Polar_Star_Scope_of_Work_for_ODF16.docx
DOCX document 18 KB Posted
- Attached to
- CGC POLAR STAR Repar of Purifiers
- Solicitation number
- HSCG85-15-Q-P45W38
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_02_CGC_POLAR_STAR.doc | DOC document | |
| Amendment_CGC_POLAR_STAR.doc | DOC document | |
| POLAR_STAR_1449.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Polar Star Scope of Work for Purifier Repairs
Fuel Oil Purifiers USPX413 Conduct complete teardown of both machines (8,000 HR Overhaul) IAW Manufactures Technical Publication Replacement parts are to be in the form of Alfa Laval Major and Minor Kits P/N 99155825 Replacement of the following components Level Ring P/N 8708302-80 Light Phase Pairing Disc P/N 81113980
Contractor to replace Vibration Feet, Cushions, and Bushings. Perform Motor alignment where required.
Upon disassembly of both units, Contractor to provide CFR, listing any other damaged parts that would require action.
Contractor to clean both unit bowls and all discs, reassemble, and test operate for 24 hours or acceptance of the CG Inspector. Results of the operational test shall be provided via CFR.
Lube Oil/Hydraulic Oil Purifiers WHPX405 Conduct Complete Teardown of the following Machines (8,000 HR Overhaul) IAW Manufactures Technical Publication
#1 HOP, #3 LOP, #1A LOP #2B LOP
Replacement parts are to be in the form of Alfa Laval Major and Minor Kits P/N 548978, 547034, and 547035 Replace the following components NR1 Hydraulic Oil Purifier Distributing Cover P/N 54694902 Distributing Ring P/N 53714004 Cover P/N 53714104 Control Pairing Disc P/N 53714204 Screw P/N 22170620 (4 ea) Screw P/N 71276 (3 ea)
Troubleshoot Operation of TRIAC Modules, Provide CFR
Upon disassembly of each unit, Contractor shall provide CFR, listing any other damaged parts that would require action.
Contractor to replace Vibration Feet, Cushions, and Bushings on Purifiers.
Contractor to clean each unit bowl and all discs, reassemble, and test operate for 24 hours or acceptance of the CG Inspector. Results of the operational test shall be provided via CFR.
File details come from the government source that posted it. Updated .