CGC KANAWHA SCHEDULE.xls

XLS spreadsheet 28 KB Posted

Attached to
USCGC KANAWHA FY12 DRYDOCK REPAIRS
Solicitation number
HSCG85-12-Q-P45525
Issued by

About this file

USCGC KANAWHA FY12 DD - SCHEDULE

View the file

Other files

File Type Posted
SF30 Amendment A00003 .doc DOC document
CGC KANAWHA REVISED SCHEDULE 02-02-12.xls XLS spreadsheet
75E-WLR_3603_1_1_-_2.pdf PDF
75E-WLR_4808_2_1_-_2.pdf PDF
75E-WLR_3601_2_1_-_1.pdf PDF
SF30 Amendment A00002 .doc DOC document
75E-WLR_103_5_1_-_1.pdf PDF
SF30 Amendment A00001 .doc DOC document
CGC KANAWHA FY12 DD REVISED SPEC REV-1.doc DOC document
CGC KANAWHA REVISED SCHEDULE.xls XLS spreadsheet
CGC KANAWHA RFP 1-10-12.doc DOC document
CGC KANAWHA SPEC REV 0-12-6-11.pdf PDF
SF1449.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR: HSCG85-12-R-P45525
USCGC KANAWHA (WLR-75E) DRYDOCK AVAILABILITY 2012
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Hull Plating, Ultrasonic Testing (UT Shots) - TenderJOB1
D-002Hull Plating , Ultrasonic Testing (UT Shots) - BargeJOB1
O-003Hull and Structural Plating – 12.75 -Pound Steel Plate, Repair - Tender4SQFT25
O-004Hull and Structural Plating – 12.75 -Pound Steel Plate, Repair - Barge4SQFT25
O-005Hull and Structural Plating – Degraded Weld (Steel), Repair - TenderFt10
O-006Hull and Structural Plating – Degraded Weld (Steel), Repair - BargeFt10
D-007Appendages (U/W), Leak Test - TenderJOB1
D-008Appendages (U/W), Leak Test - BargeJOB1
D-009Propulsion Shaft Rope Guards, Inspect and RepairJOB1
O-010Appendages (U/W) - Internal, Preserve - TenderJOB1
O-011Appendages (U/W) - Internal, Preserve - BargeJOB1
D-012Voids (Non-Accessible), Leak Test - TenderJOB1
D-013Voids (Non-Accessible), Leak Test - BargeJOB1
O-014Voids (Non-Accessible), Preserve Internal SurfacesJOB1
O-015Voids (Non-Accessible), Preserve Internal SurfacesJOB1
D-016Propulsion Shafting, Strain Gage Alignment InspectionsJOB1
D-017Propulsion Shaft Bearings (External) , Check ClearancesJOB1
O-018Propeller, Perform Minor Repairs and ReconditioningEa2
D-019Keel Coolers , Clean , Inspect and HydroJOB1
D-020Keel Coolers , Clean , Inspect and HydroJOB1
D-021Spud Well Liners, Renew - TenderJOB1
D-022Spud Well Liners, Renew - BargeJOB1
D-023Spud Wells, Preserve - TenderJOB1
D-024Spud Wells, Preserve - BargeJOB1
D-025U/W Body, Preserve “100%” - TenderJOB1
D-026U/W Body, Preserve “100%” - BargeJOB1
D-027Cathodic Protection, Renew - TenderJOB1
D-028Cathodic Protection, Renew - BargeJOB1
D-029Drydocking - TenderJOB1
D-030Drydocking - BargeJOB1
D-031Temporary Services, ProvideJOB1
D-032Deck Fittings, Inspect - TenderJOB1
D-033Deck Fittings, Inspect - BargeJOB1
D-034Decks - Exterior, Preserve (Non-Skid Broadcast Grit System) - TenderJOB1
O-035Deck Covering (Wet/Dry), SealJOB1
D-036Propulsion Shafting, StraightenJOB1
D-037Propellers, Remove, Inspect, and ReinstallJOB1
D-038Fathometer Transducer, Renew - TenderJOB1
D-039Fathometer Transducer, Renew - BargeJOB1
D-040Rudder Assembly, Remove, Inspect and ReinstallJOB1
D-041Decks - Exterior(Barge Buoy), PreserveJOB1
D-042Stern Tube Interior Surfaces, Preserve 100%JOB1
D-043Hull Plating (Buoy Port Areas), PreserveJOB1
D-044Sea Trial Performance, Provide SupportJOB1
D-045Buoy and Cargo Handling Crane, Shrink WrapJOB1
D-046Hull and Structural Plating – 15.3 -Pound Steel Plate , Repair4SQFT25
D-047Propulsion Shafting; Remove, Inspect, and ReinstallJOB1
D-048Propulsion Shaft Bearings (External), RenewJOB1
D-049Crews Head RefurbishJOB1
O-00AComposite Labor RateHour1000
D-00BGFP ReportNSPEANSP
D-00CTravel and Perdiem$0.00JOB$0.00
O-00ZLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

&C(10/7/2011) Draft-0 - Page &P of &N

File details come from the government source that posted it. Updated .