ATTACHMENT_1_(Rev28Aug15)_SCHED_OF_SUPP_SERVICES_HSCG85-15-Q-P45B45_LEAD_ _ASBESTOS_ABATEMENT_AND_ASSESSMENTS.xlsx
XLSX spreadsheet 39 KB Posted
- Attached to
- LEAD AND ASBESTOS ABATEMENT
- Solicitation number
- HSCG85-15-Q-P30868
About this file
Attachment 1 Schedule of Supplies and Services HSCG85-15-Q-P30868 (Rev28Aug15) IDIQ MATOC Lead and Asbestos Abatement/Assessments
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLINs
| SCHEDULED OF SUPPLIES AND SERVICES - SUMMARY BASE YEAR AND ALL OPTIONS |
| HSCG85-15-Q-P30868 Lead and Asbestos Abatement / Assessments on USCG Cutters and Barges |
| ATTACHMENT 1 |
| CLIN 0001 | ||
| ELIN | EXHIBIT LINE ITEM NUMBER (ELIN) DESCRIPTION | Base Year |
| O-001 | Electrical Cable, Renew | $ - 0 |
| O-002 | Interferences, Remove and Reinstall | $ - 0 |
| O-003 | Contaminated Loose Gear, Dispose | $ - 0 |
| O-004 | Ship Structures, Test for Presence of Hazardous Material | $ - 0 |
| O-005 | Lead Dust, Clean | $ - 0 |
| O-006 | Lead-Based Paint & Asbestos-Containing Material,Abate or Encapsulate | $ - 0 |
| O-007 | Lead-Based Paint, Abate or Encapsulate | $ - 0 |
| O-008 | Ship Structures, Perform ACM Condition Assessment | $ - 0 |
| O-00A | Composite Labor Rate | $ - 0 |
| O-00B | Travel and Perdiem | $ - 0 |
| O-00C | Materials | $ - 0 |
| Total Price of ELINS 0-001 THROUGH 0-OOC (CLIN 0001 BASE YEAR) | $ - 0 |
| CLIN 1001 | ||
| ELIN | EXHIBIT LINE ITEM NUMBER (ELIN) DESCRIPTION | Option Year 1 |
| O-101 | Electrical Cable, Renew | |
| O-102 | Interferences, Remove and Reinstall | |
| O-103 | Contaminated Loose Gear, Dispose | |
| O-104 | Ship Structures, Test for Presence of Hazardous Material | |
| O-105 | Lead Dust, Clean | |
| O-106 | Lead-Based Paint & Asbestos-Containing Material,Abate or Encapsulate | |
| O-107 | Lead-Based Paint, Abate or Encapsulate | |
| O-108 | Ship Structures, Perform ACM Condition Assessment | |
| O-10A | Composite Labor Rate | |
| O-10B | Travel and Perdiem | |
| O-10C | Materials | |
| Total Price of ELINS 0-101 THROUGH 0-10C (CLIN 1001 OPTION YEAR 1) | $ - 0 |
| CLIN 2001 | ||
| ELIN | EXHIBIT LINE ITEM NUMBER (ELIN) DESCRIPTION | Option Year 2 |
| O-201 | Electrical Cable, Renew | |
| O-202 | Interferences, Remove and Reinstall | |
| O-203 | Contaminated Loose Gear, Dispose | |
| O-204 | Ship Structures, Test for Presence of Hazardous Material | |
| O-205 | Lead Dust, Clean | |
| O-206 | Lead-Based Paint & Asbestos-Containing Material,Abate or Encapsulate | |
| O-207 | Lead-Based Paint, Abate or Encapsulate | |
| O-208 | Ship Structures, Perform ACM Condition Assessment | |
| O-20A | Composite Labor Rate | |
| O-20B | Travel and Perdiem | |
| O-20C | Materials | |
| Total Price of ELINS 0-201 THROUGH 0-20C (CLIN 2001 OPTION YEAR 2) | $ - 0 |
| CLIN 3001 | ||
| ELIN | EXHIBIT LINE ITEM NUMBER (ELIN) DESCRIPTION | Option Year 3 |
| O-301 | Electrical Cable, Renew | |
| O-302 | Interferences, Remove and Reinstall | |
| O-303 | Contaminated Loose Gear, Dispose | |
| O-304 | Ship Structures, Test for Presence of Hazardous Material | |
| O-305 | Lead Dust, Clean | |
| O-306 | Lead-Based Paint & Asbestos-Containing Material,Abate or Encapsulate | |
| O-307 | Lead-Based Paint, Abate or Encapsulate | |
| O-308 | Ship Structures, Perform ACM Condition Assessment | |
| O-30A | Composite Labor Rate | |
| O-30B | Travel and Perdiem | |
| O-30C | Materials | |
| Total Price of ELINS 0-301 THROUGH O-30C (CLIN 3001 OPTION YEAR 3) | $ - 0 |
| CLIN 4001 | ||
| ELIN | EXHIBIT LINE ITEM NUMBER (ELIN) DESCRIPTION | Option Year 4 |
| O-401 | Electrical Cable, Renew | |
| O-402 | Interferences, Remove and Reinstall | |
| O-403 | Contaminated Loose Gear, Dispose | |
| O-404 | Ship Structures, Test for Presence of Hazardous Material | |
| O-405 | Lead Dust, Clean | |
| O-406 | Lead-Based Paint & Asbestos-Containing Material,Abate or Encapsulate | |
| O-407 | Lead-Based Paint, Abate or Encapsulate | |
| O-408 | Ship Structures, Perform ACM Condition Assessment | |
| O-40A | Composite Labor Rate | |
| O-40B | Travel and Perdiem | |
| O-40C | Materials | |
| Total Price of ELINS 0-401 THROUGH O-40C (CLIN 4001 OPTION YEAR 4) | $ - 0 |
| TOTAL PRICE (CLINS 0001 THROUGH 4001) | |
| Base Year, Option Year 1, 2, 3, and 4 | $ - 0 |
(08/21/2015)
Rev-0 - Page &P of &N
SOS&S Base Year
| SCHEDULE OF SUPPLIES AND SERVICES - EXHIBIT LINE ITEMS - BASE YEAR |
| HSCG85-15-Q-P30868 Lead and Asbestos Abatement / Assessments on USCG Cutters and Barges |
| ATTACHMENT 1 |
| ELIN | EXHIBIT LINE ITEM NUMBER (ELIN) DESCRIPTION (BASE YEAR) | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| O-001 | Electrical Cable, Renew | NSP | NSP | NSP | NSP |
| O-001A | Cable Size LSDSGU-3 through LSDSGU-4 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-001B | Cable Size LSTSGU-3 through LSTSGU-4 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-001C | Cable Size LSFSGU-3 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-001D | Cable Size LSDSGU-9 through LSDSGU-14 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-001E | Cable Size LSTSGU-9 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-001F | Cable Size LSFSGU-4 through LSFSGU-9 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-001G | Cable Size LSMSCU-7 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-001H | Cable Size LSMSCU-10 through LSMSCU-14 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-001I | Cable Size LSTSGU-14 through LSTSGU-23 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-001J | Cable Size LSDSGU-23 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-001K | Cable Size LSFSGU-23 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-001L | Cable Size LSMSCU-19 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-001M | Cable Size LSTSGU-30 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-001N | Cable Size LSDSGU-50 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-001O | Cable Size LSTSGU-50 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-001P | Cable Size LSDSGU-75 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-001Q | Cable Size LSTSGU-75 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-002 | Interferences, Remove and Reinstall | HR | 400 | ||
| O-003 | Contaminated Loose Gear, Dispose | NSP | NSP | NSP | NSP |
| O-003A | Miscellaneous Gear - "Testing" (Sample) | EA | 10 | ||
| O-003B | Disposal - "Non-hazardous" (55 Gal) | EA | 3 | ||
| O-003C | Disposal - "Non-hazardous" (10 Cu Yd) | EA | 2 | ||
| O-003D | Disposal - "Non-hazardous" (20 Cu Yd) | EA | 2 | ||
| O-003E | Disposal - "Hazardous" (55 Gal) | EA | 3 | ||
| O-003F | Disposal - "Hazardous" (10 Cu Yd) | EA | 2 | ||
| O-003G | Disposal - "Hazardous" (20 Cu Yd) | EA | 2 | ||
| O-004 | Ship Structures, Test for Presence of Hazardous Material | NSP | NSP | NSP | NSP |
| O-004A | Lead Paint - "Bulk Sample" | EA | 125 | ||
| O-004B | Lead Dust - "10 Wipe Samples" | JB | 30 | ||
| O-004C | Asbestos Containing Material - "Bulk Sample" | EA | 50 | ||
| O-004D | Asbestos Fibers - "Aggressive Air Sample" | EA | 40 | ||
| O-005 | Lead Dust, Clean | NSP | NSP | NSP | NSP |
| O-005A | Bulkhead/Overhead/Bilges/Decks - Machinery Compartment (100 Sq Ft) | EA | 5 | ||
| O-005B | Bulkhead/Overhead/Bilges/Decks - Machinery Compartment (500 Sq Ft) | EA | 2 | ||
| O-005C | Bulkhead/Overhead/Bilges/Decks - Non-Machinery Compartment (100 Sq Ft) | EA | 5 | ||
| O-005D | Bulkhead/Overhead/Bilges/Decks - Non-Machinery Compartment (500 Sq Ft) | EA | 2 | ||
| O-005E | Equipment/Loose Gear (Man Hour) | HR | 80 | ||
| O-006 | Lead-Based Paint and Asbestos-Containing Material, Abate or Encapsulate | NSP | NSP | NSP | NSP |
| O-006A | Bulkhead/Overhead/Deck Tile Surfaces - "Abate" (50 Sq Ft, Continuous) | EA | 1 | ||
| O-006B | Bulkhead/Overhead/Deck Tile Surfaces - "Abate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-006C | Bulkhead/Overhead/Deck Tile Surfaces - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-006D | Miscellaneous Surfaces - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-006E | Miscellaneous Surfaces - "Abate" (100 Sq Ft, Sporadic) | EA | 1 | ||
| O-006F | Bulkhead/Overhead/Deck Tile Surfaces - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-006G | Bulkhead/Overhead/Deck Tile Surfaces - "Encapsulate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-006H | Miscellaneous Surfaces - "Encapsulate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-007 | Lead-Based Paint, Abate or Encapsulate | NSP | NSP | NSP | NSP |
| O-007A | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Abate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-007B | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-007C | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-007D | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-007E | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Encapsulate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-007F | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Encapsulate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-007G | Interior Surfaces (Miscellaneous Surfaces) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-007H | Interior Surfaces (Miscellaneous Surfaces) - "Abate" (100 Sq Ft, Sporadic) | EA | 1 | ||
| O-007I | Interior Surfaces (Miscellaneous Surfaces) - "Encapsulate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-007J | Interior Surfaces (Bilge, Machinery Space) - "Abate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-007K | Interior Surfaces (Bilge, Machinery Space) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-007L | Interior Surfaces (Bilge, Machinery Space) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-007M | Interior Surfaces (Bilge, Machinery Space) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-007N | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-007O | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-007P | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-007Q | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-007R | Interior Surfaces (Bilge, Machinery Space) - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-007S | Interior Surfaces (Bilge, Machinery Space) - "Encapsulate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-007T | Interior Surfaces (Bilge, Non-Machinery Space) - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-007U | Interior Surfaces (Bilge, Non-Machinery Space) - "Encapsulate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-007V | Exterior Surfaces (Freeboard) - "Abate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-007W | Exterior Surfaces (Freeboard) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-007X | Exterior Surfaces (Superstructure) - "Abate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-007Y | Exterior Surfaces (Superstructure) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-007Z | Exterior Surfaces (Miscellaneous Surfaces) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-008 | Ship Structures, Perform ACM Condition Assessment | NSP | NSP | NSP | NSP |
| O-008A | Assessment (Compartment) | EA | 25 | ||
| O-00A | Composite Labor Rate | Hour | 250 | ||
| O-00B | Travel and Perdiem | LOT | 1 | ||
| O-00C | Materials | LOT | 1 | ||
| Total Price of ELINS (BASE YEAR) |
Rev-0 - Page &P of &N
SOS&S Option Year (1)
| SCHEDULE OF SUPPLIES AND SERVICES - EXHIBIT LINE ITEMS - OPTION YEAR 1 |
| HSCG85-15-Q-P30868 Lead and Asbestos Abatement / Aseessments on USCG Cutters and Barges |
| ATTACHMENT 1 |
| ELIN | EXHIBIT LINE ITEM NUMBER (ELIN) DESCRIPTION (OPTION YEAR 1) | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| O-101 | Electrical Cable, Renew | NSP | NSP | NSP | NSP |
| O-101A | Cable Size LSDSGU-3 through LSDSGU-4 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-101B | Cable Size LSTSGU-3 through LSTSGU-4 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-101C | Cable Size LSFSGU-3 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-101D | Cable Size LSDSGU-9 through LSDSGU-14 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-101E | Cable Size LSTSGU-9 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-101F | Cable Size LSFSGU-4 through LSFSGU-9 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-101G | Cable Size LSMSCU-7 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-101H | Cable Size LSMSCU-10 through LSMSCU-14 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-101I | Cable Size LSTSGU-14 through LSTSGU-23 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-101J | Cable Size LSDSGU-23 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-101K | Cable Size LSFSGU-23 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-101L | Cable Size LSMSCU-19 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-101M | Cable Size LSTSGU-30 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-101N | Cable Size LSDSGU-50 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-101O | Cable Size LSTSGU-50 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-101P | Cable Size LSDSGU-75 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-101Q | Cable Size LSTSGU-75 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-102 | Interferences, Remove and Reinstall | HR | 400 | ||
| O-103 | Contaminated Loose Gear, Dispose | NSP | NSP | NSP | NSP |
| O-103A | Miscellaneous Gear - "Testing" (Sample) | EA | 10 | ||
| O-103B | Disposal - "Non-hazardous" (55 Gal) | EA | 3 | ||
| O-103C | Disposal - "Non-hazardous" (10 Cu Yd) | EA | 2 | ||
| O-103D | Disposal - "Non-hazardous" (20 Cu Yd) | EA | 2 | ||
| O-103E | Disposal - "Hazardous" (55 Gal) | EA | 3 | ||
| O-103F | Disposal - "Hazardous" (10 Cu Yd) | EA | 2 | ||
| O-103G | Disposal - "Hazardous" (20 Cu Yd) | EA | 1 | ||
| O-104 | Ship Structures, Test for Presence of Hazardous Material | NSP | NSP | NSP | NSP |
| O-104A | Lead Paint - "Bulk Sample" | EA | 125 | ||
| O-104B | Lead Dust - "10 Wipe Samples" | JB | 30 | ||
| O-104C | Asbestos Containing Material - "Bulk Sample" | EA | 50 | ||
| O-104D | Asbestos Fibers - "Aggressive Air Sample" | EA | 40 | ||
| O-105 | Lead Dust, Clean | NSP | NSP | NSP | NSP |
| O-105A | Bulkhead/Overhead/Bilges/Decks - Machinery Compartment (100 Sq Ft) | EA | 5 | ||
| O-105B | Bulkhead/Overhead/Bilges/Decks - Machinery Compartment (500 Sq Ft) | EA | 2 | ||
| O-105C | Bulkhead/Overhead/Bilges/Decks - Non-Machinery Compartment (100 Sq Ft) | EA | 5 | ||
| O-105D | Bulkhead/Overhead/Bilges/Decks - Non-Machinery Compartment (500 Sq Ft) | EA | 2 | ||
| O-105E | Equipment/Loose Gear (Man Hour) | HR | 80 | ||
| O-106 | Lead-Based Paint and Asbestos-Containing Material, Abate or Encapsulate | NSP | NSP | NSP | NSP |
| O-106A | Bulkhead/Overhead/Deck Tile Surfaces - "Abate" (50 Sq Ft, Continuous) | EA | 1 | ||
| O-106B | Bulkhead/Overhead/Deck Tile Surfaces - "Abate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-106C | Bulkhead/Overhead/Deck Tile Surfaces - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-106D | Miscellaneous Surfaces - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-106E | Miscellaneous Surfaces - "Abate" (100 Sq Ft, Sporadic) | EA | 1 | ||
| O-106F | Bulkhead/Overhead/Deck Tile Surfaces - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-106G | Bulkhead/Overhead/Deck Tile Surfaces - "Encapsulate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-106H | Miscellaneous Surfaces - "Encapsulate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-107 | Lead-Based Paint, Abate or Encapsulate | NSP | NSP | NSP | NSP |
| O-107A | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Abate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-107B | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-107C | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-107D | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-107E | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Encapsulate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-107F | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Encapsulate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-107G | Interior Surfaces (Miscellaneous Surfaces) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-107H | Interior Surfaces (Miscellaneous Surfaces) - "Abate" (100 Sq Ft, Sporadic) | EA | 1 | ||
| O-107I | Interior Surfaces (Miscellaneous Surfaces) - "Encapsulate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-107J | Interior Surfaces (Bilge, Machinery Space) - "Abate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-107K | Interior Surfaces (Bilge, Machinery Space) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-107L | Interior Surfaces (Bilge, Machinery Space) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-107M | Interior Surfaces (Bilge, Machinery Space) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-107N | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-107O | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-107P | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-107Q | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-107R | Interior Surfaces (Bilge, Machinery Space) - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-107S | Interior Surfaces (Bilge, Machinery Space) - "Encapsulate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-107T | Interior Surfaces (Bilge, Non-Machinery Space) - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-107U | Interior Surfaces (Bilge, Non-Machinery Space) - "Encapsulate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-107V | Exterior Surfaces (Freeboard) - "Abate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-107W | Exterior Surfaces (Freeboard) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-107X | Exterior Surfaces (Superstructure) - "Abate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-107Y | Exterior Surfaces (Superstructure) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-107Z | Exterior Surfaces (Miscellaneous Surfaces) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-108 | Ship Structures, Perform ACM Condition Assessment | NSP | NSP | NSP | NSP |
| O-108A | Assessment (Compartment) | EA | 25 | ||
| O-10A | Composite Labor Rate | Hour | 250 | ||
| O-10B | Travel and Perdiem | LOT | 1 | ||
| O-10C | Materials | LOT | 1 | ||
| Total Price of ELINS (OPTION YEAR 1) |
Rev-0 - Page &P of &N
SOS&S Option Year (2)
| SCHEDULE OF SUPPLIES AND SERVICES - EXHIBIT LINE ITEMS - OPTION YEAR 2 |
| HSCG85-15-Q-P30868 Lead and Asbestos Abatement / Assessments on USCG Cutters and Barges |
| ATTACHMENT 1 |
| ELIN | EXHIBIT LINE ITEM NUMBER (ELIN) DESCRIPTION (OPTION YEAR 2) | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| O-201 | Electrical Cable, Renew | NSP | NSP | NSP | NSP |
| O-201A | Cable Size LSDSGU-3 through LSDSGU-4 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-201B | Cable Size LSTSGU-3 through LSTSGU-4 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-201C | Cable Size LSFSGU-3 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-201D | Cable Size LSDSGU-9 through LSDSGU-14 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-201E | Cable Size LSTSGU-9 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-201F | Cable Size LSFSGU-4 through LSFSGU-9 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-201G | Cable Size LSMSCU-7 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-201H | Cable Size LSMSCU-10 through LSMSCU-14 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-201I | Cable Size LSTSGU-14 through LSTSGU-23 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-201J | Cable Size LSDSGU-23 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-201K | Cable Size LSFSGU-23 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-201L | Cable Size LSMSCU-19 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-201M | Cable Size LSTSGU-30 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-201N | Cable Size LSDSGU-50 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-201O | Cable Size LSTSGU-50 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-201P | Cable Size LSDSGU-75 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-201Q | Cable Size LSTSGU-75 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-202 | Interferences, Remove and Reinstall | HR | 400 | ||
| O-203 | Contaminated Loose Gear, Dispose | NSP | NSP | NSP | NSP |
| O-203A | Miscellaneous Gear - "Testing" (Sample) | EA | 10 | ||
| O-203B | Disposal - "Non-hazardous" (55 Gal) | EA | 3 | ||
| O-203C | Disposal - "Non-hazardous" (10 Cu Yd) | EA | 2 | ||
| O-203D | Disposal - "Non-hazardous" (20 Cu Yd) | EA | 2 | ||
| O-203E | Disposal - "Hazardous" (55 Gal) | EA | 3 | ||
| O-203F | Disposal - "Hazardous" (10 Cu Yd) | EA | 2 | ||
| O-203G | Disposal - "Hazardous" (20 Cu Yd) | EA | 1 | ||
| O-204 | Ship Structures, Test for Presence of Hazardous Material | NSP | NSP | NSP | NSP |
| O-204A | Lead Paint - "Bulk Sample" | EA | 125 | ||
| O-204B | Lead Dust - "10 Wipe Samples" | JB | 30 | ||
| O-204C | Asbestos Containing Material - "Bulk Sample" | EA | 50 | ||
| O-204D | Asbestos Fibers - "Aggressive Air Sample" | EA | 40 | ||
| O-205 | Lead Dust, Clean | NSP | NSP | NSP | NSP |
| O-205A | Bulkhead/Overhead/Bilges/Decks - Machinery Compartment (100 Sq Ft) | EA | 5 | ||
| O-205B | Bulkhead/Overhead/Bilges/Decks - Machinery Compartment (500 Sq Ft) | EA | 2 | ||
| O-205C | Bulkhead/Overhead/Bilges/Decks - Non-Machinery Compartment (100 Sq Ft) | EA | 5 | ||
| O-205D | Bulkhead/Overhead/Bilges/Decks - Non-Machinery Compartment (500 Sq Ft) | EA | 2 | ||
| O-205E | Equipment/Loose Gear (Man Hour) | HR | 80 | ||
| O-206 | Lead-Based Paint and Asbestos-Containing Material, Abate or Encapsulate | NSP | NSP | NSP | NSP |
| O-206A | Bulkhead/Overhead/Deck Tile Surfaces - "Abate" (50 Sq Ft, Continuous) | EA | 1 | ||
| O-206B | Bulkhead/Overhead/Deck Tile Surfaces - "Abate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-206C | Bulkhead/Overhead/Deck Tile Surfaces - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-206D | Miscellaneous Surfaces - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-206E | Miscellaneous Surfaces - "Abate" (100 Sq Ft, Sporadic) | EA | 1 | ||
| O-206F | Bulkhead/Overhead/Deck Tile Surfaces - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-206G | Bulkhead/Overhead/Deck Tile Surfaces - "Encapsulate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-206H | Miscellaneous Surfaces - "Encapsulate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-207 | Lead-Based Paint, Abate or Encapsulate | NSP | NSP | NSP | NSP |
| O-207A | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Abate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-207B | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-207C | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-207D | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-207E | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Encapsulate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-207F | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Encapsulate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-207G | Interior Surfaces (Miscellaneous Surfaces) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-207H | Interior Surfaces (Miscellaneous Surfaces) - "Abate" (100 Sq Ft, Sporadic) | EA | 1 | ||
| O-207I | Interior Surfaces (Miscellaneous Surfaces) - "Encapsulate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-207J | Interior Surfaces (Bilge, Machinery Space) - "Abate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-207K | Interior Surfaces (Bilge, Machinery Space) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-207L | Interior Surfaces (Bilge, Machinery Space) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-207M | Interior Surfaces (Bilge, Machinery Space) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-207N | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-207O | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-207P | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-207Q | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-207R | Interior Surfaces (Bilge, Machinery Space) - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-207S | Interior Surfaces (Bilge, Machinery Space) - "Encapsulate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-207T | Interior Surfaces (Bilge, Non-Machinery Space) - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-207U | Interior Surfaces (Bilge, Non-Machinery Space) - "Encapsulate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-207V | Exterior Surfaces (Freeboard) - "Abate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-207W | Exterior Surfaces (Freeboard) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-207X | Exterior Surfaces (Superstructure) - "Abate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-207Y | Exterior Surfaces (Superstructure) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-207Z | Exterior Surfaces (Miscellaneous Surfaces) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-208 | Ship Structures, Perform ACM Condition Assessment | NSP | NSP | NSP | NSP |
| O-208A | Assessment (Compartment) | EA | 25 | ||
| O-20A | Composite Labor Rate | Hour | 250 | ||
| O-20B | Travel and Perdiem | LOT | 1 | ||
| O-20C | Materials | LOT | 1 | ||
| Total Price of ELINS (OPTION YEAR 2) |
Rev-0 - Page &P of &N
SOS&S Option Year (3)
| SCHEDULE OF SUPPLIES AND SERVICES - EXHIBIT LINE ITEMS - OPTION YEAR 3 |
| HSCG85-15-Q-P30868 Lead and Asbestos Abatement / Assessments on USCG Cutters and Barges |
| ATTACHMENT 1 |
| ELIN | EXHIBIT LINE ITEM NUMBER (ELIN) DESCRIPTION (OPTION YEAR 3) | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| O-301 | Electrical Cable, Renew | NSP | NSP | NSP | NSP |
| O-301A | Cable Size LSDSGU-3 through LSDSGU-4 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-301B | Cable Size LSTSGU-3 through LSTSGU-4 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-301C | Cable Size LSFSGU-3 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-301D | Cable Size LSDSGU-9 through LSDSGU-14 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-301E | Cable Size LSTSGU-9 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-301F | Cable Size LSFSGU-4 through LSFSGU-9 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-301G | Cable Size LSMSCU-7 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-301H | Cable Size LSMSCU-10 through LSMSCU-14 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-301I | Cable Size LSTSGU-14 through LSTSGU-23 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-301J | Cable Size LSDSGU-23 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-301K | Cable Size LSFSGU-23 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-301L | Cable Size LSMSCU-19 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-301M | Cable Size LSTSGU-30 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-301N | Cable Size LSDSGU-50 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-301O | Cable Size LSTSGU-50 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-301P | Cable Size LSDSGU-75 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-301Q | Cable Size LSTSGU-75 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-302 | Interferences, Remove and Reinstall | HR | 400 | ||
| O-303 | Contaminated Loose Gear, Dispose | NSP | NSP | NSP | NSP |
| O-303A | Miscellaneous Gear - "Testing" (Sample) | EA | 10 | ||
| O-303B | Disposal - "Non-hazardous" (55 Gal) | EA | 3 | ||
| O-303C | Disposal - "Non-hazardous" (10 Cu Yd) | EA | 2 | ||
| O-303D | Disposal - "Non-hazardous" (20 Cu Yd) | EA | 2 | ||
| O-303E | Disposal - "Hazardous" (55 Gal) | EA | 3 | ||
| O-303F | Disposal - "Hazardous" (10 Cu Yd) | EA | 2 | ||
| O-303G | Disposal - "Hazardous" (20 Cu Yd) | EA | 1 | ||
| O-304 | Ship Structures, Test for Presence of Hazardous Material | NSP | NSP | NSP | NSP |
| O-304A | Lead Paint - "Bulk Sample" | EA | 125 | ||
| O-304B | Lead Dust - "10 Wipe Samples" | JB | 30 | ||
| O-304C | Asbestos Containing Material - "Bulk Sample" | EA | 50 | ||
| O-304D | Asbestos Fibers - "Aggressive Air Sample" | EA | 40 | ||
| O-305 | Lead Dust, Clean | NSP | NSP | NSP | NSP |
| O-305A | Bulkhead/Overhead/Bilges/Decks - Machinery Compartment (100 Sq Ft) | EA | 5 | ||
| O-305B | Bulkhead/Overhead/Bilges/Decks - Machinery Compartment (500 Sq Ft) | EA | 2 | ||
| O-305C | Bulkhead/Overhead/Bilges/Decks - Non-Machinery Compartment (100 Sq Ft) | EA | 5 | ||
| O-305D | Bulkhead/Overhead/Bilges/Decks - Non-Machinery Compartment (500 Sq Ft) | EA | 2 | ||
| O-305E | Equipment/Loose Gear (Man Hour) | HR | 80 | ||
| O-306 | Lead-Based Paint and Asbestos-Containing Material, Abate or Encapsulate | NSP | NSP | NSP | NSP |
| O-306A | Bulkhead/Overhead/Deck Tile Surfaces - "Abate" (50 Sq Ft, Continuous) | EA | 1 | ||
| O-306B | Bulkhead/Overhead/Deck Tile Surfaces - "Abate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-306C | Bulkhead/Overhead/Deck Tile Surfaces - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-306D | Miscellaneous Surfaces - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-306E | Miscellaneous Surfaces - "Abate" (100 Sq Ft, Sporadic) | EA | 1 | ||
| O-306F | Bulkhead/Overhead/Deck Tile Surfaces - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-306G | Bulkhead/Overhead/Deck Tile Surfaces - "Encapsulate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-306H | Miscellaneous Surfaces - "Encapsulate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-307 | Lead-Based Paint, Abate or Encapsulate | NSP | NSP | NSP | NSP |
| O-307A | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Abate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-307B | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-307C | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-307D | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-307E | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Encapsulate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-307F | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Encapsulate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-307G | Interior Surfaces (Miscellaneous Surfaces) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-307H | Interior Surfaces (Miscellaneous Surfaces) - "Abate" (100 Sq Ft, Sporadic) | EA | 1 | ||
| O-307I | Interior Surfaces (Miscellaneous Surfaces) - "Encapsulate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-307J | Interior Surfaces (Bilge, Machinery Space) - "Abate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-307K | Interior Surfaces (Bilge, Machinery Space) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-307L | Interior Surfaces (Bilge, Machinery Space) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-307M | Interior Surfaces (Bilge, Machinery Space) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-307N | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-307O | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-307P | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-307Q | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-307R | Interior Surfaces (Bilge, Machinery Space) - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-307S | Interior Surfaces (Bilge, Machinery Space) - "Encapsulate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-307T | Interior Surfaces (Bilge, Non-Machinery Space) - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-307U | Interior Surfaces (Bilge, Non-Machinery Space) - "Encapsulate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-307V | Exterior Surfaces (Freeboard) - "Abate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-307W | Exterior Surfaces (Freeboard) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-307X | Exterior Surfaces (Superstructure) - "Abate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-307Y | Exterior Surfaces (Superstructure) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-307Z | Exterior Surfaces (Miscellaneous Surfaces) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-308 | Ship Structures, Perform ACM Condition Assessment | NSP | NSP | NSP | NSP |
| O-308A | Assessment (Compartment) | EA | 25 | ||
| O-30A | Composite Labor Rate | Hour | 250 | ||
| O-30B | Travel and Perdiem | LOT | 1 | ||
| O-30C | Materials | LOT | 1 | ||
| Total Price of ELINS (OPTION YEAR 3) |
Rev-0 - Page &P of &N
SOS&S Option Year (4)
| SCHEDULE OF SUPPLIES AND SERVICES - EXHIBIT LINE ITEMS - OPTION YEAR 4 |
| HSCG85-15-Q-P30868 Lead and Asbestos Abatement / Assessments on USCG Cutters and Barges |
| ATTACHMENT 1 |
| ELIN | EXHIBIT LINE ITEM NUMBER (ELIN) DESCRIPTION (OPTION YEAR 4) | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| O-401 | Electrical Cable, Renew | NSP | NSP | NSP | NSP |
| O-401A | Cable Size LSDSGU-3 through LSDSGU-4 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-401B | Cable Size LSTSGU-3 through LSTSGU-4 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-401C | Cable Size LSFSGU-3 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-401D | Cable Size LSDSGU-9 through LSDSGU-14 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-401E | Cable Size LSTSGU-9 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-401F | Cable Size LSFSGU-4 through LSFSGU-9 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-401G | Cable Size LSMSCU-7 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-401H | Cable Size LSMSCU-10 through LSMSCU-14 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-401I | Cable Size LSTSGU-14 through LSTSGU-23 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-401J | Cable Size LSDSGU-23 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-401K | Cable Size LSFSGU-23 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-401L | Cable Size LSMSCU-19 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-401M | Cable Size LSTSGU-30 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-401N | Cable Size LSDSGU-50 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-401O | Cable Size LSTSGU-50 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-401P | Cable Size LSDSGU-75 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-401Q | Cable Size LSTSGU-75 (25 Ln Ft) (Including (2) Stuffing Tubes) | EA | 1 | ||
| O-402 | Interferences, Remove and Reinstall | HR | 400 | ||
| O-403 | Contaminated Loose Gear, Dispose | NSP | NSP | NSP | NSP |
| O-403A | Miscellaneous Gear - "Testing" (Sample) | EA | 10 | ||
| O-403B | Disposal - "Non-hazardous" (55 Gal) | EA | 3 | ||
| O-403C | Disposal - "Non-hazardous" (10 Cu Yd) | EA | 2 | ||
| O-403D | Disposal - "Non-hazardous" (20 Cu Yd) | EA | 2 | ||
| O-403E | Disposal - "Hazardous" (55 Gal) | EA | 3 | ||
| O-403F | Disposal - "Hazardous" (10 Cu Yd) | EA | 2 | ||
| O-403G | Disposal - "Hazardous" (20 Cu Yd) | EA | 1 | ||
| O-404 | Ship Structures, Test for Presence of Hazardous Material | NSP | NSP | NSP | NSP |
| O-404A | Lead Paint - "Bulk Sample" | EA | 125 | ||
| O-404B | Lead Dust - "10 Wipe Samples" | JB | 30 | ||
| O-404C | Asbestos Containing Material - "Bulk Sample" | EA | 50 | ||
| O-404D | Asbestos Fibers - "Aggressive Air Sample" | EA | 40 | ||
| O-405 | Lead Dust, Clean | NSP | NSP | NSP | NSP |
| O-405A | Bulkhead/Overhead/Bilges/Decks - Machinery Compartment (100 Sq Ft) | EA | 5 | ||
| O-405B | Bulkhead/Overhead/Bilges/Decks - Machinery Compartment (500 Sq Ft) | EA | 2 | ||
| O-405C | Bulkhead/Overhead/Bilges/Decks - Non-Machinery Compartment (100 Sq Ft) | EA | 5 | ||
| O-405D | Bulkhead/Overhead/Bilges/Decks - Non-Machinery Compartment (500 Sq Ft) | EA | 2 | ||
| O-405E | Equipment/Loose Gear (Man Hour) | HR | 80 | ||
| O-406 | Lead-Based Paint and Asbestos-Containing Material, Abate or Encapsulate | NSP | NSP | NSP | NSP |
| O-406A | Bulkhead/Overhead/Deck Tile Surfaces - "Abate" (50 Sq Ft, Continuous) | EA | 1 | ||
| O-406B | Bulkhead/Overhead/Deck Tile Surfaces - "Abate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-406C | Bulkhead/Overhead/Deck Tile Surfaces - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-406D | Miscellaneous Surfaces - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-406E | Miscellaneous Surfaces - "Abate" (100 Sq Ft, Sporadic) | EA | 1 | ||
| O-406F | Bulkhead/Overhead/Deck Tile Surfaces - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-406G | Bulkhead/Overhead/Deck Tile Surfaces - "Encapsulate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-406H | Miscellaneous Surfaces - "Encapsulate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-407 | Lead-Based Paint, Abate or Encapsulate | NSP | NSP | NSP | NSP |
| O-407A | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Abate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-407B | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-407C | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-407D | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-407E | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Encapsulate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-407F | Interior Surfaces (Deck, Bulkhead, and Overhead) - "Encapsulate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-407G | Interior Surfaces (Miscellaneous Surfaces) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-407H | Interior Surfaces (Miscellaneous Surfaces) - "Abate" (100 Sq Ft, Sporadic) | EA | 1 | ||
| O-407I | Interior Surfaces (Miscellaneous Surfaces) - "Encapsulate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-407J | Interior Surfaces (Bilge, Machinery Space) - "Abate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-407K | Interior Surfaces (Bilge, Machinery Space) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-407L | Interior Surfaces (Bilge, Machinery Space) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-407M | Interior Surfaces (Bilge, Machinery Space) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-407N | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-407O | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-407P | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-407Q | Interior Surfaces (Bilge, Non-Machinery Space) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-407R | Interior Surfaces (Bilge, Machinery Space) - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-407S | Interior Surfaces (Bilge, Machinery Space) - "Encapsulate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-407T | Interior Surfaces (Bilge, Non-Machinery Space) - "Encapsulate" (25 Sq Ft, Continuous) | EA | 1 | ||
| O-407U | Interior Surfaces (Bilge, Non-Machinery Space) - "Encapsulate" (250 Sq Ft, Continuous) | EA | 1 | ||
| O-407V | Exterior Surfaces (Freeboard) - "Abate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-407W | Exterior Surfaces (Freeboard) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-407X | Exterior Surfaces (Superstructure) - "Abate" (100 Sq Ft, Continuous) | EA | 1 | ||
| O-407Y | Exterior Surfaces (Superstructure) - "Abate" (500 Sq Ft, Continuous) | EA | 1 | ||
| O-407Z | Exterior Surfaces (Miscellaneous Surfaces) - "Abate" (25 Sq Ft, Sporadic) | EA | 1 | ||
| O-408 | Ship Structures, Perform ACM Condition Assessment | NSP | NSP | NSP | NSP |
| O-408A | Assessment (Compartment) | EA | 25 | ||
| O-40A | Composite Labor Rate | Hour | 250 | ||
| O-40B | Travel and Perdiem | LOT | 1 | ||
| O-40C | Materials | LOT | 1 | ||
| Total Price of ELINS (OPTION YEAR 4) |