SCIOTO_(WLR_65B)_DD_FQ3_BMM_16ER0_BLANK.xls
XLS spreadsheet 38 KB Posted
- Attached to
- HSCG85-16-C-P45664 SCIOTO DD REPAIRS
- Solicitation number
- HSCG85-16-C-P45664
About this file
SCIOTO BLANK SECTION B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SCIOTO_(WLR_65B)_DD_FQ3_BMM_16R0_Specification.pdf | ||
| Past_Performance_Questionnaire.docx | DOCX document | |
| SCIOTO_-_FY16_DRYDOCK_-_SOLICITATION.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC SCIOTO (WLR-65B) DRYDOCK AVAILABILITY FY2016 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (Side Scan), Ultrasonic Testing - Tender | JOB | 1 | $0.00 | |
| D-002 | Hull Plating (Side Scan), Ultrasonic Testing - Barge | JOB | 1 | $0.00 | |
| D-003 | Hull Plating (U/W Body), Inspect - Tender | JOB | 1 | $0.00 | |
| D-004 | Hull Plating (U/W Body), Inspect - Barge | JOB | 1 | $0.00 | |
| D-005 | Appendages (U/W), Leak Test - Tender | JOB | 1 | $0.00 | |
| D-006 | Appendages (U/W), Leak Test - Barge | JOB | 1 | $0.00 | |
| O-007 | Appendages (U/W) - Internal, Preserve - Tender | JOB | 1 | $0.00 | |
| O-008 | Appendages (U/W) - Internal, Preserve - Barge | EA | 2 | $0.00 | |
| O-009 | Propulsion Shafting, Straighten | EA | 2 | $0.00 | |
| D-010 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| D-011 | Propulsion Shaft Bearings (External), Check Clearances | JOB | 1 | $0.00 | |
| O-012 | Propulsion Shaft Bearings (External), Renew | JOB | 1 | $0.00 | |
| O-013 | Propeller, Perform Minor Repairs and Reconditioning | EA | 2 | $0.00 | |
| D-014 | Propellers, Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| D-015 | Keel Coolers, Clean, Inspect and Hydro - Tender | JOB | 1 | $0.00 | |
| D-016 | Keel Coolers, Clean, Inspect and Hydro - Barge | JOB | 1 | $0.00 | |
| D-017 | Barge, Diesel Engine Exhaust Piping, Commercial Clean | JOB | 1 | $0.00 | |
| D-018 | Rudder Assembly; Remove, Inspect and Reinstall | JOB | 1 | $0.00 | |
| D-019 | Spuds, Overhaul - Tender | JOB | 1 | $0.00 | |
| D-020 | Spuds, Overhaul - Barge | JOB | 1 | $0.00 | |
| D-021 | Spud Wells, Preserve - Tender | JOB | 1 | $0.00 | |
| D-022 | Spud Wells, Preserve - Barge | JOB | 1 | $0.00 | |
| D-023 | Tanks (Sewage Holding), Preserve “100%” - Tender | JOB | 1 | $0.00 | |
| D-024 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | 1 | $0.00 | |
| D-025 | U/W Body, Preserve (100%) - Tender | JOB | 1 | $0.00 | |
| D-026 | U/W Body, Preserve (100%) - Barge | JOB | 1 | $0.00 | |
| D-027 | Drydock - Tender | JOB | 1 | $0.00 | |
| D-028 | Drydock - Barge | JOB | 1 | $0.00 | |
| D-029 | Temporary Services, Provide - Tender and Barge | JOB | 1 | $0.00 | |
| D-030 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| D-031 | Boat Davit Winch, Shrink Wrap | JOB | 1 | $0.00 | |
| D-032 | Buoy and Cargo Handling Crane, Shrink Wrap | JOB | 1 | $0.00 | |
| D-033 | Deck Covering (Interior Wet/Dry), Renew | JOB | 1 | $0.00 | |
| D-034 | Hull Plating Forward, Renew - Tender | JOB | 1 | $0.00 | |
| D-035 | Barge Hold(s) Hull Plating, Renew | JOB | 1 | $0.00 | |
| D-036 | Hull Plating Aft, Renew - Tender | JOB | 1 | $0.00 | |
| D-037 | Propulsion Shaft Seals, Mechanical & Inflatable, Overhaul and Renew | JOB | 1 | $0.00 | |
| D-038 | Hot Water Accumulator Tanks, Clean and Inspect | JOB | 1 | $0.00 | |
| D-039 | Deck Covering, Wet, Seal | JOB | 1 | $0.00 | |
| D-040 | Deck Covering, Dry, Seal | JOB | 1 | $0.00 | |
| D-041 | Lead-Based Paint and Asbestos-Containing Material, 100% Abatement, Perform | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 350 | 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(12/18/2015)
Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | ||||||||||||||||||||||||
| Assumed G&A Factor | 15% | ||||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | ||||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData | |
| 1 | 62 | Baltimore, MD | |||||||||||||||||||||||
| 1 | 52 | Biloxi, MS | |||||||||||||||||||||||
| 1 | 56 | Boston, MA | |||||||||||||||||||||||
| 1 | 50 | Charleston, SC | |||||||||||||||||||||||
| 1 | 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 1 | 51 | Hampton Roads | |||||||||||||||||||||||
| O-007 | 1 | 64 | Honolulu, HI | ||||||||||||||||||||||
| O-008 | EA | 2 | 55 | Houston, TX | |||||||||||||||||||||
| O-009 | EA | 2 | 56 | Los Angeles, CA | |||||||||||||||||||||
| 1 | 55 | Median Rate | |||||||||||||||||||||||
| 1 | 49 | Miami | |||||||||||||||||||||||
| O-012 | 1 | 50 | Narragansett Bay, RI | ||||||||||||||||||||||
| O-013 | EA | 2 | 55 | New London, CN | |||||||||||||||||||||
| 1 | 45 | New Orleans | |||||||||||||||||||||||
| 1 | 62 | NYNY | |||||||||||||||||||||||
| 1 | 49 | Panama City, FL | |||||||||||||||||||||||
| 1 | 60 | Philadelphia, PA | |||||||||||||||||||||||
| 1 | 51 | Portland, ME | |||||||||||||||||||||||
| 1 | 57 | Portland, OR | |||||||||||||||||||||||
| 1 | 55 | San Diego, CA | |||||||||||||||||||||||
| 1 | 67 | San Francisco, CA | |||||||||||||||||||||||
| 1 | 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 1 | 55 | SE North Carolina | |||||||||||||||||||||||
| 1 | 65 | Seattle, WA | |||||||||||||||||||||||
| 1 | 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 1 | 60 | Wilmington, DE | |||||||||||||||||||||||
| 1 | |||||||||||||||||||||||||
| 1 | |||||||||||||||||||||||||
| 1 | |||||||||||||||||||||||||
| 1 | |||||||||||||||||||||||||
| 1 | |||||||||||||||||||||||||
| 1 | |||||||||||||||||||||||||
| 1 | |||||||||||||||||||||||||
| 1 | |||||||||||||||||||||||||
| 1 | |||||||||||||||||||||||||
| 1 | |||||||||||||||||||||||||
| 1 | |||||||||||||||||||||||||
| 1 | |||||||||||||||||||||||||
| 1 | |||||||||||||||||||||||||
| D-040 |
&C(09/28/2009)_x000D_ Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .