drawing 101 WTGB 561-002, Rev R, Hydraulic Steering SystemA&D
Coast Guard Drawing 101 WTGB 581-001, Rev T, Anchor Handling A & D
Coast Guard Drawing 101 WTGB 581-002, Rev C, Anch. Windls Outline Instl Data
Coast Guard Drawing 101 WTGB 581-003, Rev E, Anch. Windls Mchry Assy
Coast Guard Drawing 101 WTGB 583-004, Rev F, New Boat/Cargo Boxn & Fdn Dets
Coast Guard Drawing 101 WTGB 583-006, Rev A, 140’ Boat/Cargo Boom Control Console
Modifications
Coast Guard Drawing 101 WTGB 583-007, Rev -, Boat/Cargo Boom Control Console
Coast Guard Drawing 101 WTGB 801-004, Rev E, General Arrangement Below Deck
Coast Guard Drawing 101-WTGB 561-4, Rev G, Hyd Pwr Unit Instl
Coast Guard Drawing 101-WTGB 561-5, Rev M, Hyd Pwr Unit Machry Assy
Coast Guard Drawing 101-WTGB 320-6, Rev K, Power System One Line Diagram http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace v (Rev-0)
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Technical Publication (TP) 3366, Section 583-A, Dec 2005, Boat Davit Hydraulic System
Coast Guard Technical Publication (TP) 3478, 03-APR-01, Manufacturer's Instruction Book-SWBS
Group(s) 324
Coast Guard Technical Publication (TP) 3482, SWBS 561, Steering System, Installation and Maintenance
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2014, Overhaul AC
Electrical Motors
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary
Hull Accesses
OTHER REFERENCES
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets
Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2008, Occupational Safety and Health
Standards for Shipyard Employment
Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2013, Occupational Safety and Health
Standards for Shipyard Employment
DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems
Federal Specification (Fed Spec) RR-C-271, Rev E, Dec 2010, Chain and Attachments, Welded and
Weldless
MIL-C-24633, Apr 1998, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded
MIL-DTL-23549, Dec 2011, Grease, General Purpose
National Electrical Manufacturers Association (NEMA) Stds, Pub. No. AB4, 2003, Guidelines for
Inspection and Preventive Maintenance of Molded Case Circuit Breakers Used in Commercial and
Industrial Applications
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 6/NACE No. 3, 2007, Commercial Blast Cleaning
Underwriters Laboratories Inc. (UL) 489, May 2002, Molded Case Circuit Breaker vi (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
This section is not applicable to this package.
vii (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
6 Anchor Chain(s) and Ground Tackle, Inspect and Repair
7 Boat Boom, Inspect and Service viii (Rev-0)
PRINCIPAL CHARACTERISTICS - TUG, ICEBREAKING
140’ WTGB (TUG, ICEBREAKING)
PHYSICAL
Length overall 140' 0"
Length between perpendiculars 130' 0"
Breadth, extreme 37' 7-1/4"
Depth, molded 18' 2-3/8"
Frame spacing 1' 6"
Full load (Winter) draft (at ) 12' 1-1/2"
Full load (winter) displacement 687 Long tons (LT)
Full load (winter) center of gravity
Above base (kg) 13' 1"
Full load trimming moment (forward) 75.6 Ft-LT
Min. operating condition draft (at ) 11' 6-3/8"
Min. operating condition displacement 640 Long tons
Min. operating condition center of gravity
Above base (kg) 13' 4-1/4"
Min. operating condition trimming moment
Forward 76.8 Ft-LT
Height of vessel above DWL Approx. 62' 0"
MACHINERY
Main Propulsion
Engine Type Diesel-electric
Number of units: 2
Total shaft horsepower: 2500
Propeller
Number of propellers 1
Number of blades 4
Diameter of propeller 8' 6"
Pitch Fixed
NOTE
Stability values above are for representative tug. Draft and longitudinal lever values provided above are for tugs in fresh water. Longitudinal lever values are provided to adjust tug's design drag of 1.0 feet by the stern.
1 (Rev-0)
00000_0315_FLT
REC_00000_FLT_ Commercial Project @ CG Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-0)
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec
0000, in accomplishing the following task:
Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC
Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable
Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is small.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an
NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3 (Rev-0)
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste
Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the
Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to adequately accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40
CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the
Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For
Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor shall be aware of the following:
3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the
Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast
Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
None.
4 (Rev-0)
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
Vessel Name Hull # Work Item # Work Item Title
Location of Work (incl. frame #’s) Area (sqft)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down
(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max.
threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Name of QP-1/NACE Inspector Signature Cert. # Date / Time
6 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE &
TIME
ACTIVITY
(Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION
(Frame & Deck, relation to equipment, etc.)
TEMPERATURE
% REL.
HUMID-
ITY DEW
PT.
SURFACE AMBIENT
ΔT
| DP -
Surface |
7 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
Location of Work (Frame References) Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min Max Mean
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
8 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min Max Mean
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
_____ mils _____ mils _____ mils _____ mils _____ mils
9 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15
DATE TEST LOCATIONS
CONDUCTIVITY
(microsiemens/cm)
10 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
Coating Mfg Product Name Batch # Induction
Time
Coating System Sequence
(Primer/Touchup/3rd Coat, etc.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL
READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation
3 Before
Adjustments
After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation
3 Before
Adjustments
After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation
3 Before
Adjustments
After Adjustments
Avg.
Application Method (Airless, Conventional Spray, Rolled) Average DFT
11 (Rev-0)
12300_1014_FLT
REC_63110_FLT_CHNLKR_140’ WTGB (ALL) (0110)
WORK ITEM 1: Chain Lockers, Clean and Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the
Chain Lockers.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 101 WTGB 801-004, Rev E, General Arrangement Below Deck
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall refer to Coast Guard Drawing 101 WTGB 801-004 for guidance.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
12 (Rev-0)
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std
Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
Anchors and chains
Fluid contents of chain locker(s)
Deck grating
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.2 Cleaning tasks. The Contractor shall refer to Coast Guard Drawing 101 WTGB 801-004 for guidance and clean all interior surfaces free of all foreign materials, such as sediment or sludge.
Remove all persistent residues, taking care not to damage the coating system. Remove cleaning media and residues continuously during the washing process. Remove any residual wash media and wipe up residual moisture with clean lint-free cloths. Collect, contain, and dispose of all wash media, residues, and cleaning materials in accordance with all Federal, state, and local regulations.
3.3 Inspection. The Contractor shall visually inspect sounding tubes and chain locker surfaces, including associated structural members. Submit a CFR including the following, as applicable:
Structural condition
Inaccessible areas
Condition of coating system, including measurements taken, percentage, location, and type of coating failure.
This section is not applicable to this work item.
13 (Rev-0)
25901_0715_FLT
REC_25901_FLT_140 WTG (ALL) (0411)
WORK ITEM 2: Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean (both) Main
Diesel Engines (MDE) exhaust piping system, including the associated stack uptakes.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 101 WTGB 259-001, Rev L, Diesel Exhausts & Steam Generator
Exhausts System A & D
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2013, Occupational Safety and Health Standards for Shipyard Employment
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
14 (Rev-0)
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std
Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
Access covers
Exhaust stack.
MDE
Piping
Pipe insulation
Vent ducting
Wiring
Exhaust pipe expansion joints
Exhaust insulation blankets
Support brackets
3.2 Scaffolding. The Contractor shall, in accordance with 29 CFR 1915, Subpart E, erect suitable staging or scaffolding, as required, to facilitate work.
3.3 Safety precaution. The Contractor shall rig suitable safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.
3.4 Work plan. The Contractor shall develop and submit, to the COR, a plan for collecting and disposing of waste extracted during cleaning process. Ensure that the proposed plan shall detail how and where exhaust piping will be disconnected, how entire length of exhaust piping will be divided/sectioned for cleaning, and precautions to protect the MDE. The Contractor shall perform this work upon receiving Coast Guard approval of the plan.
3.5 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the exhaust stack system, to demonstrate existing operational condition. Submit a CFR.
3.6 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping and stack uptakes to the MDE, shown on Coast Guard Drawings 101 WTGB 259-001, to a condition free from soot, tar, and any other foreign matter as follows:
3.6.1 Disconnect the exhaust piping as necessary to facilitate cleaning.
15 (Rev-0)
3.6.2 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel.
Clean all adjacent stack uptake surfaces. Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.
3.6.3 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming. Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.
3.6.4 Reassemble exhaust piping; renew all flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials; and renew all fasteners.
3.7 Inspection and report. The Contractor shall perform a visual inspection of the following components; submit a CFR:
Exhaust stack access hatches, including all associated studs and nuts.
All cleaned exhaust stack surfaces.
All exhaust expansion joints, including associated bolts.
3.7.1 Following cleaning of the interior of each exhaust pipe system, demonstrate completeness of the cleaning process to the Coast Guard Inspector, showing that the entire length of exhaust piping has been satisfactorily cleaned according to the work plan.
3.8 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13
(Touch-ups and minor coating repairs.)
3.9 Operational test – post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the exhaust stack system to be in satisfactory operating condition. Submit a CFR
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
16 (Rev-0)
25902_0612_FLT
REC_25902_FLT_140 WTG (ALL) (0210)
WORK ITEM 3: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean (both) Ship
Service Diesel Generators exhaust piping.
1.2 Government-furnished equipment.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 101 WTGB 259-001, Rev L, Diesel Exhausts & Steam Generator
Exhausts System A & D
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2008, Occupational Safety and Health Standards for Shipyard Employment
3. REQUIREMENTS
3.1 General.
17 (Rev-0)
3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences):
Access covers.
Exhaust stack.
SSDG.
Vent ducting.
Wiring.
Exhaust pipe expansion joints.
Exhaust insulation blankets.
Support brackets
3.1.5 Safety precaution. The Contractor shall rig suitable safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.
3.1.6 Access openings.
Not applicable.
3.2 Work plan. The Contractor shall develop and submit to the COTR, a plan for collecting and disposing of waste extracted during cleaning process. Ensure that the proposed plan shall detail how and where exhaust piping will be disconnected, how entire length of exhaust piping will be divided/sectioned for cleaning, and precautions to protect the SSDG. The Contractor shall perform this work upon receiving Coast Guard approval of the plan.
3.3 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the exhaust stack system, to demonstrate existing operational condition. Submit a CFR.
3.4 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping to the SSDG, shown on Coast Guard Drawing(s) 101 WTGB 259-001, to a condition free from soot, tar, and any other foreign matter as follows:
3.4.1 Disconnect the exhaust piping as necessary to facilitate cleaning.
18 (Rev-0)
3.4.2 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel.
Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.
3.4.3 Upon completion of cleaning, do the following:
3.4.3.1 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming. Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.
3.4.3.2 Reassemble exhaust piping; renew all flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials; and renew all fasteners.
3.5 Inspection and report. The Contractor shall perform a visual inspection of the following components; submit a CFR:
Exhaust stack access hatches, including all associated studs and nuts.
All cleaned exhaust stack surfaces.
All exhaust expansion joints, including associated bolts.
3.6 Touch-up preservation. The Contractor shall prepare and touch-up coat all disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, Appendix B (Cutter and Boat Interior Painting Systems).
3.7 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of the exhaust stack system to prove satisfactory operating condition. Submit a CFR.
19 (Rev-0)
25903_1014_FLT
REC_25903_FLT_140 WTGB (ALL) (0414)
WORK ITEM 4: Boiler Exhaust Stack Uptakes, Commercial Clean
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean (both) Boilers exhaust piping.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 101 WTGB 259-001, Rev L, Diesel Exhausts & Steam Generator
Exhausts System A & D
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
20 (Rev-0) the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std
Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
Access covers.
Exhaust stack.
Boiler.
Exhaust pipe expansion joints.
Exhaust insulation blankets.
Support brackets
3.1.5 Safety precaution. The Contractor shall rig suitable safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.
3.2 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast
Guard Personnel perform an initial operational test of the exhaust stack system, to demonstrate existing operational condition. Submit a CFR.
3.3 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping to the Boiler, shown on Coast Guard Drawing(s) 101 WTGB 259-001, to a condition free from soot, tar, and any other foreign matter as follows:
3.3.1 Disconnect the exhaust piping as necessary to facilitate cleaning.
3.3.2 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel.
Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.
3.3.3 Upon completion of cleaning, do the following:
3.3.3.1 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming. Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.
3.3.3.2 Reassemble exhaust piping; renew all flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials; and renew all fasteners.
21 (Rev-0)
3.4 Inspection and report. The Contractor shall perform a visual inspection of the following components; submit a CFR:
Exhaust stack access hatches, including all associated studs and nuts.
All cleaned exhaust stack surfaces.
All exhaust expansion joints, including associated bolts.
3.5 Touch-up preservation, general. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
3.6 Operational test – post repairs. After completion of work, the Contractor shall, in the presence of the Coast Guard Inspector, thoroughly test and prove of the exhaust stack system to be satisfactory operating condition. Submit a CFR.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
22 (Rev-0)
32123_DCH_0814_140
WORK ITEM 5: Circuit Breakers (60 Hz), Inspect and Test
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and test circuit breakers (60 Hz) located on the Main Switchboard.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 101-WTGB 320-6, Rev K, Power System One Line Diagram
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3478, 03-APR-01, Manufacturer's Instruction
Book-SWBS Group(s) 324
OTHER REFERENCES
National Electrical Manufacturers Association (NEMA) Stds, Pub. No. AB4, 2003, Guidelines for Inspection and Preventive Maintenance of Molded Case Circuit
Breakers Used in Commercial and Industrial Applications
Underwriters Laboratories Inc. (UL) 489, May 2002, Molded Case Circuit Breaker
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
http://www.techstreet.com/ http://www.techstreet.com/cgi-bin/detail?product_id=1173948
23 (Rev-0) the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std
Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Inspection requirement. The Contractor shall inspect all circuit breakers wire connectors, screws and plating and submit a CFR.
3.2.1 The Contractor shall provide skilled technicians, portable instrument standards and all necessary equipment to inspect and test circuit breakers designated in the work item. The
Contractor may remove the Circuit Breakers from the vessel to a shoreside test facility. If this is done the Contractor shall exercise extreme care in transporting and reinstalling the circuit breakers to original operating condition on Switchboard.
3.2.2 Prior to any wiring disconnection and removal of circuit breakers, the Contractor shall record all wiring information, trip setting adjustments, and equipment locations necessary for use in later reinstallation. Retain all mounting and connecting hardware for later reuse. Submit a
CFR.
3.2.3 Disconnect and remove the circuit breakers listed in the Table 1. Coordinate the disconnection and removal of the circuit breakers with the COR to minimize disruption of power.
Temporarily cover or insulate switchboard or panel board openings created by the removal of circuit breakers to prevent personnel contact with energized conductors.
3.2.4 The Contractor shall notify the COR 48 Hours prior to start work on this item.
3.2.5 Surface burn marks and hairline cracks are acceptable but shall not deteriorate the mold surface or impair physical strength. Cracks are not permitted in wall section between phase and a ground plane when there is a conducting part in contact with the wall section. Cracks shall not exceed 0.75 inch in length, and in no case should be greater than 50 percent of the length of the surface in which the crack appears. Submit a CFR
3.3 Circuit breaker testing. The contractor shall test circuit breakers listed in the Table 1 in accordance with the National Electrical Manufacturers Association (NEMA) AB 4 or UL 489
Molded Case Circuit Breakers. The test shall include, at a minimum:
Mechanical Operation
Insulation Resistance
Individual Pole Resistance
Inverse-Time Over current Tripping
Instantaneous Over current Tripping
Rated Hold-In Current (Note: Perform this test only on the circuit breakers which are tripping under normal load condition. The COR will identify the circuit breakers).
24 (Rev-0)
3.4 Circuit breaker data sheet. The contractor shall provide data sheet of each circuit breaker testing with the following information:
Circuit Breaker Model and Serial Number
Circuit Breaker Service
Circuit Breaker Visual Condition
Test Voltage/Test Amperes
Type of Test/Test Method/Test Date/Name of Test Laboratory
Result of Testing
3.5 Contractor’s option for circuits breaker renewal. The Contractor may elect to renew circuit breakers in lieu of testing (due to high cost of labor for testing or non available nearby testing facilities) at no additional cost to the government. Ensure that all circuit breakers shall be UL 489
Certified.
TABLE 1 – CIRCUIT BREAKER LIST
QUANTITY
GENERAL
ELECTRIC
DESCRIPTION SERVICE
AKR-6D-30E
NSN:5925-01-120-
3 Pole 800 Amp Frame, 400
Amp Trip Rating.
SSDG No.1 & No.2
1SG-4P-1S/2SG-4P-1S
AKR-6D-30
NSN:5925-01-120-
3 Pole, 800 Amp Frame, 400
Amp Trip Rating.
Shore Power
1S-PS424
AKR-6-30
NSN:5925-01-120-
3 Pole, 800 Amp Frame, 400
Amp Trip Rating.
Fire Pump Bus Circuit
Breaker BT1
3.6 Circuit breaker reinstallation. After all testing is complete; reinstall circuit breakers using previously recorded wiring information to its original operating condition and Coast Guard TP
3478.
NOTE
3.7 Operational test - specific.
3.7.1 Operational test – post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all circuit breakers to be in satisfactory operating condition. Submit a CFR.
3.7.2 Operate each Circuit Breaker “ON” and “OFF” several times to exercise the circuit breaker and ensure that mechanical linkages are free.
3.7.3 Direction of Rotation Test – Perform a direction of rotation test on each new and disturbed three-phase motor circuit.
25 (Rev-0)
26 (Rev-0)
58101_0814_FLT
REC_58110_FLT_140 WTGB (ALL) (0313)
WORK ITEM 6: Anchor Chain(s) and Ground Tackle, Inspect and Repair
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform inspection and repairs to the anchor chain assembly, including associated ground tackle.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 101 WTGB 581-001, Rev T, Anchor Handling A & D
Coast Guard Drawing 101 WTGB 581-002, Rev C, Anch. Windls Outline Instl Data
Coast Guard Drawing 101 WTGB 581-003, Rev E, Anch. Windls Mchry Assy
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Federal Specification (Fed Spec) RR-C-271, Rev E, Dec 2010, Chain and Attachments, Welded and Weldless
MIL-DTL-23549, Dec 2011, Grease, General Purpose
MIL-C-24633, Apr 1998, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface
Preparation Standard SSPC-SP 6/NACE No. 3, 2007, Commercial Blast Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1
(SSPC-SP 1), 2004, Solvent Cleaning http://208.233.211.117/cgi-bin/SoftCart.exe/STORE/PAGES/SP1.htm?L+sspcstore+wukd3494+1057295146 http://208.233.211.117/cgi-bin/SoftCart.exe/STORE/PAGES/SP1.htm?L+sspcstore+wukd3494+1057295146
27 (Rev-0)
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
3.2.3 (Inspections).
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures -…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .