SHERMAN_(WHEC_378W)_DS_FQ4_DBS_15R0.doc
DOC document 865 KB Posted
- Attached to
- CGC SHERMAN Single Point Davit level 3 overhaul, RHIB Davit, Chocks recondition, hydraulic hose renewal
- Solicitation number
- HSCG85-15-Q-P45H46
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_CGC_SHERMAN_Single_Point_Davit.doc | DOC document | |
| SHERMAN_1449.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC SHERMAN (WHEC 720)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2015
Developed By: Delfino B Saucedo (Rev-0, 22 April 2015)
TABLE OF CONTENTS
iiiRevisions Record ivConsolidated List of References viConsolidated List of Government-furnished Property viiConsolidated List of Critical Inspection Items viiiPrincipal Characteristics
1General Requirements
12WORK ITEM 1: Allied 5700 Lb Single Point Davit, Renew
21WORK ITEM 2: RHIB Davit, Chocks Recondition, Hydraulic Hose Renewal
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:
· American Welding Society (AWS): http://www.awspubs.com/index.php
· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
· NFPA: http://www.nfpa.org
· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 378-FRAM-W 583-16, Rev -, RHIB Handling & Fdn Dets
Coast Guard Drawing 378-FRAM-W 801-1, Rev J, Booklet of General Plans
Coast Guard Drawing 378-FRAM-W 801-1, Rev J; Booklet of General Plans
Coast Guard Drawing FL 8201-79, Rev B, Rigid Hull Inflatable Boat Stwg Dets 6-M
COAST GUARD PUBLICATIONS
CG Tech Pub 2754, HYDRAULIC POWER UNIT Manufacturers Instruction Book, SWBS Group(s) 583, 6/22/84
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Coast Guard Technical Publication (TP) 3485C, 05-SEP-13, Single Point Boat Davit – Model D5700CT, Multiple Class Cutters
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.15 (SSPC-SP 15), 2004, Commercial Grade Power Tool Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning
The Society for Protective Coatings (SSPC)/NACE Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2004, Near-White Blast Cleaning
Consolidated List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/Unit)
| 1 |
| Y |
| Allied 5700 lb. Single Point Davit |
| NSN: 2030-01-476-6301 |
| 1 ea. |
| $94,625.27 |
| 1 |
| Y |
| Quick Release Hook Block |
| NSN: 4030-01-512-2113 |
| 1 ea. |
| $1,105.00 |
| 1 |
| N |
| Wire Rope Assembly |
| P/N 34220 |
| 1 ea. |
| $795.65 |
| 1 |
| Y |
| OTH RHI Boat Trailer |
1 ea.
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
| Work Item |
| Title |
This section is not applicable to this package.
Principal Characteristics
378 WHEC (W-Class: SHERMAN)
Physical
| Length overall |
| 378' 3" |
| Length between perpendiculars |
| 350' 0" |
| Maximum beam (@ 13' 6" dwl) |
| 42' 0" |
| Beam @ main deck |
| 42' 0" |
| Depth |
| 26' 3/8" |
| Main deck camber |
| 6" in 21' 0" |
| Minimum berth depth |
| 30' 0" |
| Height of highest projection |
| 116' |
| Draft, fwd @ full load |
| 14.78' |
| Draft, aft @ full load |
| 15.61' |
| Draft, fwd @ minimum operating |
| 14.63' |
| Draft, aft @ minimum operating |
| 15.33' |
| Full load displacement |
| 3313 long tons |
| Minimum operating displacement |
| 2762 long tons |
| Light ship displacement |
| 2433 long tons |
Hull
| Frame spacing |
| 1' 0" |
Material
| Deckhouse, fwd of frame 96 |
| HY-100 Steel |
| Main deck frames 183 to 242-1/2 and fwd of FR 96 |
| HY-80 Steel |
| 01 level frames 183 to 316 |
| HY-80 Steel |
| Lower hull around bow thruster, port and starboard strakes A-3 and A-4, frames 56 to 96 |
| HY-80 Steel |
| Masts and superstructure above the 01 deck |
| Type 3456 Aluminum |
| Remaining |
| ASTM A-131 |
Machinery
| Type of propulsion |
| CODOG |
| Two diesel engines |
| Fairbanks More 12-cylinder opposed piston 38-TD-8-1/8; 7000 SHP total |
| Two gas turbines |
| Pratt and Whitney FT4A-2; 36,000 SHP total |
| Two controllable pitch propellers |
| Escher Wyss 4 blade, 13' 0" diameter; 149 RPM max on Diesel engines; 235 RPM max on Gas turbines |
| Two reduction gears |
| Western Gear |
| Electrical characteristics |
| Two 550KW-AC Type, 450V, 60 Hz, 3 Phase, 720 RPM GM 8-645 diesel driven ship's service generators (located in the Engine Room) |
One 500KW-AC Type, 450V, 60 Hz, 3 Phase, Solar Model 101506-2001 gas turbine driven emergency service generator
Two 25 KVA (PF = 0.8), 120V, 400 Hz, 3 Phase Electronic Specialty motor generators
Two 10 KVA (PF = 0.8), 120V, 400 Hz, 3 Phase Electronic Specialty motor generators
Tank Capacities
| Diesel oil |
| 192,858 gal. (95%) |
| Fresh water |
| 17,695 gal. (100%) |
| JP-5 fuel |
| 27, 603 gal. (95%) |
00000_0315_FLT
REC_00000_FLT_ Commercial Project @ CG Facility (1212) General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
Coast Guard Drawings
None
Coast Guard Publications
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Other References
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.2 Contractor-provided fire extinguishers. The Contractor shall provide portable fire extinguishers.
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
· Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
· Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 5 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 5 of COMDTINST MI0360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is _________.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
· Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
· National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
· Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to adequately accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor shall be aware of the following:
3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
· None.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
| DATE & TIME |
| ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION (Frame & Deck, relation to equipment, etc.) |
| TEMPERATURE |
| % REL. HUMID-ITY |
| DEW PT. |
| SURFACE |
| AMBIENT |
| ΔT |
| DP - Surface |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (Frame References) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15
| DATE |
| TEST LOCATIONS |
| CONDUCTIVITY |
(microsiemens/cm)
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Coating Mfg |
| Product Name |
| Batch # |
| Induction Time |
| Coating System Sequence (Primer/Touchup/3rd Coat, etc.) |
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| AVERAGE VALUE |
*BASE METAL READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| Application Method (Airless, Conventional Spray, Rolled) |
| Average DFT |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
SYY_NNN_58300_JAH_0714_726
WORK ITEM 1: Allied 5700 Lb Single Point Davit, Renew
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to install a GFM reconditioned Single Point Davit.
1.2 Government-furnished property.
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/UNIT)
| Y |
| Allied 5700 lb. Single Point Davit |
| NSN: 2030-01-476-6301 |
| 1 ea. |
| $94,625.27 |
| Y |
| Quick Release Hook Block |
| NSN: 4030-01-512-2113 |
| 1 ea. |
| $1,105.00 |
| N |
| Wire Rope Assembly |
| P/N 34220 |
| 1 ea. |
| $795.65 |
| Y |
| OTH RHI Boat Trailer |
1 ea.
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 378-FRAM-W 801-1, Rev J; Booklet of General Plans Coast Guard Publications
Coast Guard Technical Publication (TP) 3485C, 05-SEP-13, Single Point Boat Davit – Model D5700CT, Multiple Class Cutters
CG Tech Pub 2754, HYDRAULIC POWER UNIT Manufacturers Instruction Book, SWBS Group(s) 583, 6/22/84
Other References
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not Applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
· Hydraulic Fluid.
· RHI Boat
3.1.4.1 Ship’s force shall lower the RHI boat and place it in the trailer.
3.2 Receipt of GFM.
3.2.1 Receive the remanufactured Allied Single Point Davit.
3.2.2 Uncrate and inspect the davit assembly. Ensure that davit wire rope and quick release hook block assembly are received. Ensure all hydraulic connections on the new davit are capped to prevent entry of contamination into the hydraulic system during shipping.
3.2.3 Submit a CFR on condition of the equipment received. Note any shipping damage.
3.2.4 Retain the shipping cradle, packing for return of the existing single point davit assembly.
3.3 Remove existing single point davit assembly as a unit.
3.3.1 Drain the oil from the CT winch assembly on the existing davit.
3.3.2 Disconnect and cap all hydraulic lines leading from the control station to the davit to prevent entry of contamination.
3.3.3 Bleed any remaining hydraulic fluid from the davit assembly.
3.3.4 Attach a lifting crane to the davit assembly to allow removal of the davit from the cutter. The cutter shall be moored port side to the pier to allow ease of accessing the davit assembly.
3.3.5 Disconnect the foundation mounting bolts and remove the crane from the pedestal foundation.
3.3.6 Transport the existing davit assembly to the shop.
3.3.7 Disconnect and remove the existing quick release hook block assembly from the davit assembly. Pack the hook block assembly separate from the davit.
3.3.8 Visually check the davit to ensure that packing, seals, plugs, etc. are all in place and that there is no leakage or damage.
3.3.9 Lubricate and grease the davit assembly.
3.3.10 Preserve the winch and cable, bearings, bushings, swing gear and other unpainted surfaces with a non-running grease.
3.3.11 Pack the old davit assembly in the shipping cradle of the newly received GFM davit assembly.
3.3.12 Turn over the davit and hook block assembly to the Coast Guard for return shipment.
3.4 Davit Pedestal Foundation Inspection and Preservation.
3.4.1 Wash the foundations with fresh soapy water to remove salts and greases
3.4.2 Power tool clean the pedestal foundation, both the interior and the exterior of the foundation assembly, to near white metal in accordance with SSPC-SP 11. Feather all edges to existing paint.
3.4.3 Dye penetrant test all of the foundation welds for any indication of cracking in the foundation welds. Submit a CFR noting any evidence of cracking of welds. If cracking is noted, a contract modification may be issued to correct.
3.4.4 Solvent wipe the foundations in accordance with SSPC-SP 1 to remove any remaining contaminants. Remove all grease and hydraulic fluid.
3.4.5 Paint the interior and the exterior of the davit pedestal foundations with 2 coats of surface tolerant epoxy paint, each coat to be 5-6 mils dft. Follow guidance in SFLC Std Spec 6310.
3.5 Install GFM Davit.
3.5.1 Following guidance in CG Tech Pub 3485C, Chapter 8, install the reconditioned GFM davit on the pedestal foundation. Provide and install new mounting bolts and washers.
3.5.2 Torque new mounting bolts as shown in figure 8-1 of the tech pub.
3.5.3 Install the new wire rope assembly on the CT winch. Pressure lubricate the wire rope assembly as it is installed.
3.5.4 Install the new Quick Release Hook Block Assembly on the wire rope.
3.5.5 Reconnect all of the hydraulic lines to the davit assembly.
3.5.6 Flush the hydraulic system following guidance in Chapter 8, para 8.2(6) a-f. This includes flushing the HPU, winch, and boom assembly as separate units.
3.5.7 Prepare the davit assembly for operation as described in Para 8.3, including the preliminary checks described in chapter 5.
3.6 Load Test Newly Installed Davit. The following load testing shall be accomplished on the newly installed Single Point Davit.
(a) No load test
(b) Static Load Test the Davit, 150% of rated load = 8,550 lbs
(c) Dynamic Load Test the Davit, 125% of rated load at no specific speed = 7,125 pounds
(d) Rated load test at rated speed with 5700 lbs
(e) Constant Tension Feature Testing with 2500 lbs
(f) Static Load Testing OTH RHIB rigging gear consisting of the sling to 6500 lbs
NOTE
OTH Single Point Davit Tests are conducted with independent test weights or water bag. The boat is NOT used. The Contractor shall provide water bag.
3.7 No Load Testing. Conduct an operation test of the SPD with no load. Ensure all safety features operate properly. Test the davit through the entire range of motion. Adjust the Two-Block limit switch and verify that it shuts down the equipment.
3.8 Static Testing. Test the static strength of the SPD by attaching 8,550 lbs of Contractor furnished weights (or water bag) to the hook. Ensure that the weight will not strike the cutter or damage it in any way. Hold the weight for at least 10 minutes in this condition. No visually observable creep/slip shall be allowed. The Contractor shall provide 8,550 lbs test weight.
3.8.1 Use a crane to place the weight on the davit hook. It will not bear weight during testing, but shall remain on the hook for the duration of the static weight test. Upon the completion of static test, remove all weights
3.8.2 Post Test Inspection. Following each test, an inspection shall be made in the presence of the Coast Guard Inspector to ensure that no parts have been strained and to verify that all parts are in proper condition. Typical defects to look for are:
· Elongated, deformed or cracked shackles
· Cracks or deformation of bolt holes or bolts
· Deformed or cracked welds
· Loss in strength due to corrosion or deterioration
· Elongated or frayed wire rope
· Loosening of wire rope fittings
· Absence of lubrication on cables, rollers and sheaves
· High strands, bird caging or kinks in wire rope
3.9 Dynamic Testing. After successful static testing, operationally test the SPD to 125 percent of hoisting capacity (7125 lbs). Ensure that the Contractor furnished weight will not strike the cutter or damage it in any way. Check winch for rated speed at rated load and check rated hydraulic oil flow and pressure in accordance with the manufacturer recommendation.
NOTE
7125 lbs is the maximum operational test load for the 5700CT SPD.
3.9.1 Test the winch operation by raising and lowering the weight. Raise and lower the weight through at least 3 cycles. Ensure wire rope reeves fair on the winch drum and all mechanisms are set properly.
3.9.1.1 Lower the weight. Stop and raise the weight 6“. Hold for 5 minutes without slippage.
3.9.1.2 Raise the weight and breast the davit in and out.
3.9.1.3 Stow weight and repeat steps above, 3 times.
3.9.2 Test the swing drives by holding the weight against the cutter’s rail after first protecting the rail with chafing gear.
3.10 Rated Load Test. Operationally test the SPD to 100 percent of hoisting capacity (5700 lbs) at rated speed. Test the winch operation by raising and lowering the weight. Raise and lower the weight through at least 3 cycles. Ensure wire rope reeves fair on the winch drum and all mechanisms are set properly.
3.10.1 Lower the weight. Stop and raise the weight 6“. Hold for 5 minutes without slippage.
3.10.2 Raise the weight and breast the davit in and out.
3.10.3 Stow weight and repeat steps above, 3 times.
3.11 CT Operational Test. Test the CT winch as described in the procedure attached to the end of this specification item.
3.12 Emergency Operation Simulation. With the OTH RHI Boat in the stowed position, cut off all electrical power to the HPU and SPD. Conduct emergency OTH RHI Boat handling operations in accordance with CG Tech Pub 3485A.
3.13 Test Report. Submit a Condition Found Report (CFR) of all, tests and inspections to the Coast Guard Inspector within 24 hours.
3.14 Provide and attach an engraved brass label plate showing the Rated working Load, Dynamic Load Test, and Static Test Load, place and date of test. The Coast Guard Inspector will designate the location for this plate.\
3.15 Restoration.
3.15.1 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures).
3.15.2 Restore all interferences to their original condition in accordance with the General Requirements.
4. NOTES
The Coast Guard Availability Project Manager (APM) and cutter shall complete the following Maintenance Procedure Cards (MPC) associated with this install upon completion of this work item:
· A-C-10383, Test Davit Hook (Depot)
· A-M-50, Lubricate/Inspect Single Point Davit (Org)
· A-S-81, Check Single Point Davit Oil Levels (Org)
· A-S-87, Inspect Single Point Davit (Org)
Single Point Davit Constant Tension Testing Procedures as Presented by Technicians from Allied Systems
Step 1: Energize the davit and lower the hook to an appropriate height to be tied.
Step 2: Tie the hook to a fixed point on the deck.
· Recommend using triple braid nylon line with a taught-line hitch.
· Ensure that the line goes through the handle of the davit’s hook.
· Ensure that the wire rope is as vertical as possible.
· SHERMAN used the tying system pictured below to accomplish the requirements above.
Step 3: Using the winch controls, reel in the cable until there is sufficient tension in the line so that the tension indicator engages (pictured below).
Step 4: Press the Constant Tension (CT) button.
· At this point the indicator light should illuminate indicating that CT is on.
· Although CT has been selected it should not fully engage yet.
Step 5: Using the winch, slack the line until the tension indicator disengages.
· At this point CT should be engaged.
Step 6: Have someone physically pull down on the cable.
· When CT is properly set to its minimum tension setting, someone should be able to pull out the cable with about 50lbs of force.
· If the above does not work, then either constant tension is not working or the minimum tension is not properly set. In the consol there is a small potentiometer that can be adjusted to correct the minimum tension.
· From that point, you should be able to adjust the tension from the winch control joystick.
LT Landyshev wrote: these test procedures were demo’ed to the CG personnel onboard CGC Sherman on 02May2013 by Allied service manager (Mr. Adam Quint).
SYY_NNN_58300_JAH_0415_720
WORK ITEM 2: RHIB Davit, Chocks Recondition, Hydraulic Hose Renewal
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to recondition the chocks which are used to support the RHIB boat used with the ALLIED Single Point Davit and to supply new hydraulic hoses.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing FL 8201-79, Rev B, Rigid Hull Inflatable Boat Stwg Dets 6-M
Coast Guard Drawing 378-FRAM-W 801-1, Rev J, Booklet of General Plans
Coast Guard Drawing 378-FRAM-W 583-16, Rev -, RHIB Handling & Fdn Dets
Coast Guard Publications
Coast Guard Technical Publication (TP) 3485C, 05-SEP-13, Single Point Boat Davit – Model D5700CT, Multiple Class Cutters
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Other References
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning
The Society for Protective Coatings (SSPC)/NACE Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2004, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.15 (SSPC-SP 15), 2004, Commercial Grade Power Tool Cleaning
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
None.
3.1.2 Tech Rep. Not Applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
· RHIB Boat
3.1.4.1 Perform the following work in conjunction with renewal of the Allied Single Point Davit. The RHIB Boat shall have already been removed from the cutter and stored.
3.2 RHIB boat chocks, recondition.
3.2.1 Using the information contained in CG Dwg FL 8201-69, remove the fore and aft chocks for the RHIB boat associated with the ALLIED Single Point Davit.
3.2.2 While the fore and aft chock assemblies are removed, power tool clean the chock base assembly for each chock to commercial clean metal in accordance with SSPC SP-15. Power tool the deck area for 1 ft. on either side of each base assembly to commercial clean metal. Feather all edges. Paint the base assembly for each base and the surrounding deck areas in accordance with SFLC Std Spec 6310.
3.2.3 Disassemble the forward and aft chock assemblies. Remove and store leather and wood and felt covering on each of the chocks.
3.2.4 Abrasive blast all other portions of the chock assemblies to near white metal in accordance with SSPC SP-10.
3.2.4.1 Inspect each chock assembly for deterioration. Submit a CFR if chocks are in need of renewal.
3.2.4.2 Paint all chock parts in accordance with SFLC Std Spec 6310.
3.2.5 Using the removed coverings as a template, fabricate and install new wood, leather and felt coverings on each chock. Dispose of old covers after completion.
3.2.7 Reinstall the fore and aft chock assemblies onboard the cutter in their correct orientation and location. Grease all moving parts.
3.3 Hydraulic hose renewal.
3.3.1 Using Figure 3-8 Hydraulic Schematic Diagram in CG Tech Pub 3485A, renew each of the hoses listed in the table below. Materials to be equal to existing when new.
TABLE 1 – Hydraulic Hose Renewal List
| Hydraulic Hose ID No. |
| Material |
| Hose Listing |
| Test Pressure |
Swing Drive Motor S5
Swing Drive Motor S6
Boom Lift Cylinder B1
Boom Lift Cylinder B2
CT Winch CTR
CT Winch CTP
CT Winch WUP
CT Winch WDN
3.3.2 Remove an dispose of the designated hoses and maintain existing system cleanliness.
3.3.3 Furnish and install new hoses in place of the removed. Hydrostatically test each of the new hoses prior to installation.
3.3.4 Renew all lost system fluids.
3.3.5 Maintain system integrity. Ensure that no contaminants enter the hydraulic system while hoses are removed.
3.3.5.1 The Contractor shall wrap all hose end fittings exposed to weather with a suitable commercially available protective tape, completely covering all exposed metal. The tape shall be a petrolatum base compound on a fabric carrier (e.g. Densyl Tape [www.densona.com], Carbowrap Marine Tape [www.carboline.com], Petro tape. [www.pertotape.co.za], or equivalent).
3.3.6 Hose Fitting Documentation. For each hose assembly renewed, the Contractor shall provide the information as indicated on table 2.
TABLE 2: HOSE FITTINGS DOCUMENTATION
System Or Component AND LOCATION ON CUTTER:________________________
HOSE SERIAL NUMBER:_________________
| Hydrostatic test pressure (PSIG) |
| Location on Cutter (Compartment) |
| System and service description |
| Material |
| Size Inches |
| Length Inches |
| Part number |
FITTING #1
| Design pressure |
| Reusable Y/N |
| Material |
| Type |
| Size |
| Manufacturer |
| Part number |
FITTING #2
| Design pressure |
| Reusable Y/N |
| Material |
| Type |
| Size |
| Manufacturer |
| Part number |
3.3.7 Hose tags. The Contractor shall provide new hose tags, in accordance with MIL-DTL-15024. Ensure tag color coding of black on natural or black on white. Ensure that tags shall be attached using materials that will not damage hose assembly in any way, or interfere with the normal flexing motion of the hose.
3.3.7.1 Hose tag information. Ensure the following is placed on each hose tag:
· Hose Log Item Number. (Serial number)
· Hydro Test Pressure and Test Date [DD/MM/YY]
· Service Life (Replacement Date) Date [QTR "Q"/FY]
NOTE
HYDRO TEST PRESSURE AND TEST DATE MAY BE PROVIDED BY THE ASSEMBLY MANUFACTURER ON AN INDEPENDENT TAG. WHERE A HYDRO TEST IS NOT REQUIRED, INSERT THE ANNOTATION "NA".
3.4 Restoration.
3.4.1 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures).
3.4.2 Restore all interferences to their original condition in accordance with the General Requirements.
4. NOTES
This section is not applicable to this work item.