SCHEDULE_OF_ITEMS_(MTU_PROJECT).doc
DOC document 38 KB Posted
- Solicitation number
- HSCG85-13-R-P45N14
About this file
Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Redacted_JA_for_Other_Than_Full__Open_Competition_-_BERTHOLF.pdf | ||
| BERTHOLF_UPDS_MDE_Repairs_FY13_-_Rev2((b).pdf | ||
| Contractor_Price_Breakdown_(rev._1).xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. HSCG85-13-R-P45N14 Dockside Repairs, Cross Connect Gear & 8000 Hour Repairs, of CGC BERTHOLF
ATTACHMENT NO. 1
SCHEDULE OF ITEMS - PRICES
CLIN 0001 - DEFINITE ITEMS
These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.
| ITEM NO. |
| DESCRIPTION |
| AMOUNT |
| D-01 |
| Open, Inspect, Realign and Test Cross Connect Gear |
| D-01A |
| Phase 1 – Preparation for Work |
| $ |
| D-01B |
| Phase 2- Disassembly and Removal |
| $ |
| D-01C |
| Phase 3 – Maintenance Repairs |
| $ |
| D-01D |
| Phase 4 – Installation (Material & Labor Included) |
| $ |
| D-01E |
| Phase 5 – Completion, Clean-Up, and Validation |
| $ |
| D-02 |
| Startboard Main Propulsion Diesel Engine Coolant Plate-Core Heat Exchanger Clean & Inspect |
| $ |
| D-03 |
| Main Propulsion Diesel Engine Geislinger Coupling, Clean & inspect |
| $ |
| D-04 |
| Main Propulsion Diesel Engine HP and LP Intercoolers Saltwater & Air sides, Chemical Cleaning & Inspection |
| $ |
| D-05 |
| Main Propulsion Diesel Engine (MPDE) Turbocharger Control, Overhaul |
| $ |
| D-06 |
| Main Propulsion Diesel Engine Exhaust Turbochargers, Renewal & Inspection |
| $ |
| TOTAL AMOUNT OF ALL DEFINITE ITEMS |
| $ |
CLIN 0002 -- COMPOSITE LABOR HOUR RATE APPLICABLE TO CONTRACT
CHANGES
The following labor hour rate shall be used in pricing all contract changes in accordance with the clause entitled "COMPOSITE LABOR HOUR RATE FOR CONTRACT CHANGES."
LABOR HOUR RATE
ESTIMATED QUANTITY
806 hours
EXTENDED AMOUNT
**NOTE: The estimated quantity and extended amount indicated above are for evaluation of bids only. The quoted rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.