General Decision NumberVA 15.doc

DOC document 49 KB Posted

Attached to
PORTSMOUTH, VA; REPLACE/SEAL COAT UPH ROOF
Solicitation number
HSCG83-09-B3WG158
Issued by

View the file

Other files

File Type Posted
Bid Results3WG158.xls XLS spreadsheet
RVALUE INSULATION CLARIFICATION.pdf PDF
SPECS 07142 CLARIFICATION.pdf PDF
C7633A02.tif TIF image
C7633A01.tif TIF image
C7633X.doc DOC document
C7633A03.tif TIF image
UPH ROOF FINAL SOL.doc DOC document
C7633G01.tif TIF image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: VA080015 07/03/2009 VA15

Superseded General Decision Number: VA20070015

State: Virginia

Construction Type: Building

Counties: Chesapeake*, Norfolk*, Portsmouth*, Suffolk* and

Virginia Beach* Counties in Virginia.

*INDEPENDENT CITIES

BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories)

Modification Number Publication Date

0 02/08/2008

1 02/15/2008

2 03/07/2008

3 05/02/2008

4 05/16/2008

5 07/04/2008

6 08/29/2008

7 01/09/2009

8 05/01/2009

9 07/03/2009

BRVA0001-001 07/01/2008

Rates Fringes

BRICKLAYER.......................$ 21.26 6.86

CARP0613-005 05/01/2006

Rates Fringes

Carpenters (Including Drywall

Hanging, Acoustical Ceiling and Formsetting).................$ 18.85 5.29+2%

* ELEC0080-002 03/01/2009

Rates Fringes

Electricians.....................$ 23.05 12.5%+5.00+a

a. Workmen shall take off 2 hours with pay, at the discretion of the employer, on State and National Election days;

Tuesday following the first Monday in November, provided they are qualified and vote.

ELEV0052-001 01/01/2009

Rates Fringes

ELEVATOR MECHANIC................$ 32.73 18.285+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

b. VACATIONS: 6% men under 5 (five) years based on regular hourly rate and 8% men over 5 (five) years based on regular hourly rate for all hours worked.

ENGI0147-019 05/01/2008

Rates Fringes

Power equipment operator -forklift.........................$ 20.88 8.69%+5.10

IRON0079-003 05/01/2009

Rates Fringes

Ironworker, reinforcing and structural.......................$ 23.40 6.5%+9.72

LABO0388-001 03/01/2006

Rates Fringes

Mason tender, brick..............$ 13.20 3.30

PAIN0051-013 06/01/2008

Rates Fringes

Painters, Brush and Roller

(Including Drywall Finishing)....$ 17.42 7.56

PLUM0110-003 05/01/2008

Rates Fringes

Plumbers and Pipefitters.........$ 23.10 13.10

SUVA2002-001 11/15/2002

Rates Fringes

Cement Mason/Finisher............$ 13.79 0.61

Laborers:

Fence Erectors..............$ 12.93 2.25

Mason Tenders, Cement.......$ 8.50 0.24

Pipelayers..................$ 10.91 0.79

Unskilled Laborers..........$ 8.71

Power equipment operators:

Backhoes....................$ 13.27

Bulldozers..................$ 15.00 0.73

Cranes......................$ 17.33

Graders.....................$ 10.00

Roofers..........................$ 12.65 0.59

Sheet Metal Worker...............$ 14.00 0.97

Truck drivers

2 Axle......................$ 12.00 1.25

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .