USCGC MELLON (WHEC 717)
378 FOOT W HIGH ENDURANCE CUTTER
SPECIFICATION FOR DOCKSIDE REPAIRS
Developed By: Bryan J Radik
(Rev-0, 27 June 2011)
USCGC MELLON (WHEC-378W) DOCKSIDE AVAILABILITY 2011
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ....................................................................................................................................... iii Consolidated List of References ................................................................................................................ iv Consolidated List of Government-furnished Property ............................................................................... vi Consolidated List of Critical Inspection Items ......................................................................................... vii Principal Characteristics .......................................................................................................................... viii General Requirements
WORK ITEM 1: BOILER EXHAUST STACK UPTAKES CLEANING
WORK ITEM 2: INSULATION RENEWAL Engineering Spaces WORK ITEM 3: INSULATION RENEWAL Non-Engineering Spaces WORK ITEM 4: Evaporator Salinity Panel Renewal & Calibration WORK ITEM 5: Whip Antenna Foundations Renew WORK ITEM 6: Magazine Sprinkler Gage Lines; Renew WORK ITEM 7: Galley Dresser Renewals WORK ITEM 8: UNREP Weight Handling Fittings Inspect & Test WORK ITEM 9: SPD Hydraulic Power Unit Overhaul iii (Rev-0)
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free or charge. Other Government documents may be accessed – free of charge – as follows:
• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
• American Welding Society (AWS): http://www.awspubs.com/index.php
• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
• NFPA: http://www.nfpa.org
• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 378-FRAM-W 152-1, Rev -, Deck Plating & Framing Coast Guard Drawing 378-FRAM-W 162-3, Rev -, Stack Coast Guard Drawing 378-FRAM-W 162-5, Rev -, Stack Coast Guard Drawing 378-FRAM-W 162-6, Rev -, Stack Coast Guard Drawing 378-FRAM-W 184-8, Rev -, Whip Antenna Foundations Coast Guard Drawing 378-FRAM-W 259-14, Rev -, Mn Prpl Dsl Eng & Dsl Gen Exh & Blr Flue Dets Coast Guard Drawing 378-FRAM-W 259-4, Rev B, Mn Prpln Dsl Eng & Dsl Gen Exh & Blr Flue Arr Coast Guard Drawing 378-FRAM-W 437-5, Rev -, Salinity Indic Sys Ckt 1SB ISO & Elem W.D.
Coast Guard Drawing 378-FRAM-W 504-1, Rev -, List of Gages (Pages Missing) Coast Guard Drawing 378-FRAM-W 505-11, Rev -, Struct Penetrations Pipe Cplings & Weld Sleeves Coast Guard Drawing 378-FRAM-W 508-1, Rev -, Insulation Schedule Coast Guard Drawing 378-FRAM-W 522-1, Rev -, Diagram Magazine Sprinkling System Coast Guard Drawing 378-FRAM-W 534-2, Rev -, Steam & Condensate System in Machinery Space Arrgt Coast Guard Drawing 378-FRAM-W 534-4, Rev -, Condensate Return Cooler Assembly Coast Guard Drawing 378-FRAM-W 534-6, Rev -, Boiler Feedwater Pump Paco Model 27-1243-7 Coast Guard Drawing 378-FRAM-W 571-1, Rev -, Replenishment At Sea, Fuel At Sea & Tas Coast Guard Drawing 378-FRAM-W 571-2, Rev -, Replenishment At Sea a&D Frame 248-1/2 Coast Guard Drawing 378-FRAM-W 571-4, Rev -, Replenishment At Sea a&DFR182 Port & Stbd Coast Guard Drawing 378-FRAM-W 602-2, Rev -, Hull Label Plates Coast Guard Drawing 378-FRAM-W 635-1, Rev M, Insulation a&D Coast Guard Drawing 378-FRAM-W 651-1, Rev -, Galley Arrgt Mn Dk Coast Guard Drawing 378-FRAM-W 801-1, Rev -, Booklet of General Plans Coast Guard Drawing 378-FRAM-W 801-1, Rev G, Booklet of General Plans v (Rev-0)
Coast Guard Drawing FL 1204-3, Rev -, Welded Padeyes & Links (Supercedes Fl-1204-2)
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual Coast Guard Commandant Instruction (COMDTINST) M6260.16, Feb 1996, Asbestos Exposure Control Manual Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual Coast Guard Technical Publication (TP) 2754, 22-JUN-84, Manufacturer's Instruction Book-SWBS Group(s)(s) 583 Coast Guard Technical Publication (TP) 3274, Jun 2007, Manufacturer's Instruction Book, SWBS Group(s) 531, Section A, 378' WHEC Class Cutters, Salinity Indicator System Coast Guard Technical Publication (TP) 3485A, 10-JAN-06, Boat Davit, Single Point - Models D5000CT and
D5700CT
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3041, Jan 2009, Shipboard Electric Cable Test Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3042, Jan 2009, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel ASTM International (ASTM) F1836M, Reapproved 2007, Standard Specification for Stuffing Tubes, Nylon and Packing Assemblies (Metric) Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning Naval Ship's Technical Manual (NSTM) Chapter 635, Jul 1998, Thermal, Fire and Acoustic Insulation NAVSEA Dwg 803-1385850, Jul 1990, Piping, Instrument Pressure for All Service The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning The Society for Protective Coatings SSPC-SP 1, 11/1/2004; Solvent Cleaning The Society for Protective Coatings SSPC-SP 3, 11/1/2004; Power Tool Cleaning vi (Rev-0)
Consolidated List of Government-furnished Property The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
4 N *** Salinity Indicator
Panel McNab Inc. 383-2 East 29th Street | Buena Vista, VA
MDM-ATC-10-3D-DSMB 1 ea. $5000.00
8 N Anchor Plate Assembly 2040-00-581-9471 1 ea.
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter vii (Rev-0)
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph
3.2.6.5 (Inspection report particulars)):
Work Item Title
1 BOILER EXHAUST STACK UPTAKES CLEANING
2 INSULATION RENEWAL Engineering Spaces 3 INSULATION RENEWAL Non-Engineering Spaces viii (Rev-0)
PC_378W_WHEC_717_1109
Principal Characteristics
378W WHEC (MELLON)
PHYSICAL CHARACTERISTICS
Length Overall 378' 3" Length between Perpendiculars 350' 0" Maximum Beam (@ 13' 6" DWL) 42' 0" Beam @ Main Deck 42' 0" Depth 26' 3/8" Main Deck Camber 6" in 21' 0" Minimum Berth Depth 20' 0" Height of highest projection 115' 3/4" Draft, Fwd @ Full Load 14.78' Draft, Aft @ Full Load 15.61' Draft, Fwd @ Minimum Operating 14.63' Draft, Aft @ Minimum Operating 15.33' Full Load Displacement 3171 long tons Minimum Operating Displacement 2760 long tons Light Ship Displacement 2422 long tons
HULL CHARACTERISTICS
Frame Spacing 1' 0" Material Deckhouse, fwd of Fram 96 HY-100 Steel Main Deck Frames 183 to 242-1/2 and fwd of FR 96 HY-80 Steel 01 Level Frames 183 to 316 HY-80 Steel Lower hull around bow thruster, port and starboard Strakes A-3 and A-4, Frames 56 to 96 HY-80 Steel Masts and superstructure above the 01 Deck Type 3456 Aluminum Remaining ASTM A-131
MACHINERY CHARACTERISTICS
Type of Propulsion CODOG
Two Diesel Engines Fairbanks More 12-cylinder opposed piston 38-TD-8-1/8; 7000 SHP total
Two Gas Turbines Pratt and Whitney FT4A-2; 36,000 SHP total
Two Controllable Pitch Propellers Liaaen 4 blade, 13' 0" diameter; 149 RPM max on Diesel engines; 235 RPM max on Gas turbines
Two Reduction Gears Western Gear
Electrical Characteristics Two 550KW-AC Type, 450V, 60 Hz, 3 Phase, 720 RPM GM 8-645 diesel driven ship's service generators (located in the Engine Room)
One 500KW-AC Type, 450V, 60 Hz, 3 Phase, Solar Model 101506-2001 gas turbine driven emergency service generator
Two 25 KVA (PF = 0.8), 120V, 400 Hz, 3 Phase Electronic Specialty motor generators
Two 10 KVA (PF = 0.8), 120V, 400 Hz, 3 Phase Electronic Specialty motor generators
TANK CAPACITIES
Diesel Oil 198,092 gal (95%) ix (Rev-0)
Fresh Water 17,794 gal (100%) JP-5 Fuel 25,717 gal (95%)
1 (Rev-0)
00000_PWB_0211_FLT
REC_0000_FLT_ Commercial Project @ CG Facility (0211)
General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. REFERENCES
COAST GUARD DRAWINGS
None.
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and
Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface
Profile of Blast Cleaned Steel Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety
Administration, Department Of Transportation MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel
Surfaces Prepared by Dry Abrasive Blast Cleaning
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
2 (Rev-0)
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0700-1400, Monday through Friday, and limited to ten Coast Guard fire watch personnel.
3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.4 HW disposal. The Contractor shall be responsible for all hazardous wastes generated by work under this contract. Label and package all hazardous wastes in 49 CFR-approved containers, and in accordance with all other applicable Federal, state, and local laws and regulations. In addition, comply with applicable parts of 40 CFR 262, applicable to handling of hazardous wastes.
3.4.1 Along with the Government, the Contractor shall be contractually considered the co-generator of all hazardous wastes; be aware that the Government will make available its facility’s EPA Generator Identification (ID) Number for manifesting of hazardous wastes.
3.4.2 The Contractor shall identify, arrange, and be responsible for the turnover of all hazardous wastes, within the confines of the Coast Guard shore facility, to the facility’s HM/HW Coordinator. Notify the ship’s HW Coordinator prior to any transfers of HW from ship to shore.
3.4.3 The Contractor shall prepare a manifest of hazardous waste to be reviewed and signed by the HM/HW Coordinator. Contact the HM/HW Coordinator for turnover of any hazardous waste; in addition, notify the COTR in writing 24 hours prior to any waste removals, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.4.4 The Contractor shall be aware of the following:
3.4.4.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COTR or KO-approval.
3.4.4.2 Local environmental regulations at the Government facilities may be more stringent than in many jurisdictions. As with all environmental regulations, it is the Contractor's responsibility to research, prepare for, and comply with local and state regulations.
3.4.4.3 Coast Guard facilities do not have Facilities Response Plans (see 33 CFR 154 Subpart F). It is the Contractor’s responsibility to furnish the Facility Response Plan (FRP) when required for over-the-water liquids transfers to and from vessels. This requirement is applicable to transfers to/from vessels with an oil/fuel capacity of 250 barrels or more.
3.5 Pre-surface preparation test coupon. In order to ensure production of required surface profile, the Contractor shall accomplish the following tasks, whenever abrasive-blasting is required in a work item that is deemed a ”critical-coated’ surface:
3 (Rev-0)
3.5.1 Coupon material and test set-up particulars.
3.5.1.1 Conduct a performance test on all abrasive blasting operations on a Contractor- provided test coupon, prior to starting abrasive blasting operations on the vessel. Ensure the following:
• The coupon shall be a new metal plate, of the same metal type and material properties as the vessel area to be blasted - steel or aluminum plate, as applicable, and shall have no existing anchor profile - other than the surface irregularities from the manufacturing process.
• The test coupon shall be flat, with nothing welded to the side used for the anchor profile test, no thinner than a 1/8-inch plate and measuring no smaller than 1-foot by 1-foot.
• For steel substrates, the coupon shall have the mill scale intact, and be in a Rust Grade "A" condition, in accordance with SSPC-VIS 1.
• The test coupon shall be affixed so as to not permit excessive movement during the performance test, but shall not be affixed to the vessel.
3.5.1.2 Ensure that the abrasive-blasting operation for the test coupon is conducted with the identical setup and parameters that will be used blasting the designated vessel surfaces – including, but not limited to:
• The abrasive media type and media size selected to achieve the anchor profile range, as specified in the applicable work items.
• Nozzle size and type (straight bore, high velocity nozzle, angle nozzle...).
• Delivery rate and pressure settings.
3.5.1.3 Blast a one-square foot area on one side of the test coupon to the abrasive surface preparation standard specified in the work item, and perform an anchor profile test of the blasted surface in accordance with ASTM D4417, Method B or C. Notify the COTR in advance of the abrasive blasting operation test, to permit the witnessing of the test by the COTR. Submit a CFR documenting the results of the abrasive blasting operation test. The CFR shall include at a minimum, the following:
• Area of the vessel for which the verified setup will be used to abrasive blast.
• The selected abrasive media type and size.
• The nozzle size and type.
• The delivery rate and pressure.
• The test coupon starting properties (material type and surface conditions).
• The resultant anchor profile readings from the test (a minimum of 3 locations, separated by a minimum of 2 inches shall be recorded).
NOTES
1. A performance test of the abrasive blasting operations on a test coupon and measuring the resultant
4 (Rev-0) anchor profile prior to performing the abrasive blasting operation on the cutter is required. The test coupon will be used to evaluate the anchor profile produced by the equipment setup and selected abrasive media.
2. The reverse side of the test coupon may be used for the subsequent test, provided that the conditions in paragraph 3.5.1 (Coupon material and test set-up particulars) are met.
3. Ultra high pressure water jetting does not create an anchor profile and is exempt from the anchor profile test coupon check.
3.5.1.4 Repeat the abrasive blasting operation test in the following instances:
• The equipment setup, that was evaluated during the test coupon abrasive blasting performance test in paragraph 3.5.1 (Coupon material and test set-up particulars), has changed.
• The resultant anchor profile readings observed on the vessel are outside the specified anchor profile range.
• Media is changed from MIL-A-22262 to CID A-A-59316 or vice versa.
• The supplier of the abrasive blasting media changes, regardless if the new source for the media has the same specifications.
• When Directed by the COTR.
CAUTION!
Ensure that blast media from the performance test does not strike the vessel during the test.
3.6 Interim changes to SFLC Std Spec 0000. The Contractor shall be aware of the fact that the requirements of paragraph 3.3.2.1.1 (Water depth) have been revised to read as follows:
“3.3.2.1.1 Water depth. Ensure that water depth is sufficient at the pier to allow the vessel's lowest underwater appendage to clear the bottom by at least two feet at:
• Ordinary low water mark on non-tidal rivers.
• At all tide conditions predicted during the availability for tidal rivers and other navigable waterways (Bay, Lake, etc.).”
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
Vessel Name Hull # Work Item # Work Item Title
Location of Work (incl. frame #’s) Area (sqft)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down
(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).
Verify surface anchor profile using ASTM D4417-Methods B or C against COMDTINST M10360.3. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max.
threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Name of QP-1/NACE Inspector Signature Cert. # Date / Time
6 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE &
TIME
ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION
(Frame &
Deck, relation to equipment, etc.)
TEMPERATURE % REL.
HUMID-
ITY DEW PT. SURFACE AMBIENT ΔT
| DP - Surface |
7 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
Location of Work (Frame References) Area (sqft)
SURFACE PREPARATION
METHOD
PROFILE ACHIEVED (mils) Min Max Mean
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________ Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
8 (Rev-0)
9 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
SURFACE PREPARATION
METHOD
PROFILE ACHIEVED (mils) Min Max Mean
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________ Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading: _____ mils _____ mils _____ mils _____ mils mils
Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
_____ mils _____ mils _____ mils _____ mils
10 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15
DATE TEST LOCATIONS CONDUCTIVITY
(microsiemens/cm)
11 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
Coating Mfg Product Name Batch # Induction Time
Coating System Sequence (Primer/Touchup/3rd Coat, etc.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2
SPOT 1 2 3 4 5 AVERAGE
VALUE
*BASE METAL
READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Application Method (Airless, Conventional Spray, Rolled) Average DFT
12 (Rev-0)
25900_JAH_0108_378W
WORK ITEM 1: BOILER EXHAUST STACK UPTAKES CLEANING
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the port and starboard boiler exhaust piping from the boiler discharge to the terminus.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 378-FRAM-W 162-3, Rev -, Stack Coast Guard Drawing 378-FRAM-W 162-5, Rev -, Stack Coast Guard Drawing 378-FRAM-W 162-6, Rev -, Stack Coast Guard Drawing 378-FRAM-W 259-4, Rev B, Mn Prpln Dsl Eng & Dsl Gen Exh & Blr Flue Arr Coast Guard Drawing 378-FRAM-W 259-14, Rev -, Mn Prpl Dsl Eng & Dsl Gen Exh & Blr Flue Dets
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, Jan 2009, General
Requirements
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s): Not Applicable.
3.2 Boiler Stack Cleaning
13 (Rev-0)
A Contractor shipcheck is encouraged to understand full scope of this work, including interferences and/or other potential work difficulties prior to submitting bid.
A separate specification item titled “INSPECT AND TEST CIRCUIT BREAKERS” may be included in this work package. If invoked, the circuit breaker testing item requires removal of the circuit breaker supplying power to the ship’s electric hot water heater. Coordinate work between this specification item and the “INSPECT AND TEST CIRCUIT BREAKERS” specification item to ensure that the hot water supply is not interrupted.
3.2.1 Erect scaffolding and follow all pertinent safety precautions when working on and around the stacks including wearing hardhats, wearing safety harnesses and lifelines.
3.2.2 Use a Contractor furnished cleaning equipment that will effectively remove and clean both Boiler's exhaust piping of soot deposits. All exhaust piping from Boiler exit to stack terminus shall be cleaned. See referenced drawings to help determine layout of piping to be cleaned.
This is a performance requirement. The end result must be clean exhaust piping free of soot. The exact type of equipment used, and how piping will be divided/sectioned during the cleaning operation is at discretion of Contractor to achieve the end result. The Contractor shall take all necessary precautions to protect machinery and equipment in the areas affected as a result of this work item.
3.2.3 The Contractor shall propose a plan for collecting and disposing of waste extracted during cleaning process by submitting a report to the Coast Guard Inspector. Proposed plan shall detail how and where Exhaust Piping will be disconnected, how entire length of exhaust piping will be divided/sectioned for cleaning, and precautions to protect Boiler. The Contractor shall perform this work upon receiving the Coast Guard’s approval of the plan.
3.2.3.1 The Contractor shall be responsible for restoring any exhaust pipe insulation disturbed to its pre-work condition as well as restoring any broken pipe connections required to perform cleaning.
3.2.4 When Contractor believes he has obtained a satisfactory cleaning results (of each individual section/length being cleaned), in the presence of the CG Inspector the Contractor shall inspect to determine if piping has been successfully cleaned of soot. If inspection reveals piping is not satisfactorily cleaned of soot Contractor shall continue cleaning process until satisfactory results are obtained (exhaust piping free of soot).
3.2.5 Upon completion of satisfactory cleaning, reassemble exhaust piping using new in kind Contractor furnished gaskets, fasteners, and lock-washers.
3.2.6 Dispose of all generated waste in accordance with all federal, state and local laws and regulations.
3.2.7 Contractor shall clean the affected and surrounding areas of any dirt, debris, liquid, etc. at completion of work to ensure these areas are restored to a pre-work condition of cleanliness.
3.3 Inspection Of Exhaust System
3.3.1 The contractor will visually inspect the exterior of the exhaust system as a part of the cleaning process.
After completion of the visual inspection submit a CFR. Indicate in the CFR any damaged or deteriorated lagging and any damaged or broken exhaust hangers.
3.4 Acceptance Testing
3.4.1 Clearing Tags – As needed for testing, restore all affected systems and clear tags.
14 (Rev-0)
3.4.2 Test Performance – All acceptance tests shall be performed in the presence of the Coast Guard Inspector.
Provide a written report to the Coast Guard Inspector of all test results within one week of test completion.
3.4.3 Operational Test - The Contractor shall perform operational tests of any disturbed pipe connections for exhaust leaks prior to replacing insulation. Repair all leaks until system is free of leaks.
3.5 Restoration
3.5.1 Touch-up preservation. The Contractor shall prepare and touch-up coat all disturbed surfaces to match existing adjacent surfaces in accordance with COMDTINST M10360.3, Appendix B (Cutter and Boat Interior Painting Systems). Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures).
4. NOTES
This section is not applicable to this work item.
15 (Rev-0)
63500_JAH_0605_378W
WORK ITEM 2: INSULATION RENEWAL Engineering Spaces
1.1 Intent. This work item describes the requirements for the Contractor to renew bulkhead or overhead insulation in various compartments throughout the vessel.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 378-FRAM-W 508-1, Rev -, Insulation Schedule Coast Guard Drawing 378-FRAM-W 635-1, Rev M, Insulation a&D Coast Guard Drawing 378-FRAM-W 801-1, Rev G, Booklet of General Plans
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual Coast Guard Commandant Instruction (COMDTINST) M6260.16, Feb 1996, Asbestos Exposure Control
Manual Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, Jan 2009, Welding and
Allied Processes
OTHER REFERENCES
Naval Ship's Technical Manual (NSTM) Chapter 635, Jul 1998, Thermal, Fire and Acoustic Insulation The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
• 3.3.1 (Structural Inspection).
16 (Rev-0)
3.2 Insulation Removal – Remove insulation from the designated work area(s). Asbestos abatement shall be in accordance with COMDTINST M6260.16. Dispose in accordance with local, state, and federal laws and regulations. Designated work areas are listed in the table below.
TABLE 3.2A – COMPLETE INSULATION RENEWAL
COMPARTMENT NAME COMPARTMENT NO. LOCATIONS FOR
RENEWAL
Aft Steering 2-320-0-E Port, Stbd, and Aft
Bulkheads, per CG Dwg
378 FRAM W 635-1
DC Stores 3-336-0-A Aft Bulkhead and Overhead Only
Aux Machinery Rm No. 1 3-179-1-E STBD Side Bulkhead
TABLE 3.2B – PARTIAL INSULATION RENEWAL
COMPARTMENT NAME COMPARTMENT NO. APPROX. SQ. FT.
DC Shop 2-304-2-Q Overhead and Port Side, approx. 40 sq. ft.
3.2.1 For compartments listed for complete insulation renewal, renew all insulation as described.
3.2.2 For compartments listed for partial insulation renewal, inspect each compartment and identify insulation requiring renewal. Inspect the listed compartments in the presence of the Coast Guard Inspector. Document the insulation which requires renewal or repair and submit a Condition Found Report.
3.3 Surface Preparation – Prepare all steel surfaces where insulation was removed by power tool cleaning in accordance with SSPC-SP 3.
3.3.1 Structural Inspection. In the presence of the Coast Guard Inspector, inspect all prepared surfaces for deterioration or damage. Submit a CFR to the Coast Guard Inspector.
3.3.2 Upon verification of the surface preparation by the Coast Guard Inspector, coat the prepared surfaces in accordance with COMDTINST M10360.3. Apply the primer coats only.
3.4 Installation – Install new insulation in accordance with referenced CG Drawings and NSTM Chapter 635.
3.5 Preparation – Prepare and coat all new insulation material in accordance with COMDTINST M10360.3B.
Final topcoat shall match original existing color.
3.6 Piping Insulation Renewal. Renew insulation on the following piping systems as described below:
TABLE 3.6 – PIPING INSULATION RENEWAL
COMPARTMENT NAME COMPARTMENT NO. APPROX. SQ. FT.
None
3.6.1 Renew insulation describe above. Follow guidance in CG Dwg 378 FRAM W 508-1.
17 (Rev-0)
3.7 Compartment Restoration
3.7.1 Restore all affected work areas to a clean condition.
18 (Rev-0)
63500_JAH_0605_378W
WORK ITEM 3: INSULATION RENEWAL Non-Engineering Spaces
1.1 Intent. This work item describes the requirements for the Contractor to renew bulkhead or overhead insulation in various compartments throughout the vessel.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 378-FRAM-W 508-1, Rev -, Insulation Schedule Coast Guard Drawing 378-FRAM-W 635-1, Rev M, Insulation a&D Coast Guard Drawing 378-FRAM-W 801-1, Rev G, Booklet of General Plans
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual Coast Guard Commandant Instruction (COMDTINST) M6260.16, Feb 1996, Asbestos Exposure Control
Manual Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, Jan 2009, Welding and
Allied Processes
OTHER REFERENCES
Naval Ship's Technical Manual (NSTM) Chapter 635, Jul 1998, Thermal, Fire and Acoustic Insulation The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
• 3.3.1 (Structural Inspection).
19 (Rev-0)
3.2 Insulation Removal – Remove insulation from the designated work area(s). Asbestos abatement shall be in accordance with COMDTINST M6260.16. Dispose in accordance with local, state, and federal laws and regulations. Designated work areas are listed in the table below.
TABLE 3.2A – COMPLETE INSULATION RENEWAL
COMPARTMENT NAME COMPARTMENT NO. LOCATIONS FOR
RENEWAL
Anchor Windlass Room 2-16-0-A Port and Stbd Bulkheads, per CG Dwg 378 FRAM
W 635-1 Port Hawser Room 2-32-2-A Port Bulkhead, per CG
Dwg 378 FRAM W 635-1 Stbd Hawser Room 2-32-1-A
Cargo Space 3-48-0-A Port and Stbd Bulkheads, per CG Dwg 378 FRAM
W 635-1
TABLE 3.2B – PARTIAL INSULATION RENEWAL
COMPARTMENT NAME COMPARTMENT NO. APPROX. SQ. FT.
Ship’s Office 1-179-01-Q Stbd Side, Approx. 10 Sq.
Ft.
Berthing Area Head 2-120-2-L Approx. 30 Sq. Ft.
Armory 2-80-3-O Approx. 75 Sq. Ft.
Ordnance Stores 3-80-2-A Approx. 300 Sq. Ft.
Mag. No. 1 5-32-0-M Approx. 15 Sq. Ft.
76 MM Control Booth 1-48-2-C Approx. 1 Sq. Ft.
3.2.1 For compartments listed for complete insulation renewal, renew all insulation as described.
3.2.2 For compartments listed for partial insulation renewal, inspect each compartment and identify insulation requiring renewal. Inspect the listed compartments in the presence of the Coast Guard Inspector. Document the insulation which requires renewal or repair and submit a Condition Found Report.
3.3 Surface Preparation – Prepare all steel surfaces where insulation was removed by power tool cleaning in accordance with SSPC-SP 3.
3.3.1 Structural Inspection. In the presence of the Coast Guard Inspector, inspect all prepared surfaces for deterioration or damage. Submit a CFR to the Coast Guard Inspector.
3.3.2 Upon verification of the surface preparation by the Coast Guard Inspector, coat the prepared surfaces in accordance with COMDTINST M10360.3. Apply the primer coats only.
3.4 Installation – Install new insulation in accordance with referenced CG Drawings and NSTM Chapter 635.
3.5 Preparation – Prepare and coat all new insulation material in accordance with COMDTINST M10360.3B.
Final topcoat shall match original existing color.
3.6 Piping Insulation Renewal. Renew insulation on the following piping systems as described below:
20 (Rev-0)
TABLE 3.6 – PIPING INSULATION RENEWAL
COMPARTMENT NAME COMPARTMENT NO. APPROX. SQ. FT.
Berthing area 2-96-1-L Approx. 50 lin. ft. 2 ips chilled water piping, 4 valves.
Berthing Area Head 2-96-2-L 2 valves
3.6.1 Renew insulation describe above. Follow guidance in CG Dwg 378 FRAM W 508-1.
3.7 Compartment Restoration
3.7.1 Restore all affected work areas to a clean condition.
21 (Rev-0)
S10_001_43700_JSP_0311_717
WORK ITEM 4: Evaporator Salinity Panel Renewal & Calibration
1.1 Intent. This work item describes the requirements for the Contractor to renew Evaporator Salinity Panel, salinity cells and calibrate system.
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
N *** Salinity Indicator Panel McNab Inc. 383-2 East 29th Street | Buena Vista, VA
MDM-ATC-10-3D-DSMB 1 ea. $5000.00
***Government-furnished property which will be supplied by the vessel
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 378-FRAM-W 534-2, Rev -, Steam & Condensate System in Machinery Space
Arrgt Coast Guard Drawing 378-FRAM-W 534-4, Rev -, Condensate Return Cooler Assembly Coast Guard Drawing 378-FRAM-W 534-6, Rev -, Boiler Feedwater Pump Paco Model 27-1243-7 Coast Guard Drawing 378-FRAM-W 437-5, Rev -, Salinity Indic Sys Ckt 1SB ISO & Elem W.D.
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General
Requirements Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3041, Jan 2009, Shipboard
Electric Cable Test Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3042, Jan 2009, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation Coast Guard Technical Publication (TP) 3274, Jun 2007, Manufacturer's Instruction Book, SWBS
Group(s) 531, Section A, 378' WHEC Class Cutters, Salinity Indicator System
OTHER REFERENCES
ASTM International (ASTM) F1836M, Reapproved 2007, Standard Specification for Stuffing Tubes, Nylon and Packing Assemblies (Metric)
22 (Rev-0)
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures. Furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination.
Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):
• Sheathing
• Bulkhead insulation
• Piping (Note: Some of the salinity cells, especially the one above the condensate tank are extremely hard to access. There maybe some piping interferences that require removal to access.)
• Electrical cables
3.1.5 The Contractor shall refer to Coast Guard Drawings 378-FRAM-W-534-2, 378-FRAM-W-534-4, 378- FRAM-W-534-6 and 378-FRAM-W-437-005 for guidance.
3.1.6 Materials The Contractor shall supply following material listed in the Table 1.
TABLE 1 – BILL OF MATERIALS
QUANTITY DESCRIPTION SUGGESTED SOURCE OF SUPPLY
3 Salinity Cell, Model MC-80 (20
Feet Cable) McNab Inc. 383-2 East 29th Street
Buena Vista, VA 3 Valve assemblies, P/N L2-A, NSN 5845-01-039-5364
McNab Inc. 383-2 East 29th Street
Buena Vista, VA 1 Junction box and junction box plug for boiler feed pump suction salinity cell No. 1.
as per reference TP 3274 ch. 5, table 5-1, reference figure 6-5
3.1.6.1 The Contractor shall supply all material required for complete installation of Salinity Indicator Panel & Salinity cells. The contractor shall provide miscellaneous hardware required for electrical installation (i.e. Q Stuffing Tubes, Box Connectors, Lugs, Fasteners, Wire Nuts, Tape, Cable ties & Brackets) of new system.
3.2 Equipment removal. The Contractor shall remove the following equipment listed in the Table 2.
23 (Rev-0)
TABLE 2 – EQUIPMENT REMOVAL
EQUIPMENT LOCATION
Salinity Indicator Panel No.2 Engine Room, Lower Level (5-192-01-E)
Boiler Feed Pump Suction Salinity Cell No.1 (S10) STBD, AMR Frame 194 Condensate Clear Outlet Salinity Cell No.2 (S11) STBD, Engine Room, Frame 254
Condensate Pump Suction Salinity Cell No.3 (S12) STBD, Engine Room, Lower Level, Frame 252
Valve assemblies In conjunction with salinity cells
3.2.1 The Contractor shall remove salinity cell in accordance with Para 2.5 of the Coast Guard Tech Pub 3274.
Also remove valve assemblies and renew.
3.2.2 Cable disconnection. The Contractor shall disconnect following cables listed in the Table 3 in accordance with SFLC Std Spec 3042. The Contractor shall coil back cables at Salinity Indicator Panel No.2 for later re-connection to new GFE Panel. The Contractor shall record wiring information and submit the CFR. Contractor shall also inspect all junction boxes, junction plugs, and cabling for damaged or missing components. Submit CFR for all discrepancies with recommended actions.
TABLE 3 – CABLE DISCONNECTION
CABLE NUMBER EQUIPMENT
C-1SB1 from J-Box Salinity Indicator Panel No.2 C-1SB2 from J-Box Salinity Indicator Panel No.2 C-1SB3 from J-Box Salinity Indicator Panel No.2
C-1SB6 from Terminal Box Salinity Indicator Panel No.2 None Power Cable Salinity Indicator Panel No.1
Boiler Feed Pump Suction Salinity Cell No.1 (S10)
Junction Box(there currently is no junction box. Procure and install new junction box and plug as per reference TP 3274 ch. 5, table 5-1, reference figure 6-5.)
Condensate Clear Outlet Salinity Cell No.2 (S11) Junction Box
Condensate Pump Suction Salinity Cell No.3 (S12) Junction Box
3.3 Salinity indicator panel installation. The Contractor shall install new GFE Salinity Indicator Panel No.2 with stainless steel hardware at Engine Room Lower level (5-192-01-E). Ensure that all mounting hardware is installed and that fasteners are adequately torqued to prevent loosening in response to hull vibration.
3.3.1 The Contractor shall re-connect cables to Salinity Indicator Panel No.2 with previously recorded wiring information and also in accordance with the Coast Guard Drawing 378 FRAM-W-437-005. The Contractor shall install cables with nylon stuffing tubes in accordance with ASTM F1836M.
3.4 Salinity cell installation. The Contractor shall install Salinity Cells at following location as shown on Coast Guard Drawing 378-FRAM-W-534-2, 378-FRAM-W-534-4 & 378-FRAM-W-534-6.
• Boiler Feed Pump Suction Salinity Cell No.1 (S10)
• Condensate Clear Outlet Salinity Cell No.2 (S11)
• Condensate Pump Suction Salinity Cell No.3 (S12)
24 (Rev-0)
3.4.1 The Contractor shall install salinity cell in accordance with Para 2.5 of the Coast Guard Tech Pub 3274.
3.4.2 Reconnect salinity cell cables to Junction Box as shown on Coast Guard Drawing 378 FRAM-W-437-005.
The Contractor shall install cables with nylon stuffing tubes in accordance with ASTM F1836M.
3.5 Perform all cable work in accordance with SFLC Std Spec 3042. Ensure that the following actions are not overlooked:
3.5.1 Perform insulation tests of all new and disturbed cables per SFLC Std Spec 3041.
3.6 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures).
3.7 Salinity indicator panel calibration. The Contractor shall calibrate and troubleshoot Salinity Indicator Panel and Salinity Cells in accordance with Section 3 of the Coast Guard Tech Pub 3274 and submit CFR.
3.8 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) to prove satisfactory operating condition. Submit a CFR.
25 (Rev-0)
S10-008_18400_JAH_0311_378W_717
WORK ITEM 5: Whip Antenna Foundations Renew
1.1 Intent. This work item describes the requirements for the Contractor to renew the foundations for the port and starboard whip antennas and to repair damage to the deck below the foundations.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 378-FRAM-W 152-1, Rev -, Deck Plating & Framing Coast Guard Drawing 378-FRAM-W 184-8, Rev -, Whip Antenna Foundations Coast Guard Drawing 378-FRAM-W 505-11, Rev -, Struct Penetrations Pipe Cplings & Weld Sleeves Coast Guard Drawing 378-FRAM-W 801-1, Rev -, Booklet of General Plans
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
The Society for Protective Coatings SSPC-SP 1, 11/1/2004; Solvent Cleaning The Society for Protective Coatings SSPC-SP 3, 11/1/2004; Power Tool Cleaning
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. None.
3.1.2 Technical Representative. Not applicable.
3.1.3 Protective measures.
26…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| Request for Clarification | — | |
| TECHNICAL EVALUATION CRTERIA.doc | DOC document | |
| Solicitation Pkg | — | |
| SF1449 -MELLON.doc | DOC document | |
| NOTICE TO OFFERORS(MELLON).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .