Rev-2 to the Specifications

View the file

Other files

File Type Posted
Questions-Answers 01.docx DOCX document
A0001 SF30.docx DOCX document
RFP CGC GEORGE COBB.docx DOCX document
GEORGE COBB —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC GEORGE COBB (WLM 564)

175 FOOT COASTAL BUOY TENDER

SPECIFICATION FOR DRYDOCK REPAIRS

Developed By: Miguel K. Augustin

(Rev-2, 10 December 2010)

USCGC GEORGE COBB (WLM-175) DRYDOCK AVAILABILITY 2011

ii (Rev-2)

TABLE OF CONTENTS

Revisions Record ....................................................................................................................................... iv Consolidated List of References ................................................................................................................. v Consolidated List of Government-furnished Property ................................................................................ x Consolidated List of Critical Inspection Items .......................................................................................... xi Principal Characteristics ........................................................................................................................... xii General Requirements WORK ITEM 1: Appendages (U/W), Leak Test WORK ITEM 2: Appendages (U/W) - Internal, Preserve WORK ITEM 3: Tanks (MP Fuel Stowage and Overflow), Inspect WORK ITEM 4: Tanks (Potable Water), Inspect WORK ITEM 5: Sea Strainers (All Sizes), Renew WORK ITEM 6: Compressed Air Receivers, Clean, Inspect, and Test WORK ITEM 7: Anchor, Anchor Chain and Ground Tackle, Inspect and Repair WORK ITEM 8: Grey Water Holding Tanks, Clean and Inspect WORK ITEM 9: Sewage Holding Tanks, Clean and Inspect WORK ITEM 10: Decks – Exterior (Buoy), Preserve WORK ITEM 11: Potable Water Pneumatic Tanks, Clean and Inspect WORK ITEM 12: Firemain Valves, Overhaul or Renew WORK ITEM 13: Bilges (Machinery Space), Preserve WORK ITEM 14: Z-Drive Propulsion Unit Seal Oil Tank , Relocate WORK ITEM 15: Drydocking WORK ITEM 16: Voids (Non-Accessible), Leak Test WORK ITEM 17: Voids (Non-Accessible), Preserve Internal Surfaces WORK ITEM 18: Cathodic Protection / Zincs, Renew WORK ITEM 19: Hull Plating, U/W Body, Inspect WORK ITEM 20: Hull Plating (U/W Body), Ultrasonic Testing WORK ITEM 21: Sea Bay, Inspect WORK ITEM 22: Sewage Piping , Clean and Flush WORK ITEM 23: U/W Body, Preserve (“100%”) WORK ITEM 24: U/W Body, Preserve (“Partial – Condition A”) WORK ITEM 25: U/W Body, Preserve (“Partial - Condition B”) WORK ITEM 26: U/W Body, Preserve (“Partial - Condition C ”) WORK ITEM 27: Hull Plating Freeboard, Preserve (“ Partial ”) WORK ITEM 28: Superstructure, Preserve “100%” WORK ITEM 29: Chain Locker, Preserve 100% WORK ITEM 30: Temporary Services, Provide

WORK ITEM 31: DE-INSTALL FORWARD SCAN SONAR UNIT TRANSDUCER

WORK ITEM 32: Propulsion Shaft Bulkhead Seals , Upgrade WORK ITEM 33: Sea Valves and Waster Pieces , Overhaul or Renew WORK ITEM 34: Deck Covering (Interior Wet/Dry) , Renew WORK ITEM 35: Circuit Breakers (60 Hz), Inspect and Test iii (Rev-2)

WORK ITEM 36: Oily Water Separator, Overhaul WORK ITEM 37: Chains, Gripes, and Binds - Inspect and Test WORK ITEM 38: Z-Drive Propulsion Units, Overhaul WORK ITEM 39: Buoy Chain (In-Haul) Winch, Modify

WORK ITEM 40: DELETED

WORK ITEM 41: SW Heat Exchangers , Clean , Inspect and Hydro WORK ITEM 42: Thruster Unit (General) , Overhaul WORK ITEM 43: Cross Deck Winches, Level 2 Inspect and Repair WORK ITEM 44: Warping Capstan , Inspect and Repair - “Level 2” WORK ITEM 45: Single Point Davit, Level 2 Inspect and Repair WORK ITEM 46: Buoy Crane, Inspect and Repair WORK ITEM 47: Hydraulic Chain Stoppers, Inspect and Repair - “Level 2” iv (Rev-2)

Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

v (Rev-1)

Consolidated List of References

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free or charge. Other Government documents may be accessed – free of charge – as follows:

• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::

www.gpoaccess.gov

The Government is aware of the following internet web links where contractors may procure commercial specifications:

• American Welding Society (AWS): http://www.awspubs.com/index.php

• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

• NFPA: http://www.nfpa.org

• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

{or} Coast Guard Drawing __________, Rev #, Title Coast Guard Drawing _________________ Coast Guard Drawing 175 WLM 114-001, Rev D, Shell Appendages Coast Guard Drawing 175 WLM 184-001, V850 Transducer Adaptor Ring Coast Guard Drawing 175 WLM 201-001, Rev C, Machinery Spaces Arrangment Coast Guard Drawing 175 WLM 243-2, Rev E, Propulsion Shaft Arrangement Coast Guard Drawing 175 WLM 243-202, Rev F, Propulsion Shaft Arrangement Coast Guard Drawing 175 WLM 244-001, Rev -, 4.48” ND Type Bulkhead Seal Coast Guard Drawing 175 WLM 245-1, Rev A, Propeller Coast Guard Drawing 175 WLM 256-001, Rev H, Seawater Cooling System Diagram Coast Guard Drawing 175 WLM 256-003, Rev D, Seawater Cooling System FR 61 Forward Coast Guard Drawing 175 WLM 256-004, Rev J, Seawater Cooling System Arrangements and Details Coast Guard Drawing 175 WLM 256-005, Rev -, Z-Drive Lube Oil Heat Exchanger Tube Bundle, Replacement and Piping Mods Coast Guard Drawing 175 WLM 256-012, Rev A, Auxiliary Seawater System Piping Mods Coast Guard Drawing 175 WLM 320-001, Rev U, Electrical One-Line Diagram Coast Guard Drawing 175 WLM 320-003, Rev L, Power System Deck Plan, Fr 61-24, Below Main Deck Coast Guard Drawing 175 WLM 320-004, Rev F, Power System Deck Plan, ER and Pump Room Coast Guard Drawing 175 WLM 320-007, Rev P, Power System Deck Plan, 01 Level and Above Coast Guard Drawing 175 WLM 437-008, Rev G, HVAC Control System; Block, ISO & Elem W.D.

Coast Guard Drawing 175 WLM 506-001, Rev G, Overflows, Air Escapes & Sounding Tubes Diagram Coast Guard Drawing 175 WLM 512-017, Rev B, HVAC Mods to Compartments 2-52-0-C & 02-61-0-C.

vi (Rev-2)

Coast Guard Drawing 175 WLM 533-006, Rev D, Independent Tank Potable Water Hb 950 Coast Guard Drawing 175 WLM 541-001, Rev H, Fuel Oil System Diagram Coast Guard Drawing 175 WLM 541-006, Rev C, Independent Tanks, Emergency Generator Day Tank IIP:7- Coast Guard Drawing 175 WLM 551-001, Rev H, Compressed Air System Diagram Coast Guard Drawing 175 WLM 561-1, Rev J, Z-Drive Hydraulic System Diagram Coast Guard Drawing 175 WLM 581-001, Rev E, Anchor Handling System Arrangement Coast Guard Drawing 175 WLM 593-001, Rev G, Sewage & Waste Water System Diagram Coast Guard Drawing 175 WLM 593-009, Rev E, Independent Tanks, Sewage Holding Tank Coast Guard Drawing 175 WLM 601-001, Rev L, General Arrangement and Inboard and Outboard Profiles Coast Guard Drawing 175 WLM 601-003, Rev F, Booklet of General Drawings 552-564 Coast Guard Drawing 175 WLM 601-003, Rev F, Booklet of General Plans Coast Guard Drawing 175 WLM 633-001, Rev D, Cathodic Protection Coast Guard Drawing 175 WLM 635-1, Rev F, Hull Thermal & Acoustic Insulation Schedule Coast Guard Drawing 175 WLM 801-006, Rev H, Docking Drawing Coast Guard Drawing 175 WLM 801-006, Rev H, Docking Plan Coast Guard Drawing 175 WLM 801-019, Rev C, Shell Expansion Coast Guard Drawing 175 WLM 801-19, Rev C; Shell Expansion Coast Guard Drawing 175 WLM 801-6, Rev H; Docking Plan Coast Guard Drawing 175-WLM 320-1, Rev U, Electrical One-Line Diagram Coast Guard Drawing 175-WLM 593-001, Rev G, Sewage & Waste Water System Diagram Coast Guard Drawing 175-WLM 568-001, Rev B, Bow Thruster Arrangement & Detail Coast Guard Drawing FL 2804-13, Rev G, Visual Id Kit Sched Coast Guard Drawing FL 2804-15, Rev-, Draft Figs Coast Guard Drawing FL-2605-013, Rev-, Buoy Chain Model CW1: Pins Coast Guard Drawing FL-2605-035, Rev-, Buoy Chain Winch Pedestal Bearing Modification Coast Guard Fleet Drawing FL 2804-11, Rev D, Visual Id Numeral & Letter for Ships Coast Guard Fleet Drawing FL 2804-12, Rev-, U.S.C.G. Emblem Coast Guard Yard Drawing xxxxxx, Rev 1, Title NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes

COAST GUARD PUBLICATIONS

CG Tech Pub 3630-573-A, 175 WLM, SWBS 573-A, CRANE, BUOY, MMC PN 573-01-01 CG Tech Pub 3632, MANUFACTURER’S INSTRUCTION BOOK – SWBS GROUP(S) 582-583 Coast Guard Comm andant Instruction (COMDTINST) M10360.3 (series) , Coatings and Color Manual Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual Coast Guard Technical Publication (TP) 3498, Section A, Feb 2008, Buoy Chain Winch Coast Guard Technical Publication (TP) 3613, Tab 243-B, Bulkhead Seal Coast Guard Technical Publication (TP) 3613, Dec 2002; SWBS 245, Section A; Z-Drive Coast Guard Technical Publication (TP) 3619, 13-AUG-98, Manufacturers Instruction Book-SWBS Group(s) Coast Guard Technical Publication (TP) 3627, Mar 2007, SWBS 556, Tab 556A - Deck Equipment Hydraulic Power Unit Coast Guard Technical Publication (TP) 3628, 1/1/1999; Vol 4 of 9, Instruction Manual, Bow Thruster Coast Guard Technical Publication (TP) 3631, Mar 2007, Section 573B, Technical Manual - Operation, Maintenance, And Repair Instructions for Hydraulic Cross-Deck Winch Model Bmb-463 Coast Guard Technical Publication (TP) 3632, F eb 2001, Chapter 583, Section C, Technical Manual for Slewing Arm Davit Model D6000CT vii (Rev-2)

Coast Guard Technical Publication (TP) 3633, Oct 2000, Manufacturer's Instruction Book - SWBS Group(s) Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, Jan 2009; General Requirements Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 085, Jan 2009, General Requirements for Drawing Preparation Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3041, Jan 2009, Shipboard Electric Cable Test Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3042, Jan 2009, Shipboard Electrical Cable Removal, Relocation, Splice, Repair and Installation Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000 ), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0000 (Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 0740 (SFLC STD SPEC 0740), Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5 000 (SFLC Std Spec 5000 ), Jan 2009, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), Jan 2009, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), Jan 2009, Inspect, Repair, and Test Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), Jan 2009, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), Jan 2009, Provide Temporary Services Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2009, Temporary Hull Accesses viii (Rev-2)

OTHER REFERENCES

«OTHER_REF»

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities American National Standards Institute/NSF International (ANSI/NSF) 61, 2002, Drinking Water System Components - Health Effects American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System Components - Health Effects American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End ASTM International (ASTM) D 4138, 2007, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component Adhesives (An) ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates Coast Guard Technical Publication (TP) 3613, Jan 1997, Manufacturers Instruction Book-SWBS Group(s) 242-262 Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Antiseize, Zinc Dust- Petrolatum Commercial Item Description (CID) A-A-59323, Rev A, Cloths, Cleaning, Low-Lint Commercial Item Description (CID) A-A-59588, Jul 2005, Rubber Silicone DOD-STD-1399 Section 301A, Jul 1986, Ship Motion and Attitude DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-69, 2003, Pipe Hangers and Supports - Selection and Application Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-89, 2003, Pipe Hangers and Supports – Fabrication and Installation Practices MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418) MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning MIL-F-1183, Rev J; Fittings, Pipe Cast Bronze Silver-Brazing MIL-F-24402, May 1995, Filters (Hydraulic), Filter Elements (High Efficiency), and Filter Differential Pressure Indicators, General Specification MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application MIL-PRF-24647, Jun 2006, Paint System, Anticorrosive and Antifouling, Ship Hull MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant ix (Rev-2)

MIL-T-24107, Oct 1987, Tube, Copper (Seamless) (Copper Alloy Numbers C10100, C10200, C10300, C10800, C12000, C12200, and C14200) National Electrical Manufacturers Association (NEMA) Stds, Pub. No. AB4, 2003, Guidelines for Inspection and Preventive Maintenance of Molded Case Circuit Breakers Used in Commercial and Industrial Applications Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C 6183, 2005, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 1999, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), Jan 2009, Install New Deck Covering Systems The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC), June 1996, Paint Application Specification No. 2 (PA-2), Measurement of Dry Coating Thickness with Magnetic Gages The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2007, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 7/NACE No.4, 2007, Brush-Off Blast Cleaning The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating Underwriters Laboratories Inc. (UL) 489, May 2002, Molded Case Circuit Breaker Wartsila Defense, Inc. Technical Manual for Type ND Seal x (Rev-2)

Consolidated List of Government-furnished Property The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

15 Y *Transducer Cover

Plate N/A 3 ea. 50.00

30 Y **Seal, Bulkhead Shaft (entire seal)

Wartsila PN: H76287-01 1 ea.

30 N Diaphragm Assembly, ND Seal With O-Cord

Wartsila PN: H76287-01-2 4 ea.

30 N Packing, Preformed (O- Cord)

Wartsila PN: H76287-01-2-2 4 ea.

36 N Z drive seal Set PN: D8202363 2 ea. 25,493.00 36 N Socket cap Screws PN: 3SCS3/8NX1SS (Dwg PN

4034) 24ea. 1.40

36 N Prop Seal Liner Gasket PN: B7807133 (Dwg PN 4802) 2 ea. 29.80 36 N Hydraulic Nut PN: 36/EA101 2 ea. 40.00 36 N **Liner PN: 3-355-0107 2 ea. 13,100.00 36 N **Seal sleeve PN: B8105113 2 ea. 1,000.00 36 N **Seal ring PN: B7807158 2 ea. 1,100.00 36 N **Retaining ring PN: N5002-550 2 ea. 60.00 36 Y **Clutch assembly NSN: 3010-01-417-4626 2 ea. 19,000.00 36 N **Locking Nut B8202416 2 ea. 613 36 N **Seal ring B8106487 2 ea. 7,007 36 N **Lantern Ring B7802062 2 ea. 1,017 38 N Seal kit, Bow thruster NSN: 2010-01-555-9048 1 ea. 3,634.00 38 N Zinc Anode PN: A000SM44197 9 ea. 113.75

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xi (Rev-2)

Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph

3.2.6.5 (Inspection report particulars)):

Work Item Title 1 Appendages (U/W), Leak Test 7 Anchor, Anchor Chain and Ground Tackle, Inspect and Repair 13 Bilge (Machinery Space), Preserve 16 Voids (Non-Accessible), Leak Test 20 Hull Plating (U/W Body), Ultrasonic Testing 21 Sea Bay, Inspect 23 U/W Body, Preserve ( “100%” ) 43 Cross Deck Winches, Level 2 Inspect and Repair 44 Warping Capstan , Inspect and Repair - “Level 2” 45 Single Point Davit, Level 2 Inspect and Repair

Buoy Crane, Inspect and Repair Hydraulic Chain Stoppers, Inspect and Repair – “Level 2” xii (Rev-2)

PC_175_WLM_310

Principal Characteristics

175' WLM BUOY TENDER

PHYSICAL CHARACTERISTICS

Length Overall 174' 8" Length between Perpendiculars 155' 1" Depth 14' 8" Maximum Beam 36' 0" Designed Draft 8' 0" Mast Height (Above 8' Waterline) 58' 8" Frame Spacing 20" Full Load Displacement 906.42 long tons Light Load Displacement 840 long tons Minimum Op Condition Displ 870 long tons

MACHINERY CHARACTERISTICS

Main Propulsion (Engine) Two Caterpillar 3508 DITA V-8 diesel; 999 BHP ea @

1500 RPM

Main Propulsion (Propulsor) Two Ulstein 360 degree steerable Z-Drives, 403 SRPM @

1600 ERPM

Reduction Gears Two Z-Drive units, Cardan shafting; 3.973:1 gear ratio

Shaft Seal John Crane Type ND

Shaft Bearings Five pedestal mounted, Cooper split roller bearings

Number of Propellers 2

Number of Blades 4

Diameter 57.1"

Rudders None; Z-drive

Ship's Service Generators Three Caterpillar Model 3406 DITA Turbocharged;

285KW, 450V, 60 Hz, 1800 RPM

Emergency Diesel Generator One Caterpillar Model 3406 DIT 210 KW, 24V, 60 Hz, 1800 RPM

TANK CAPACITIES

Diesel Oil Capacity (100%) 16,385 gal Fresh Water Capacity (100%) 7,339 gal Lubricating Oil (100%) 86 gal xiii (Rev-2)

1 (Rev-2)

00000_0310_FLT

REC_0000_FLT_ Commercial Project @ Contractor’ Facility (1209)

General Requirements

1. SCOPE

1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.

2. REFERENCES

COAST GUARD DRAWINGS

None.

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and

Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety

Administration, Department Of Transportation

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:

2 (Rev-2)

• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.

3.4 HW disposal. The Contractor is considered as the generator of all contract-generated hazardous wastes and shall use its facility’s EPA generator ID number for management, transportation, and disposal of said hazardous wastes. Ensure the following:

3.4.1 Contractor’s hazardous waste handlers shall comply with applicable requirements of 40 CFR 262.

3.4.2 All contract generated hazardous wastes shall be packaged in 49 CFR-compliant containers.

3.4.3 The designated wastes shall be disposed of at a state or Federally-approved and permitted HW TSDF.

3.4.4 Name of destination TSDF shall be submitted to the KO at the Arrival Conference.

4. NOTES

4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp

4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

3 (Rev-2)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ Specific Area Being Preserved: ___________________________________________________________

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).

Verify surface anchor profile (1.5-3.5 mils for abrasive-blasted steel surfaces; 1.0 mil (minimum) for power-tool cleaned surfaces; 1.0-1.5 mils for abrasive-blasted aluminum surfaces); and 1.5 –2.5 for surfaces to be coated w/single coat of inorganic zinc). Conduct 5 sets of 3 readings for the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Measure soluble salt conductivity (5 measurements per 1000 sqft) – maximum threshold: 70 microsiemens/cm for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces.

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application:_________/_________; Return to service or removal from environment controls: _______/_______

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________

4 (Rev-2)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________

(Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)

DATE &

TIME

ENTER ACTIVITY

(Surface preparation, primer coat, barrier coat, top coat, etc…)

LOCATION

TEMPERATURE

% REL.

HUMIDITY

SIGNATURE

OF

INSPECTOR DEW

POINT SURFACE AMBIENT

?T | DP - Surface

Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________

5 (Rev-2)

QA-3 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG)

Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ Location of Surface Profile Measurements: ___________________________________________________________

SURFACE PREPARATION METHOD PROFILE

(mils) Min Max Avg.

SSPC-SP-10/NACE No. 2 SSPC-SP-12/NACE No. 5

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

Abrasive Manufacturer and Sieve Size: _________________________________ Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record. Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Average Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________

Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________

6 (Rev-2)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________

Location of Work (including frame numbers): _______________________________________ Area (square feet): ____________

DATE TEST LOCATIONS CONDUCTIVITY

(microsiemens/cm)

Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________

7 (Rev-2)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence) Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________

Coating Manufacturer: ___________________Product Name: _______________________Batch Number: ____________ Induction Time: _______________________________________________________________ Coating System Sequence (Indicate Whether: Primer, Touch-Up Primer, Barrier Coat, 3rd Coat…): __________________

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC PA-2

SPOT 1 2 3 4 5 AVERAGE

VALUE

*BASE METAL

READING (BMR)

*Required, If Magnetic Pull-Of (Type I/Banana) Gauge Is Used.

Location (Frame Reference): ___________________

SPOT 1 2 3 4 5

Overall Avg. DFT

ADJUSTMENTS

1 Avg. BMR Deviation 3 Before

Adjustments After Adjustments

Avg.

Location (Frame Reference): ___________________

SPOT 1 2 3 4 5

Overall Avg. DFT

ADJUSTMENTS

1 Avg. BMR Deviation 3 Before

Adjustments After Adjustments

Avg.

Location (Frame Reference): ___________________

SPOT 1 2 3 4 5

Overall Avg. DFT

ADJUSTMENTS

1 Avg. BMR Deviation 3 Before

Adjustments After Adjustments

Avg.

Application Method (Airless, Conventional Spray, Rolled):____________________ Average DFT: __________________________________________________________

Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________

8 (Rev-2)

11400_UW_Appendages_0310_FLT REC_11400_UW_Appendages_FLT_175’ WLM (ALL) (0310)

WORK ITEM 1: Appendages (U/W), Leak Test

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to perform leak test of the U/W appendages (see Table I).

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 175 WLM 114-001, Rev D, Shell Appendages Coast Guard Drawing 175 WLM 801-006, Rev H, Docking Plan Coast Guard Drawing 175 WLM 801-019, Rev C, Shell Expansion

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes

OTHER REFERENCES

ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component

Adhesives (An) MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant

3. REQUIREMENTS

3.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):

• 3.2 (Leak test particulars).

3.2 Leak test particulars. In the presence of the Coast Guard Inspector, the Contractor shall accomplish the following tasks for all appendages as designated in paragraph 1.1(Intent) and Table 1 below, using the Coast Guard drawings listed in Section 2 (References) as guidance:

9 (Rev-2)

• Remove and dispose of the existing drain plugs.

• Submit a CIR noting any liquids draining from any of the appendages – indicating the presence of a leak.

• Dispose of any drained liquids in accordance with all Federal, state, and local laws and regulations.

CAUTION!

Some liquids that are drained may be may be classified as hazardous materials or hazardous waste depending on state and local regulations. The vessel environmental coordinator may assist with determination of waste category.

3.3 Plug renewal. Upon completion of all work on appendages, the Contractor shall accomplish the following tasks:

• Chase the hull insert threads of all plugs.

• Renew stainless steel, Type 316 and Monel drain plugs (as applicable) in place of those removed.

• Coat new plugs prior to installation with a sealing and locking compound conforming to ASTM D5363- AN0123 or a flexible joint compound conforming to MIL-S-45180, Type II.

TABLE I – DRAIN PLUGS FOR U/W APPENDAGES

APPENDAGE FRAME SIDE

Skeg 79 ½ to 92 CL

3.3 Appendage air test. If a Change Request or Quick Chit has been authorized and released, the Contractor shall accomplish the following tasks, for each appendage designated by the Coast Guard Inspector:

• Apply a vacuum or pressure of 2 psig to the void, in accordance with SFLC Std Spec 0740, Appendix C.

• Submit a CFR.

This section is not applicable to this work item.

10 (Rev-2)

11402_UW_APPENDAGES_310_FLT

REC_11400_UW_Appendages_FLT_175’ WLM (ALL) (0310)

WORK ITEM 2: Appendages (U/W) - Internal, Preserve

1.1 Intent. This work item describes the requirements for the Contractor to preserve internal surfaces of U/W appendage(s) (see Table I).

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 175 WLM 114-001, Rev D, Shell Appendages Coast Guard Drawing 175 WLM 801-006, Rev H, Docking Plan Coast Guard Drawing 175 WLM 801-019, Rev C, Shell Expansion

COAST GUARD PUBLICATIONS

None.

OTHER REFERENCES

MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application

3. REQUIREMENTS

3.1 General – work coordination. The Contractor shall coordinate performance of this work item with the “Appendages (U/W), Leak Test” work item, which is a separate work item in this specification package.

3.2 Preservation of void internal surfaces. The Contractor shall accomplish the following tasks for each appendage designated by the Coast Guard Inspector, using the Coast Guard Drawings listed in Section 2 (References) herein as guidance:

• Fill all appendage interior surfaces with a rust preventive compound conforming to MIL-PRF-16173, Class II, Grade 3, to coat all surfaces.

• Drain, collect, and dispose of remaining compound in accordance with all applicable Federal, state, and local regulations.

11 (Rev-2)

• Ensure that the coated surfaces are left exposed to the atmosphere for 24 hours to allow for adequate drying.

TABLE 1 - DRAIN PLUGS FOR U/W APPENDAGES

APPENDAGE FRAME SIDE

SKEG 79 ½ TO 92 CL

12 (Rev-2)

12301_MP_FUEL_STOW_DLA_1209_FLT

REC_12311_FLT_175’ WLM (ALL) (0310)

WORK ITEM 3: Tanks (MP Fuel Stowage and Overflow), Inspect

1.1 Intent. This work item describes the requirements for the Contractor to inspect the following tank(s):

TYPE OF TANK LOCATION CAPACITY - 95%

(gallons)

LOW SUCTION

(GALLONS)

Diesel Storage 3-24-1-F 6,247 200 Diesel Storage 3-24-2-F 6,247 200

Diesel Overflow 3-35-2-F 696 50 Diesel Storage

(EDG)

02-77-1-F 245 50

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 175 WLM 541-001, Rev H, Fuel Oil System Diagram Coast Guard Drawing 175 WLM 541-006, Rev C, Independent Tanks, Emergency Generator Day Tank

IIP:7-1

Coast Guard Drawing 175 WLM 601-003, Rev F, Booklet of General Drawings 552-564

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes

OTHER REFERENCES

Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and

Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets

13 (Rev-2)

3. REQUIREMENTS

3.1 General. The Contractor shall refer to Coast Guard Drawings 175 WLM 541-001, 175 WLM 541-006 and 175 WLM 601-003 for guidance.

3.1.1 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all TLIs for tanks listed in paragraph 1.1 (Intent), to demonstrate existing operational condition. Submit a CFR.

3.1.2 Tank content removal. The Contractor shall remove and dispose of up to a total of 5,000 gallons of diesel fuel.

NOTE

Vessel may come in with less tank fluid contents than specified above.

3.1.3 Tank content and waste disposal. The Contractor shall dispose of tank contents and all cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COTR upon completion of work.

3.2 Inspection. The Contractor shall remove manhole cover(s) for all tanks listed in paragraph 1.1 (Intent); and visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:

• Tank structural condition.

• Inaccessible areas.

• Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.

• Tank level indicator (TLI) and/or float switch condition.

• Sounding/vent tube and striker plate condition.

• Suction and discharge piping condition.

• Fastener material and condition (correct fastener material is stainless steel).

The Contractor shall measure up to 10 “pits” within each tank as designated by the Coast Guard Inspector using a Contractor supplied ‘Pit Gauge’. The results of these measurements should also be included in the inspection report showing where pit measurements were taken and the depth of the pit.

3.3 Tank closing. The Contractor shall ensure that the tank(s) remain open for at least 24 hours after completion of any KO-authorized repair and preservation procedures. Notify the COTR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183. Chase threads on studs to ensure

14 (Rev-2) even installation of the access covers. Renew any damaged or non-monel nuts with nickel-copper alloy (monel) nuts meeting QQ-N-281, Class A or B. The nuts and bolts shall be of different classes to prevent galling.

Existing undamaged fasteners meeting this specification may be reused. For purpose of bid, assume 10% of existing fasteners will require renewal.

3.4 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of all disturbed tank TLIs to prove satisfactory operating condition. Submit a CFR.

3.5 Ultrasonic thickness (UT) measurement. The Contractor shall take a total of 50 UT measurements of tank plating, in locations designated by the Coast Guard Inspector, in accordance with SFLC Std Spec 0740, Appendix C. Submit a CIR.

4. NOTES

4.1 Tank content removal. The Ship’s force will pump down the tanks to the maximum extent possible with the installed pumping system.

15 (Rev-2)

12301_POTWTR_DLA_1209_FLT

REC_12314_FLT_175’ WLM (ALL) (0310)

WORK ITEM 4: Tanks (Potable Water), Inspect

1.1 Intent. This work item describes the requirements for the Contractor to inspect the following tank(s):

TYPE OF

TANK LOCATION CAPACITY - 95%

(gallons)

LOW SUCTION

(gallons)

Potable Water 1-94-0-W 2,167 68 Potable Water 2-36-1-W 5,172 163

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 175 WLM 601-003, Rev F, Booklet of General Plans Coast Guard Drawing 175 WLM 533-006, Rev D, Independent Tank Potable Water Hb 950

COAST GUARD PUBLICATIONS

None.

OTHER REFERENCES

American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System

Components - Health Effects American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities

3.1 General. The Contractor shall refer to Coast Guard drawings 175 WLM 601-003 and 175 WLM 533-006 for guidance. The Contractor shall notify the Dockmaster prior to filling or draining the potable water tank(s), when this item is being executed in a drydock availability. The Contractor shall accomplish the following for the tank(s) designated in paragraph 1.1 (Intent):

16 (Rev-2)

3.1.1 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all tank TLIs for tanks listed in paragraph 1.1 (Intent), to demonstrate existing operational condition. Submit a CFR.

3.1.2 Tank content removal. Remove and dispose of all fluids and/or residues in accordance with all applicable Federal, state, and local regulations.

3.1.3 Inspection. Remove manhole cover(s); and visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:

• Tank structural condition.

• Inaccessible areas, if any.

• Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.

• Tank level indicator (TLI) and/or float switch condition (if applicable).

• Sounding tube and striker plate condition.

• Suction and discharge piping condition.

• Fastener material and condition (correct fastener material is stainless steel).

3.2 Tank closing. The Contractor shall notify the COTR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector, and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to ANSI/NSF 61. Renew all stud cotton grommets (as applicable) upon reinstallation of manhole cover(s).

3.3 Tank disinfecting. After all other authorized work involving the potable water system and tank closing have been completed, the Contractor shall disinfect and treat the affected potable water tank(s) and associated disturbed piping and components, as necessary, to meet or exceed the requirements of AWWA C652. After tank disinfecting; remove and dispose of all treated water in accordance with all Federal, state and local regulations.

NOTE

Ensure that no one enters the tanks once disinfection is completed.

3.4 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of all disturbed tank TLIs to prove satisfactory operating condition. Submit a CFR.

17 (Rev-2)

52040_MWC_0909_FLT

REC_52040_FLT_175 WLM (ALL) [tender] (0309)

WORK ITEM 5: Sea Strainers (All Sizes), Renew

1.1 Intent. This work item describes the requirements for the Contractor to renew the following sea strainer(s):

EQUIPMENT/LOCATION MFR & MODEL SIZE QTY CONNECTION TYPE

Between Sea Chest and Sea Bay P-3-69-4 and S-3-69-3

KRAISSL 72-44F 8”

Bronze Simplex w/Yoke

Covers

2 150# ANSI FLANG

ASW Pump Suction KRAISSL 72-44F 3” Bronze Duplex w/Yoke

Covers

1 150# ANSI FLANG

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing _________________

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General

Requirements

OTHER REFERENCES

ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 1999, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric

3.1 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to

18 (Rev-2) the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):

• Deck plates and grating (as applicable).

3.2 Renewal. The Contractor shall renew and test the designated strainers (see paragraph 1.1 (Intent)), shown on Coast Guard Drawings ______________________. Accomplish the following for each sea strainer in accordance with manufacturer’s recommendations:

3.2.1 Removal. Secure, isolate, tag-out, and remove the designated sea strainers. Install blank flanges and gaskets over the piping system openings and secure with at least two bolts 180-degrees apart to provide a watertight seal. Ensure that the blank flanges are installed immediately after the sea strainers are removed and remain in-place until new strainers are installed. Turn over the removed strainers to the Coast Guard Property Administrator for disposition.

3.2.2 Plug valve testing. Where applicable, lubricate the valves with plug valve grease conforming to AMS-G- 6032. Hydrostatically test the plug valves of all duplex strainers for each strainer chamber, at a test pressure of 50 psig. To determine leakage rate, the strainer shall have the outlet blanked and the unpressurized side top cover removed (two tests per duplex strainer). While maintaining the test pressure at the inlet side, the non-pressurized side shall not fill within 30 minutes. Provide a CFR which shall include, but is not limited to, the following information:

• Grease type, including batch number and manufacturer.

• Time elapsed for chamber to fill, if less than thirty minutes.

CAUTION!

Ensure that the drain valve for each chamber is closed.

3.3 Installation. After completion and acceptance by the Coast Guard Inspector, the Contractor shall install all new strainers to the original locations, as shown on Coast Guard Drawings ______________________. Renew all gaskets with material conforming to ASTM D1330 of the same size and configuration as those gaskets removed. Renew all hardware with nickel-copper alloy (Monel) fasteners.

3.4 Notification. The Contractor shall notify the Coast Guard Inspector at least 24 hours prior to installing sea strainers.

3.5 Leak test. After all authorized work is completed, the Contractor shall perform an operational test of the sea water system using…