CG-300 Crane Specification
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_1 _CLIN_ _Price_List _CG-300_Ocean_Master_Crane.xlsx | XLSX spreadsheet | |
| Attachment_3 _Past_Performance_Ref_Form _CG-300_Ocean_Master_Crane.docx | DOCX document | |
| CG-300_Ocean_Master_Crane_Solicitation_073015_with_changes_made_6_August _posted.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
American Aero Oceanmaster CG-300 Crane
SPECIFICATION FOR OVERHAUL AND REPAIR
FY2015
Developed By: Thurston B. Sumner III and Paul W Beausejour (Rev-0, 4 March 2015)
TABLE OF CONTENTS
iiiRevisions Record ivConsolidated List of References viConsolidated List of Government-furnished Property viiConsolidated List of Critical Inspection Items viiiPrincipal Characteristics
1General Requirements
10WORK ITEM 1: CG-300 Equipment and Components, Inspect and Service
21WORK ITEM 2: CG-300 Upper Works Equipment and Components, Inspect and Service
40WORK ITEM 3: CG-300 Boom, Inspect and Service
43WORK ITEM 4: Technical On-Site Support and Diagnostics, Provide
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:
· American Welding Society (AWS): http://www.awspubs.com/index.php
· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
· NFPA: http://www.nfpa.org
· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing FL 9210-1, Rev -, Weatherford Marine CG 300 Crane
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST)_M10360.3 (series), Coatings and Color Manual
Coast Guard Technical Publication (TP) 1952B, SWBS 589, Section A, Sep 2008, Construction Crane, Oceanmaster CG300
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, And Installation
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Inspect, Repair, And Test Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
ASTM International (ASTM) 6966, 2008, Standard Practice for Collection of Settled Dust Samples Using Wipe Sampling Methods for Subsequent Determination of Metals
Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2008, Occupational Safety and Health Standards
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
Consolidated List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/Unit)
| 1 |
| Y |
| CG300 Crane Equipment and Components |
| Kit |
| 1 Box |
| 96,250.00 |
| 2 |
| Y |
| Oceanmaster CG300 Marine Crane |
| Crane Upper Works |
| 1 |
| 296,250.00 |
| 3 |
| Y |
| CG300 Crane Boom Base |
| N/A |
| 1 ea. |
| 15600.00 |
| 3 |
| Y |
| CG300 Crane Boom Tip |
| N/A |
| 1 ea. |
| 19600.00 |
| 3 |
| Y |
| CG300 Crane Boom Mid Section 10’ |
| N/A |
| 1 ea. |
| 10500.00 |
| 3 |
| Y |
| CG300 Crane Boom Mid Section 20’ |
| N/A |
| 1 ea. |
| 13,500.00 |
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the task order contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
| Work Item |
| Title |
| 1 |
| CG-300 Equipment and Components, Inspect and Service |
| 2 |
| CG-300 Upper Works Equipment and Components, Inspect and Service |
| 3 |
| CG-300 Boom, Inspect and Service |
Principal Characteristics
Principal Characteristics
American Aero Oceanmaster CG300 Marine Crane
CRANE
| Design Max. Boom Length |
| 70' 0" |
| Standard Boom Length |
| 60' 0" |
| Extension Lengths |
| 10'/20’ |
| Height (turntable base to top of gantry) |
| 11' 0" |
| Length |
| 10’ 6” |
| Width |
| 9’ 3” |
| Tail Swing (from center line of turntable) |
| 7’ 4” |
| Vertical Center of Gravity (above the pedestal ring) |
| 3’ 7-7/8” |
| Gross Weight at a Boom Length of 60 FT |
| 28,893 lbs |
| Gross Weight at a Boom Length of 70 FT |
| 29,956 lbs |
PRIME MOVER
| Manufacturer |
| Caterpillar/Perkins |
| Model |
| Series 110, Model VK |
| Size |
| 365 Cu. In. |
| Rated |
| 150 BHP @ 2500 RPM |
PUMPS
| Type |
| Commercial, 3-Stage |
| Pressure |
| 2800 PSI (Max.) |
00000_0215_FLT
REC_00000_FLT_ MATOC Dockside (1014) General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel equipments repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
Coast Guard Drawings
None
Coast Guard Publications
Coast Guard Commandant Instruction (COMDTINST)_MI0360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Other References
ASTM International (ASTM) 6966, 2008, Standard Practice for Collection of Settled Dust Samples Using Wipe Sampling Methods for Subsequent Determination of Metals
Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2008, Occupational Safety and Health Standards
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
Code of Federal Regulations (CFR) Title 33 CFR, Jul 2013 Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, 2013, Protection of the Environment Code of Federal Regulations (CFR) Title 49, Oct 2013, Transportation
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with (COMDTINST)_MI0360.3C , Chapter 11 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 5 of COMDTINST MI0360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to adequately accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content: None.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
| DATE & TIME |
| ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION (Frame & Deck, relation to equipment, etc.) |
| TEMPERATURE |
| % REL. HUMID-ITY |
| DEW PT. |
| SURFACE |
| AMBIENT |
| ΔT |
| DP - Surface |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (Frame References) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15
| DATE |
| TEST LOCATIONS |
| CONDUCTIVITY |
(microsiemens/cm)
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Coating Mfg |
| Product Name |
| Batch # |
| Induction Time |
| Coating System Sequence (Primer/Touchup/3rd Coat, etc.) |
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| AVERAGE VALUE |
*BASE METAL READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| Application Method (Airless, Conventional Spray, Rolled) |
| Average DFT |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
58900_CG300EqpmntCmpnts_TBS_0215_IBCT
WORK ITEM 1: CG-300 Equipment and Components, Inspect and Service
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and service designated associate equipment and components contained within the Kit Box.
1.2 Government-furnished property.
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/UNIT)
| Y |
| CG300 Crane Equipment and Components |
| Kit |
| 1 Box |
| 96,250.00 |
2. REFERENCES
Coast Guard Drawings
None
Coast Guard Publications
Coast Guard Technical Publication (TP) 1952B, Section A, Construction Crane, Oceanmaster CG300
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Inspect, Repair, And Test Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Other References
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following task(s) in Table 1:
· Task # 1.
· Task # 2.
· Task # 4.
· Task # 5.
· Task # 6.
· Task # 7.
· Task # 8.
· Task # 10.
· Task #11.
· Task #12.
· Task #13.
· Task #29.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures-general. The Contractor shall furnish and install all protective coverings to seal off and protect all components and equipment against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment and components to original condition of cleanliness.
NOTE
Plastic bags may be used only when arrangement or configuration prevents the use of the other sealing methods specified above.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Inspection and service particulars. The Contractor shall perform the tasks specified in Table I, in accordance with SFLC Std Spec 5000 and CG TP 1952. Renew all gaskets, O-rings, seals, plugs, cotter pins, and fasteners during reassembly.
NOTE
Contractor has the option to renew vs. Disassemble and Inspect if it is more cost advantageous at no additional cost to the Government
TABLE 1 – Recurring TASKS
ADDITIONAL REQUIREMENTS
| TASK# |
| TASK TYPE (SFLC STD SPEC 5000 PARA. REF.) |
| QTY |
| COMPONENT OR ASSEMBLY |
| APPENDIX AND PARA. FROM SFLC STD SPEC 5000 |
| OTHER |
In accordance with TP-1952B
| 1 |
| Disassemble, Inspect |
| 1 |
| Government-Furnished Kit |
| N/A |
| 1. Upon receipt of the kit, unload and perform inventory. Kit inventory consists of items listed in tasks 2 -55 in Table 1. Submit a CIR |
2. Load post kit disassembly, inspect, and renew. Inventory shall be secured within kit as applicable with new type 316L Stainless Steel Fasteners.
3. Complete pre-shipment inspection and inventory, secure kit box top with new type 316L Stainless Steel Fasteners and rubber tie downs.
4. Kit shall be made ready for CG procured shipping and loaded as required.
| 2 |
| Disassemble, Inspect, and Preserve |
| 4 |
| PD12-C Braden Winch w/ Motors, PD12-C(2) (1)RP, one (1) with CB Valve |
| 3.2.3 (Disassemble and Inspect) |
3.2.4 (Preservation) Submit a CIR.
| 3 |
| Renew |
| 4 |
| PD12-C Braden Winch components: Steel Disks, Cam Clutches, Friction Disks, and Bearings |
| 4 |
| Disassemble, Inspect, and Preserve |
| 1 |
| Two-Speed Counterbalance Valve (on Winch), with Adapter (supplied mounted on winch) |
3.2.3 (Disassemble and Inspect)
3.2.4 (Preservation)
C2.4 (Valves and Manifolds) Submit a CIR.
Adjust Counterbalance manifold setting in accordance with CG TP 1952B.
| 5 |
| Disassemble, Inspect, and Preserve |
| 1 |
| Swing Valve |
| 3.2.3 (Disassemble and Inspect) |
3.2.4 (Preservation)
C2.4 (Valves and Manifolds) Submit a CIR.
| 6 |
| Disassemble, Inspect, and Preserve |
| 1 |
| Boom Valve |
| 3.2.3 (Disassemble and Inspect) |
3.2.4 (Preservation)
C2.4 (Valves and Manifolds) Submit a CIR.
| 7 |
| Disassemble, Inspect, and Preserve |
| 1 |
| Main Control Valve |
| 3.2.3 (Disassemble and Inspect) |
3.2.4 (Preservation)
C2.4 (Valves and Manifolds) Submit a CIR.
| 8 |
| Disassemble, Inspect, and Preserve |
| 1 |
| Two-Speed Valve, |
| 3.2.3 (Disassemble and Inspect) |
3.2.4 (Preservation) Submit a CIR.
| 9 |
| Renew |
| 1 |
| Hi-Angle Kickout Valve (Boom Base Left Side) |
Submit a CFR.
| 10 |
| Disassemble, Inspect, and Preserve |
| 1 |
| Swing Drive Assembly to include motor and break assembly (Static and Dynamic) |
| 3.2.3 (Disassemble and Inspect) |
3.2.4 (Preservation) Submit a CIR.
Contractor shall ensure swing drive plate is machined to fit CG-300 crane.
| 11 |
| Disassemble, Inspect, and Preserve |
| 1 |
| Swivel Sheave Mounting Bracket, (Gantry Top 18") |
| 3.2.3 (Disassemble and Inspect) |
3.2.4 (Preservation) Submit a CFR.
| 12 |
| Disassemble, Inspect, and Preserve |
| 1 |
| Dead eye link, (#1 Main Hook Connects Wire to Boom Tip) |
| 3.2.3 (Disassemble and Inspect) |
3.2.4 (Preservation) Submit a CFR.
| 13 |
| Disassemble, Inspect, NDE, Preserve |
| 1 |
| Boom Suspension Arm Assembly (Complete), (qty 2 on crane) |
| 3.2.2 (Service and inspect) |
3.2.5 (NDE)
3.2.4 (Preservation) Submit a CFR.
| 14 |
| Service, Inspect, and NDE |
| 1 |
| Boom Foot Pin, (Right Side Pin) |
| 3.2.2 (Service and inspect) |
3.2.5 (NDE)
Submit CFR.
| 15 |
| Service, Inspect, and NDE |
| 1 |
| Boom Foot Pin/High Angle Kick out, (Left Side Pin) |
3.2.2 (Service and inspect)
3.2.5 (NDE)
Submit a CFR.
| 16 |
| Service, Inspect, and NDE |
| 1 |
| Swivel Sheave Pin, (Gantry Top 18") |
| 3.2.2 (Service and inspect) |
3.2.5 (NDE)
Submit a CFR.
| 17 |
| Service, Inspect, and NDE |
| 1 Kit |
| Hammer lead Pin, with Nut |
| 3.2.2 (Service and inspect) |
3.2.5 (NDE)
Submit a CFR.
| 18 |
| Service, Inspect, and NDE |
| 1 |
| Main Tip Pin |
| 3.2.2 (Service and inspect) |
3.2.5 (NDE)
Submit a CFR.
| 19 |
| Service, Inspect, and NDE |
| 2 |
| Gantry Sheave Pin, 2 Part, (Gantry Top 12") |
| 3.2.2 (Service and inspect) |
3.2.5 (NDE)
Submit a CFR.
| 20 |
| Service, Inspect, and NDE |
| 8 or 12 |
| Boom Connector Pin with Nut |
| 3.2.2 (Service and inspect) |
3.2.5 (NDE)
Submit a CFR.
| 21 |
| Service, Inspect, and NDE |
| 2 |
| Boom Suspension. Pivot Pin |
| 3.2.2 (Service and inspect) |
3.2.5 (NDE)
Submit a CFR.
| 22 |
| Service, Inspect, and NDE |
| 2 |
| Load/Idler Sheave Pins |
| 3.2.2 (Service and inspect) |
3.2.5 (NDE)
Submit a CFR.
| 23 |
| Service, Inspect, and NDE |
| 1 |
| Pillow Block Shaft |
| 3.2.2 (Service and inspect) |
3.2.5 (NDE)
Submit a CFR.
| 24 |
| Service, Inspect, and NDE |
| 8 |
| Sheave, 12", (qty 12 on crane) (Kit includes qty 8) |
| 3.2.2 (Service and inspect) |
3.2.5 (NDE)
Submit a CFR.
| 25 |
| Service, Inspect, and NDE |
| 2 |
| Boom Suspension Pin, (Boom Tip Paddles Sheave Side) |
| 3.2.2 (Service and inspect) |
3.2.5 (NDE)
Submit a CFR.
| 26 |
| Service, Inspect, and NDE |
| 1 |
| Ratchet Pawl, Pin small |
| 3.2.2 (Service and inspect) |
3.2.5 (NDE)
Submit a CFR.
| 27 |
| Service, Inspect, and NDE |
| 1 |
| Ratchet Pawl, Pin large; |
| 3.2.2 (Service and inspect) |
3.2.5 (NDE)
Submit a CFR.
| 28 |
| Renew |
| 24 |
| Ball Ring Bolts, Outer, w/ Washers |
| D2.1(Fastener Assemblies) |
| Provide Certification as a part of Final Reports |
| 29 |
| Disassemble, Inspect, and Preserve |
| 1 |
| Relief Valve/Dump Valve, Boom Valve Block |
| 3.2.3 (Disassemble and Inspect) |
3.2.4 (Preservation)
C2.4 (Valves and Manifolds) Submit a CIR.
| 30 |
| Renew |
| 4 |
| Roller Cable Guide, (Tip Guide) |
| 31 |
| Renew |
| 2 |
| Override/Brake Valve |
| 32 |
| Renew |
| 1 |
| Two-Speed Solenoid Valve |
| 33 |
| Renew |
| 4 |
| 3" ID Spacers/Main Tip |
| 34 |
| Renew |
| 3 |
| Fairlead Rollers, (Mid Section) |
| 35 |
| Renew and Preserve |
| 3 |
| Shaft Fairlead Rollers, (Mid Section) |
| 3.2.4 (Preservation) |
| 36 |
| Renew and Preserve |
| 1 |
| Ratchet Pawl Cylinder, |
| 3.2.4 (Preservation) |
| 37 |
| Renew |
| 1 |
| Boom Foot Pin/High Angle Kick Out, Bushing, Left Side) |
| 38 |
| Renew |
| 4 |
| Brass Spacer, 2" Pin, |
| 39 |
| Renew |
| 8 or 12 |
| Boom Connector Cotter Pin |
| 40 |
| Renew |
| 2 |
| Self-Aligning Bearing, (Boom Base) |
| 41 |
| Renew and Preserve |
| 2 |
| Pillow Blocks |
| 3.2.4 (Preservation) |
| 42 |
| Renew |
| 8 |
| Load/Idler Spacers |
| 43 |
| Renew |
| 8 |
| Bearing and Race (for 12" sheave) (qty 12 on crane) (Kit includes qty 8) |
| 44 |
| Renew |
| 4 |
| Sheave, 18", with Bearing and Race |
| 45 |
| Renew and Preserve |
| 1 |
| Three-stage hydraulic pump to include fitting o-rings |
| 3.2.4 (Preservation) |
| 46 |
| Renew |
| 1 |
| Ratchet Pawl Clevis, Pin Small |
| 47 |
| Renew |
| 1 |
| Ratchet Pawl Clevis, Pin large |
| 48 |
| Renew |
| 1 |
| Ratchet Pawl Jam Nut |
| 49 |
| Renew |
| 1 |
| Ratchet Boom Pawl |
| 50 |
| Renew |
| 1 |
| Load Cell, Gauge, Load Cell Fluid (1 Gal) , and Hand Pump (Load Cell Charging) |
| B2.9 (Label Plates) |
C2.5 (Gages)
| 51 |
| Renew |
| 12 |
| Pin Keepers (Boom Foot Pins, 12" Sheaves, and Boom Tip 18") Drilled to fit on site. |
| 52 |
| Renew |
| 1 Kit |
| Control Valves, (4) Winches, and Swing Drive Fitting Kit |
| 53 |
| Renew |
| 1 Kit |
| Control Valves, (4) Winches, and Swing Drive Bolt Kit |
| 54 |
| Renew |
| 1 |
| Renew Static Brake; (Part of Slew Motor Assembly) |
| 55 |
| Renew |
| 1 |
| Renew Dynamic Brake, (Part of Slew Motor Assembly) |
| 56 |
| Weight Test, Fabricate, and Install Label Plates |
| 1 |
| PD12-C Braden Winch w/ Motors, PD12-C(2) (1)RP, one (1) with CB Valve |
| B2.3 (Winches) |
B2.9 (Label Plates) Perform weight testing.
See Table 2 below for requirements.
Submit CFR.
| 57 |
| Submit Final Reports |
| 1 |
| Crane Kit Assembly |
Submit two copies of final reports - one to the COR, and the other, to be shipped with the Kit Assembly.
Reports shall include but are not limited to:
· Kit Inventory, Weight and Speed Test Results.
· Wire Rope Certification, Gauge and Meter Certification, and Fastener Certifications.
NOTE
Contractor personnel will complete all weight tests.
TABLE 2 – WINCH TEST WEIGHTS
Main Hoist Test Weights
| Rated Load with Speed Test |
| 10,000 lbs |
| Dynamic Load Test, Raise minimum of 10’/ 3 cycles |
| 12,500 lbs |
| Brake Hold Test,10 Minutes |
| 12,500 lbs |
3.3 Additional maintenance requirements. The Contractor shall perform tasks in Table 3 when authorized by the KO. Submit CFR to document all inspections and recommended additional repairs. Combine or group CFR, as required, to minimize administrative burden and maximize efficiency.
Tasks will be exercised via authorized and released Change Requests (CR), when determined to be necessary by inspection results.
TABLE 3 – ADDITIONAL MAINTENANCE Requirements
ADDITIONAL REQUIREMENTS
TASK
| TASK TYPE (SFLC STD SPEC 5000 PARA. REF.) |
| QTY |
| COMPONENT OR ASSEMBLY |
| APPENDIX AND PARA. FROM SFLC STD SPEC 5000 |
| OTHER |
| 1 |
| Renew and Preserve |
| 1 |
| PD12-C Braden Winch w/ Motors, PD12-C(2) (1)RP, one (1) with CB Valve |
| 3.2.4 (Preservation) |
| 2 |
| Renew and Preserve |
| 1 |
| Two-Speed Counterbalance Valve (on Winch), with Adapter (supplied mounted on winch) |
| 3.2.4 (Preservation) |
C2.4 (Valves and Manifolds)
| 3 |
| Renew and Preserve |
| 1 |
| Swing Valve |
| 3.2.4 (Preservation) |
| 4 |
| Renew and Preserve |
| 1 |
| Boom Valve |
| 3.2.4 (Preservation) |
| 5 |
| Renew and Preserve |
| 1 |
| Main Control Valve |
| 3.2.4 (Preservation) |
| 6 |
| Renew and Preserve |
| 1 |
| Two-Speed Valve |
| 3.2.4 (Preservation) |
| 7 |
| Renew and Preserve |
| 1 |
| Swing Drive Assembly to include motor and break assembly (Static and Dynamic) |
| 3.2.4 (Preservation) |
| 8 |
| Renew and Preserve |
| 1 |
| Relief Valve/Dump Valve |
| 3.2.3 (Disassemble and Inspect) |
| Submit a CFR. |
| 9 |
| Renew and Preserve |
| 1 |
| Hi-Angle Kickout Valve, (Boom Base Left Side) |
| 3.2.4 (Preservation) |
| 10 |
| Renew |
| 1 |
| Boom Connector Pin with Nut and Cotter Pin |
| D2.1 Fastener assemblies |
| 11 |
| Renew |
| 1 |
| 10 Conductor Electric Swivel |
| 12 |
| Renew |
| 1 |
| Wire rope assembly 60’ Boom |
| D2.2 (Wire Rope Assemblies) |
| 60' Boom 545 ft 5/8" 6x36 EEIPS wire rope with open spelter socket on 1 end and pressure lubed with Dynagard Blue, #4 winch |
| 13 |
| Renew |
| 1 |
| Wire rope assembly 60’ Boom |
| D2.2 (Wire Rope Assemblies) |
| 60' Boom 150 ft 5/8" 6x36 EEIPS wire rope with open spelter socket on 1 end and pressure lubed with Dynagard Blue, #2 winch |
| 14 |
| Renew |
| 1 |
| Wire rope assembly 60’ Boom |
| D2.2 (Wire Rope Assemblies) |
| 60' Boom 150 ft 5/8" 6x36 EEIPS wire rope with open spelter socket on 1 end and pressure lubed with Dynagard Blue, #3winch |
| 15 |
| Renew |
| 1 |
| Wire rope assembly 60’ Boom |
| D2.2 (Wire Rope Assemblies) |
| 60' Boom 240 ft 5/8" 6x36 EEIPS wire rope with open spelter socket on 1 end and pressure lubed with Dynagard Blue, #1 winch |
| 16 |
| Renew |
| 1 |
| Wire rope assembly 70’ Boom |
| D2.2 (Wire Rope Assemblies) |
| 70' Boom 625 ft 5/8" 6x36 EEIPS wire rope with open spelter socket on 1 end and pressure lubed with Dynagard Blue, #4 winch |
| 17 |
| Renew |
| 1 |
| Wire rope assembly 70’ Boom |
| D2.2 (Wire Rope Assemblies) |
| 70' Boom 170 ft 5/8" 6x36 EEIPS wire rope with open spelter socket on 1 end and pressure lubed with Dynagard Blue, #2 winch |
| 18 |
| Renew |
| 1 |
| Wire rope assembly 70’ Boom |
| D2.2 (Wire Rope Assemblies) |
| 70' Boom 170 ft 5/8" 6x36 EEIPS wire rope with open spelter socket on 1 end and pressure lubed with Dynagard Blue, #3winch |
| 19 |
| Renew |
| 1 |
| Wire rope assembly 70’ Boom |
| D2.2 (Wire Rope Assemblies) |
| 70' Boom 270 ft 5/8" 6x36 EEIPS wire rope with open spelter socket on 1 end and pressure lubed with Dynagard Blue, #1 winch |
4. NOTES
This section is not applicable to this work item.
58900_CG300UpprWrks_TBS_0215_IBCT
WORK ITEM 2: CG-300 Upper Works Equipment and Components, Inspect and Service
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and service the Upper Works for the Oceanmaster CG300 Marine Crane.
1.2 Government-furnished property.
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/UNIT)
| Y |
| Oceanmaster CG300 Marine Crane |
| Crane Upper Works |
| 1 |
| 296,250.00 |
Coast Guard Drawing FL 9210-1, Rev -, Weatherford Marine CG 300 Crane
Coast Guard Publications
Coast Guard Technical Publication (TP) 1952B, SWBS 589, Section A, Sep 2008, Construction Crane, Oceanmaster CG300 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, And Installation
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Inspect, Repair, And Test Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Other References
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following locations:
· Table 1,Task # 1.
· Table 1,Task # 2.
· Table 1,Task # 3.
· Table 1,Task #9.
· Table 1,Task #10.
· Table 1,Task # 12.
· Table 1,Task # 14.
· Table 1,Task #15.
· Table 1,Task # 16.
· Table 1,Task # 17.
· Table 1,Task # 18.
· Table 1,Task # 19.
· Table 1,Task #20.
· Table 1,Task #21.
· Table 1,Task # 22.
· Table 1,Task #23.
· Paragraph 3.3.1 (Visual inspection, operational testing and diagnostics).
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures-general. The Contractor shall furnish and install all protective coverings to seal off and protect all components and equipment against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment and components to original condition of cleanliness.
NOTE
Plastic bags may be used only when arrangement or configuration prevents the use of the other sealing methods specified above.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Inspect and service task particulars. The Contractor shall perform the tasks specified in Table 1, in accordance with SFLC Std Spec 5000 and CG TP 1952, as applicable.
TABLE 1 – Recurring TASKS
ADDITION REQUIREMENTS
TASK
| TASK TYPE (SFLC STD SPEC 5000 PARA. REF.) |
| QTY |
| COMPONENT OR ASSEMBLY |
| APPENDIX AND PARA. FROM SFLC STD SPEC 5000 |
| OTHER |
| 1 |
| Disassemble, Inspect, NDE, and Preserve |
| 1 |
| Crane Cab Upper Works |
| 3.2.3 (Disassemble and Inspect) |
3.2.5 (NDE)
3.2.4 (Preservation)
1. Disassemble and remove entire cab to all allow for inspection and complete preservation of all previously-painted components.
Submit a CIR.
2. During reassembly, renew of as applicable, the following cab assembly components shown on Coast Guard Fleet Drawing FL-9210-1 and the drawings in CG TP 1952B but not limited to the below items:
· Fluid, Fluid filters, strainers, and associated mounting hardware.
· Diesel engine components: including the hot starts, flanged exhaust flex pipe (3-inch stainless steel), muffler, engine mounts, and associated mounting hardware.
· Seat assembly and associated mounting hardware.
· All hydraulic fittings.
· Cab deck plates
· All pins, sheaves, keepers, shafts, plates, spacers, rollers, and associated mounting hardware.
· All gaskets, O-rings, seals, plugs, cotter pins, stuffing tubes, chaffing gear, and fasteners.
| 2 |
| Disassemble, Inspect, NDE, and Preserve |
| 2 |
| Boom Stops |
| 3.2.3 (Disassemble and Inspect) |
3.2.5 (NDE)
Submit a CIR.
In accordance with TP-1952B, Ensure boom stops have a clearance notch is machined on both sides of the boom stop bases to allow adequate clearance of the operator cab (left side) when lowered to 0 degrees and the topping lift wire rope clears (Right Side).
| 3 |
| Disassemble, Inspect, NDT, and Preserve |
| 1 |
| Pedestal Ball Ring Bearing (Turn Table Bearing) |
| 3.2.3 (Disassemble and Inspect) |
3.2.5 (NDE)
3.2.4 (Preservation)
D2.4.1 Open Gearing Lubrication Submit a CIR.
Rotate bearing during lubrication to ensure proper application.
Reinstall the ball ring assembly with new internal and external certified bolts and Type 316L Stainless Steel washers in accordance with TP 1952B (Bolt Torque and Installation Procedure).
| 4 |
| Renew and Test |
| 1 |
| Hydraulic Oil Heat Exchanger |
| C2.7 (Pressure Testing) |
| Submit a CFR |
| 5 |
| Renew |
| All |
| All tank internal and external filters, filler caps, drain, ball valves, 1½” fuel oil fill pipe, tank breather, hydraulic tank sight glass, fuel oil tank sending unit, emergency lowering kit, engine compartment light, AC unit, battery and cables, foot brake, and cab windows with seals and fasteners. |
Components shall be renewed prior to the closing of tanks as applicable.
All renewals shall be in accordance with CG TP-1952
| 6 |
| Renew |
| All |
| All gauges noted in Table 3 |
| B2.9 (Label Plates) |
C2.5.2 (Calibration)
| 7 |
| Renew |
| All |
| All Flex Hoses |
| C2.2 (Hose assemblies) |
| Submit a CFR |
| 8 |
| Renew |
| 1 |
| Winch Control Assembly to Include Two Speed Switch Labels and Hand Grips |
| 9 |
| Disassemble and Inspect |
| 1 |
| Electrical Panels, Breakers, and Wiring |
Submit a CIR.
Refer to SFLC Std Spec 3042.
Renew all stuffing tubes.
Renew all labels.
| 10 |
| Disassemble, Inspect, and Preserve |
| 4 |
| PD12-C Braden Winch w/ Motors, PD12-C(2) (1)RP, one (1) with CB Valve |
3.2.3 (Disassemble and Inspect)
Submit a CIR.
| 11 |
| Renew |
| All |
| PD12-C Braden Winch components: Steel Disks, Cam Clutches, and Friction Disks, Sprag Clutch, Sight Glass, Needle Valve, Speedy Sleeve |
| 12 |
| Disassemble, Inspect, and Preserve |
| 1 |
| Two-Speed Counterbalance Valve (on Winch), with Adapter (supplied mounted on winch) |
3.2.3 (Disassemble and Inspect)
C2.4 (Valves and Manifolds) Submit a CIR.
Adjust Counterbalance manifold setting in accordance with CG TP 1952B.
| 13 |
| Weight Test, Fabricate, and Install Label Plates |
| 1 |
| PD12-C Braden Winch w/ Motors, PD12-C(2) (1)RP, one (1) with CB Valve |
| B2.9 (Label Plates) |
B2.3 (Winches) Perform weight testing listed in Table 5.
Submit a CFR.
| 14 |
| Disassemble, Inspect, and Preserve |
| 1 |
| Swing Valve |
| 3.2.3 (Disassemble and Inspect) |
3.2.4 (Preservation)
C2.4 (Valves and Manifolds) Submit a CIR.
| 15 |
| Disassemble, Inspect, and Preserve |
| 1 |
| Boom Valve |
| 3.2.3 (Disassemble and Inspect) |
3.2.4 (Preservation)
C2.4 (Valves and Manifolds) Submit a CIR.
| 16 |
| Disassemble, Inspect, and Preserve |
| 1 |
| Main Control Valve |
| 3.2.3 (Disassemble and Inspect) |
3.2.4 (Preservation)
C2.4 (Valves and Manifolds) Submit a CIR.
| 17 |
| Disassemble, Inspect, and Preserve |
| 1 |
| Two-Speed Valve |
| 3.2.3 (Disassemble and Inspect) |
3.2.4 (Preservation) Submit a CIR.
| 18 |
| Disassemble and Inspect |
| 1 |
| Hi-Angle Kickout Valve, (Boom Base Left Side) |
| 3.2.3 (Disassemble and Inspect) |
| Submit a CIR. |
| 19 |
| Disassemble and Inspect |
| 1 |
| Relief Valve/Dump Valve |
| 3.2.3 (Disassemble and Inspect) |
| Submit a CIR. |
| 20 |
| Disassemble, Inspect, and Preserve |
| 1 |
| Swing Drive Assembly to include motor and break assembly (Static and Dynamic) |
| 3.2.3 (Disassemble and Inspect) |
3.2.4 (Preservation) Submit a CIR.
Ensure swing drive plate is machined to fit CG-300 crane.
| 21 |
| Disassemble, Inspect, and Preserve |
| 1 |
| Swivel Sheave Mounting Bracket, (Gantry Top 18") |
| 3.2.3 (Disassemble and Inspect) |
3.2.4 (Preservation) Submit a CIR.
| 22 |
| Disassemble, Inspect, and Preserve |
| 1 |
| Dead eye link, (#1 Main Hook Connects Wire to Boom Tip) |
| 3.2.3 (Disassemble and Inspect) |
3.2.4 (Preservation) Submit a CIR.
| 23 |
| Disassemble, Inspect, NDE, Preserve |
| 2 |
| Boom Suspension Arm Assembly (Complete), (qty 2 on crane) |
| 3.2.2 (Service and inspect) |
3.2.5 (NDE)
3.2.4 (Preservation) Submit a CIR.
| 24 |
| Renew |
| 1 |
| Boom Foot Pin, (Right Side Pin) |
D2.1 (Fastener assemblies)
| 25 |
| Renew |
| 1 |
| Boom Foot Pin/High Angle Kick out, (Left Side Pin) |
D2.1 (Fastener assemblies)
| 26 |
| Renew |
| 1 |
| Swivel Sheave Pin, (Gantry Top 18") |
| D2.1 (Fastener assemblies) |
| 27 |
| Renew |
| 1 Kit |
| Hammer lead Pin, with Nut |
| D2.1 (Fastener assemblies) |
| 28 |
| Renew |
| 1 |
| Main Tip Pin |
| D2.1 (Fastener assemblies) |
| 29 |
| Renew |
| 2 |
| Gantry Sheave Pin, 2 Part, (Gantry Top 12") |
D2.1 (Fastener assemblies)
| 30 |
| Renew |
| 2 |
| Boom Susp. Pivot Pin, |
| D2.1 (Fastener assemblies) |
| 31 |
| Renew |
| 2 |
| Load/Idler Sheave Pins, |
| D2.1 (Fastener assemblies) |
| 32 |
| Renew |
| 1 |
| Pillow Block Shaft, |
| D2.1 (Fastener assemblies) |
| 33 |
| Renew |
| 12 |
| Sheave, 12" w/ Bearing and Race |
| 34 |
| Renew |
| 2 |
| Boom Suspension Pin, (Boom Tip Paddles Sheave Side) |
| D2.1 (Fastener assemblies) |
| 35 |
| Renew |
| 1 Kit |
| Ball Ring Bolts, Outer, (qty 24) and Inner (qty 24) w/ Washers (qty 48) |
| D2.1 (Fastener assemblies) |
| Provide Fastener Certification |
| 36 |
| Renew |
| 1 |
| Pressure Switch/Slew Alarm |
| 3.2.6 (Groom and lubricate) |
| 37 |
| Renew |
| 4 |
| Roller Cable Guide, (Tip Guide) |
| 38 |
| Renew |
| 2 |
| Override/Brake Valve |
| 39 |
| Renew |
| 1 |
| Two-Speed Solenoid Valve |
| 3.2.4 (Preservation) |
| 40 |
| Renew |
| 4 |
| 3" ID Spacers/Main Tip |
| 41 |
| Renew |
| 3 |
| Fairlead Rollers, ( Mid Section) |
3.2.4 (Preservation)
| 42 |
| Renew and Preserve |
| 3 |
| Shaft Fairlead Rollers, (Mid Section) |
| 3.2.4 (Preservation) |
| 43 |
| Renew |
| 1 |
| Boom Foot Pin/High Angle Kick Out, Bushing, Left Side) |
| 44 |
| Renew |
| 4 |
| Brass Spacer, 2" Pin, |
| 45 |
| Renew |
| 2 |
| Self-Aligning Bearing, (Boom Base) |
| 46 |
| Renew and Preserve |
| 2 |
| Pillow Blocks |
| 3.2.4 (Preservation) |
| 47 |
| Renew |
| 8 |
| Load/Idler Spacers |
| 48 |
| Renew |
| 4 |
| Sheave, 18", with Bearing and Race |
| 49 |
| Renew and Preserve |
| 1 |
| Three-stage hydraulic pump to include fitting o-rings |
| 3.2.4 (Preservation) |
| 50 |
| Renew |
| 1 |
| Ratchet Pawl Cylinder Assembly, to include large and small pins w/ clevises, boom Pawl, and Jam Nut |
| D2.1 (Fastener assemblies) |
| 51 |
| Renew |
| 1 |
| Load Cell, Gauge, Load Cell Fluid , 1 Gal and Hand Pump (Load Cell Charging) |
| B2.9 (Label Plates) |
| 52 |
| Renew |
| All |
| Pin Keepers as applicable |
| 53 |
| Renew |
| 1 |
| Renew Static Brake; (Part of Slew Motor Assembly) |
| 54 |
| Renew |
| 1 |
| Renew Dynamic Brake; 483358-001 (Part of Slew Motor Assembly) |
| 55 |
| Renew |
| 3 |
| Gauge |
| N/A |
| See Table 3 for gauge particulars. |
| 56 |
| Overhaul and Preserve |
| 5 |
| Door |
| 3.2.4 (Preservation) |
| 1. See Table 4 for door particulars. |
2. Overhaul the designated doors and associated door frames as shown on Drawings CG3002B and CG3002B1 contained in TP 1952, in accordance with the door manufacturer’s instructions.
· Overhaul includes but not limited to renewing latches, gaskets, and sealing material. Door gaskets shall be MIL-PRF-900, Mar 1991, Rubber Gasket Material, 45 Durometer Hardness
· Upon completion of overhaul, perform chalk test in accordance with SFLC Std Spec 0740.
Submit a CFR
| 57 |
| Clean and Inspect |
| 1ea. |
| Fuel Oil Supply Tank and Hydraulic Tank |
1.Tank Capacity: 80 Gallons – each tank.
2. Tank content disposal:
· Dispose of residual tank contents and all cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations
· Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery.
· Submit document to the COR upon completion of work.
3. Cleaning requirements:
· Remove tank cover(s) and clean tank interior surfaces free of all foreign materials, such as sediment or sludge, taking care not to damage the coating system (if applicable)
· Remove cleaning media and residues continuously during the washing process.
· Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths
· Provide new oil for testing and properly drain to meet shipping requirements for over the road transportation.
4. Inspection: Visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces.
Submit a CFR including the following, as applicable:
· Tank structural condition.
· Inaccessible areas.
· Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.
· Tank level indicator (TLI) and/or float switch condition, as applicable.
· Sounding tube and striker plate condition.
· Suction and discharge piping condition.
· Fastener material and condition (correct fastener material is stainless steel).
5. Tank closing:
· Ensure that the tank(s) remain open for approximately 24 hours after completion of all authorized repair and preservation procedures.
· Notify the COR at least 24 hours prior to closing the tank(s).
· After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183.
· Renew all tank plugs
| 58 |
| Groom and Lubricate |
| 1 |
| Crane Cab, Boom, and Accessories |
| 3.2.6 (Groom and Lubricate) |
| Renew all grease fittings and lubricate all moving components as required with manufacturer's recommended lubricants. |
Ensure all gear boxes are filled in accordance with CG TP 1952B.
| 59 |
| Weight and Speed Tests, Fabricate, and Install Label Plates |
| 1 |
| Crane Assembly |
| 3.2.8 Operational and weight testing |
B2.9 (Label Plates) Perform weight testing See Table 5 for requirements.
Mount crane on suitable test stand to complete tests outlined in Table 5. Reference paragraph 3.2.
Complete all tests in the presence of a CG inspector. If any inspection or test fails to meet the requirements herein, take corrective procedures and/or furnish materials to correct each deficiency.
Submit a CFR.
| 60 |
| Prepare For Shipment |
| 1 |
| Crane Assembly |
Disassemble and ready the crane assembly for shipment and load crane assembly on CG-provided over the road shipping transportation.
| 61 |
| Submit Final Reports |
| 1 |
| Crane Assembly |
Provide two copies of the Final reports - one to the COR and the other, to be shipped with the crane Reports shall include but are not limited to:
· Crane Serial#, Weight and Speed Test Results, Wire Rope Certification,
· Gauge and Meter Certification, Crane Engine Log w/ Current Hours, hose log and Fastener Certification.
| 62 |
| Crane Core Receipt |
| 1 |
| Crane Assembly |
Unload crane assembly for CG procured shipping and stage for the next overhaul.
Contractor personnel will complete all weight tests.
TABLE 2 – WINCH TEST WEIGHTS (Test STand)
Main Hoist Test Weights
| Rated Load with Speed Test |
| 10,000 lbs |
| Dynamic Load Test, Raise minimum of 10’/ 3 cycles |
| 12,500 lbs |
| Brake Hold Test,10 Minutes |
| 12,500 lbs |
TABLE 3 – GAuge Renewals
| # |
| Guage/Meter |
| SErvicing |
| Range |
| 1 |
| Pressure |
| Main and Whip |
| 0-3000 psig |
| 2 |
| Pressure |
| Boom Hoist |
| 0-3000 psig |
| 3 |
| Pressure |
| Slewing(Swing) Drive |
| 0-3000 psig |
| 4 |
| Level |
| Fuel Oil |
| (E)mpty - (F)ull |
TABLE 4 – Door PARTICULARS
| # |
| SIZE |
| Description |
| 1 |
| 26” x 66”, Steel, 2-dog, RH |
| Operator’s Access Door w/ Renewed Window |
| 2 |
| 24” x 30”, Steel, 1-dog, LH |
| Engine Compartment Door |
| 3 |
| 20” x 30”, Steel, 2-dog, LH |
| Hydraulic Machinery Compartment Door |
| 4 |
| 24” x 30”, Steel, 1-dog, LH |
| Hydraulic Machinery Compartment Door |
| 5 |
| 24” x 30”, Steel, 2-dog, LH |
| Heat Exchanger/Radiator Access Door |
3.2 Crane test. The Contractor shall perform the below tasks, using the test loads listed in Table 5. Submit a CFR.
3.2.1 Swing Bearing Wear Inspection. Take dial indicator readings at the 12, 3, 6, and 9 o’clock positions with the boom at 80 degrees and then again at 15 degrees.
NOTE
1. No weight attached for this test.
2. Max bearing deflection is .095”.
3.2.2 Timed speed test. Conduct timed speed test for all winches using a standardized test load of 8,250 (+200/0) lbs, as follows:
· Attach a ten foot length of…