Attachment_2_Price_Schedule_Instructions.doc
DOC document 28 KB Posted
- Attached to
- Manufacturing and Delivery of Steel Ocean Buoys
- Solicitation number
- HSCG84-17-R-BHQ001
About this file
Pricing Sheet Instructions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0002_w_attachments.pdf | ||
| Amendment_0001_with_Attach_58_Replacement_Page_1.pdf | ||
| Attachment_1_Price_Schedule_w_EPA_Adjust.xls | XLS spreadsheet | |
| Drawings_and_Specifications.zip | ZIP file | |
| Attachment_57_Delivery_Locations.doc | DOC document | |
| Attachment_55_DHS_700-21_Form.pdf | ||
| Attachment_56_DD_250_Form.pdf | ||
| Solicitation_HSCG84-17-R-BHQ001.pdf | ||
| Attachment_58_Past_Performance_Questionnaire.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 56
PRICE SCHEDULE INSTRUCTIONS
1. The offeror shall complete the Price Schedule (attachment 57) which includes tabs for each performance period (Base Period – Option Period Four) and submit with their completed offer.
2. The offeror shall provide a “Unit Price” for all items. Although formulas to calculate the “Estimated Amounts” and the “Estimated Grand Totals” are in the Excel spreadsheet, please double check that the calculations are correct before submitting a proposal.
3. For each CLIN/item, the offeror shall provide the amount of the portion of the unit price that is subject to one of the EPA Clauses in the columns labeled “Portion of the Unit Price Subject to the EPA”.
Buoys and related product CLINs are subject to the EPA Clause for Steel.
Transportation CLINs are subject to the EPA Clause for Fuel.
For purposes of submitting an offer, the “Portion of the Unit Price Subject to the EPA” should be the same amount for the same item for all performance periods (Base Period – Option Period 4).
Example: If the “Portion of the Unit Price Subject to the EPA” for CLIN 00001AA, Lighted, Whistle, Radar Reflector Buoy, (9x35 LWR) is $100 for the Base Period, then the price should be $100 for each Option Period CLIN for the same item (CLINs 10001AA through 40001AA).
4. The completed/awarded price schedule will be incorporated into Section B.6 of the contract upon award.
File details come from the government source that posted it. Updated .