Amendment 00001 - Questions and Answers

View the file

Other files

File Type Posted
Schedule_of_Suppliesservices-2013-2018.xls XLS spreadsheet
QA_-_SF30-Amend-2.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1.CONTRACT ID CODE

PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO.

AMENDMENT 00001

3. EFFECTIVE DATE

01/25/2013

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable)

6 . ISSUED BY CODE|____________

USCG SILC

Coast Guard Island Bldg. 54-C

Alameda, CA 94501-5100

7. ADMINISTERED BY (If other than Item 6) CODE|__________________

Same as Issued By

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) To all interested Parties

(()
9a. AMENDMENT OF SOLICITATION NO.

9.

10.

9b. DATED (SEE ITEM 11)

11.

10a. MODIFICATION OF CONTRACT/ORDER

NO.

HSCG84-13-R-B13029

12.

10b. DATED (SEE ITEM 13) 01/08/2013

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITAITONS

FORMCHECKBOX

The above numbered solicitation is amended as set forth in item 14. The hour and date for receipt of Offers ( is extended, FORMCHECKBOX is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a). By completing Items 8 and 15, and returning __1___ copies of the amendment, (b) By acknowledging receipt of this amendment on your copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF ACKNOWLEGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM AP[LIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(()
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, ect.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.

C.. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D.. OTHER (Specify type of modification and authority)

E. IMPORTANT: CONTRACTOR ( is not ( is required to sign this document and return _____copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

TITLE: Overhaul and Outfitting of Aids to Navigation (a/n) Buoys The purpose of this amendment is to respond to questions received prior to the deadline, 25 January 2013 as indicated in the subject solicitation, page 1, Notice to Offerors.

Continued on page 2 Except as provided herein, all terms and conditions of the document referenced in item 9A or 10a, as heretofore changed, remains unchanged and in full force and effect

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED
16B. UNITED STATES OF AMERICA

BY ________________________________________

(Signature of Contracting Officer) 16c. DATE SIGNED

NSN 7540-01-152-8070

STANDARD FORM 30 (rev. 10-83)

PREVIOUS EDITION UNUSABLE

Prescribed by GSA

FAR (48 CFR) 52.243

Amendment 00001

Continuation page 2 of 3 Question 1: Does the Buy American Act apply to this solicitation?

Answer: No

Question 2: Are Tapper, Counterweights and Swing Bolts Government Furnished Equipment (GFE)?

Answer: Tappers & swing bolts are GFE; counterweights would be if we were to replace one.

Question 3: How long does it take to unload/load a truck?

Answer: Loading and unloading can take between 2 – 4 hours but typically 2 hours.

Deliveries and Pick-ups are normally schedule in advance to ensure enough time is allotted.

Question 4: How clean will the Buoys be upon receipt – Marine life, bird droppings, etc?

Answer: Buoys will be pressure washed & scraped to remove marine growth, this includes the whistle tube you may see small patches of shells.

Question 5: Are the option years mandatory; can the contractor opt not to exercise an option year?

Answer: No, options are solely at the discretion of the Government, provided the Government gives the Contractor a preliminary written notice of its intent to extend.

Question 6: Where are the specific instruction for Volume II Pricing?

Answer: Page 83 and 84, no page limits, original plus one with cover sheet clearly marked Volume II Question 7: After reviewing the link with the drawings for the buoys, I realized that two drawings were missing. They are as follows:

121151 REV E

9X35 LR BOUY ASSEMBLY

121125 REV F

1992 TYPE 6X20 LR BOUY

Please respond with whether or not we are supposed to go off of another drawing, and if so, which one? If not, when and where will these two drawings be available?

Answer: 121151 Rev E 9x35LWR buoy is now showing as Rev F which will still work for purpose of this contract. The second number identified above is incorrect (not incorrect in the solicitation) and should be 121152 and is there.

Question 8: Transportation Line Items: Should these be considered as round trip or one way only?

Answer: One way only; could be either a pick-up or drop-off and will be indentified in the task order.

Amendment 00001

Continuation page 3 of 3 Question 9: Do truck drivers require Transportation Workers Identification Cards (TWIC)

Answer: No; however, the Contractor is required to maintain current insurance coverage throughout the life of this contract and all transportation must meet all applicable Local, State and Federal regulations.

Question 10: Is there a provision for cost escalations for fuel/transportation/materials/supplies on multiyear options?

Answer: No

Question 11: Section C-2.4.1 LEAD PAINT requires the Contractor to perform testing on each buoy to determine lead content.

A. What specific test is required?

B. What is the Action Level if some lead is detected?

Answer: A. The Contractor is required to comply with all Federal, State and Local laws and regulations with regards to required testing methods and allowable levels for lead.

B. If lead is found, the Contractor shall immediately notify the COR or Contracting Officer and stop all work on that buoy until further direction is received.

Question 12: Will the Coast Guard make available to the Contractor design drawings necessary to fabricate buoy handling devices to duplicate what is used by the USCG?

Answer: There are no drawings for buoy handling devices, “dollies" but CG would provide all dimensions and photos needed so that one could be fabricated.