USCGC CLAMP (WLIC 75306)

75 FOOT "D CLASS" INLAND CONSTRUCTION TENDER

USCG 68B BARGE (68016)

SPECIFICATION FOR DRYDOCK REPAIRS

FY2012

Developed By: Nasaria E Valadez (REV 0, 29 October 2012)

TABLE OF CONTENTS

Revisions Recordiv
Consolidated List of Referencesv
Consolidated List of Government-furnished Propertyxi
Consolidated List of Critical Inspection Itemsxii
Principal Characteristics - Tenderxiii
Principal Characteristics - Bargexiv
General Requirements1
WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing - Tender19
WORK ITEM 2: Hull Plating (Side Scan), Ultrasonic Testing - Barge23
WORK ITEM 3: Hull and Structural Plating (General) - 10.2-Pound Steel, Repair - Tender27
WORK ITEM 4: Hull and Structural Plating (General) - 10.2-Pound Steel, Repair - Barge29
WORK ITEM 5: Appendages (U/W), Leak Test - Tender31
WORK ITEM 6: Appendages (U/W), Leak Test - Barge34
WORK ITEM 7: Appendages (U/W) - Internal, Preserve - Tender37
WORK ITEM 8: Appendages (U/W) - Internal, Preserve - Barge39
WORK ITEM 9: Voids (Non-Accessible), Leak Test - Tender41
WORK ITEM 10: Voids (Non-Accessible), Leak Test - Barge44
WORK ITEM 11: Voids (Non-Accessible), Preserve Internal Surfaces - Tender47
WORK ITEM 12: Voids (Non-Accessible), Preserve Internal Surfaces - Barge49
WORK ITEM 13: Tanks (MP Fuel Service), Clean and Inspect - Tender51
WORK ITEM 14: Tanks (MP Fuel Service), Clean and Inspect - Barge55
WORK ITEM 15: Propulsion Shafting, Strain Gage Alignment Inspections59
WORK ITEM 16: Propulsion Shaft Seals (Mechanical), Inspect And Clean63
WORK ITEM 17: Propulsion Shaft Bearings (External), Check Clearances68
WORK ITEM 18: Fathometer Transducer, Renew – Tender71
WORK ITEM 19: Fathometer Transducer, Renew – Barge75
WORK ITEM 20: Rudder Stock Bearings, Check Clearances79
WORK ITEM 21: Spuds, Overhaul - Barge82
WORK ITEM 22: Spud Wells, Preserve - Barge86
WORK ITEM 23: Spud Well Surfaces, Inspect - Barge88
WORK ITEM 24: Tanks (Sewage Holding), Clean and Inspect - Tender90
WORK ITEM 25: Decks – Exterior (Barge Construction), Preserve 100%93
WORK ITEM 58: U/W Body, Preserve “100%” - Tender96
WORK ITEM 23: U/W Body, Preserve “100%” - Barge99
WORK ITEM 28: Cathodic Protection / Zinc Anodes, Renew- Tender102
WORK ITEM 29: Cathodic Protection / Zinc Anodes, Renew - Barge105
WORK ITEM 30: Drydocking - Tender108
WORK ITEM 31: Drydocking - Barge111
WORK ITEM 32: Temporary Services, Provide114
WORK ITEM 33: Sea Trial Performance, Provide Support117
WORK ITEM 34: Tanks (Potable Water), Preserve “Partial” - Tender121
WORK ITEM 35: Tanks (Potable Water), Preserve “Partial” - Barge124
WORK ITEM 36: Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Repair - Tender127
WORK ITEM 37: Propulsion Shaft Rope Guards, Inspect and Repair129
WORK ITEM 38: Keel Coolers, Clean, Inspect and Hydro131
WORK ITEM 39: Vent Ducts (Galley), Commercial Clean135
WORK ITEM 40: Sea Strainers - Duplex (All Sizes), Overhaul138
WORK ITEM 41: Accessible Void, Preserve “100%” - Barge141
WORK ITEM 42: Hull Fittings (Mooring and Towing), Inspect and Test - Tender144
WORK ITEM 43: Hull Fittings (Mooring and Towing), Inspect and Test - Barge147
WORK ITEM 44: Compartment Insulation (Fidley), Renew - Tender151
WORK ITEM 45: Galley Cabinet Doors & Drawers, Renew154
WORK ITEM 46: Forepeak Tank Sounding Tube, Renew159
WORK ITEM 47: Bilge System Piping, Renew164
WORK ITEM 48: Internal Structural Members, Repair (Barge)171
WORK ITEM 49: Internal Structural Members, Repair (Tender)174
WORK ITEM 50: Bilge Pipe and Strainers, Install177
WORK ITEM 51: HW/CW Water Valves, Renew180
WORK ITEM 52: Ventilation Systems, Reinstall183
WORK ITEM 53: Galley Supply Ventilation Shroud, Renew187
WORK ITEM 54: Propellers, Remove, Inspect, and Reinstall189
WORK ITEM 55: Traction Winches (Tender), Overhaul193
WORK ITEM 56: Buoy and Cargo Handling Crane, Shrink Wrap196
WORK ITEM 57: MDE Foundation, Repair231

USCGC CLAMP (WLIC-75D) DRYDOCK AVAILABILITY FY2012

iii
(Rev-0)

Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE
REV#
WORK ITEM#
CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

USCGC CLAMP (WLIC-75D) DRYDOCK AVAILABILITY FY2012

iv
(Draft-3)

Consolidated List of References The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:

· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:

· American Welding Society (AWS): http://www.awspubs.com/index.php

· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

· NFPA: http://www.nfpa.org

· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

2901-004, Rev -, Curves of Form Coast Guard 68B CGB 2602-2, Rev A, Spud Well Details Coast Guard Drawing 68 CGB 0700-003, Rev. -, 68FT Steel Barge Docking Block Arrangement (“A” and “B” Class) Coast Guard Drawing 68 CGB-1101-1, Sheet 1, Rev - , Structural Sections and Details Coast Guard Drawing 68B CGB 0103-2, Rev -, General Arrangement Plan and Outboard Profile Coast Guard Drawing 68B CGB 0103-8, Rev 1, General Arrangement Plan and Outboard Profile Coast Guard Drawing 68B CGB 1105-001, Rev C, Bulkheads Coast Guard Drawing 68B CGB 2901-002, Rev -, Tank Capacities-Fresh Water, Fuel Oil, and Trim Tanks Coast Guard Drawing 68B CGB 2901-004, Rev -, Curves of Form Coast Guard Drawing 68B CGB 5501-001, Rev B, Fuel Oil and Exhaust Piping-Plan and Details Coast Guard Drawing 68B CGB-103-5, Rev A, HOLD ARRANGEMENT PLAN Coast Guard Drawing 68B CGB-1103-1, Rev C, Lines, Plating, Deck, and Bottom Framing Plans Coast Guard Drawing 68B-CGB 103-3, Rev A, Inboard Profile Coast Guard Drawing 68B-CGB 3801-1, Rev -, Ventilation Coast Guard Drawing 68B-CGB 4801-1, Rev -, Jetting Water, Bilge & Cooling Water - Flow Diagram Coast Guard Drawing 68B-CGB 4801-2, Rev A, Jetting Water, Bilge & Cooling Water Piping - Plan Coast Guard Drawing 68B-CGB 6401-1, Rev -, Electrical System Coast Guard Drawing 68B-CGB 6401-2, Rev -, Electrical System Coast Guard Drawing 68B-CGB 103-04, Rev -, Booklet of Gen Plans Coast Guard Drawing 68B-CGB 1103-01, Rev C, Lines, Plating & Deck & Bottom Fr Plans Coast Guard Drawing 68B-CGB 1105-01, Rev C, Bulkheads Coast Guard Drawing 68-CGB 4800-1, Rev -, Sounding Tubes & Vents Jetting, Bilge & Fw System Coast Guard Drawing 68-CGB 1112-2, Rev -, Transducer Wet Wall & Blister Installation Coast Guard Drawing 68-CGB-2901-2, Sheet 2, Rev, Tank Capacity Tables Coast Guard Drawing 75 WAGL 0103-2, Rev 1, Outboard Profile and Inboard Profile Coast Guard Drawing 75 WAGL 0700-004, Rev -, Docking Plan Coast Guard Drawing 75 WLIC 123-2, Rev-, Sewage Tank Coast Guard Drawing 75 WLIC 593-2, Rev B, Arrangement Vacuum Flush System Coast Guard Drawing 75D Drawing 1101-1, Rev C, Shell Expansion (75306-75307) Coast Guard Drawing 75D WAGL 0103-4, Rev C, General Arrangement – Main Deck and Hold Coast Guard Drawing 75D WAGL 0500-003, Rev -, Lines and Offsets Coast Guard Drawing 75D WAGL 0700-004, Rev -, 75FT “D” Class Towboat Docking Block Arrangement Coast Guard Drawing 75D WAGL 1101-001, Rev C, Shell Expansion (75306) Coast Guard Drawing 75D WAGL 1101-001, Rev C, Shell Expansion (75306-75307) Coast Guard Drawing 75D WAGL 1103-002, Rev -, Framing Plan Coast Guard Drawing 75D WAGL 1103-003, Rev A, Frames 4, 12, 16, 21, 31, & 36 Coast Guard Drawing 75D WAGL 1105-007, Rev -, Miscellaneous Bulkheads and Frames Coast Guard Drawing 75D WAGL 2200-001, Rev A, Rudder Stock and Fittings (75306-75307) Coast Guard Drawing 75D WAGL 2200-002, Rev A, Steering Gear Arrangement (75306-75307) Coast Guard Drawing 75D WAGL 2901-001, Rev A, Curves of Form Coast Guard Drawing 75D WAGL 3801-001, Rev B, Vent Heating & A/C (75306-75307) Coast Guard Drawing 75D WAGL 3801-002, Rev -, Fan Instl & Misc Dets (75306-75307) Coast Guard Drawing 75D WAGL 3801-005, Rev -, A/C Cond Cooling Water Pipe Plan and Details (75309-75310) Coast Guard Drawing 75D WAGL 3901-001, Rev -, Insulation and Sheathing Schedule Coast Guard Drawing 75D WAGL 3902-001, Rev -, Joiner Details-Engine Room Coast Guard Drawing 75D WAGL 4103-002, Rev B, Cooling Water Piping Plan (75306-75307) Coast Guard Drawing 75D WAGL 4103-003, Rev C, Cooling Water Piping Plan (75306-75307) Coast Guard Drawing 75D WAGL 4103-008, Rev -, Cooling Water Flow Diagram (75306-75307) Coast Guard Drawing 75D WAGL-1103-02, Rev -, Hull Framing Plan (75306-75307) Coast Guard Drawing 75D-WAGL 103-4, Rev C, Gen Arrg Mn Dk & Hold (75306-75307) Coast Guard Drawing 75D-WAGL 2803-1, Rev -, Name Plate & Labeling Sched (75306-75307) Coast Guard Drawing 75D-WAGL 3801-1, Rev B, Vent Heating & A/C (75306-75307) Coast Guard Drawing 75D-WAGL 4301-3, Rev -, Shafting Installation to Suit If 1312 MDE Coast Guard Drawing 75D-WAGL 4800-1, Rev -, Dets of Pipe Hangers (75309-75310) Coast Guard Drawing 75D-WAGL 4801-1, Rev -, Bilge Piping Plan (75306-75307) Coast Guard Drawing 75D-WAGL 4801-2, Rev -, Bilge Piping Sections (75306-75307) Coast Guard Drawing 75D-WAGL 4803-1, Rev -, Firemn & Bilge Flow Diag Coast Guard Drawing 75D-WAGL 4809-1, Rev -, Vent Fills & Sounds (75306-75307) Coast Guard Drawing 75D-WAGL 103-08, Rev A, Booklet of Gen Plans (75306) Coast Guard Drawing 75D-WAGL 1103-2, Rev -, Hull Framing Plan (75306-75307) Coast Guard Drawing 75D-WAGL 1105-1, Rev C, Transverse BHDs & Transom Coast Guard Drawing 75D-WAGL 1901-1, Rev A, Instructions to Painters (75306-75310) Coast Guard Drawing 75D-WAGL 3402-001, Rev D, Galley & Mess RM A&D (75306-75307) Coast Guard Drawing 75-WAGL 4301-5, Rev E, Shafting Machining Details to Suit If 1312 MDE Coast Guard Drawing 75-WAGL 4400-3, Rev E, Propeller to Suit IF1312 MDE Coast Guard Drawing 75-WLIC 529-1, Rev A, Bilge System Diagram Coast Guard Drawing 75-WLIC 529-2, Rev A, Bilge System Arrangement Coast Guard Drawing 75-WLIC 651-001, Rev A, Galley & Mess RM A&D Coast Guard Drawing 75-WLIC 85-001, Rev -, Booklet of General Plans Coast Guard Drawing 75-WLIC-506-001, Rev A; Tanks Vents & Sounding Tubes Coast Guard Drawing FL 3306-25, Rev G, Furniture Standards & Specifications Coast Guard Drawing FL 3306-38, Rev C, Booth Seating CPO Mess Coast Guard Drawing FL 6713-203, Rev -, CRP-V850 Transducer (SS505) Adapter Assembly Coast Guard Drawing Coast Guard Fleet Drawing FL 2602-10, Rev D, Spud Arrangements and Details NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation Details NAVSEA Dwg 803-1385866, Penetrations; Bulkhead and Deck NAVSEA Dwg 804-5773931, Acoustic & Thermal Insulation for Compartments NAVSEA Dwg 810-1385781, Hanger, Pipe, Surface Ship, Temperature to 425F (Superseded by NAVSEA Dwg. 804-1385781) NAVSEA Dwg 810-1385866, Penetration, Bulkhead and Deck - (See Dwg - 803-1385866) NAVSEA Dwg 810-1385880, Fittings, Cu-Ni Alloy, Slip on Sleeve

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual Coast Guard Commandant Instruction (COMDTINST) M10360.3 (Series), Coatings and Color Manual Coast Guard Commandant Instruction (COMDTINST) M10360.3C Coatings and Color Manual Coast Guard Commandant Instruction (COMDTINST) M6240.4A, Food Service Sanitation Manual Coast Guard Technical Publication (TP) 1797, SWBS 589, Section A, Nov 2009, Winch, 20-Ton Coast Guard Technical Publication (TP) 2718, SWBS 555, Jun 2006, Fire extinguishing Systems (270 WMEC A-Class) Coast Guard Technical Publication (TP) 3494, 09-DEC-03, Shaft Seal - Type Fse Surface Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009; General Requirements Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), Jan 2009, Overhaul AC Electrical Motors Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 5000, Jan 2009, Inspect, Repair, And Test Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), Jan 2009, Clean Shipboard Ventilation Systems Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), Jan 2009, Install New Deck Covering Systems Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), Jan 2009, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), Jan 2009, Provide Temporary Services Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2009, Temporary Hull Accesses

OTHER REFERENCES

American Bureau of Shipping (ABS) 2, Rule Requirements for Survey After Construction, 2007, Part 7, Appendix Section 10, Guide for Bronze and Stainless Steel Propeller Castings American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System Components - Health Effects American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2006, Recommended Practice for Nondestructive Testing Personnel Qualification and Certification American Society for Testing and Materials (ASTM) B61-08, 2008, Standard Specification for Steam or Valve Bronze Castings American Society of Mechanical Engineers (ASME) B16.11, 2005, Forged Steel Fittings, Socket-Welding and Threaded American Society of Mechanical Engineers (ASME) B16.15, 2011, Cast Copper Alloy Threaded American Society of Mechanical Engineers (ASME) B16.25, 2007, Buttwelding Ends American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End American Society of Mechanical Engineers (ASME) B16.5, 2003, Pipe Flanges & Flanged Fittings: Nps 1/2 Through Nps 24 American Society of Mechanical Engineers (ASME) B16.9, 2007, Factory-Made Wrought Buttwelding Fittings ASTM International (ASTM) A105, 2005, Standard Specification for Carbon Steel Forgings for Piping Applications ASTM International (ASTM) A106, 2008, Standard Specification for Seamless Carbon Steel Pipe for High-Temperature Service ASTM International (ASTM) A123, Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products ASTM International (ASTM) A181, 2006, Standard Specification for Carbon Steel Forgings, For General-Purpose Piping ASTM International (ASTM) B62, 2002, Standard Specification for Composition Bronze or Ounce Metal Castings ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D1709, 2008, Standard Test Methods for Impact Resistance of Plastic Film by the Free-Falling Dart Method ASTM International (ASTM) D1922, 2008, Standard Test Method for Propagation Tear Resistance of Plastic Film and Thin Sheeting by the Pendulum Method ASTM International (ASTM) D3951, Reapproved 2004, Standard Practice for Commercial Packaging ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component Adhesives (An) ASTM International (ASTM) D882, 2009, Standard Test Method for Tensile Properties of Thin Plastic Sheeting ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation Commercial Item Description (CID) A-A-52624, Nov 2008, Antifreeze, Multi Engine Type, Ethylene Glycol (For Caterpillar equipment applications, use CAT Extended Life Pre-Mix coolant.)

Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Antiseize, Zinc Dust-Petrolatum Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement Duramax Marine DuraCooler Installation Manual International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing Tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50 m, Inclusive International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50m, Inclusive International Standard Organization (ISO) 2953, 1999, Mechanical Vibration, Balancing Machines, Description and Evaluation Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-58, Pipe Hangers and Supports - Selection and Application Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008, Bronze Gate, Globe, Angle and Check Valves MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418) MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning MIL-DTL-15024, Nov 1997, Plates, Tags and Bands for Identification of Equipment, General Specification for MIL-P-21035, Paint, High Zinc Dust Content, Galvanizing Repair MIL-P-21035, Paint, High Zinc Dust Content, Galvanizing Repair MIL-PRF-16173, 2006, Corrosive Preventive Compound, Solvent Cutback, Cold Application MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application MIL-PRF-24647, Jun 2006, Paint System, Anticorrosive and Antifouling, Ship Hull MIL-PRF-32038, 11 March 1999, General Specifications for Shipboard Furniture, Fixtures, Fittings and Accessories MIL-PRF-32038, 11 March 1999, General Specifications for Shipboard Furniture, Fixtures, Fittings and Accessories MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant MIL-STD-167-1, Nov 2005, Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and Type II - Internally Excited) NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for Fabrication, Welding, and Inspection of Submarine Structure Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 1999, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2004, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2007, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating

USCGC CLAMP (WLIC-75D) DRYDOCK AVAILABILITY FY2012

x
(Draft-3)

Consolidated List of Government-furnished Property The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK ITEM
MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/UNIT)

17
N
**Wartsila FSE H74537-02 Face Changeout Kit (WLP001365-002)
01-560-3273
2 ea.
6,690.00
18
N
***Fathometer Transducer, Shallow Water, 50-200 kHz
NSN: 5845-01-470-2500 Airmar Technology SS505
1 ea.
148.92
19
N
***Fathometer Transducer, Shallow Water, 50-200 kHz
NSN: 5845-01-470-2500 Airmar Technology SS505
2 ea.
148.92
26
Y
*Transducer Cover Plate
N/A
1 ea.
50.00
27
Y
*Transducer Cover Plate
N/A
4 ea.
50.00
54
Y
**Propeller right hand
NSN: 2010-01-534-9089
1 ea.
10,129.00
54
Y
**Propeller left hand
NSN: 2010-01-534-9095
1 ea.
10,129.00

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter

xi
(Draft-3)

Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item
Title
1
Hull Plating (Side Scan), Ultrasonic Testing - Tender
2
Hull Plating (Side Scan), Ultrasonic Testing - Barge
5
Appendages (U/W), Leak Test - Tender
6
Appendages (U/W), Leak Test - Barge
9
Voids (Non-Accessible), Leak Test - Tender
10
Voids (Non-Accessible), Leak Test - Barge
17
Propulsion Shaft Bearings (External), Check Clearances
20
Rudder Stock Bearings, Check Clearances
38
Keel Coolers, Clean, Inspect and Hydro
54
Propellers, Remove, Inspect, and Reinstall
55
Traction Winches, Tender – Overhaul
xii
(Draft-3)

PC_75D_WLIC_0909

Principal Characteristics - Tender

75' WLIC(D-CLASS)

PHYSICAL CHARACTERISTICS

Length Overall
75' 0"
Depth
7' 7-3/4"
Maximum Beam
22' 0"
Height of Highest Projection
32' 0"
Full Load Draft
4' 0"
Full Load Displacement
145 long tons
Shore Tie Voltage Requirements
440 VAC / 3 Phase
Frame Spacing
1' 6"

MACHINERY CHARACTERISTICS

Number of Propellers
2
Number of Blades
4
Diameter of Propeller
48"
Pitch
40" fixed
RPM
400
Shaft Diameter
4.5"
xiii
(Draft-3)

PC_CGB_68B_1009

Principal Characteristics - Barge 68' Barge ('B' Class: Hulls 68016 -68020)

Physical Characteristics

Length Overall
68' 6-1/2"
Depth
7' 0"
Maximum Beam
28' 0"
Full Load Draft
3' 0"
Full Load Displacement
135 tons
Shore Tie Voltage Requirements
440 VAC / 3 Phase
Frame Spacing
1' 0"
234
(Rev-0)

00000_PWB_0312_FLT

REC_0000_FLT_ Commercial Project @ Contractor’ Facility (0212) General Requirements

1. SCOPE

1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.

2. REFERENCES

Coast Guard Drawings None.

Coast Guard Publications Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Other References ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for Fabrication, Welding, and Inspection of Submarine Structure The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.

3.3.1 HY-130 material substitution. The Contractor shall be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B-Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 shall be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY-130.

3.3.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive testing/inspection (NDT/NDI) in accordance with NAVSEA TP 1688. The Contractor shall be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.

3.3.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B-Class” cutters, the Contractor shall provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s shall be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor shall ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.

NOTE

NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Weldox 900 shall be considered the same as those for welding HY-130

3.4 HW disposal. The Contractor is considered as the generator of all contract-generated hazardous wastes and shall use its facility’s EPA generator ID number for management, transportation, and disposal of said hazardous wastes. Ensure the following:

3.4.1 Contractor’s hazardous waste handlers shall comply with applicable requirements of 40 CFR 262.

3.4.2 All contract generated hazardous wastes shall be packaged in 49 CFR-compliant containers.

3.4.3 The designated wastes shall be disposed of at a state or Federally-approved and permitted HW TSDF.

3.4.4 Name of destination TSDF shall be submitted to the KO at the Arrival Conference.

3.5 Interim changes and additions to SFLC Std Spec 0000. The Contractor shall be aware of the following interim changes and additions to the 2009 Edition of SFLC Std Spec 0000:

3.5.1 Acronyms and term definitions – paragraph 1.3 (Acronym and term definitions).

3.5.1.1 The term “COTR” has been replaced with “COR”, which is defined as follows:

“COR”: Contracting Officer’s Representative – the person delegated by the KO as the on-scene representative for matters concerning performance of work; this includes correctness, timeliness, and quality of the Contractor’s work. Normally, the CO/OINC is designated the COR.”

3.5.1.2 Definition addition for the term “Ungrounded, as follows:

“Ungrounded”: A power system where all of the current-carrying conductors and windings (including any neutral connection) are insulated from ground. In contrast, a generator or transformer in which at least one conductor or point (usually the midpoint or corner of a delta winding or the common center of a wye winding) is intentionally grounded, either solidly or through an impedance, is considered grounded. Note that the distinction concerns only current-carrying conductors; for both ungrounded and grounded power systems, non-current carrying metal parts and equipment grounding conductors are always bonded to earth ground for personnel safety. At non-Governmental facilities, dockside wye connected transformer secondary windings are almost always grounded and are generally not suitable for connection to a Coast Guard cutter without a separate Contractor furnished isolation transformer.”

3.5.2 Changes to paragraph 3.2.4 2.3 (QP-1 Inspector or Tech Rep duties).

“3.2.4.2.3 QP 1 Inspector or Tech Rep duties.

3.2.4.2.3.1 The Coating Inspector for the “QP 1-certified” Contractor or the Contractor-provided NACE-certified Tech Rep shall remain on site, to perform the following duties, as applicable, for each work item that involves preservation of “critical-coated surfaces”:

Verify inspection instrument calibration.

Verify and approve the suitability of ambient conditions before surface preparation is begun, and before each coat of paint is applied.

Verify all aspects of surface preparation – including, but not limited to:

· Cleanliness of compressed air.

· Adequacy of solvent cleaning.

· Proper handling of blast media.

· Actual surface preparation procedure.

Inspect and approve final surface preparation, before application of primer coat.

Supervise and approve coating system preparation and application procedures, including but not limited to: mixing and thinning, stripe coating application, spray techniques, and film thickness measurements and recordings.

Determine when applied coats have sufficiently cured for overcoating, or for system service resumption (see paragraph A2.1.18 (Critical drying time requirements)).

Complete and sign the quality assurance (QA) inspection forms (see QA-1 thru QA-5), provided in Appendix A (Requirements for Preservation of Ship Structures) of this document.

Submit all completed QA inspection forms to the COR (through the Contractor), upon completion of work.

3.2.4.2.3.2 The Contractor shall ensure the NACE Inspector is formally informed - via suitable subcontract documentation- and is willing and able to perform of all duties listed above. Submit documentation of this contract and assumption of duties to the KO at the Arrival Conference.”

3.5.3 Changes to contents of paragraph 3.2.5 (Planning document).

“3.2.5 Planning document. The Contractor shall generate a legible Planning Document (PD) with the following characteristics:

Graphical in format (see Fig. 1 (Sample Planning Document Submittal)).

Shows overall period of performance for each CLIN, with start and stop dates of major sub-tasks.

Contains due dates for Critical Inspection Reports (CIR) and any events requiring Coast Guard Inspector presence.

Identifies all work item time periods that require OEM Tech Rep assistance.

Identifies the “critical paths” for the project.

Shows calculations for the “float” along the critical paths and labels the critical paths with the number of delay days the critical paths can absorb without affecting the final delivery date.

NOTE

Float is the number of days that the critical paths can be delayed without affecting the final delivery date.

3.2.5.1 Ensure that the PD also includes the names, contact information, and written commitment from all Tech Reps required by the Contract - indicating they are available for work during the proposed time period.

3.2.5.2 Submit a preliminary electronic copy of the PD to the COR - for Government review - no later than one week after contract award.

3.2.5.3 Submit 3 copies of the PD to the COR, 15 days prior to the start of the performance period, and at all weekly Progress Meetings.

NOTE

A separate document, specifically prepared for the Government is not desired or required. A copy or summary of the Contractor’s internal scheduling document is preferred.

FIG. 1 - SAMPLE PLANNING DOCUMENT SUBMITTAL

3.2.5.4 When the critical path extends beyond or encroaches upon the final delivery date, provide a resource constraint and scheduling evaluation of the critical path before any request for extension will be entertained. Submit the resource constraint and scheduling evaluation via a CFR.

NOTE

The intent of the resource constraint and scheduling evaluation is to identify the resources necessary to ‘crash’ the critical path or make adjustments to the production schedule to meet the delivery date in lieu of a project extension.”

3.5.4 Additional sub-paragraphs to paragraph to 3.2.6.5 (Inspection report particulars).

“3.2.6.5.3 CFR tracking system. The Contractor shall create and maintain a CFR tracking system for the project. At a minimum, ensure that the CFR tracking system shall list all required reports, broken down by the following:

Work item and paragraph number.

Due dates.

Submission dates.

CFR/CIR submission number.

3.2.6.5.3.1 Be aware that the COR will respond via the CFR reply as to whether the CIR/CFR ‘fully’ or ‘partially’ satisfied the inspection and reporting requirements in the associated work item.

3.2.6.5.3.2 When submitting a CFR, ensure that the applicable work item and paragraph number for which the inspection report is being submitted is included on the CFR.

3.2.6.5.3.3 Submit a copy of the CFR tracking sheet to the COR at the arrival conference.

3.2.6.5.3.4 At a minimum the Contractor shall update and submit a copy of the CFR tracking sheet to the COR the day before each weekly progress meeting. At the required CFR due date, submit the CFR tracking sheet to the COR via a CFR for review and formal archiving with the project records.”

3.5.5 Changes to contents of paragraph 3.2.11.1 (Sanitary facilities for vessel-personnel due to disruption of grey water and sewage systems).

“3.2.11.1 (Sanitary facilities for vessel-personnel due to disruption of grey water and sewage systems. When the shipboard grey water and sewage systems are disrupted due to repairs required by contract work, the Contractor shall provide vessel-personnel with a sanitary facility, within a five minute walking distance from the vessel, to include the amenities listed in Table II (Sanitary Facility Amenities). Ensure the following:

Shower stalls are equipped with privacy screens.

Sinks are provided with fresh hot and cold water.

Electrical convenience GFI receptacles, in accordance with NFPA 70, National Electric Code (NEC), are located in vicinity of sinks.

Toilets have doors or privacy dividers.

Lockers are capable of being locked.”

3.5.6 Changes to contents of paragraph 3.3.2.1.1 (Water depth).

“3.3.2.1.1 Water depth. Ensure that water depth is sufficient at the pier to allow the vessel's lowest underwater appendage to clear the bottom by at least two feet at:

Ordinary low water mark on non-tidal rivers.

At all tide conditions predicted during the availability for tidal rivers and other navigable waterways (Bay, Lake, etc.).”

3.5.7 Electrical compliance planning.

“3.3.14 Electrical compliance planning. For cutter availabilities, the Contractor shall submit to the KO the following electrical compliance planning documentation during the pre-award phase of the contract.

3.3.14 1 Shore power. When ungrounded shore power is to be provided per SFLC Std Spec 8635, provide a one line electrical diagram showing how such power will be supplied, including the winding and grounding configuration and rating of any generator or isolation transformer. For drydock availabilities, separate diagrams should be submitted for waterborne and non-waterborne periods.

3.3.14.2 Arc welding. When electric arc welding is to be performed per SFLC Std Spec 0740 while the vessel is waterborne, provide a diagram showing the general proposed location of each welding machine, the grounding configuration of each machine, and the return current conductor size and length. For drydock availabilities, separate diagrams may be necessary for waterborne and non-waterborne periods.

3.3.14.3 Hull bonding and lightning protection. For work periods while the vessel is not waterborne, provide a diagram showing how the hull grounding straps required by SFLC Std Spec 8635 will be sized (length and gauge) and connected.

3.3.14.4 Tool and equipment power. Provide a diagram showing how Contractor tool and equipment power will be supplied and distributed for dockside and shipboard use in accordance with SFLC Std Spec 0450. For drydock availabilities, separate diagrams should be submitted for waterborne and non-waterborne periods.”

3.5.8 Changes to paragraph to A2.1.1.3 (Document submission).

“A2.1.1.3 Document submission.

A2.1.1.3.1 For all work involving preservation of “critical-coated surfaces”, ensure the following is submitted to the COR at the Arrival Conference, for each coating system intended to be applied:

Coating system manufacturer’s name.

Product data sheets.

MSDS.

COC.

A2.1.1.3.2 Documentation shall be broken out by work item, to also include the following information:

Brand name.

Color.

Intended mil thickness.

Time between coats.

Intended final cure time prior to immersion or full duty rating, as applicable.

A2.1.1.3.3 For work involving preservation of surfaces not designated as “critical-coated surfaces”, submit all product data sheets, MSDS, and COC to the COR, prior to commencement of work.”

3.5.9 Requirements changes to paragraphs A2.1.5 (Tenting) and A2.1.6 (Ambient condition control).

“A2.1.5 Tenting and ambient condition control – “for critical-coated surfaces”.

A2.1.5.1 When the ambient condition parameters necessary for full paint cure or to meet environmental conditions, as required in paragraph A.2.1.4 (Ambient condition parameters), cannot be met for successful application and curing of “critical-coated” surface coating systems, the Contractor shall provide the following, at no additional cost to the Government:

Suitable tenting, as applicable, for exterior surface preservation.

Suitable ambient condition control equipment, which may include, but not be limited to the below-listed, to create and maintain ambient conditions recommended by the coating system’s manufacturer, and facilitate successful coating application and curing.

· AC system.

· Heaters.

· Blowers.

· Dehumidifiers.

A2.1.5.2 Submit an ambient condition control plan to the COR within 24 hours prior to initiating ambient condition control process

NOTE

The Contractor is expected to be aware of the advent of environmental conditions that are adverse to preservation of critical-coated surfaces and include all costs in

3.5.10 Pre-surface preparation requirements – additional to paragraph A2.1.7 (Pre-surface preparation requirements).

“A2.1.7.4 Coupon test. In order to ensure production of required surface profile, the Contractor shall accomplish the following, tasks, whenever abrasive-blasting is required in a work item:

A2.1.7.4.1 Conduct a performance test on all abrasive blasting operations on a Contractor- provided test coupon, prior to starting abrasive blasting operations on the vessel. Use a new metal plate, of the same metal type and material properties as the area to be blasted, steel or aluminum plate, as applicable. For steel plates, the new plate shall have the mill scale intact and the plate will be in a Rust Grade "A" condition, per the SSPC-VIS 1 visual standard cards. No existing anchor profile, other than the surface irregularities from the manufacturing process are permitted on the test coupon. The test coupon shall be flat, with nothing welded to the side used for the anchor profile test, no thinner than a 1/8-inch plate and measuring no smaller than 1-foot by 1-foot. The test coupon shall be affixed so as to not permit excessive movement during the performance test.

CAUTION!

Do not affix the coupon to the vessel nor shall the blast media from the performance test strike the vessel during the test A2.1.7.4.2 Ensure that the abrasive blasting operation test on the test coupon is with the very same setup that will be used to blast the vessel. The setup shall include, but not be limited to:

The abrasive media to be used (material and media size).

Nozzle size and type (straight bore, high velocity nozzle, angle nozzle...).

Delivery rate and pressure settings.

A2.1.7.4.3 Blast an one-square foot area on one side of the test coupon to the abrasive surface preparation standard specified in the applicable work item and perform an anchor profile test of the blasted surface in accordance with ASTM D4417, method A or C. Notify the COR in advance of the abrasive blasting operation test, to permit the witnessing of the test by appropriate Coast Guard personnel. Submit a CFR documenting the results of the abrasive blasting operation test. CFR shall include at a minimum, the following:

Area of the vessel that the verified setup will be used to abrasive blast with.

The abrasive media used.

The nozzle size and type.

The delivery rate and pressure.

The test coupon starting properties (material type and surface conditions).

The resultant anchor profile readings from the test.

NOTES

1. Ultra high pressure water jetting does not create an anchor profile and is exempt from the anchor profile test coupon check.

2. The reverse side of the test coupon may be used for the subsequent test, provided that the conditions in paragraph A2.1.7.4 (Coupon test) are met.

A2.1.7.4.3 Repeat the abrasive blasting operation test in the following instances:

The setup, as defined in paragraph A2.1.7.4.1 is changed.

The resultant anchor profile readings observed on the vessel are outside the specified anchor profile range.

Media is changed from MIL-A-22262 to CID A-A-59316 or vice versa.

The supplier of the abrasive blasting media changes, regardless if the new source for the media has the same specifications.

When Directed by the COR.

NOTE

A performance test of the abrasive blasting operations on a test coupon and measuring the anchor profile prior to performing the operation on the cutter, in order to confirmed that the anchor profile range that the operation is going to produce. An abrasive blasting operation test is prudent, as there are enough variables in the equipment setup and media properties that the resulting anchor profiles from one contractor to the next vary significantly.

3.5.11 Post-surface preparation requirements - additional to paragraph A2.1.8 (Post-surface preparation requirements).

A2.1.8.8 Substrate profile measurements - during and post-surface preparation. In order to ensure production of required surface profile, the Contractor shall accomplish the following tasks, whenever abrasive-blasting is required in a work item for complete preservation of a ”critical-coated” surface:

A2.1.8.8.1 During surface preparation by abrasive blasting or waterjetting operations, spot check the existing anchor profile per 500-square feet, in order to 'project' the need to manage the excessive anchor inspect for both excessive and insufficient anchor profiles . When the Contractor elects to prepare a substrate by waterjetting, the Contractor shall inspect the substrate for areas of insufficient or excessive anchor profile, both visually and in accordance with ASTM D4417, Method A or C. Submit a CFR detailing the location, square footage, measured anchor profiles, and the anchor profile range required for the applicable coating system.

A2.1.8.8 2 Post completion of surface preparation, measure the profile of the resultant bare surfaces, in accordance with ASTM D4417, Method A or C.”

3.5.12 Caution verbiages – additional to paragraph A2.1.18 (Critical drying and cure time requirements).

“CAUTIONS!

1. Hard cure times or cure time prior to immersion for any “critical coated system” shall be met as published on the Product Data Sheets available online. No early undocking or relaxation of these published requirements is permitted without prior approval from the KO. Coating system manufacturer’s Sales or Technical Representatives may not relax these requirements. Painting and curing of all tank coating systems (except for tanks that are inboard and not touching the skin of the vessel (side and/or bottom) shall occur while the cutter is out of the water.

2. CAPAC systems shall not be energized until full cure of all underwater paint systems has occurred.”

3.5.13 Preservation Plan.

“A2.2 Preservation Plan (PP). The contractor shall submit a PP to the COR at the arrival conference, to allow for review of all work items pertaining to the preservation of the vessel. At a minimum, PP shall include the following and be broken down by work item:

Coatings to be applied – listed by manufacturer and product identification numbers.

Target wet and dry film thickness values.

Authorized reducers/solvents - including maximum percent by volume for reducers/solvents.

Colors by FED-STD-595 color number.

Application method for each coat.

Application pressure and nozzle size requirements listed on the manufacturer’s product data sheet(s).

Minimum recoat windows for applying subsequent coats, maximum recoat windows to apply subsequent coats, adjusted for anticipated temperatures.

Any special instructions or environmental limits listed by the coating manufacturer.

Intended final cure times prior to immersion or full duty rating (as applicable).”

3.5.14 Changes to paragraph B2.2.3.3.1.

“B2.2.3.3.1 Do not release lead or lead-contaminated materials into the environment. Conduct periodic air monitoring (as appropriate) for lead in the worker’s breathing zone, during the course of any abatement work involving lead containing materials, to prevent exposure at or above the PEL. Submit results of all air monitoring samples to the COR, within 24 hours of completion of sampling.”

3.5.15 Booming requirements during the offload or on-load of petroleum products.

“B2.2.10 Booming requirements during the offload or load of petroleum products. The Contractor shall provide a containment boom system and boom off the cutter during all petroleum cargo on-loads and offloads. The cutter shall be boomed off by the contractor during both shipyard functions and the final bunkering of the cutter by ship's force. The contractor is responsible to provide the labor to deploy and recover the boom during all operations, including operations conducted by ship's force. The containment boom shall at a minimum, fullly encapsulate the cutter from the pier wall in front of the cutter to the pier wall at the stern of the cutter. When moored alongside a pier that does not provide a fully intact pier wall that will contain a spill, the containment boom shall wrap completely around the cutter on all sides to provide spill containment. For tug and barge configurations, the containment boom shall encapsulate both the cutter and the barge, as applicable.”

4. NOTES

4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp

4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.

CHECKPOINT 2 -…