TACKLE_(WYTL_65A)_DD_FQ3_TBS_13R0.docx
DOCX document 194 KB Posted
- Solicitation number
- HSCG85-13-Q-P45808
About this file
Specification USCGC TACKLE
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Government_Property_Form.pdf_.pdf | ||
| Solicitation_For_USCGC_TACKLE_(WYTL-65604)_FY13__DRYDOCK_.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC TACKLE (WYTL 65604)
65 FOOT "A CLASS" SMALL HARBOR TUG
SPECIFICATION FOR DRYDOCK REPAIRS
FY2013
Developed By: Thurston B Sumner (Rev-0, 05 June 2013)
TABLE OF CONTENTS
| Revisions Record | iii |
| Consolidated List of References | iv |
| Consolidated List of Government-furnished Property | vii |
| Consolidated List of Critical Inspection Items | viii |
| Principal Characteristics - Tender | ix |
| General Requirements | 1 |
| WORK ITEM 1: Hull and Structural Plating (General) -10.2-Pound Steel (1/4”), Repair | 10 |
| WORK ITEM 2: Hull and Structural Plating (General) - 15.3-Pound Steel Plate (3/8”), Repair | 12 |
| WORK ITEM 3: Hull and Structural Plating (General) - 7.5-Pound (3/16") Steel Plate, Repair | 14 |
| WORK ITEM 4: Hull and Structural Plating (General) - Degraded Weld (Steel), Repair | 16 |
| WORK ITEM 5: Appendages (U/W), Leak Test | 18 |
| WORK ITEM 6: Appendages (U/W) - Internal, Preserve | 21 |
| WORK ITEM 7: Voids (Non-Accessible), Leak Test | 23 |
| WORK ITEM 8: Voids (Non-Accessible), Preserve Internal Surfaces | 26 |
| WORK ITEM 9: Tanks (Potable Water), Clean and Inspect | 28 |
| WORK ITEM 10: Propulsion Shafting; Remove, Inspect, and Reinstall | 31 |
| WORK ITEM 11: Propulsion Shafting, Straighten | 35 |
| WORK ITEM 12: Propeller, Remove, Inspect, and Reinstall | 37 |
| WORK ITEM 13: Propeller, Perform Minor Repairs and Reconditioning | 41 |
| WORK ITEM 14: Keel Coolers, Clean, Inspect and Hydro | 45 |
| WORK ITEM 15: Fathometer Transducer, Renew | 49 |
| WORK ITEM 16: Sea Strainers Duplex (All Sizes) Overhaul, & Renew (Simplex) | 53 |
| WORK ITEM 17: Halon 1301 Fire Extinguishing System Cylinder, Inspect and Test | 57 |
| WORK ITEM 18: Rudder Assembly, Remove, Inspect and Reinstall | 62 |
| WORK ITEM 19: Decks - Exterior, Preserve (Pre Slip-Resistant Sheet Installation) | 66 |
| WORK ITEM 20: U/W Body, Preserve “100%” | 70 |
| WORK ITEM 21: Stern Tube Interior Surfaces, Preserve 100% | 73 |
| WORK ITEM 22: Hull Plating Freeboard, Preserve -“100%” | 76 |
| WORK ITEM 23: Cathodic Protection / Zinc Anodes, Renew | 80 |
| WORK ITEM 24: Drydocking | 83 |
| WORK ITEM 25: Temporary Services, Provide | 86 |
| WORK ITEM 26: Sea Trial Performance, Provide Support | 89 |
| WORK ITEM 27: Hull Plating (U/W Body), Ultrasonic Testing | 93 |
USCGC TACKLE (WYTL-65A) DRYDOCK AVAILABILITY FY2013
| ii |
| (Rev-0) |
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
USCGC TACKLE (WYTL-65A) DRYDOCK AVAILABILITY FY2013
| iii |
| (Rev-0) |
Consolidated List of References The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:
· American Welding Society (AWS): http://www.awspubs.com/index.php
· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
· NFPA: http://www.nfpa.org
· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 65 WYT 0103-002, Rev B, Outboard, Inboard Profiles, and General Arrangements Coast Guard Drawing 65 WYT 0103-3, Rev -, Booklet of General Plans, (65601-65602) Coast Guard Drawing 65 WYT 0500-001, Rev -, Lines and Offsets Coast Guard Drawing 65 WYT 0700-003, Rev -, Docking Block Arrangement (‘A’ Class) Coast Guard Drawing 65 WYT 1101-003, Rev A, Inboard Construction Profile and Sections Coast Guard Drawing 65 WYT 1112-001, Rev A, Strut, Skeg, Main Engine and Generator Foundation Details Coast Guard Drawing 65 WYT 1201-002, Rev -, Tow Rail and Guard Rails Coast Guard Drawing 65 WYT 2200-001, Rev B, Rudder Drawing Coast Guard Drawing 65 WYT 2901-005, Rev A, Curves of Form Coast Guard Drawing 65 WYT 4301-001, Rev H, Shafting Plan Coast Guard Drawing 65B WYT 4103-004, Rev C, Engine Starting F/O and Engine Cooling System Arrangement and Details (65613-15) Coast Guard Drawing 65B WYT 4400-003, Rev C, Propeller Coast Guard Drawing 65B WYT 4800-2, Rev A, Firemain and Bilge System & Plumbing Drains Coast Guard Drawing 65B-WYT 4301-4, Rev A, Propulsion Shaft Single Sheet Detail Coast Guard Drawing 65-WYT 4301-2, Rev B, 65601 Thru 65615 Shafting Plan Coast Guard Drawing 65-WYT 9300-3, Rev -, Fire Alarm / Detection System Mods (Supersedes 65-WYT -9300-2) Coast Guard Drawing FL 2804-13, Rev G, Visual ID Kit Schedule Coast Guard Drawing FL 2804-15, Rev-, Draft Figs Coast Guard Drawing FL 6713-201, Rev B, CRP-V850 Transducer (B-14) Adapter Assembly Coast Guard Fleet Drawing FL 2804-11, Rev D, Visual ID Numeral & Letter for Ships Coast Guard Fleet Drawing FL 2804-12, Rev-, U.S.C.G. Emblem NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M9000.6, Oct 2004, Naval Engineering Manual (NEM) Coast Guard Technical Publication (TP) 3210, Manufacturer's Instruction Book-SWBS Group(s)(s) 555 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2012, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2012, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2012, Temporary Services
OTHER REFERENCES
American Bureau of Shipping (ABS) 2, Rule Requirements for Survey After Construction, 2007, Part 7, Appendix Section 10, Guide for Bronze and Stainless Steel Propeller Castings American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System Components - Health Effects ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D3951, Reapproved 2004, Standard Practice for Commercial Packaging ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component Adhesives (An) Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 46, Part 147, Section 65, 2007, Coast Guard, Department of Homeland Securtiy, Carbon Dioxide and Halon Fire Extinguishing Systems.
Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation COMDTPUB P16700.4, NVIC 3-95, 6/19/1995; Periodic Inspection and Testing of Fixed Halon Fire Fighting Equipment Aboard Mechant Vessels Commercial Item Description (CID) A-A-52624, Nov 2008, Antifreeze, Multi Engine Type, Ethylene Glycol (For Caterpillar equipment applications, use CAT Extended Life Pre-Mix coolant.)
Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Antiseize, Zinc Dust-Petrolatum Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement Fernstrum Gridcooler Installation and Maintenance Manual, 2006, Form 165 International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing Tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50 m, Inclusive International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50m, Inclusive MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418) MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning MIL-PRF-16173, 2006, Corrosive Preventive Compound, Solvent Cutback, Cold Application MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application MIL-PRF-24647, Jun 2006, Paint System, Anticorrosive and Antifouling, Ship Hull MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant MIL-STD-167-1, Nov 2005, Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and Type II - Internally Excited) MIL-STD-2191, Nov 1992, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for Fabrication, Welding, and Inspection of Submarine Structure Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 1999, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning
USCGC TACKLE (WYTL-65A) DRYDOCK AVAILABILITY FY2013
| vi |
| (Rev-0) |
Consolidated List of Government-furnished Property The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/UNIT)
| 10 |
| Y |
| **Propeller shaft |
| NSN: 2010-01-040-5504 |
| 1 ea. |
| 12 |
| Y |
| **Propeller |
| NSN: 2010-01-482-6135 |
| 1 ea. |
| 6,561.81 |
| 14 |
| N |
| **50/50 Premix Coolant |
| N/A |
| 110 gallons |
| 200.00 |
| 15 |
| N |
| ***Fathometer Transducer, Shallow Water, 50-200 kHz |
| NSN: 5845-01-470-2500 Airmar Technology SS505 |
| 1 ea. |
| 148.92 |
| 24 |
| Y |
| *Transducer Cover Plate |
| N/A |
| 1 ea. |
| 50.00 |
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter
| vii |
| (Rev-0) |
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph 3.2.6.5 (Inspection report particulars)):
| Work Item |
| Title |
| 5 |
| Appendages (U/W), Leak Test |
| 7 |
| Voids (Non-Accessible), Leak Test |
| 10 |
| Propulsion Shafting; Remove, Inspect, and Reinstall |
| 12 |
| Propeller, Remove, Inspect, and Reinstall |
| 14 |
| Keel Coolers, Clean, Inspect and Hydro |
| 18 |
| Rudder Assembly, Remove, Inspect and Reinstall |
| viii |
| (Rev-0) |
PC_65A_WYTL_0909
Principal Characteristics - Tender 65' WYTL (‘A’ Class: Hulls 65601, 65602, 65604)
PHYSICAL CHARACTERISTICS
| Length Overall |
| 64' 10-1/2" |
| Depth |
| 8' 11" |
| Maximum Beam |
| 19' 3/8" |
| Height of Highest Projection |
| 27' 10" |
| Full Load Draft |
| 6' 2" |
| Full Load Displacement |
| 72 long tons |
| Shore Tie Voltage Requirements |
| 440 V |
| Frame Spacing |
| 1' 6" |
HULL CHARACTERISTICS
Hull/Main Weatherdeck Material
Superstructure
MACHINERY CHARACTERISTICS
| Number of Propellers |
| 1 |
| Number of Blades |
| 4 |
| Diameter of Propeller |
| 60" |
| Pitch |
| 38" |
| RPM |
| 400 |
| Shaft Diameter |
| 3.5 |
| 94 |
| (Rev-0) |
00000_PWB_0312_FLT
REC_0000_FLT_ Commercial Project @ Contractor’ Facility (0212) General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
2. REFERENCES
Coast Guard Drawings None Coast Guard Publications Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures Other References Code of Federal Regulations (CFR) Title 33 CFR, Jul 2010, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 11 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 11 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 HW disposal. The Contractor is considered as the generator of all contract-generated hazardous wastes and shall use its facility’s EPA generator ID number for management, transportation, and disposal of said hazardous wastes. Ensure the following:
3.5.1 Contractor’s hazardous waste handlers shall comply with applicable requirements of 40 CFR 262.
3.5.2 All contract generated hazardous wastes shall be packaged in 49 CFR-compliant containers.
3.5.3 The designated wastes shall be disposed of at a state or Federally-approved and permitted HW TSDF.
3.5.4 Name of destination TSDF shall be submitted to the KO at the Arrival Conference.
3.6 SFLC Standard Specification Approved Changes. The Contractor shall be aware that the following are approved changes to published SFLC 2012 Edition Standard Specifications and supersede published content:
3.6.1 SFLC Std Spec 8634, Drydocking, Appendix A, page A5, paragraph A2.7.1.3 Side Blocks. Remove formula value shown as g – Acceleration of gravity – 32.3 Ft/sec2, and replace with formula value g - Acceleration of gravity - 32.174 ft/sec2.
3.6.2 SFLC Std Spec 0740, Welding and Allied Processes. SFLC Std Spec 0740 added Appendix E, Stray Current Protection. New Appendix is posted with SFLC Standard Specifications as a separate document on internet and intranet webpage.
3.6.2.1 SFLC Std Spec 0740, Welding and Allied Processes, page 1, paragraph 1.2 Appendices. Add ‘Stray Current Protection’ to ‘Process Standard column of appendices table. Add ‘E’ to ‘Appendix’ column of appendices table.
3.6.2.2 SFLC Std Spec 0740, Welding and Allied Processes, page 4, paragraph 3.1.3 Stray current protection. Add “The Contractor shall meet all requirements for stray current protection as specified in Appendix E - Stray Current Protection.” directly after paragraph 3.1.3 title.
3.6.2.3 SFLC Std Spec 0740, Welding and Allied Processes, page 4, paragraph 3.1.3 Stray current protection. Delete paragraphs 3.1.3.1 and 3.1.3.2.
3.6.3 SFLC Std Spec 0450, Electrical Power for Contractor’s Tools and Equipment, page 1, paragraph 1.1 Intent. Add sentence, “Note that stray current protection for welding equipment is covered in SFLC Standard Specification 0740, Welding and Allied Processes, Appendix E.” to end of paragraph.
3.6.3.1 SFLC Std Spec 0450, Electrical Power for Contractor’s Tools and Equipment, page 5, paragraph 3.4 Equipment Grounding. Add sentence, “Stray current protection for welding equipment is covered in SFLC Standard Specification 0740, Welding and Allied Processes, Appendix E.” to end of paragraph.
3.6.3.2 SFLC Std Spec 0450, Electrical Power for Contractor’s Tools and Equipment, page 6, paragraph 3.4 Equipment Grounding. Delete paragraphs 3.4.1.4 and 3.4.1.5.
3.6.3.3 SFLC Std Spec 0450, Electrical Power for Contractor’s Tools and Equipment, page 6, paragraph 3.4 Equipment Grounding. Delete Figure 5.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
| DATE & TIME |
| ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION (Frame & Deck, relation to equipment, etc.) |
| TEMPERATURE |
| % REL. HUMID-ITY |
| DEW PT. |
| SURFACE |
| AMBIENT |
| ΔT |
| DP - Surface |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (Frame References) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________ Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________ Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15
| DATE |
| TEST LOCATIONS |
| CONDUCTIVITY |
(microsiemens/cm)
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Coating Mfg |
| Product Name |
| Batch # |
| Induction Time |
| Coating System Sequence (Primer/Touchup/3rd Coat, etc.) |
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| AVERAGE VALUE |
*BASE METAL READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| Application Method (Airless, Conventional Spray, Rolled) |
| Average DFT |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
11100_10.2Pound_SteelPlate_0712_FLT REC_11100_Steel_FLT_65' WYTL (‘A’ Class: Hulls 65601, 65602, 65604) (0112) WORK ITEM 1: Hull and Structural Plating (General) -10.2-Pound Steel (1/4”), Repair
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew 10.2-pound steel shell plating.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 65 WYT 1101-003, Rev A, Inboard Construction Profile and Sections Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures Other References None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
NOTE
This item does not address interferences in way of repair work. Cost of interference removal and reinstallation must be negotiated via the Change Request process.
3.2 Renewal. The Contractor shall renew up to 4 square feet of the steel plating specified in Section 1.1 (Intent) herein, as designated by the Coast Guard Inspector. Use Coast Guard Drawing 65 WYT 1101-003 as guidance.
3.3 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable.
4. NOTES
This section is not applicable to this work item.
11100_15.3Pound_SteelPlate_0712_FLT REC_11100_Steel_FLT_65' WYTL (‘A’ Class: Hulls 65601, 65602, 65604) (0112) WORK ITEM 2: Hull and Structural Plating (General) - 15.3-Pound Steel Plate (3/8”), Repair
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew 15.3-pound steel shell plating.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 65 WYT 1101-003, Rev A, Inboard Construction Profile and Sections Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures Other References None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
NOTE
This item does not address interferences in way of repair work. Cost of interference removal and reinstallation must be negotiated via the Change Request process.
3.2 Renewal. The Contractor shall renew up to 4 square feet of the steel plating specified in Section 1.1 (Intent) herein, as designated by the Coast Guard Inspector. Use Coast Guard Drawing 65 WYT 1101-003 as guidance.
3.3 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable.
4. NOTES
This section is not applicable to this work item.
11100_3/16”SteelPlate_0712_FLT REC_11100_Steel_FLT_65' WYTL (‘A’ Class: Hulls 65601, 65602, 65604) (0112) WORK ITEM 3: Hull and Structural Plating (General) - 7.5-Pound (3/16") Steel Plate, Repair
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew 7.5-pound (3/16th) hull plating.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 65 WYT 1101-003, Rev A, Inboard Construction Profile and Sections Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures Other References None.
3. REQUIREMENTS
3.1 General. The Contractor shall perform the tasks specified herein, using Coast Guard Drawing 65 WYT 1101-003 as guidance.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
NOTE
This item does not address interferences in way of repair work. Cost of interference removal and reinstallation must be negotiated via the Change Request process.
3.2 Renewal. The Contractor shall renew the specified size plating, as designated by the Coast Guard Inspector, up to 4 square feet, using Coast Guard Drawing 65 WYT 1101-003 as guidance.
3.3 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable.
4. NOTES
This section is not applicable to this work item.
11100_SteelWeld_0712_FLT REC_11100_Steel_FLT_65' WYTL (‘A’ Class: Hulls 65601, 65602, 65604) (0112) WORK ITEM 4: Hull and Structural Plating (General) - Degraded Weld (Steel), Repair
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew degraded steel welds.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 65 WYT 1101-003, Rev A, Inboard Construction Profile and Sections Coast Guard Publications Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures Other References Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
NOTE
This item does not address interferences in way of repair work. Cost of interference removal and reinstallation must be negotiated via the Change Request process.
3.2 Renewal. The Contractor shall renew degraded steel welds designated by the Coast Guard Inspector, up to 10 linear feet in increments of one linear foot, using Coast Guard Drawing 65 WYT 1101-003 as guidance.
3.3 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable.
4. NOTES
This section is not applicable to this work item.
11400_UW_Appendages_0912_FLT REC_11400_UW_Appendages_FLT_65’ WYTL (‘A’ Class: Hulls 65601, 65602, 65604) (1011) WORK ITEM 5: Appendages (U/W), Leak Test
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform leak test of the U/W appendages (see Table I).
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 65 WYT 0700-003, Rev -, Docking Block Arrangement (‘A’ Class) Coast Guard Drawing 65 WYT 1101-003, Rev A, Inboard Construction Profile and Sections Coast Guard Drawing 65 WYT 1112-001, Rev A, Strut, Skeg, Main Engine and Generator Foundation Details Coast Guard Drawing 65 WYT 2200-001, Rev B, Rudder Drawing Coast Guard Publications Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes Other References ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component Adhesives (An) MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph:
3.2 (Leak test particulars).
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Leak test particulars. In the presence of the Coast Guard Inspector, the Contractor shall accomplish the following tasks for all appendages as designated in paragraph 1.1(Intent) and Table 1 below, using the Coast Guard drawings listed in Section 2 (References) as guidance:
Remove and dispose of the existing drain plugs.
Submit a CIR noting any liquids draining from any of the appendages – indicating the presence of a leak.
Dispose of any drained liquids in accordance with all Federal, state, and local laws and regulations.
CAUTION!
Some liquids that are drained may be may be classified as hazardous materials or hazardous waste depending on state and local regulations. The vessel environmental coordinator may assist with determination of waste category.
3.3 Plug renewal. Upon completion of all work on appendages, the Contractor shall accomplish the following tasks:
Chase the hull insert threads of all plugs.
Renew stainless steel, Type 316 and Monel drain plugs (as applicable) in place of those removed.
Coat new plugs prior to installation with a sealing and locking compound conforming to ASTM D5363-AN0123 or a flexible joint compound conforming to MIL-S-45180, Type II.
TABLE I – DRAIN PLUGS FOR U/W APPENDAGES
| APPENDAGE |
| FRAME |
| SIDE |
| Skeg |
| 19 to 41 |
| CL |
| Fwd Skeg |
| 5 to 12 |
| CL |
| Strut |
| 40 to 41 |
| CL |
| Transducer Fairing |
| 13 |
| S |
3.4 Appendage air test. If a Change Request has been authorized and released, the Contractor shall accomplish the following tasks for any appendage from the above list designated by the Coast Guard Inspector:
Apply a vacuum or pressure of 2 psig to the void, in accordance with SFLC Std Spec 0740, Appendix C.
Submit a CFR.
4. NOTES
This section is not applicable to this work item.
11402_UW_APPENDAGES_0712_FLT
REC_11400_UW_Appendages_FLT_65’ WYTL (‘A’ Class: Hulls 65601, 65602, 65604) (1011) WORK ITEM 6: Appendages (U/W) - Internal, Preserve
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to preserve internal surfaces of designated U/W appendage(s) (see Table I).
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 65 WYT 0700-003, Rev -, Docking Block Arrangement (‘A’ Class) Coast Guard Drawing 65 WYT 1101-003, Rev A, Inboard Construction Profile and Sections Coast Guard Drawing 65 WYT 1112-001, Rev A, Strut, Skeg, Main Engine and Generator Foundation Details Coast Guard Drawing 65 WYT 2200-001, Rev B, Rudder Drawing Coast Guard Publications None.
Other References MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph:
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Preservation of void internal surfaces. The Contractor shall accomplish the following tasks for each appendage designated by the Coast Guard Inspector, using the Coast Guard Drawings listed in Section 2 (References) herein as guidance:
Fill all appendage interior surfaces with a rust preventive compound conforming to MIL-PRF-16173, Class II, Grade 3, to coat all surfaces.
Drain, collect, and dispose of remaining compound in accordance with all applicable Federal, state, and local regulations.
Ensure that the coated surfaces are left exposed to the atmosphere for 24 hours to allow for adequate drying.
TABLE 1 - DRAIN PLUGS FOR U/W Appendages
| APPENDAGE |
| FRAME |
| SIDE |
| Skeg |
| 19 to 41 |
| CL |
| Fwd Skeg |
| 5 to 12 |
| CL |
| Strut |
| 40 to 41 |
| CL |
| Transducer Fairing |
| 13 |
| S |
4. NOTES
This section is not applicable to this work item.
12300_Voids_Non-Accessible_GBS_0912_FLT REC_12300 (Non-Accessible Voids)_FLT_65’ WYTL (‘A’ Class: Hulls 65601, 65602, 65604) (0310) WORK ITEM 7: Voids (Non-Accessible), Leak Test
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to leak test designated non-accessible voids (see Table I).
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 65 WYT 0700-003, Rev -, Docking Block Arrangement (‘A’ Class) Coast Guard Drawing 65 WYT 1201-002, Rev -, Tow Rail and Guard Rails Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes Other References ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component Adhesives (An) MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph:
3.2 (Leak test particulars).
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Leak test particulars. In the presence of the Coast Guard Inspector, the Contractor shall accomplish the following tasks for all designated non-accessible voids (see Table 1for list) and submit a CIR, using the Coast Guard drawings listed in Section 2 (References) as guidance:
Remove and dispose of the existing drain plugs.
Submit a CIR noting any liquids draining from any of the voids - indicating the presence of a leak.
Dispose of any drained liquids in accordance with all Federal, state, and local laws and regulations.
CAUTION!
Some liquids that are drained may be classified as hazardous materials or hazardous waste depending on state and local regulations. The vessel environmental coordinator may assist with determination of waste category.
3.3 Plug renewal. Upon completion of all work on appendages, the Contractor shall accomplish the following tasks:
Chase the hull insert threads of all plugs.
Install new stainless steel, Type 316, or Monel drain plugs, in place of original plugs.
Coat new plugs prior to installation with a sealing and locking compound conforming to ASTM D5363-AN0123 or a flexible joint compound conforming to MIL-S-45180, Type II.
TABLE 1 - DRAIN PLUGS FOR NON-ACCESSIBLE VOIDS
| VOID |
| FRAME |
| SIDE |
| Bowrail |
| Bow to FM9 |
| P/S |
| Towrail |
| 21 to Stern |
| P/S |
| Freeboard Half Round |
| Freeboard |
| P/S |
3.4 Void air test. The Contractor shall accomplish the following tasks for any designated non-accessible void from the above list:
Apply a vacuum or pressure of 2 psig to the void, in accordance with SFLC Std Spec 0740, Appendix C.
Submit a CFR.
4. NOTES
This section is not applicable to this work item.
12302_Voids_Non-Accessible_GBS_0511_FLT REC_12300 (Non-Accessible Voids)_FLT_65’ WYTL (‘A’ Class: Hulls 65601, 65602, 65604) (0811) WORK ITEM 8: Voids (Non-Accessible), Preserve Internal Surfaces
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to preserve internal surfaces of non-accessible voids (see Table I).
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 65 WYT 0700-003, Rev -, Docking Block Arrangement (‘A’ Class) Coast Guard Drawing 65 WYT 1201-002, Rev -, Tow Rail and Guard Rails Coast Guard Publications None.
Other References MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures.
Not applicable.
3.1.4 Interferences.
None.
3.1.5 Work coordination. The Contractor shall coordinate performance of this work item with the “Voids (Non-Accessible), Leak Test” work item, which is a separate work item in this specification package. The Contractor shall refer to the Coast Guard drawing(s) listed in Section 2 (References) for guidance.
3.2 Preservation of void internal surfaces. The Contractor shall accomplish the following tasks for each void designated by the Coast Guard Inspector, using the Coast Guard Drawings listed in Section 2 (References) herein as guidance:
Fill all void interior surfaces with a rust preventive compound conforming to MIL-PRF-16173, Class II, Grade 3, to coat all surfaces.
Drain, collect, and dispose of remaining compound in accordance with all applicable Federal, state, and local regulations.
Ensure that the coated surfaces are left exposed to the atmosphere for 24 hours to allow for adequate drying.
TABLE 1 - DRAIN PLUGS FOR NON-ACCESSIBLE VOIDS
| VOID |
| FRAME |
| SIDE |
| Towrail |
| 21 to Stern |
| P/S |
| Bowrail |
| Bow to FM9 |
| P/S |
| Freeboard Half Round |
| Freeboard |
| P/S |
4. NOTES
This section is not applicable to this work item.
12314_1012_FLT
REC_12314_FLT 65’ WYTL (ALL) (0611)
WORK ITEM 9: Tanks (Potable Water), Clean and Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):
| TYPE OF TANK |
| LOCATION |
| CAPACITY - 95% |
(gallons)
LOW SUCTION
(gallons)
| Potable Water |
| 2-31-0-W |
| 1,000 |
| 50 |
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings None.
Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements Other References American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System Components - Health Effects American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
Fluid contents Piping RO system components Deck grating.
3.1.5 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all designated tanks listed in paragraph 1.1 (Intent), to demonstrate existing operational condition. Submit a CFR.
3.2 Requirements.
3.2.1 Tank content removal. The Contractor shall remove and dispose of all fluids and/or residues in accordance with all applicable Federal, state, and local regulations. The Contractor shall notify the Dockmaster prior to filling or draining the potable water tank(s), when this item is being executed in a drydock availability.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .