Amendment_0001.pdf
PDF 60 KB Posted
- Solicitation number
- HSCG85-15-R-P30E33
About this file
Amendment 0001 - Addresses Requests for Clarifications (RFCs) received up to date 04MAY15
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0001 05MAY15 21-15-855P30E33
6. ISSUED BY CODE HSCG85 7. ADMINISTERED BY (If other than Item 6) CODE
COMMANDER, USCG
Surface Forces Logistics Center – Contract & Procurement Division 1301 Clay Street, Suite 807N Oakland, CA 94612
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.
TO ALL PROSPECTIVE OFFERORS
HSCG85-15-R-P30E33
X 9B. DATE (SEE ITEM 11)
22 APRIL 2015
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SUBJECT: Solicitation No. HSCG85-15-R-P30E33, USCGC WAESCHE (WMSL 751) Topside Preservation Services FY15 FQ3
SEE CONTINUATION PAGES
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Jake M. Apolonio, CONTRACT SPECIALIST 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
Solicitation No. HSCG85-15-R-P30E33 CGC WAESCHE (WMSL 751) Topside Preservation FY15 FQ3 Amendment No. 0001
The purpose of this amendment is as follows:
1. To address the following clarification questions
D-03, Para 3.1.5.2 (Decks Exterior Surface, Preserve) Q: ” Fantail and Boat Deck The contractor shall include the base of the winch, the base and accessible areas underneath of the hose reel, base of pyrotechnics box, cradle appendages, stuffing tube box foundation, and dadoes.”
Does that mean the 150 SQ FT consists of the base of the winch, hose reel, pyrotechnics box, cradle appendages, stuffing tube box foundation and their respective dadoes? Please advise.
A: The intent is to preserve the entire deck surface in addition to the specifics identified in paragraph 3.1.5.2. The 150sqft should have read 1,500sqft.
D-03, Para 3.1.5.2 (Decks Exterior Surface,Preserve) Q: ” The Contractor shall ensure that water in all surface preparation tasks, including pre-surface preparation wash and waterjetting is of sufficient purity and quality that it does not prevent the surface being cleaned from achieving the required degree of surface cleanliness or nonvisible contamination criteria. Ensure that surface preparation water does not contain sediments or other impurities that are destructive to the proper functioning of the cleaning equipment.”
Definition above is no better explained in SFLC 0000 nor 6310. Typically Ships/Pier Potable water is used, poured in a glass and visually checked for particles and clarity. If clear then used, using the assumption if it’s PW and good enough to drink, cook and wash with then it must be ok to use to clean and blast decks.
Is there a specific test or series of tests that the Coast Guard requires to exactly meet the requirements of Para 3.1.6
A: Ships/Pier potable water is acceptable. There is no specific test or series of tests beyond those required to meet CG requirement for potable water.
D-04, Para 3.1.5.1 (Superstructure, Preserve “Partial”) Q: ” The contractor shall prepare the Stbd Boat Deck Superstructure areas to include bulkheads, Cleats and Pad eyes, not to include doors..”
Aft 20 feet of fwd to aft stbd bulkhead extends 24 feet to the Black paint on the Stack Stbd side.
Does the Coast guard intend to have the remaining 20 feet aft below the black done also as part of this work or will another “Cut Line” be established at a weld line partially uf the stack bulkhead
A: Contractor to preserve the Stbd side boat deck super structure up to the black from the Fwd edge aft to a weld seam in the approx vicinity of frame 52-54 and establish a cut line there.
The intent is the remaining portion of superstructure can be preserved from the CIWS deck by Ships force without the need for scaffolding or lifts.
Solicitation No. HSCG85-15-R-P30E33 CGC WAESCHE (WMSL 751) Topside Preservation FY15 FQ3 Amendment No. 0001
The solicitation closing date is NOT extended due to this amendment. Receipt of proposals are still due no later than 14MAY15 @ 1300 Pacific time.
| SF 30 (0001) |
| Jake M. Apolonio, CONTRACT SPECIALIST |
Page 2 - 0001
File details come from the government source that posted it. Updated .