GALLATIN Maintenance and Repair2 FY12 Rev 0
320 KB Posted
- Attached to
- Mini-Dockside repairs of CGC GALLATIN
- Solicitation number
- HSCG85-12-R-P45B87
Text of this file
USCGC GALLATIN (WHEC-378E) DOCKSIDE AVAILABILITY 2012
USCGC GALLATIN (WHEC 721)
378 FOOT "E CLASS" HIGH ENDURANCE CUTTER
SPECIFICATION FOR MAINTENANCE & REPAIRS (2)
Developed By: Jennifer L Rest (Rev-0, 07 May 2012)
TABLE OF CONTENTS
iiiRevisions Record ivConsolidated List of References viConsolidated List of Government-furnished Property viiConsolidated List of Critical Inspection Items viiiPrincipal Characteristics
1General Requirements
12WORK ITEM D-01: Weather Deck Exterior Preservation
17WORK ITEM O-02: Weather Deck Plating Renewal
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:
· American Welding Society (AWS): http://www.awspubs.com/index.php
· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
· NFPA: http://www.nfpa.org
· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 378 FRAM-E 512-004, Rev F, HVAC Detail Line Diagram Coast Guard Drawing 378 FRAM-E 512-005, Rev D, Vent General Construction Coast Guard Drawing 378-FRAM-W 152-1, Rev -, Deck Plating & Framing Coast Guard Drawing 378-FRAM-W 259-12, Rev 6, Main Propulsion Gas Turbine Exhaust Coast Guard Drawing 378-FRAM-W 259-13, Rev 4, Main Propulsion Gas Turbine Exhaust Coast Guard Drawing 378-FRAM-W 508-1, Rev C, Insulation Schedule Coast Guard Drawing 378-FRAM-W 635-1, Rev -, Insulation a&D Coast Guard Drawing 378-FRAM-W 801-1, Rev -, Booklet of General Plans NOTE TO USER : Modify list of drawings as applicable to ducts being cleaned. Modify list references cited in paragraph 3.3 to match.
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), Jan 2009, Clean Shipboard Ventilation Systems
OTHER REFERENCES
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning Naval Ship's Technical Manual (NSTM) Chapter 635, Jul 1998, Thermal, Fire and Acoustic Insulation NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for Fabrication, Welding, and Inspection of Submarine Structure The Society for Protective Coatings (SSPC) Paint Application Specification No. 1 (SSPC-PA Guide 1), 2004, Shop, Field, And Maintenance Painting of Steel The Society for Protective Coatings (SSPC) Paint Application Specification No. 3 (SSPC-PA Guide 3), 1995, A Guide to Safety in Paint Application The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Standard VIS 4 /NACE No. 7, 2001, Visual Reference Photograph for Steel Cleaned by Waterjetting The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating The Society for Protective Coatings (SSPC)/NACE Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning The Society for Protective Coatings SSPC-SP 1, 11/1/2004; Solvent Cleaning The Society for Protective Coatings SSPC-SP 3, 11/1/2004; Power Tool Cleaning
Consolidated List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
This section is not applicable to this package.
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item Title D-01
WEATHER DECK EXTERIOR PRESERVATION
PC_378E_WHEC_721_1109
Principal Characteristics
378E WHEC (GALLATIN)
Physical Characteristics
| Length Overall |
| 378' 3" |
| Length between Perpendiculars |
| 350' 0" |
| Maximum Beam (@ 13' 6" DWL) |
| 43' 3/4" |
| Beam @ Main Deck |
| 42' 0" |
| Depth |
| 26' 0-3/8" |
| Main Deck Camber |
| 6" in 21' 0" |
| Minimum Berth Depth |
| 20' 0" |
| Height of highest projection |
| 115' 0-3/4" |
| Draft, Fwd @ Full Load |
| 14.78' |
| Draft, Aft @ Full Load |
| 15.61' |
| Draft, Fwd @ Minimum Operating |
| 14.63' |
| Draft, Aft @ Minimum Operating |
| 15.33' |
| Full Load Displacement |
| 3150 long tons |
| Minimum Operating Displacement |
| 2760 long tons |
| Light Ship Displacement |
| 2422 long tons |
Hull Characteristics
| Frame Spacing |
| 1' 0" |
Material
| Deckhouse, fwd of Fr 96 |
| HY-100 Steel |
| Main Deck Frames 183 to 242-1/2 and fwd of FR 96 |
| HY-80 Steel |
| 01 Level Frames 183 to 316 |
| HY-80 Steel |
| Lower hull around bow thruster, port and starboard Strakes A-3 and A-4, Frames 56 to 96 |
| HY-80 Steel |
| Masts and superstructure above the 01 Deck |
| Type 3456 Aluminum |
| Remaining |
| ASTM A-131 |
Machinery Characteristics
| Type of Propulsion |
| CODOG |
| Two Diesel Engines |
| Fairbanks Morse 12-cylinder opposed piston 38-TD-8-1/8; 7000 SHP total |
| Two Gas Turbines |
| Pratt and Whitney FT4A-2; 36,000 SHP total |
| Two Controllable Pitch Propellers |
| Escher Wyss 4 blade, 13' 0" diameter; 149 RPM max on Diesel engines; 235 RPM max on Gas turbines |
| Two Reduction Gears |
| Western Gear |
| Electrical Characteristics |
| Two 550KW-AC Type, 450V, 60 Hz, 3 Phase, 720 RPM GM 8-645 diesel driven ship's service generators (located in the Engine Room) |
One 500KW-AC Type, 450V, 60 Hz, 3 Phase, Solar Model 101506-2001 gas turbine driven emergency service generator
Two 25 KVA (PF = 0.8), 120V, 400 Hz, 3 Phase Electronic Specialty motor generators
Two 10 KVA (PF = 0.8), 120V, 400 Hz, 3 Phase Electronic Specialty motor generators
Tank Capacities
| Diesel Oil |
| 198,092 gal (95%) |
| Fresh Water |
| 17,794 gal (100%) |
| JP-5 Fuel |
| 25,717 gal (95%) |
This page was left blank intentionally. Do not delete.
00000_PWB_0811_FLT
REC_0000_FLT_ Commercial Project @ CG Facility (0211) General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. REFERENCES
Coast Guard Drawings None.
Coast Guard Publications Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Other References ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for Fabrication, Welding, and Inspection of Submarine Structure The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
· Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
· Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
NOTE
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Weldox 900 shall be considered the same as those for welding HY-130
3.4 HW disposal. The Contractor shall be responsible for all hazardous wastes generated by work under this contract. Label and package all hazardous wastes in 49 CFR-approved containers, and in accordance with all other applicable Federal, state, and local laws and regulations. In addition, comply with applicable parts of 40 CFR 262, applicable to handling of hazardous wastes.
3.4.1 Along with the Government, the Contractor shall be contractually considered the co-generator of all hazardous wastes; be aware that the Government will make available its facility’s EPA Generator Identification (ID) Number for manifesting of hazardous wastes.
3.4.2 The Contractor shall identify, arrange, and be responsible for the turnover of all hazardous wastes, within the confines of the Coast Guard shore facility, to the facility’s HM/HW Coordinator. Notify the ship’s HW Coordinator prior to any transfers of HW from ship to shore.
3.4.3 The Contractor shall prepare a manifest of hazardous waste to be reviewed and signed by the HM/HW Coordinator. Contact the HM/HW Coordinator for turnover of any hazardous waste; in addition, notify the COR in writing 24 hours prior to any waste removals, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.4.4 The Contractor shall be aware of the following:
3.4.4.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.
3.4.4.2 Local environmental regulations at the Government facilities may be more stringent than in many jurisdictions. As with all environmental regulations, it is the Contractor's responsibility to research, prepare for, and comply with local and state regulations.
3.4.4.3 Coast Guard facilities do not have Facilities Response Plans (see 33 CFR 154 Subpart F). It is the Contractor’s responsibility to furnish the Facility Response Plan (FRP) when required for over-the-water liquids transfers to and from vessels. This requirement is applicable to transfers to/from vessels with an oil/fuel capacity of 250 barrels or more.
3.5 Pre-surface preparation test coupon. In order to ensure production of required surface profile, the Contractor shall accomplish the following tasks, whenever abrasive-blasting is required in a work item that is deemed a ”critical-coated’ surface:
3.5.1 Coupon material and test set-up particulars.
3.5.1.1 Conduct a performance test on all abrasive blasting operations on a Contractor- provided test coupon, prior to starting abrasive blasting operations on the vessel. Ensure the following:
· The coupon shall be a new metal plate, of the same metal type and material properties as the vessel area to be blasted - steel or aluminum plate, as applicable, and shall have no existing anchor profile - other than the surface irregularities from the manufacturing process.
· The test coupon shall be flat, with nothing welded to the side used for the anchor profile test, no thinner than a 1/8-inch plate and measuring no smaller than 1-foot by 1-foot.
· For steel substrates, the coupon shall have the mill scale intact, and be in a Rust Grade "A" condition, in accordance with SSPC-VIS 1.
· The test coupon shall be affixed so as to not permit excessive movement during the performance test, but shall not be affixed to the vessel.
3.5.1.2 Ensure that the abrasive-blasting operation for the test coupon is conducted with the identical setup and parameters that will be used blasting the designated vessel surfaces – including, but not limited to:
· The abrasive media type and media size selected to achieve the anchor profile range, as specified in the applicable work items.
· Nozzle size and type (straight bore, high velocity nozzle, angle nozzle...).
· Delivery rate and pressure settings.
3.5.1.3 Blast a one-square foot area on one side of the test coupon to the abrasive surface preparation standard specified in the work item, and perform an anchor profile test of the blasted surface in accordance with ASTM D4417, Method B or C. Notify the COR in advance of the abrasive blasting operation test, to permit the witnessing of the test by the COR. Submit a CFR documenting the results of the abrasive blasting operation test. The CFR shall include at a minimum, the following:
· Area of the vessel for which the verified setup will be used to abrasive blast.
· The selected abrasive media type and size.
· The nozzle size and type.
· The delivery rate and pressure.
· The test coupon starting properties (material type and surface conditions).
· The resultant anchor profile readings from the test (a minimum of 3 locations, separated by a minimum of 2 inches shall be recorded).
NOTES
1. A performance test of the abrasive blasting operations on a test coupon and measuring the resultant anchor profile prior to performing the abrasive blasting operation on the cutter is required. The test coupon will be used to evaluate the anchor profile produced by the equipment setup and selected abrasive media.
2. The reverse side of the test coupon may be used for the subsequent test, provided that the conditions in paragraph 3.5.1 (Coupon material and test set-up particulars) are met.
3. Ultra high pressure water jetting does not create an anchor profile and is exempt from the anchor profile test coupon check.
3.5.1.4 Repeat the abrasive blasting operation test in the following instances:
· The equipment setup, that was evaluated during the test coupon abrasive blasting performance test in paragraph 3.5.1 (Coupon material and test set-up particulars), has changed.
· The resultant anchor profile readings observed on the vessel are outside the specified anchor profile range.
· Media is changed from MIL-A-22262 to CID A-A-59316 or vice versa.
· The supplier of the abrasive blasting media changes, regardless if the new source for the media has the same specifications.
· When Directed by the COR.
CAUTION!
Ensure that blast media from the performance test does not strike the vessel during the test.
3.6 Interim changes to SFLC Std Spec 0000. The Contractor shall be aware of the following interim changes to the SFLC Std Spec 0000:
3.6.1 Contents of paragraph 3.3.2.1.1 (Water depth) have been revised to read as follows:
“3.3.2.1.1 Water depth. Ensure that water depth is sufficient at the pier to allow the vessel's lowest underwater appendage to clear the bottom by at least two feet at:
· Ordinary low water mark on non-tidal rivers.
· At all tide conditions predicted during the availability for tidal rivers and other navigable waterways (Bay, Lake, etc.).”
3.6.2 Paragraph 3.2.11.1 (Sanitary facilities for vessel-personnel – due to disruption of grey water system) has been revised as follows:
“3.2.11.1 Sanitary facilities for vessel-personnel – due to disruption of grey water and sewage systems. When the shipboard grey water and sewage systems are disrupted due to repairs required by contract work, the Contractor shall provide vessel-personnel with a sanitary facility, within a five minute walking distance from the vessel, to include the amenities listed in Table II (Sanitary Facility Amenities). Ensure the following:
· Shower stalls are equipped with privacy screens.
· Sinks are provided with fresh hot and cold water.
· Electrical convenience GFI receptacles, in accordance with NFPA 70, National Electric Code (NEC), are located in vicinity of sinks.
· Toilets have doors or privacy dividers.
· Lockers are capable of being locked.”
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).
Verify surface anchor profile using ASTM D4417-Methods B or C against COMDTINST M10360.3. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
| DATE & TIME |
| ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION (Frame & Deck, relation to equipment, etc.) |
| TEMPERATURE |
| % REL. HUMID-ITY |
| DEW PT. |
| SURFACE |
| AMBIENT |
| ΔT |
| DP - Surface |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (Frame References) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________ Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________ Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15
| DATE |
| TEST LOCATIONS |
| CONDUCTIVITY |
(microsiemens/cm)
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Coating Mfg |
| Product Name |
| Batch # |
| Induction Time |
| Coating System Sequence (Primer/Touchup/3rd Coat, etc.) |
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| AVERAGE VALUE |
*BASE METAL READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| Application Method (Airless, Conventional Spray, Rolled) |
| Average DFT |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
Snn-nnn_63400_JAH_0711_378W_7xx
WORK ITEM D-01: Weather Deck Exterior Preservation
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the non-skid coating on the designated weather decks. For this work item weather decks are defined as the following exterior horizontal surfaces which are currently coated with a non skid coating system. The Flight Deck is specifically excluded.
Port and Starboard Side Main Deck from frame 96 aft to frame 301 measuring approximately 2600 SqFt.
Forecastle area from frame 96 forward to the bow measuring approximately 1,743 SqFt.
Port and Starboard Boat Decks, 01 level from frame 96 aft to frame 216 measuring approximately 2,500 SqFt.
Gun Deck from frame 96 forward to frame 43 measuring approximately 1,102 SqFt.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 378-FRAM-W 801-1, Rev -, Booklet of General Plans Coast Guard Publications Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Other References The Society for Protective Coatings SSPC-SP 1, 11/1/2004; Solvent Cleaning The Society for Protective Coatings (SSPC)/NACE Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Standard VIS 4 /NACE No. 7, 2001, Visual Reference Photograph for Steel Cleaned by Waterjetting The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. There is expected corrosion on the Port and Starboard boat decks. Begin Deck Preservations with the boat decks and submit a CIR within the first week of the contract in order to activate O-2 WEATHER DECK PLATING RENEWAL and determine amount of steel work to be completed.
3.1.2 Technical Representative. As per general requirements.
3.1.3 Protective measures.
3.1.3.1 The contractor will take all special protective measures required, including tarping and masking to ensure that paint chips and grit do not contaminate the engine room, surrounding water, and other areas around the ship not included in the immediate work area (i.e. ventilation).
3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):
-Designated by ship
3.1.4.1 Engine room supply fans, doors, ladders, deck drains, piping, electrical wires, stanchions (portable and stationary), air conditioning drains, small boat cradle and deck machinery, pad eyes, RAS King post mounts, gunnery mounts. *Air conditioning shall not be interrupted during contract period, contractor must control air conditioning drain run-off during performance period.
3.1.4.2 Throughout the course of this work item zero emission of paint chips, paint and other debris is allowed into the water surrounding the cutter. The Contractor shall erect a barrier around the perimeter of the work to contain all work by-products. No welding of stanchion or braces to the cutter is allowed for supporting this barrier.
3.2 Support.
3.2.1 Provide adequate explosion lighting to illuminate the work area during preparation, painting, and inspection.
3.2.2 Close all weather tight doors in the vicinity of the work area or install double curtain baffles at the entrance of each access door where airborne contamination could occur during surface preparation and painting. Install a dirt collecting mat on the deck directly inside each door.
3.2.3 Inspect the integrity of the protective covering at the beginning of each shift in which surface preparation and/or painting will be accomplished. Ensure that equipment and machinery have not been infiltrated by contamination.
3.2.4 The Contractor shall provide all inspection and testing equipment, including but not limited to surface temperature thermometer, sling psychrometer, psychrometric chart, dry film paint thickness gauge, wet film thickness gauge, surface profile tape and spring micrometer.
3.2.5 Present the Coast Guard Inspector the Material Safety Data Sheet (MSDS), paint batch number, date of manufacture, Manufacturer’s Technical Data sheet including application instructions for all materials utilized.
3.2.6 Notify the Coast Guard Inspector 48 hours prior to start of work, any surface preparation inspections, and application of any coating system.
3.3 Surface Preparation.
The Contractor has the option of using either high-/ultrahigh-pressure waterjetting or abrasive blasting to achieve the required surface preparation standard as described below. (Due to federal, state and local environmental regulations, high pressure water blast is the preferred method of coating removal.)
3.3.1 In the presence of the Coast Guard Inspector, measure the surface temperature and the dew point. Ensure that proper temperatures and humidity conditions exist for surface preparation.
**Note** Weather decks are classified as a “Critical Surface” in accordance with SFLC Std Spec 0000; therefore a qualified NACE CIP Level 3 (or QP-1) inspector must be present during surface preparations and coating applications as specified in the Quality Assurance Checklists.
The surface temperature must be at least 5°F above the dew point during surface preparation.
3.3.2 High-/Ultrahigh-Pressure Waterjetting (option 1):
3.3.2.1 For high- and ultrahigh-pressure waterjetting, prepare the work area to a WJ-2 visual level in accordance with SSPC-SP 12.
3.3.2.2 In the presence of the Coast Guard Inspector, compare the surface cleanliness level of all prepared steel work areas to SSPC-VIS 4 to verify that the surface meets the required WJ-2 cleanliness level. If flash rusting is any more severe than light flash rusting, the surface shall be re-prepared prior to the application of the first coat. Visual standards do not apply to prepared aluminum surfaces.
3.3.3 Abrasive Blasting (option 2):
3.3.3.1 Prior to any surface preparation, remove all visible oil, grease, soil, drawing and cutting compounds, and other soluble contaminants from the work area surfaces in accordance with SSPC-SP 1.
3.3.3.2 Prepare the steel work areas to near white metal in accordance with SSPC-SP 10. Do not use a blasting material that contains oil or leaves an oil residue on the prepared surfaces.
3.3.3.3 Prepare the aluminum and steel work areas to by brush blasting to bare metal with a clean, fine garnet or equivalent inert material conforming to COMDTINST M10360.3 (series). Do not use a blasting material that contains oil or leaves an oil residue on the prepared surfaces.
3.3.3.4 Remove all dust, dirt, blast residue, grease, oil and other contaminants from the entire work area.
3.3.3.5 In the presence of the Coast Guard Inspector, compare the surface cleanliness level of all prepared steel work areas to SSPC-VIS 1 to verify that the surface meets the required SSPC-SP 10 cleanliness level. Visual standards do not apply to prepared aluminum surfaces.
3.3.4 After surface preparation, perform the following tests/inspections (regardless of surface preparation method).
3.3.4.1 In the presence of the Coast Guard Inspector, inspect the condition of the steel substrate over the entire work area. Check for cracks, corrosion, or any other deficiencies in the hull plating. Note any discrepancies in a Condition Found Report (CFR). The Coast Guard Inspector prior to application of any coating shall approve surface preparation.
3.3.4.1.1 The contractor shall conduct UT inspection in the presence of the Coast Guard Inspector for any designated area with identified cracks, corrosions or any other deficiency to be renewed or repaired in optional work item. Submit CFR for determined amount of steel renewal in Optional Work Item 2.
3.3.4.2 In the presence of the Coast Guard Inspector, and for every 100 square feet of work area, take and record three (3) surface profile readings from randomly selected locations. Submit results and surface profile tapes to the Coast Guard Inspector. The surface profile shall be within the manufacturer’s published recommendation. If no recommendation exists, the profile shall be a minimum of 1.5 and a maximum of 2.5 mils.
Waterjetting does not provide any additional anchor profile to the substrate. The use of another surface preparation method may be necessary to provide the proper anchor.
3.3.4.3 In the presence of the Coast Guard Inspector, and for every 500 square feet of work area, take and record the nonvisual contamination level of one (1) randomly selected location. Use one of the methods listed in Appendix A of SSPC-SP 12. The nonvisual contamination condition shall be a NV-2(SC-2) level or better as defined in SSPC-SP 12.
3.3.5 Where new paint is to be merged into the existing paint system, provide a three inch wide, smoothly tapered boundary from the existing paint to the prepared metal surface.
3.4 Coating Application.
3.4.1 Prior to painting, remove all visible oil, grease, soil, drawing and cutting compounds, and other soluble/insoluable contaminants from the surface in accordance with SSPC-SP 1.
3.4.2 In the presence of the Coast Guard Inspector, measure the surface temperature and the dew point. Ensure that proper temperatures and humidity conditions exist for surface preparation.
The surface temperature must be at least 5°F above the dew point during all surface preparation.
3.4.3 Coat the prepared surface in accordance with COMDTINST M10360.3, Rev C, 3/11/2005; Coatings and Colors Manual Appendix A, “Weather Deck Non-skid, Steel”. Disturbed interferences shall be touched up using the top coat noted in the appropriate section of Appendix A. Appendix C notes the authorized materials to be utilized for each coating system.
The paint specified has an approximate 4 week lead time.
3.4.3.1 The non-skid surface shall show continuous and reasonably uniform profile. Aggregate shall present a rough uniformly coarse appearance over the entire surface with no loosely bound clumps of particles.
3.4.3.2 Nonskid grit exemption. There are numerous locations within the specified extent of the coating renewal of this item where grit shall not be applied. The contractor shall sketch the existing pattern prior to removing the existing coating for use in determining exact placement of these areas. The areas include, but are not limited to:
3.4.3.2.1 Within six inches of any bullnose.
3.4.3.2.2 Within two inches of all deck edges, deta couples, and bulkheads.
3.4.3.2.3 Within two inches of deck foundations (two inches measured from outermost portion of foundation, e.g. foundation brackets on anchor windlass).
3.4.3.2.4 Beneath life raft or pump foundations.
3.4.3.2.5 Within run-off channels, typically two inches wide, which divide large non-skid areas, typically transversely and diagonally.
The existing runoff channel pattern shall be duplicated without change in the accomplishment of this item, unless directed otherwise by the COR.
3.4.4 In the presence of the Coast Guard Inspector, use the dry film paint thickness gauge to verify the dry film thickness for the total system.
3.5 Restore.
3.5.1 Restore all interferences.
3.5.2 Clean the exterior of the cutter so that there is no paint debris or grit on the surfaces in and surrounding the work area. Obtain verification of cleaning from the Coast Guard Inspector.
3.15.3 Restore all interferences to their original condition in accordance with the General Requirements.
4. NOTES
This section is not applicable to this work item.
S11-006_15200_JAH_0811_378W_7xx
WORK ITEM O-02: Weather Deck Plating Renewal
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to crop and renew decking weather decks designated from inspections during non-skid renewal.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 378-FRAM-W 152-1, Rev -, Deck Plating & Framing Coast Guard Drawing 378-FRAM-W 635-1, Rev -, Insulation a&D Coast Guard Drawing 378-FRAM-W 801-1, Rev -, Booklet of General Plans Coast Guard Publications Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Other References The Society for Protective Coatings SSPC-SP 1, 11/1/2004; Solvent Cleaning The Society for Protective Coatings SSPC-SP 3, 11/1/2004; Power Tool Cleaning
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. None.
3.1.2 Technical Representative. Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000 (Interferences):
· Designated by ship
3.2 General Information
Deck renewals will be conducted based on results of inspections conducted in a separate item in this specification package.
3.3 Visual Survey
3.3.1 Accompanied by the Coast Guard Inspector, visually survey the deck areas which were recommended for renewal base on the ultrasonic surveys conducted by the Contractor in a separate specification item. Verify recommended repairs.
3.4 Hotwork – Conduct all hotwork in accordance with SFLC Std Spec 074. All welds shall be continuous, 100% efficient welds. See AWS 3.5 for general guidance on hull welding.
3.5 Deck Repairs
3.5.1 Cut and remove insulation under the deck in the compartment below to allow hot work.
3.5.2 For bidding purposes, crop out and renew approximately 50 sq. ft. of deck plating on both port and starboard sides. The plating to be renewed will be comprised of ten (10) sections, each section will be approximately five (5) ft. long by one (1) ft. wide and will extend from the fashon plate two (2) feet inboard parallel to the fashon plate. The decking to be renewed will not be nearer than 3 inches to an existing bulkhead. Crop out the areas marked for renewal in accordance with CG Dwg(s) 378-FRAM-W 152-1 and SFLC Std Spec 0740. Separate framing attached to deck plating at the framing to deck plating connection.
**Note**Actual decking renewals shall be based on results of the UT inspections and will not commence until approval of the Coast Guard Inspector has been obtained. Areas of renewal could be any combination of lengths and widths but for bidding purposes, assume 400 man hours of interference removal and repairs.
3.5.2.1 Where possible, cut all edges along existing seams. Corners shall intersect plating seams at 90 degree angles. Corners that are not formed by designed plating seams shall have a minimum radius of, three inches, or one-eighth of the transverse dimension of the cut, whichever is greater.
3.5.2.2 Ensure that welding does not warp or cause any distortion to adjacent plating.
3.6 Inspections
3.6.1 In the presence of the Coast Guard Inspector, visually inspect and perform a magnetic particle or dye penetrant test on 100% all new welds in accordance with AWS D1.1. Test acceptance standards shall be in accordance with AWS D1.1. Repair all weld deficiencies and retest.
3.7 Provide a written report of all nondestructive test findings to the Coast Guard Inspector.
3.8 Surface Preparation – Upon completion of successful nondestructive testing, prepare all new and disturbed areas in accordance with SSPC-SP 3. Feather the surrounding surfaces to obtain a 3-inch wide smoothly tapered boundary from the existing paint to the prepared surface.
3.8.1 Prior to installing new plating, blast the plating to remove mill scale and paint with a weldable primer.
3.8.3 Prior to applying any paint, remove all dust, grease, oil, or other contaminants from all prepared areas in accordance with applicable local, state, and federal laws and regulations. Solvent wipe new steel in accordance with SSPC SP-1 before painting.
3.8.4 The Coast Guard Inspector will verify all surface preparation.
3.8.5 Upon verification from the Coast Guard Inspector on all surface preparation, prime and coat all prepared surfaces to match existing adjacent surfaces in accordance with the applicable sections of COMDTINST M10360. For surfaces to be covered with insulation, apply primer coats only.
3.9 Install new insulation in place of the previously removed insulation in accordance with CG Dwg 378-FRAM-W 635-1.
3.10 Coat newly installed insulation in accordance with COMDTINST M10360.3.
3.11 Restoration
3.11.1 Prepare and paint all new and disturbed surfaces in accordance with the General Requirements and in accordance with COMDTINST M10360.3.
3.11.2 Restore all interferences to their original condition in accordance with the General Requirements.
4. NOTES
This section is not applicable to this work item.
| ii |
| (Rev-0) |
Other files
| File | Type | Posted |
|---|---|---|
| SF1449 | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .