MACKINAW _PAINT_JULY_11R1.docx
DOCX document 152 KB Posted
- Solicitation number
- HSCG85-11-Q-P20C09
About this file
Specification REV 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND0002.docx | DOCX document | |
| AMEND0001.doc | DOC document | |
| SF449MACKPAINT.pdf | ||
| MACKINAW_WLBB_240_PAINT_SOSS.xls | XLS spreadsheet | |
| USCGCMACKINAWPAINTFY11 | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC MACKINAW (WLBB 30)
240 FOOT SEAGOING BUOY TENDER BREAKER
SPECIFICATION FOR PRESERVATION (PAINT) MAINTENANCE
Developed By: Jeremy L Yandell
USCGC MACKINAW (WLBB-240) DOCKSIDE AVAILABILITY 2011
(Revision-1, 20 May 2011)
| ii |
| (Rev-1) |
TABLE OF CONTENTS
| Revisions Record | iii |
| Consolidated List of References | iv |
| Consolidated List of Government-furnished Property | vi |
| Consolidated List of Critical Inspection Items | vii |
| Principal Characteristics | 1 |
| General Requirements | 2 |
| WORK ITEM 1: Decks – Exterior (Buoy), Preserve | 14 |
| WORK ITEM 2: Decks - Exterior, Preserve (“Non-Skid Broadcast Grit” System) | 16 |
| WORK ITEM 3: Hull Plating (Buoy Port Areas), Preserve | 20 |
| WORK ITEM 4: Hull Plating Freeboard, Preserve (“ 100% ”) | 23 |
| WORK ITEM 5: Hull Plating Freeboard, Cosmetic Preserve | 26 |
| WORK ITEM 6: Superstructure, Preserve “100%” | 30 |
| WORK ITEM 7: Superstructure, Cosmetic Preserve | 33 |
| WORK ITEM 8: Main Mast, Preserve | 37 |
| WORK ITEM 9: Exhaust Stacks (Exterior), Preserve | 41 |
| WORK ITEM 10: Bilges (Machinery Space), Preserve | 44 |
| WORK ITEM 11: Ship Structures, Preserve | 47 |
| WORK ITEM 12: Interior Spaces and Non-Machinery Decks, Preserve | 50 |
| iii |
| (Rev-1) |
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
| 20MAY11 |
| 1 |
| 2 |
| Delete 3.1.2, Insert New 3.1.2 |
| 20MAY11 |
| 1 |
| 4 |
| Delete 3.1.6, Insert New 3.1.6 |
| 20MAY11 |
| 1 |
| 6 |
| Delete Note, Insert Note & Caution! |
| 20MAY11 |
| 1 |
| 8 |
| Delete 3.1.5, Insert New 3.1.5 |
| 20MAY11 |
| 1 |
| 9 |
| Delete 3.1.2, Insert New 3.1.2 |
| 20MAY11 |
| 1 |
| 11 |
| Delete Entire 3.1.5, Insert New 3.1.5 |
| 20MAY11 |
| 1 |
| 11 |
| Delete Entire 3.1.6, Insert New 3.1.6 |
| 20MAY11 |
| 1 |
| 11 |
| Insert New 3.1.7 |
| 20MAY11 |
| 1 |
| N/A |
| Delete Blank Page viii |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
| iv |
| (Rev-1) |
Consolidated List of References The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free or charge. Other Government documents may be accessed – free of charge – as follows:
· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:
· American Welding Society (AWS): http://www.awspubs.com/index.php
· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
· NFPA: http://www.nfpa.org
· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 240 WLBB 162-1, Rev B, Stack Assembly & Detail Coast Guard Drawing 240 WLBB 170-1, Rev B, Mast A&D Coast Guard Drawing 240 WLBB 405-1, Rev F, Mast and Antenna Arrangement Coast Guard Drawing 240 WLBB 601-002, Rev B, Booklet of General Plans Coast Guard Drawing 240 WLBB 601-002, Rev D, Booklet of General Drawings Coast Guard Drawing FL 2804-13, Rev G, Visual Id Kit Sched Coast Guard Drawing FL 2804-13, Rev G, Visual ID Kit Sched Coast Guard Drawing FL 2804-15, Rev-, Draft Figs Coast Guard Fleet Drawing FL 2804-11, Rev D, Visual Id Numeral & Letter for Ships Coast Guard Fleet Drawing FL 2804-11, Rev D, Visual ID Numeral & Letter for Ships Coast Guard Fleet Drawing FL 2804-12, Rev-, U.S.C.G. Emblem
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning NOTE TO USERS: Please delete all references not used.
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2004, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2004, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating
| vi |
| (Rev-1) |
Consolidated List of Government-furnished Property The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
This section is not applicable to this package.
| vii |
| (Rev-1) |
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item Title
| 10 |
| Bilges (Machinery Space), Preserve |
| viii |
| (Rev-1) |
PC_240_WLBB_1209
Principal Characteristics
240' WLBB (30 CGC MACKINAW)
PHYSICAL CHARACTERISTICS
| Length Overall |
| 240’ 0” |
| Depth (main deck at side to baseline) |
| 24' 0" |
| Maximum Beam |
| 58’ 0” |
| Height of Highest Projection (above DWL) |
| 95' 6" |
| Full Load Draft |
| 16’ 0” |
| Full Load Displacement |
| 3625 LT Freshwater |
| Shore Tie Voltage Requirements |
| 1,200 Amp total |
3EA 400A 450VAC 3PH
Ungrounded forward/aft stations
HULL CHARACTERISTICS
| Frame Spacing |
| FR 19-25 = 19" |
FR 33-39 = 21"
ALL Else = 20"
MACHINERY CHARACTERISTICS
| Number of Propellers |
| 2 |
| Number of Blades per Propeller |
| 4 |
| Diameter of Propeller |
| 10.25' |
| Pitch |
| 96.98" |
| Revolutions per Minute (RPM) |
| 226 rated 270 max |
| Shafting/Propulsion System |
| Azipod |
TANK CAPACITIES
| Diesel Oil |
| ? |
| Fresh Water Capacity |
| ? |
| Hydraulic Oil Capacity |
| ? |
| Lube Oil Storage |
| ? |
| Grey Water Tank |
| ? |
| Sewage Holding Tank |
| ? |
| 2 |
| (Rev-1) |
00000_PWB_0211_FLT
REC_0000_FLT_ Commercial Project @ CG Facility (0211) General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. REFERENCES
COAST GUARD DRAWINGS
None.
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.4 HW disposal. The Contractor shall be responsible for all hazardous wastes generated by work under this contract. Label and package all hazardous wastes in 49 CFR-approved containers, and in accordance with all other applicable Federal, state, and local laws and regulations. In addition, comply with applicable parts of 40 CFR 262, applicable to handling of hazardous wastes.
3.4.1 Along with the Government, the Contractor shall be contractually considered the co-generator of all hazardous wastes; be aware that the Government will make available the cutter’s EPA Generator Identification (ID) Number for manifesting of hazardous wastes.
3.4.2 The Contractor shall identify, arrange, and be responsible for the turnover of all hazardous wastes, within the confines of the Coast Guard shore facility, to the Cutter’s HM/HW Coordinator. Notify the ship’s HW Coordinator prior to any transfers of HW from ship to shore.
3.4.3 The Contractor shall prepare a manifest of hazardous waste to be reviewed and signed by the HM/HW Coordinator. Contact the HM/HW Coordinator for turnover of any hazardous waste; in addition, notify the COTR in writing 24 hours prior to any waste removals, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.4.4 The Contractor shall be aware of the following:
3.4.4.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard Cutter’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COTR or KO-approval.
3.4.4.2 Local environmental regulations at the Government facilities may be more stringent than in many jurisdictions. As with all environmental regulations, it is the Contractor's responsibility to research, prepare for, and comply with local and state regulations.
3.4.4.3 Coast Guard facilities do not have Facilities Response Plans (see 33 CFR 154 Subpart F). It is the Contractor’s responsibility to furnish the Facility Response Plan (FRP) when required for over-the-water liquids transfers to and from vessels. This requirement is applicable to transfers to/from vessels with an oil/fuel capacity of 250 barrels or more.
3.5 Pre-surface preparation test coupon. In order to ensure production of required surface profile, the Contractor shall accomplish the following tasks, whenever abrasive-blasting is required in a work item that is deemed a ”critical-coated’ surface:
3.5.1 Coupon material and test set-up particulars.
3.5.1.1 Conduct a performance test on all abrasive blasting operations on a Contractor- provided test coupon, prior to starting abrasive blasting operations on the vessel. Ensure the following:
· The coupon shall be a new metal plate, of the same metal type and material properties as the vessel area to be blasted - steel or aluminum plate, as applicable, and shall have no existing anchor profile - other than the surface irregularities from the manufacturing process.
· The test coupon shall be flat, with nothing welded to the side used for the anchor profile test, no thinner than a 1/8-inch plate and measuring no smaller than 1-foot by 1-foot.
· For steel substrates, the coupon shall have the mill scale intact, and be in a Rust Grade "A" condition, in accordance with SSPC-VIS 1.
· The test coupon shall be affixed so as to not permit excessive movement during the performance test, but shall not be affixed to the vessel.
3.5.1.2 Ensure that the abrasive-blasting operation for the test coupon is conducted with the identical setup and parameters that will be used blasting the designated vessel surfaces – including, but not limited to:
· The abrasive media type and media size selected to achieve the anchor profile range, as specified in the applicable work items.
· Nozzle size and type (straight bore, high velocity nozzle, angle nozzle...).
· Delivery rate and pressure settings.
3.5.1.3 Blast a one-square foot area on one side of the test coupon to the abrasive surface preparation standard specified in the work item, and perform an anchor profile test of the blasted surface in accordance with ASTM D4417, Method B or C. Notify the COTR in advance of the abrasive blasting operation test, to permit the witnessing of the test by the COTR. Submit a CFR documenting the results of the abrasive blasting operation test. The CFR shall include at a minimum, the following:
· Area of the vessel for which the verified setup will be used to abrasive blast.
· The selected abrasive media type and size.
· The nozzle size and type.
· The delivery rate and pressure.
· The test coupon starting properties (material type and surface conditions).
· The resultant anchor profile readings from the test (a minimum of 3 locations, separated by a minimum of 2 inches shall be recorded).
NOTES
1. A performance test of the abrasive blasting operations on a test coupon and measuring the resultant anchor profile prior to performing the abrasive blasting operation on the cutter is required. The test coupon will be used to evaluate the anchor profile produced by the equipment setup and selected abrasive media.
2. The reverse side of the test coupon may be used for the subsequent test, provided that the conditions in paragraph 3.5.1 (Coupon material and test set-up particulars) are met.
3. Ultra high pressure water jetting does not create an anchor profile and is exempt from the anchor profile test coupon check.
3.5.1.4 Repeat the abrasive blasting operation test in the following instances:
· The equipment setup, that was evaluated during the test coupon abrasive blasting performance test in paragraph 3.5.1 (Coupon material and test set-up particulars), has changed.
· The resultant anchor profile readings observed on the vessel are outside the specified anchor profile range.
· Media is changed from MIL-A-22262 to CID A-A-59316 or vice versa.
· The supplier of the abrasive blasting media changes, regardless if the new source for the media has the same specifications.
· When Directed by the COTR.
CAUTION!
Ensure that blast media from the performance test does not strike the vessel during the test.
3.6 Interim changes to SFLC Std Spec 0000. The Contractor shall be aware of the fact that the requirements of paragraph 3.3.2.1.1 (Water depth) have been revised to read as follows:
“3.3.2.1.1 Water depth. Ensure that water depth is sufficient at the pier to allow the vessel's lowest underwater appendage to clear the bottom by at least two feet at:
· Ordinary low water mark on non-tidal rivers.
· At all tide conditions predicted during the availability for tidal rivers and other navigable waterways (Bay, Lake, etc.).”
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
4.3 QP-1 and NACE-Certified Inspector requirements. The Contractor shall be aware that the requirements for QP-1 certification and NACE-Certified Coating Inspector, in relation to this contract, apply only to the following surfaces, which are considered “Critical-coated surfaces” (see paragraph 3.2.4.2.1 ( Painting contractor certification program requirement) of SFLC Std Spec 0000.
· Weather Decks.
· Freeboard.
· Superstructure.
· Bilges.
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: _______________________________ Area Being Preserved: ___________________________________
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).
Verify surface anchor profile using ASTM D4417-Methods B or C against COMDTINST M10360.3. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000 sqft area (maximum threshold: 70 microsiemens/cm ,for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application:_________/_________; Return to service or removal from environment controls: _______/_______
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ (Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)
| DATE & TIME |
| ENTER ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION |
| TEMPERATURE |
| % REL. HUMIDITY |
| SIGNATURE OF INSPECTOR |
| DEW POINT |
| SURFACE |
| AMBIENT |
| ΔT |
| DP - Surface |
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ Location of Surface Profile Measurements: __________________________________________________________________
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED |
(mils)
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________ Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record. Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ Location of Surface Profile Measurements: __________________________________________________________________
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED |
(mils)
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________ Record Measurements Taken In The Spaces Provided Below, To Serve As Permanent QA record. Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.
| Reading: |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| Reading: |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| Reading: |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| Reading: |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| Reading: |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| Reading: |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| Reading: |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| Reading: |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| Reading: |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| Reading: |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings:
| By Column: |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
| __________ mils |
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ Location of Work (including frame numbers): _______________________________________ Area (square feet): ____________
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15
| DATE |
| TEST LOCATIONS |
| CONDUCTIVITY |
(microsiemens/cm)
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence) Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ Coating Manufacturer: ___________________Product Name: _______________________Batch Number: ____________ Induction Time: _______________________________________________________________ Coating System Sequence (Indicate Whether: Primer, Touch-Up Primer, Barrier Coat, 3rd Coat…): _______________________
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| AVERAGE VALUE |
*BASE METAL READING (BMR)
*Required, If Magnetic Pull-Of (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
Application Method (Airless, Conventional Spray, Rolled):____________________ Average DFT: __________________________________________________________ Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
| 52 |
| (Rev-1) |
63120_Dks_Buoy_Const_FLT REC_63120_Dks_Buoy_Const_FLT_240' WLBB (30 CGC MACKINAW) (0110
WORK ITEM 1: Decks – Exterior (Buoy), Preserve
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to preserve the Buoy Deck surfaces, designated by the COTR, including adjacent bulkhead, ladderways, and foundations shown on Coast Guard Drawing 240 WLBB 601-002 (see 4.1 (Definitions)).
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 240 WLBB 601-002, Rev B, Booklet of General Plans
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
OTHER REFERENCES
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning
3. REQUIREMENTS
3.1 Protective measures. The Contractor shall protect non-affected vessel’s equipment, components, and spaces during surface preparation and coating application procedures, as specified in SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). Specific areas/equipment/components to be protected include, but are not limited to:
· Buoy crane.
· Deck machinery.
· Buoy handling equipment.
· Deck fittings
3.2 Preservation particulars. The Contractor shall accomplish the following tasks:
3.2.1 Surface preparation. Prepare all deck surfaces designated in paragraph 1.1 (Intent), including bitt and chock foundations, machinery rack guards and machinery foundations, hatches and hatch guards, stanchion sockets, vent pipes, angle coaming area, and approximately six inches up all adjacent vertical surfaces (as applicable); by abrasive-blasting to SSPC-SP10/NACE No. 2, using grit conforming to MIL-A-22262 (1.5 to 2.5 mil anchor profile).
3.2.2 Substrate inspection. After completion surface preparation and before coating application, the Contractor shall perform a visual inspection of the prepared substrate, in the presence of the COTR. Submit a CFR.
3.2.3 Surface coating. Coat all prepared surfaces with the coating system specified for “Weather Decks (Weather Deck, Buoy Tender Working Deck)”, in COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems). Select a Gray (36231) inorganic zinc coating.
CAUTIONS!
1. Unless a containment system is used to contain surface preparation dust and debris and coating application overspray during pier side/dockside preservation, the following must be adhered to:
a. All surface preparation tools/equipment must vacuum-shrouded or close-looped systems.
b. Coatings must be applied by brushing or rolling.
2. Organic zinc coating may not be substituted for inorganic zinc for Barge Buoy Deck surfaces.
3.3 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces).
NOTE
Surfaces being preserved are considered “critical-coated surfaces”.
4. NOTES
4.1 Definitions.
4.1.1 Buoy Deck. The Buoy Deck is defined as horizontal Main Deck surfaces from between Frames 09 and 46, port and starboard
4.1.2 Deck coaming. Coaming are vertical raised sections of deck plating around an opening that provide a frame and/or deflect water, such as around a hatch or gooseneck.
63120_63120_Dks_Ext _0112_FLT REC_63120_Dks_Exterior_FLT_240' WLBB (30 CGC MACKINAW) (0211)
WORK ITEM 2: Decks - Exterior, Preserve (“Non-Skid Broadcast Grit” System)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to preserve the following exterior deck surfaces, designated by the COTR, shown on Coast Guard Drawing 240 WLBB 601-002:
· 01 Level Focsle Bullnose thr Frame 13
· 01 Level Port Weather Deck Frames 46 thr Frame 83
· 01 Level Stbd Weather Deck Frames 46 thr Frame 83
· 01 Level Port Weather Deck Frames 83 thr Frame 109
· 01 Level Stbd Weather Deck Frames 83 thr Frame 109
· 01 Level Fantail Frame 109 thr Frame 133
· 02 Level Weather Deck Frame 95 thr Frame 106
· 04 Level Port Weather Deck Frame 53 thr Frame 95
· 04 Level Starboard Weather Deck Frame 53 thr Frame 99
· 04.5 Level Weather Deck Frame 78 thr Frame 93
· 05 Level Weather Deck Frame 45 thr Frame 65
· 05 Level Weather Deck Frame 62 thr Frame 65
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 240 WLBB 601-002, Rev B, Booklet of General Plans
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 Protective measures. The Contractor shall protect non-affected vessel’s equipment, components, and spaces during surface preparation and coating application procedures, as specified in SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).. Specific areas/equipment/components to be protected include, but are not limited to:
· Adjacent vertical (beyond what is specified in paragraph 3.2.1 (System particulars)).
· Deck fittings.
· Deck equipment.
3.1.2 Surface preparation particulars. For surfaces designated for preservation, the Contractor has the option of using either high/ultrahigh pressure water Jetting or abrasive blasting to achieve the required surface preparation, prior to application of the coating system. The Contractor may add abrasives to the waterjet stream, for one or both of the following reasons:
Achieving greater productivity.
Achieving the required surface profile.
NOTES
1. Waterjetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.
2. Where abrasive blasting or waterjetting is not feasible, the Contractor may prepare surfaces designated by power tool cleaning to “Bare Metal”, to provide a minimum 1 mil anchor profile, in accordance with SSPC SP-11.
3.1.3 Substrate inspection. After completion surface preparation and before coating application, the Contractor shall perform a visual inspection of the prepared substrate, and submit a CFR.
3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):
· None.
3.2 Preservation requirements - “Nonskid Broadcast Grit” system.
3.2.1 System particulars. The Contractor shall prepare and coat the weather deck surfaces designated in paragraph 1.1 (Intent), including bitt and chock foundations, machinery rack guards and machinery foundations, hatches and hatch guards, stanchion sockets, vent pipes, angle coaming area, and approximately six inches up all adjacent vertical surfaces (as applicable); use the systems specified for “Weather Deck Non-Skid, Broadcast Grit for Steel or Aluminum (Polysiloxane Top Coat)”, in COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems).
3.2.1.1 Select “Option I”freeboard system, for the applicable metal substrate, and Gray (16099) as the finish/top coat color.
3.2.1.2 Do not apply non-skid aggregate over vertical surfaces, and the following areas:
· Within two inches of deck fittings, hatches, welds, and protrusions.
· Within six inches of deck coaming, bulkheads, and deck edges.
· Within six inches of all deck edges and bulkheads.
· Within two inches of deck foundations (two inches measured from outermost portion of foundation, for example, foundation brackets on anchor windlass).
· Over deck fittings.
· Over waterways.
· Over welds.
NOTE
The “Weather Deck Non-Skid, Broadcast Grit for Steel or Aluminum“ system, as specified in Appendix A of COMDTINST M10360.3 requires application of the “Freeboard/Superstructure” coating system before the non-skid aggregrate is applied.
3.2.3 Non-skid surface appearance and texture. The Contractor shall ensure that the non-skid surface shall show continuous and reasonably uniform profile. Aggregate shall present a rough uniformly coarse appearance over the entire surface with no loosely bound clumps of particles.
3.3 “Option II” system. If a Change Request has been authorized and released, the Contractor shall select the “the “Option II” system.
NOTE
“Option II” system may be selected for one or both of the following conditions:
a. Application during sustained ambient temperatures of 90 degree F or higher.
b. Need to compensate for deeper than normal substrate profile (in excess of 2.5 mils), or pitted surfaces (following surface preparation).
3.4 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces).
NOTE AND CAUTION!
1. Surfaces being preserved are considered “critical-coated surfaces”.
2. Unless a containment system is used to contain surface preparation dust and debris and coating application overspray during pier side/dockside preservation, the following must be adhered to:
a. All surface preparation tools/equipment must vacuum-shrouded.
b. Coatings must be applied by brushing or rolling.
4. NOTES
4.1 Definition of coaming. Vertical raised sections of deck plating around an opening that provide a frame and/or deflect water, such as around a hatch or gooseneck.
63140_BuoyPort_0210_FLT REC_63140_BuoyPort _240' WLBB (30 CGC MACKINAW) (0210)
WORK ITEM 3: Hull Plating (Buoy Port Areas), Preserve
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to prepare and coat the buoy working areas, designated by the COTR, shown on Coast Guard Drawing 240 WLBB 601-002 (see 4.1 (Definition of Buoy Port)).
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 240 WLBB 601-002, Rev B, Booklet of General Plans
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
OTHER REFERENCES
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating
3. REQUIREMENTS
3.1 General.
3.1.2 Protective measures. The Contractor shall protect non-affected vessel’s equipment, components, and spaces during surface preparation and coating application procedures, as specified in SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). Specific areas/equipment/components to be protected include, but are not limited to:
· Areas where underwater body coating system interfaces with freeboard coating system (unless u/w body surfaces are also being preserved).
· Adjacent deck surfaces and deck fittings.
· Liferings
· P-6/P-100 pumps
· Handrails
· Deck equipment
3.1.3 Surface preparation optional methods. The Contractor has the option of using either high/ultrahigh pressure water Jetting or abrasive blasting to achieve the required surface preparation, prior to application of the coating system specified in 3.2 (Preservation requirements). The Contractor may add abrasives to the waterjet stream, for one or both of the following reasons:
· Achieving greater productivity.
· Achieving the required surface profile.
NOTE
Waterjetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.
3.2 Preservation particulars. The Contractor shall accomplish the following tasks:
3.2.1 Pre-surface preparation wash. Accomplish low-pressure (less than 5,000 psi) fresh water wash of all affected surfaces, to remove soluble chlorides and other surface contaminants. Collect wash water for proper disposal in accordance with all Federal, state and local regulations.
3.2.2 Surface preparation.
3.2.2.1 Prepare areas, as designated by the COTR (where there is evidence of coating failure) by waterjetting to a SSPC-SP 12/NACE No. 5, WJ-2/L standard, or by one or a combination of the following surface preparation methods:
| ABRASIVE BLASTING |
| MECHANICAL CLEANING |
| Abrasive-blasting to SSPC-SP10/NACE No. 2, using grit conforming to MIL-A-22262 (1.5 to 2.5 mil anchor profile). |
| Power too cleaning to a SSPC-SP 11 (1.0 mil anchor profile). |
3.2.2.2 Roughen/abrade all remaining surfaces where existing top coating is intact, by sweep-blasting or using 100-grit paper, to de-gloss the top-coating and produce a suitable surface profile to allow proper adhesion of a new top coating.
3.2.2.3 Feather edges of top-coating into adjacent bare areas, to create a smooth transition.
NOTES
1. A profile suitable for overcoating would be similar to what is produced by abrading the coating with 100-grit paper.
2. Waterjetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.
3.2.3 Post-surface preparation cleaning. Perform solvent cleaning of all prepared surfaces, in accordance with SSPC-SP 1, prior to coating application. Collect all debris from solvent cleaning for proper disposal.
3.2.4 Coating application.
3.2.4.1 Spot coat all bare steel surfaces with a “Polysiloxane Epoxy Primer/Mid-Coat” coating, to a thickness matching that of existing adjacent undercoating, ensuring that the primer coating extends over the feathered edges of the sound/intact coating, to minimize edge lifting and provide a better appearance.
3.2.4.2 Overcoat all primed and abraded surfaces, with an “Epoxy Polysiloxane” coating, Red (11101) to ensure a uniform thickness throughout, over all freeboard surfaces.
3.3 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces).
NOTE
Surfaces being preserved are considered “critical-coated surfaces”.
3.4 Repair of un-intended damages. The Contractor shall repair all damages, including overspray, incurred to surfaces not covered by the scope of this work item, during surface preparation and paint application procedures.
4. NOTES
4.1 Definition of Buoy Port. The Buoy Port areas are defined as freeboard surfaces between frames 15 and 26, port and starboard, from the deck level down to the top of the boot-topping; and all inboard surfaces of the gunwale.
63140_1210_FLT
REC_63140_FLT_100%_240' WLBB (30 CGC MACKINAW) (0210)
WORK ITEM 4: Hull Plating Freeboard, (Level 2) Preserve
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to preserve the freeboard surfaces, designated by the COTR, (see 4.1 (Definition of freeboard surfaces)).
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 240 WLBB 601-002, Rev B, Booklet of General Plans Coast Guard Fleet Drawing FL 2804-11, Rev D, Visual ID Numeral & Letter for Ships Coast Guard Fleet Drawing FL 2804-12, Rev-, U.S.C.G. Emblem Coast Guard Drawing FL 2804-13, Rev G, Visual ID Kit Sched Coast Guard Drawing FL 2804-15, Rev-, Draft Figs
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures. The Contractor shall protect non-affected vessel’s equipment, components, and spaces during surface preparation and coating application procedures, as specified in SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). Specific areas/equipment/components to be protected include, but are not limited to:
· Areas where underwater body coating system interfaces with freeboard coating system (unless u/w body surfaces are also being preserved).
· Adjacent deck surfaces and deck fittings.
· Liferails.
· Vents.
· Bulkheads.
· Vent intakes.
· Deck equipment
3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):
· Locking fenders.
3.1.5 Initial inspection. Prior to removing the existing coating system, the Contractor shall inspect and verify whether or not all hull identification numbers and letters have permanent markings (weld beads or impressions), showing their location on the hull. Submit a CFR.
3.1.6 Surface preparation particulars. For surfaces designated for preservation, the Contractor has the option of using either high/ultrahigh pressure water Jetting or abrasive blasting to achieve the required surface preparation, prior to application of the coating system. The Contractor may add abrasives to the waterjet stream, for one or both of the following reasons:
Achieving greater productivity.
Achieving the required surface profile.
NOTES
1. Waterjetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.
2. Where abrasive blasting or waterjetting is not feasible, the Contractor may prepare surfaces designated by power tool cleaning to “Bare Metal”, to provide a minimum 1 mil anchor profile, in accordance with SSPC SP-11.
3.1.7 Substrate inspection. After completion surface preparation and before coating application, the Contractor shall perform a visual inspection of the prepared substrate, and submit a CFR.
3.2 Preservation requirements. The Contractor shall accomplish the following tasks:
3.2.1 System particulars. Prepare and coat 100% of the freeboard surfaces as designated in paragraph 1.1 (Intent) with the system specified for “Freeboard/Superstructure/Mast (Freeboard/Superstructure)” in Appendix A (Cutter and Boat Exterior Painting Systems) of COMDTINST M10360.3. Select the following:
· “Option I” or “Option II” system, for the applicable metal substrate or as designated by the COTR.
· Red (11105), as the top/finish coat color..
3.2.2 Visual identification markings. Paint all distinctive visual identification markings, including the Coast Guard diagonal stripes, "U.S. COAST GUARD" legends, hull numbers, and draft marks in accordance with COMDTINST M10360.3, Chapter 12 (Cutter and boat identification markings, and Coast Guard Drawings FL-2804-11, FL 2804-12, FL-2804-13, and FL 2804-15 (as applicable). Use the same topcoating material as used on the rest of the freeboard surfaces, in the required colors.
NOTE
Coast Guard Emblem decals may be substituted for painted emblems. Vinyl adhesive letters and numbers may also be substituted for painted letters and numbers - at the Contractor’s discretion. Although there may be several possible procurement sources for the Coast Guard Emblem decals and vinyl adhesive letters and numbers, one known source is:
Brace Enterprises 10250 SE 138 Terrace Dunnellon, FL 34431 352-489-4442 / Fax: 35-489-4476 www.braceenterprise.com
3.3 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces).
NOTE
Surfaces being preserved are considered “critical-coated surfaces”.
3.4 Repair of un-intended damages. The Contractor shall repair all damages, including overspray, incurred to surfaces not covered by the scope of this work item, during surface preparation and paint application procedures.
4. NOTES
4.1 Definition of freeboard surfaces. For the purposes of this item the freeboard is defined as exterior steel hull surfaces from the upper limit of the boot-topping to the top of the bulwark, including lifeline stanchions, as shown on . Coast Guard Drawing 240 WLBB 601-002.
63140_DLA_1209_PARTIAL_FLT
REC_63140_FLT_PARTIAL_240' WLBB (30 CGC MACKINAW) (0110)
WORK ITEM 5: Hull Plating Freeboard, (Level 1) Preserve
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform preservation of the freeboard surfaces, designated by the COTR, (see 4.1 (Definition of freeboard surfaces)).
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 240…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .