MARCUS_HANNA__WLM_175__DD_FQ4_TEMP_SERV.pdf

PDF 16 KB Posted

Attached to
USCGC MARCUS HANNA SCHEDULED DRY-DOCK REPAIRS FY13
Solicitation number
HSCG85-13-Q-P45C28
Issued by

About this file

Revised Specification Pages 137 139 (Temporary Services)

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC MARCUS HANNA (WLM-175) DRYDOCK AVAILABILITY FY2013

137 (Rev-0)

86350_0812_FLT

WORK ITEM 36: Temporary Services, Provide

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to provide temporary services to the vessel, during the performance of this availability.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

None.

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec) , 2012, Temporary Services

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Technical Representative.

Not applicable.

3.1.3 Protective measures.

Not applicable.

USCGC MARCUS HANNA (WLM-175) DRYDOCK AVAILABILITY FY2013

138 (Rev-0)

3.2 Temporary service particulars. The Contractor shall provide the below listed temporary services, in accordance with SFLC Std Spec 8635.

TABLE I – SERVICE SELECTION

*SUB-

PARAGRAPH TITLE Y/N

3.3.1 Office space Y

3.3.2 Telephone (to include long distance line(s). Y

3.3.3 Parking Y

3.3.4 Duty section berthing: __ male, __ female. Duty section berthing shall be provided for {Note: Choose one and delete the rest: (2) during disruption of berthing areas}

Y

3.3.5 Electrical power (including all requirements in associated sub-paragraphs)

Y

3.3.6 Hull grounding straps (not applicable when cutter is waterborne) Y

3.3.7 Compressed air (including all requirements in associated sub-paragraphs)

N

3.3.9 Heavy lift equipment: 30 hour(s) Y

3.3.10 Water supply

3.3.10.1 Potable water N

3.3.10.2 Hot-circulating water N

3.3.10.3 Cooling water N

3.3.10.4 Firemain system (including all requirements in associated sub-paragraphs) N

3.3.11 Steam (including all requirements in associated sub-paragraphs) N/A

3.3.12 Refuse disposal Y

3.3.13 Sewage and grey water disposal (including all requirements in associated sub-paragraphs) Y

3.3.14 Storage – General (including all requirements in associated sub-paragraphs):

3.3.14 Dry stores. N

3.3.14 Paint and flammable stores. N

3.3.14 Refrigerated stores. N

3.3.15 Small boat storage (including all requirements in associated sub-paragraphs) Y

*Each sub-paragraph number relates directly to the identical sub-paragraph number in SFLC Std Spec 8635.

3.2 Extended temporary services. If the performance period of the contract is extended by the KO, the contractor shall continue to provide all temporary services as specified herein for the extension period.

4. NOTES

This section is not applicable to this work item.

File details come from the government source that posted it. Updated .