Amendment 0002 - REPOST.doc
DOC document 55 KB Posted
- Attached to
- Steel Ocean Buoys for USCG
- Solicitation number
- HSCG84-12-R-BHQ002
About this file
Amendment 2 - Reposted due to Administrative Error - Time for Receipt of Proposals has been extended - 21 June 2012.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach1toAmend3Attachment 10 EPA Tables Steel and Diesel-Revised.doc | DOC document | |
| Amendment 0003.doc | DOC document | |
| Attachment 1 to Amend 2.pdf | ||
| Amendment 0001.doc | DOC document | |
| Section B HSCG8412RBHQ002 for Proposal Volume III.xls | XLS spreadsheet | |
| RFP HSCG8412RBHQ002 Amendment 0001.pdf | ||
| Attachment 11 Past Performance Questionnaire.doc | DOC document | |
| Attachment 4 Spec 362-G.pdf | ||
| Attachment 13 Delivery Locations.pdf | ||
| Attachment 12 Past Performance Information Form.doc | DOC document | |
| Attachment 9. DD 1423.pdf | ||
| Attachment 2 Spec 357-D.pdf | ||
| Attachment 8 DD Form 250.pdf | ||
| Attachment 11 Past Performance Questionnaire.doc | DOC document | |
| Attachment 10 EPA Tables Steel and Diesel.doc | DOC document | |
| Attachment 7 CG Engineering Drawings.pdf | ||
| Attachment 1 Spec 464-J.pdf | ||
| Attachment 3 Spec 360-H.pdf | ||
| Attachment 6 Spec 460-I.pdf | ||
| RFP HSCG8412RBHQ002.pdf | ||
| Attachment 5 Spec 374-E.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE
| PAGE |
| OF PAGES |
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1 |
| 2 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| Amendment 0002 |
| 06/13/2012 |
| 6. ISSUED BY |
| CODE |
| 84 |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
| 84 |
Department of Homeland Security
United States Coast Guard
Shore Infrastructure Logistics Center, PCB-4
300 East Main Street, Suite 965
Norfolk, VA 23510-9112
Same as Item 6 POC: Emely Hagins (510) 437-3057 E-mail: Emely.Hagins@uscg.mil
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
HSCG84-12-R-BHQ002
| X |
| 9B. DATED (SEE ITEM 11) |
05/16/2012
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for Receipt of Offers FORMCHECKBOX is extended / FORMCHECKBOX is not extended.
Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning one copy(s) of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| CHECK ONE |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A. |
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor FORMCHECKBOX is not / FORMCHECKBOX is required to sign this document and return ___ copy(s) to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
NOTE: AMENDMENT 2 IS BEING REPOSTED DUE TO AN ADMINSTRATIVE ERROR – ADDITIONALLY, QUESTIONS 4 AND 5 HAVE BEEN ADDED Amendment 0002 is issued to answer questions received in response to the solicitation:
Question 1 - Can you provide photographs of the molds that the Government will be supplying for the fabrication of the bells and gongs?
Answer – At this time no pictures are available for viewing.
Continued on page 2
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
BY:
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
STANDARD FORM 30 (REV. 10-83) PREVIOUS EDITION UNUSABLE
Prescribed by GSA, FAR (48 CFR) 53.243
HSCG84-12-R-BHQ002
Amendment 00002
Continuation page 2 of 2
Continued
Question 2 – Can you list the buoys that will require bells and gongs?
Answer - The Bell or Gong is only required on 9x20BR/GR buoys (CLINS 00001AC & 00001AD etc).
Question 3 -In the specification 464J for the steel ocean buoys, section 3.3.3.1 External Counterweights, it calls for a "hot-applied asphalt enamel". Is there a substitution acceptable for this product?
Answer – Yes, it is also known as "Roofing Asphalt" and is available in the United States.
Question 4 - On the Buoy drawings, example DWG 121137, 121130, 121188, 121131, the assembly drawing shows the tower assembly and references another drawing, yet the tower assembly is not listed in the bill of materials list like the other drawing references, (121153, 121140 examples).Are the towers to be included in the assembly?
Answer - Yes the tower assembly is to be included in the assembly.
Question 5 – Drawing 120316 is missing from the pile. It is required for the NUN (LNR) Buoys. Can you please provide a copy?
Answer: Yes, see attachment 1 to this amendment.
Due date and time of Proposals has been extended to 21 June 2012 as a result of this amendment.