MACKINAW_(WLBB_240)_UNPLANNED_DRYDOCK_FQ4_TBS_15ER0_BLANK_SOSS.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- UNPLANNED DRYDOCK FOR THE USCGC MACKINAW
- Solicitation number
- HSCG85-15-Q-P30J25
About this file
SECTION B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MACKINAW_(WLBB_240)_UNPLANNED_DD_FQ4_TBS_15R0.docx | DOCX document | |
| USCGCMACKINAWUNPLANFY15.docx | DOCX document | |
| USCGC_Mackinaw_ABBWORKSTATEMNTDD_2015_Work_Specification__Rev_A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| LT Sumner | APM | |
| USCGC MACKINAW (WLBB-240) DRY DOCK AVAILABILITY FY2015 Rev-0 | LT Boettner | PE |
| LT Brockus | EO |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE | Type | AFC |
| D-001 | Tanks (MP Fuel Stowage and Overflow), Clean and Inspect | JOB | 1 | RWI | 30 | ||
| D-002 | Tanks (Ballast), Clean and Inspect | JOB | 1 | RWI | 30 | ||
| D-003 | Tanks (Dirty Oil and Waste), Clean and Inspect | JOB | 1 | RWI | 45 | ||
| D-004 | Vent Ducts (Galley and Pantry Room All), Commercial Cleaning | JOB | 1 | RWI | 45 | ||
| D-005 | Compressed Air Receivers, Clean, Inspect, and Test | JOB | 1 | RWI | 45 | ||
| D-006 | Fixed CO2 Fire Extinguishing System Cylinders, Inspect, Weigh, & Hydrostatic Test | JOB | 1 | RWI | 45 | ||
| D-007 | Galley Fire Suppression System, Service and Inspect | JOB | 1 | RWI | 30 | ||
| D-008 | Air Compressors 5000 Hour Overhaul | JOB | 1 | RWI | 45 | ||
| D-009 | Weathertight Doors, Renew | JOB | 1 | RWI | 30 | ||
| D-010 | Flag Mast Mount, Renew | JOB | 1 | RWI | 45 | ||
| D-011 | Sewage Piping, Repair | JOB | 1 | RWI | 45 | ||
| D-012 | Fire Main Piping, Renew | JOB | 1 | RWI | 45 | ||
| D-013 | Deck Covering (Interior Wet/Dry), Renew | JOB | 1 | RWI | 45 | ||
| D-014 | Azipod Propulsion System Repairs, Support | JOB | 1 | RWI | 45 | ||
| D-015 | Drydock | JOB | 1 | CASREP | 45 | ||
| O-015A | Drydock, Additional Day(s) | DAY | 20 | CASREP | 45 | ||
| D-016 | Temporary Services, Provide (For Azipod Tech Rep) | JOB | 1 | CASREP | 45 | ||
| O-016A | Temporary Services, Provide (For Azipod Tech Rep) Additional Day(s) | DAY | 20 | CASREP | 45 | ||
| D-017 | Temporary Services, Provide - Tender | JOB | 1 | CASREP | 45 | ||
| O-017A | Temporary Services, Provide - Tender, Additional Day(s) | DAY | 20 | CASREP | 45 | ||
| O-018 | Propeller, Remove and Reinstall | EA | 1 | CASREP | 45 | ||
| O-019 | Impressed Current Cathodic Protection System Anodes, Renew | EA | 4 | CASREP | 45 | ||
| O-020 | Impressed Current Cathodic Protection System Dielectric Shield, Repair | EA | 1 | CASREP | 45 | ||
| O-021 | Impressed Current Cathodic Protection System Reference Cells, Renew | EA | 2 | CASREP | 45 | ||
| O-00A | Composite Labor Rate | Hour | 200 | ||||
| O-00B | Laydays | DAY | 5 | ||||
| D-00B | GFP Report | NSP | EA | NSP | |||
| Total Price of Definite Items | $0.00 | ||||||
| Total Price of Option Items | $0.00 | ||||||
| Total Price of Definite and Optional Items | $0.00 |
File details come from the government source that posted it. Updated .