Specifications.pdf

PDF 438 KB Posted

Attached to
REPAIR WHARF RAMP AT USCG STATION NEW ORLEAN, LA
Solicitation number
HSCG82-17-Q-PMV101
Issued by

View the file

Other files

File Type Posted
AMENDMENT_0001.pdf PDF
SF18.pdf PDF
REF1.pdf PDF
REF3.pdf PDF
Drawings.pdf PDF
REF2.pdf PDF
REF4.pdf PDF
RFQ_Construction.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

FOR

REPAIR WHARF RAMP

AT

U.S.C.G. STATION NEW ORLEANS

LOUISIANA

PROJECT No. 6071974 November 2016

COMMANDING OFFICER, CIVIL ENGINEERING UNIT MIAMI

15608 S.W. 117TH AVENUE

MIAMI, FLORIDA

33177

TABLE OF CONTENTS

TITLE PAGES

DIVISION 1 – GENERAL REQUIREMENTS

Section 01 11 00 – General Paragraphs 011100-1 thru 011100-3 Section 01 32 00 – Progress Schedule 013200-1 thru 013200-3 Section 01 33 00 – Submittals 013300-1 thru 013300-2 Section 01 57 19 – Temporary Environmental Controls 015719-1 thru 015719-4

DIVISION 2 – EXISTING CONDITION

Section 02 41 00 – Demolition 024100-1 thru 024100-5

DIVISION 3 – CONCRETE

Section 03 20 01 – Concrete Reinforcement 032001-1 thru 032001-2 Section 03 33 00 – Cast-In-Place Concrete 033300-1 thru 033300-5

DIVISION 4 THRU 30 – NOT USED

DIVISION 31 – EARTHWORK

Section 31 23 00 – Excavation and Fill 312300-1 thru 312300-7

DIVISION 32 – EXTERIOR IMPROVEMENTS

Section 32 01 19 – Pavement Joint Sealant 320119-1 thru 320119-2 Section 32 11 23 – Graded-Crushed Aggregate Base Course 321123-1 thru 321123-3 Section 32 12 16 – Hot-Mix Asphalt (HMA) For Roads 321216-1 thru 321216-10

DIVISION 34 – NOT USED

DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION

Section 35 59 13 - Precast Prestressed Concrete Piles 355913-1 thru 355913-11

DIVISION 36 THRU 48 – NOT USED

DIVISION 1 GENERAL REQUIREMENTS

SECTION 01 11 00 – PAGE 1 1/18/2017

SECTION 011100

GENERAL REQUIREMENTS

1 GENERAL

1.1 GENERAL DESCRIPTION

The Contractor shall furnish all labor, tools, equipment, material, and supervision to perform the following work at Station New Orleans, Metairie, Louisiana. Replace an existing approach slab with a concrete, pile supported approach ramp and repair the entrance ramp adjacent to the multipurpose building .

1.2 LOCATION

The work shall be located at Coast Guard Station New Orleans, Metairie, Louisiana.

1.3 INSPECTION PRIOR TO BID

Prospective bidders are encouraged to visit the site to familiarize themselves with the existing conditions. Since the site is secured, prior arrangements for site visits should be made by contacting:

Officer in Charge USCG Station New Orleans 201 Old Hammond Highway Metairie, Louisiana 70005 Attention:

MK1 William Ezard, Engineering Petty Officer Telephone: (504) 846-6183

1.4 DRAWINGS ACCOMPANYING SPECIFICATIONS

Drawings to be used in conjunction with these specifications are listed below. The drawings are the property of the Government and shall not be used for any purpose other than that contemplated by the specification.

USCG Drawing No. M2160-D in 5 sheets.

1.5 REFERENCE DRAWINGS

The following drawings are provided as reference drawings for the purpose of indicating the original design of the existing facility. Work indicated on these drawings is not included in this project. No guarantee is offered of the accuracy to which these drawings represent the current existing or as-built conditions. All conditions indicated must be verified in the field before materials are ordered or work begun.

USCG Drawing No. 08-X3995 dated 07/12/99: C-15, C-20 C-53, C-55 of 215 sheets.

1.6 PROJECT PERFORMANCE TIME

After work begins at the site, the Contractor shall work continuously during normal working hours and show daily progress until all work is complete. The total contract performance period shall be 90 calendar days, which includes the time needed to approve all material submittals

SECTION 01 11 00 – PAGE 2 11/23/2016

1.7 SAFETY PROGRAM

1.7.1 General

The Contractor is wholly responsible for work site safety. The Contractor shall implement a safety program that protects the lives and health of personnel in the construction area, prevents damage to property and avoids work interruptions. The Contractor shall provide appropriate safety measures including but not limited to barricades, signs and signal lights as well as complying with the requirements of all applicable Federal, State and Local safety laws, rules and regulations.

1.7.2 Compliance

The Contractor is specifically required to comply with the requirements of the U. S. Army Corps of Engineers "Safety and Health Requirements Manual" (EM 385-1-1, latest version available) and the "Accident Prevention" clause (FAR 52.236-13). Once accepted, this safety plan shall become part of the contract requirements. Note: This review/acceptance does not in any way relinquish the Contractor from responsibility for work site safety nor the obligation to comply with the OSHA regulations found in 29 CFR 1910 & 1926 or any other State or Local safety law, rule or regulation applicable to the contract work. The Coast Guard will cooperate fully with the Department of Labor (Occupational Safety and Health Administration) in their enforcement of OSHA regulations.

1.7.3 Safety Plan

The Contractor shall submit a written safety plan within seven (7) calendar days following contract award. At a minimum, this plan shall describe the Contractor's general safety program and identify specific safety provisions for hazards incidental to the contract work such as elevated working surfaces, working over water, working from floating work platforms, overhead crane operations or similar conditions of the work. This Safety Plan shall be approved prior to commencing any work on site."

1.8 CONTROLS

Vertical control shall be based upon benchmark located southwest of the boat basin, at a point where Hammond Highway crosses over 17th St Canal, Benchmark H 188 1963. Elevation 7.89 feet NGVD.

Elevations on the drawings are referenced to National Geodetic Vertical Datum (NGVD) 1929 in feet based on the present tidal epoch (1983-2001).

1.9 AVAILABILITY OF UTILITY SERVICES

The Contractor shall pay all costs incurred in connecting, converting, and transferring the utilities to the work. Temporary toilet facilities, in accordance with applicable codes and health ordinances, shall be provided and maintained by the Contractor for the use of Contractor’s personnel.

1.10 SUBMITTALS

Government approval is required for submittals. The following shall be submitted in accordance with Section 01 33 00 SUBMITTALS:

a) Safety Plan

b) Personnel List

c) Final Inspection Request

1.11 WORK COORDINATION

SECTION 01 11 00 – PAGE 3 11/23/2016

The Contractor shall closely coordinate all work with the Contracting Officer's Representative (COR) in order to reduce to a minimum disturbances to personnel and operations. Provide at least two working days notice to the COR prior to any request needing coordination with the unit.

1.12 CONTRACTOR USE OF PREMISES

The Contractor will be working on a Coast Guard operational military installation. Become familiar with and obey Base, traffic, and security regulations. Personnel shall not stray from the immediate area of work nor direct avenues of ingress and egress unless authorized in advance by the COR.

1.13 STORAGE AREA

The Contractor will be provided a storage area in a location determined by the COR. The storage area shall not be used for excavation operations or stockpiling material. The Contractor shall be responsible for restoring the area to its original condition at the completion of the work. The Contractor shall be responsible for repair of any damage incurred to buildings or pavement as a result of storage activities.

New sod shall be provided to repair turf areas damaged by he Contractor’s activities.

1.14 CLEANUP

The Contractor shall keep the work area, including storage area, free from accumulations of waste materials on a daily basis and comply with all federal, state and local regulations pertaining to the storage, transport and disposal of wastes. The Contractor shall not use Coast Guard waste disposal facilities including garbage cans, trash piles or dumpsters. The Contractor shall remove all debris at the disposal site which accumulated during his work.

1.15 STORM PROTECTION

Should warnings of winds of gale force or stronger be issued, the Contractor shall take every practicable precaution to minimize danger to person, the work, and to adjacent property. Precautions shall include, but not be limited to, closing all openings, removing all loose materials, tools and equipment from exposed locations, anchoring and tying down barge, and removing or securing scaffolding and other temporary work.

1.16 RECEIPT OF MATERIALS

Shipment of equipment, materials, and supplies shall be addressed to the Contractor - not the Government. The Contractor must be on hand to accept shipments; the Government will not accept shipments.

1.17 SECURITY

1.17.1 Personnel

The Contractor shall provide the COR with a list of names of all personnel who will be working on the site. The Contractor shall submit a revised list at any time during the project. Only personnel on the approved listing will be allowed on the secured site.

1.17.2 Identification

All personnel shall carry proper identification (ID) when on site. Proper ID is defined as government issued ID with picture. The identification must be laminated, and show a facial picture of the individual.

Individuals without proper ID will be escorted off the Coast Guard premises.

1.18 WARRANTIES

SECTION 01 11 00 – PAGE 4 11/23/2016

All warranties and/or guarantees, either implied or expressed, for individual equipment shall be endorsed to the Government.

1.19 RECORD DRAWINGS

The Contractor shall maintain at the job site two sets of full size contract drawings marked to show any deviations which have been made from the contract drawings, including buried or concealed construction and utility features which are revealed during the course of construction. These drawings shall be available for review by the COR at all times. Upon completion of the work, the marked sets of prints shall be delivered to the COR. Request for final payment will not be approved until the marked prints are delivered to the Contracting Officer.

1.20 FINAL INSPECTION AND ACCEPTANCE

When the work is complete and ready for final inspection, submit a written request for final inspection to the Contracting Officer at least 10 working days in advance of the date of final inspection. Final inspection will not be scheduled until all submittals have been approved.

-- End of Section --

SECTION 01 32 00 – PAGE 1

SECTION 01 32 00

PROGRESS SCHEDULE

Prepare a Gantt chart for the progress schedule using a time scale. The project should be divided and subdivided into a sufficient number of work activities that can accurately graphically display the work sequence, activity duration, interplay of activities, and dollar value of each activity.

1.1 RESPONSIBILITY

The Contractor is responsible for executing the work within the time stated in the contract.

1.2 SUBMITTALS

1.2.1 Final Progress Schedule

Submit final progress schedule no later than 5 calendar days after receiving the Notice To Proceed (NTP). A draft schedule is to be submitted before the preconstruction conference with time periods shown but without dates of NTP and completion shown. Once a NTP date has been established, the dates are to be filled in. By having the draft schedule at the preconstruction conference, the Contracting Officer and Contractor can discuss any apparent inconsistencies or omissions, and approval can be expedited.

1.2.2 Updated Progress Schedule

Submit updated progress schedule every month along with the request for payment.

2 PRODUCTS

2.1 PROGRESS SCHEDULE

Progress schedule shall have project name, location, contract number, and company name. The final progress schedule, with the NTP and completion dates filled in, shall be signed.

2.1.1 At the left side of the form, list in columns.

a. Activity Number and Description - At a minimum, break down the project into 10 activities. If enough detail is given on the progress schedule, then the activity breakdown may be done at the Contracting Officer's discretion. Activities can be of various origins (i.e. by specification section, by logical sequence of work, by breakdown used for bid estimates, etc.)

b. Specification Section Reference - This is optional. Use only if the breakdown of activities directly correlates with the specification sections.

c. The Activities Percentage (i.e. 50%) or Weight (i.e..5) of the entire contract based on Dollar Value -the cumulative percentage should add up to 100 percent.

d. Estimated Value of the Activity - Profit and overhead should be distributed throughout activities or listed as a separate line item and distributed over the entire length of the project. The total values should add to the contract amount.

2.1.2 Top of Form

SECTION 01 32 00 – PAGE 2

Establish the time schedule across the top of the sheet for the entire project duration. Divide the project into months, weeks, or days depending on the length of the project and an appropriate time scale.

2.1.3 General

Lay out a bar graph opposite each activity, corresponding to the schedule start date and extended for the scheduled duration of the activity. Indicate the percentage of the activity which you intend to complete each week above or below each bar.

3 EXECUTION

3.1 UPDATING SCHEDULE

Update and submit progress schedule every month with progress payment showing actual progress.

Updated progress schedules shall include the original information and an updated actual progress curve using a broken line.

3.2 DELAYS

If the Contractor knows or has reason to believe that the delivery of any material or equipment, the shortage of qualified labor, delays caused by others, or the occurrence of any other difficulty may cause delay in executing the work as scheduled. He shall notify the Contracting Officer, in writing, within 3 calendar days.

3.3 SAMPLE CHART

A sample progress chart is shown on the following page. This should only be used as a guide. It displays the type of information which should be included in the submitted progress schedules.

SECTION 01 32 00 – PAGE 3

SECTION 01 33 00 – PAGE 1

SECTION 01 33 00

SUBMITTALS

PART 1 - GENERAL

1.1 SUBMITTALS REQUIRED

Items to be submitted are specified in each applicable Section of this specification. Submittals shall be approved before procurement, fabrication, or delivery of items to the job site. Partial submittals will not be acceptable and will be returned without review. Submittals shall include the size, layout dimensions, capacity, project specification and paragraph reference, applicable Federal, Military, industry and technical society publication references, and other information necessary to establish contract compliance of each item the Contractor proposes to furnish. The contractor shall indicate in the submittal which item(s) they are submitting.

1.2 TIMING OF SUBMITTALS

Submittals will be reviewed by the Contracting Officer and returned to the Contractor within 10 working days after receipt by the Contracting Officer.

1.3 DEFINITION

Contractor shall review individual sections for special submittal requirements and applicable publications relating to submittals, typical submittal types, and numbers of each required.

1.3.1 Certified Test Reports (1 electronic copy)

Before delivery of equipment, certified copies of all test reports specified in the individual sections shall be submitted for approval.

1.3.2 Certificates of Conformance (1 electronic copy)

Submit certification from the manufacturer attesting that equipment to be furnished for this project conform to the requirements of this specification and of the referenced publications. Pre-printed certifications will not be acceptable; certifications shall be in the original. The certification shall not contain statements that could be interpreted to imply that the product does not meet all requirements specified, such as "as good as"; "achieve the same end use and results as materials formulated in accordance with the referenced publications"; "equal or exceed the service and performance of the specified materials". The certification shall simply state that the product conforms to the requirements specified.

1.3.3 Standards Compliance (1 electronic copy)

When equipment must conform to the standards of organizations such as the American National Standards Institute (ANSI), American Society for Testing and Materials (ASTM), and Underwriters Laboratories (UL), proof of such conformance shall be submitted to the Contracting Officer for approval. If an organization uses a label or listing to indicate compliance with a particular standard, the label or listing, the Contractor shall submit a certificate from an independent testing organization, which is competent to perform acceptable tests and is approved by the Contracting Officer. The certificate shall state that the item has been tested in accordance with the specified organization's test methods and that the item conforms to the specified organization's standard. For equipment whose compliance with organizational standards or specifications is not regulated by an organization using its own listing or label as proof of compliance, a certificate of compliance from the manufacturer shall be submitted for approval. The certificate shall identify the manufacturer, the product, and the referenced standard and shall simply state that the manufacturer certifies that the product conforms to all requirements of the project specification and of the referenced standards listed.

SECTION 01 57 19 – PAGE 1 11/23/2016

SECTION 01 57 19

TEMPORARY ENVIRONMENTAL CONTROLS

1.0 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

CODE OF FEDERAL REGULATIONS (CFR)

29 CFR 1910.1200 Hazard Communication

40 CFR 112 Oil Pollution Prevention

40 CFR 171 General Information, Regulations, and Definitions

40 CFR 172 Hazardous Materials, Tables, and Hazardous Materials

40 CFR 173 General Requirements for Shipments and Packaging (USDOT Regulations)

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 279 Used Oil Regulations

40 CFR 300 National Oil and Hazardous Substances Pollution

Contingency Plan

40 CFR 355 Emergency Planning and Notification

1.1 DEFINITIONS

1.1.1 Sediment

Soil and other debris, including those that have eroded and have been transported by runoff water or wind.

1.1.2 Solid Waste

Garbage, refuse, debris, rubbish, or other discharged material (except hazardous waste as defined in paragraph entitled "Hazardous Waste", resulting from domestic, industrial, commercial, mining, or agricultural operations.

1.1.3 Debris

Combustible and noncombustible wastes such as ashes and waste materials resulting from construction or maintenance and repair work, leaves, and tree trimmings.

1.1.4 Chemical Wastes

This includes salts, acids, alkalis, herbicides, pesticides, and organic chemicals.

SECTION 01 57 19 – PAGE 2 11/23/2016

1.1.5 Garbage

Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.

1.1.6 Hazardous Waste

Hazardous waste as defined in 40 CFR 261 or as defined by applicable State and local regulations.

1.1.7 Oily Waste

Petroleum products and bituminous materials.

1.1.8 Regulated Waste

Those solid wastes that have specific additional Federal, state, or local controls for handling, storage, or disposal.

1.1.9 Hazardous Materials

Hazardous materials as defined in 49 CFR 171 and listed in 49 CFR 172.

1.2 ENVIRONMENTAL PROTECTION REQUIREMENTS

Provide and maintain, during the life of the contract, environmental protection as defined. Plan for and provide environmental protective measures to control pollution that develops during normal construction practice. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Comply with Federal, State, and local regulations pertaining to the environment, including water, air, solid waste, hazardous waste and substances, oily substances, and noise pollution.

1.3 Contractor Liabilities for Environmental Protection

The Contractor is advised that this project and facility are subject to Federal, State, and local regulatory inspections to review compliance with environmental laws and regulations. The Contractor shall fully cooperate with any representative from any Federal, State or local regulatory agency who may visit the job site and shall provide immediate notification to the Contracting Officer, who shall accompany them on any subsequent site inspections. The Contractor shall complete, maintain, and make available to the Contracting Officer, Base, or regulatory agency personnel all documentation relating to environmental compliance under applicable Federal, State and local laws and regulations. The Contractor shall immediately notify the Contracting Officer if a Notice of Violation (NOV) is issued to the Contractor.

2 PRODUCTS - Not used.

3 EXECUTION

3.1 PROTECTION OF NATURAL RESOURCES

Preserve the natural resources within the project boundaries and outside the limits of permanent work unless otherwise indicated. Restore to an equivalent or improved condition upon completion of work.

Confine construction activities to within the limits of the work indicated or specified.

SECTION 01 57 19 – PAGE 3 11/23/2016

3.1.1 Land Resources

Except in areas to be cleared, do not remove, cut, deface, injure, or destroy trees or shrubs without the Contracting Officer's permission. Do not fasten or attach ropes, cables, or guys to existing nearby trees for anchorages unless authorized by the Contracting Officer. Where such use of attached ropes, cables, or guys is authorized, the Contractor shall be responsible for any resultant damage.

3.1.2 Water Resources

Prevent oil or hazardous substances from entering the ground, drainage areas, or navigable waters. In accordance with 40 CFR 112, surround all temporary fuel oil or petroleum storage tanks with a temporary berm or containment of sufficient size and strength to contain the contents of the tanks, plus 10 percent freeboard for precipitation. The berm shall be impervious to oil for 72 hours and be constructed so that any discharge will not permeate, drain, infiltrate, or otherwise escape before cleanup occurs.

3.1.3 Fish and Wildlife Resources

Do not disturb fish and wildlife. Do not alter water flows or otherwise significantly disturb the native habitat adjacent to the project and critical to the survival of fish and wildlife, except as indicated or specified.

3.2 EROSION AND SEDIMENT CONTROL MEASURES

3.2.1 Burnoff

Burnoff of the ground cover is not permitted.

3.2.2 Protection of Erodible Soils

Immediately finish the earthwork brought to a final grade. Immediately protect the side slopes and back slopes upon completion of rough grading. Plan and conduct earthwork to minimize the duration of exposure of unprotected soils.

3.2.3 Temporary Protection of Erodible Soils

Use the following methods to prevent erosion and control sedimentation:

3.2.3.1 Mechanical Retardation and Control of Runoff

Mechanically retard and control the rate of runoff from the construction site. This includes construction of diversion ditches, benches, berms, and use of silt fences and straw bales to retard and divert runoff to protected drainage courses. Provide a floating silt barrier to isolate the work area from the main water body.

3.2.3.2 Sediment Basins

Trap sediment in temporary and permanent sediment basins.

3.2.3.3 Vegetation and Mulch

Provide temporary protection on sides and back slopes as soon as rough grading is completed or sufficient soil is exposed to require erosion protection. Stabilize slopes by hydro-seeding, anchoring mulch in place, covering with anchored netting, sodding, or such combination of these and other methods necessary for effective erosion control.

SECTION 01 57 19 – PAGE 4 11/23/2016

3.4 CONTROL AND DISPOSAL OF HAZARDOUS WASTES

3.4.1 Petroleum Products

Conduct the fueling and lubricating of equipment and motor vehicles in a manner that protects against spills and evaporation. All used oil generated on site shall be managed in accordance with 40 CFR

279. The Contractor shall determine if any used oil generated while on-site exhibits a characteristic of hazardous waste. In addition, used oil containing 1,000 parts per million of solvents will be considered a hazardous waste and disposed of at Contractor's expense. Used oil mixed with a hazardous waste will also be considered a hazardous waste.

3.4.2 Releases/Spills of Oil and Hazardous Substances

Take precautions to prevent releases/spills of oil and hazardous substances. In the event of any releases of oil and hazardous substances, chemicals, or gases; immediately within 15 minutes notify the COTR and the Contracting Officer. The Contractor is responsible for verbal and written notifications as required by the federal 40 CFR 355, State, local regulations. Spill response shall be in accordance with 40 CFR 300 and applicable State and local regulations. Contain and clean up these spills without cost to the Government. Provide copies of the written notification and documentation that a verbal notification was made within 20 days.

3.5 DUST CONTROL

Keep dust down at all times, including during non-working periods. Sprinkle or treat, with dust suppressants, the soil at the site, haul roads, and other areas disturbed by operations. Dry power brooming will not be permitted. Instead, use vacuuming, wet mopping, wet sweeping, or wet power brooming. Air blowing will be permitted only for cleaning non-particulate debris such as steel reinforcing bars. Only wet cutting will be permitted for cutting concrete blocks, concrete, and bituminous concrete. Do not unnecessarily shake bags of cement, concrete mortar, or plaster.

3.6 NOISE

Make the maximum use of low-noise emission products, as certified by the EPA. Blasting or use of explosives will not be permitted.

DIVISION 2 EXISTING CONDITIONS

SECTION 02 41 00 - Page 1

SECTION 02 41 00

DEMOLITION

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO M 145 (1991; R 2004) Classification of Soils and Soil-Aggregate

Mixtures for Highway Construction Purposes AASHTO T 180 (2001; R 2004) Moisture-Density Relations of Soils Using a

4.54-kg (10-lb) Rammer and an 457-mm (18-in) Drop

AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)

ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition Operations

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2003) Safety -- Safety and Health Requirements

1.2 GENERAL REQUIREMENTS

Do not begin demolition until authorization is received from the Contracting Officer. The work of this section is to be performed in a manner that maximizes recycling of materials. Remove rubbish and debris from the site daily; do not allow accumulations outside the buildings. The work includes demolition, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the COR. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.

1.3 SUBMITTALS

The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

Preconstruction Submittals Existing Conditions and Photographs

Certificates

Demolition Plan Notifications A proposed demolition and removal procedure for approval before work is started.

1.4 REGULATORY AND SAFETY REQUIREMENTS

Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSE/SAFE A10.6.

SECTION 02 41 00 - Page 2

1.4.1 Notifications

1.4.1.1 General Requirements

Furnish timely notification of demolition projects to Federal, State, regional, and local authorities.

1.5 DUST AND DEBRIS CONTROL

Prevent the spread of dust and debris and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Sweep pavements as often as necessary to control the spread of debris

1.6 PROTECTION

1.6.1 Traffic Control Signs

Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Anchor barricades in a manner to prevent displacement by wind. Notify the Contracting Officer prior to beginning such work.

Lights must be operational during periods of reduced visibility, darkness, and as directed by the Contracting Officer. Maintain the temporary services during the period of work.

1.6.2 Existing Conditions Documentation

Before beginning any demolition or deconstruction work, survey the site and examine the drawings and specifications to determine the extent of the work. Verify location of existing underground utilities.

Record existing conditions in the presence of the COR showing the condition of structures and other facilities adjacent to areas of removal. Photographs sized 4 inch will be acceptable as a record of existing conditions. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document.

1.6.3 Items to Remain in Place

Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer. Coordinate the work of this section with all other work indicated. Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract. Do not overload structural elements, and pavements to remain. Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work.

1.6.4 Existing Construction Limits and Protection

Do not disturb existing construction beyond the. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove dust, dirt, and debris from work areas daily.

1.6.5 Utility Service

Maintain existing utilities indicated to stay in service and protect against damage during demolition and deconstruction operations. Prior to start of work, utilities serving each area of alteration or removal will be shut off by the contractor and disconnected and sealed by the Contractor.

SECTION 02 41 00 - Page 3

1.6.6 Facilities

Protect electrical and mechanical services and utilities. Where removal of existing utilities is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, shoring, or lateral support until demolished or deconstructed, unless directed otherwise by the Contracting Officer. Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract.

1.6.7 Protection of Personnel

Before, during and after the demolition work the Contractor shall continuously evaluate the condition of the structure being demolished and take immediate action to protect all personnel working in and around the project site. No area, section, or structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area.

1.7 BURNING

The use of burning at the project site for the disposal of refuse and debris will not be permitted.

1.8 REQUIRED DATA

Prepare a Demolition Plan. Include in the plan procedures for careful removal and disposition of material, coordination with other work in progress, a detailed description of methods and equipment to be used for each operation and of the sequence of operations. Provide procedures for safe conduct of the work in accordance with EM 385-1-1. Plan shall be approved by Contracting Officer prior to work beginning.

1.10 ENVIRONMENTAL PROTECTION

Comply with the Environmental Protection Agency requirements specified.

1.11 USE OF EXPLOSIVES

Use of explosives will not be permitted.

PART 2 PRODUCTS

2.1 FILL MATERIAL

Comply with backfilling, and compacting procedures for soils used as backfill material to fill voids, depressions or excavations resulting from demolition. Fill material shall be waste products from demolition or deconstruction until all waste appropriate for this purpose is consumed. Voids, depressions or excavations shall be left even with the surrounding level.

Fill material must conform to the definition of satisfactory soil material as defined in AASHTO M 145, Soil Classification Groups A-1, A-2-4, A-2-5 and A-3. In addition, fill material must be free from roots and other organic matter, trash, debris, frozen materials, and stones larger than 2 inches in any dimension.

Proposed fill material must be sampled and tested by an approved soil testing laboratory, as follows:

SECTION 02 41 00 - Page 4

Soil classification AASHTO M 145

Moisture-density relations AASHTO T 180, Method B or D]

PART 3 EXECUTION

3.1 EXISTING FACILITIES TO BE REMOVED

Inspect and evaluate existing structures on site.

3.1.1 Approach Ramp

a. Remove existing approach ramp.

b. Demolish structure as to avoid any damage to adjacent wharf.

c. Locate demolition equipment throughout the area and remove materials so as to not impose excessive loads on existing wharf.

3.1.2 Utilities and Related Equipment

3.1.2.1 General Requirements

Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the COR. Do not interrupt existing utilities serving facilities occupied and used by the Government except when approved in writing and then only after temporary utility services have been approved and provided. Do not begin demolition or deconstruction work until all utility disconnections have been made. Shut off and cap utilities for future use, as indicated.

3.1.2.2 Disconnecting Existing Utilities

When utility lines are encountered that are not indicated on the drawings, the COR shall be notified prior to further work in that area.

3.1.3 Items with Unique/Regulated Disposal Requirements

Remove and dispose of items with unique or regulated disposal requirements in the manner dictated by law or in the most environmentally responsible manner.

3.2 CONCURRENT EARTH-MOVING OPERATIONS

Do not begin filling operations that are sequential to demolition or deconstruction work in areas occupied by structures to be demolished or deconstructed until all demolition and deconstruction in the area has been completed and debris removed. Fill holes, and other hazardous openings.

3.3 DISPOSITION OF MATERIAL

3.3.1 Title to Materials

All materials and equipment removed shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition, removal procedures, and authorization by the Contracting Officer to begin demolition. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.

SECTION 02 41 00 - Page 5

3.4 CLEANUP

Remove debris and rubbish from site. Remove and transport in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.

3.5 DISPOSAL OF REMOVED MATERIALS

3.5.1 Regulation of Removed Materials

Dispose of debris, rubbish, scrap, and other non salvageable materials resulting from removal operations with all applicable federal, state and local regulations. Storage of removed materials on the project site is prohibited.

3.5.2 Burning on Government Property

Burning of materials removed from demolished and deconstructed structures will not be permitted on Government property.

3.5.3 Removal from Government Property

Transport waste materials removed from demolished and deconstructed structures from Government property for legal disposal.

DIVISION 3 CONCRETE

SECTION 03 20 01 - Page 1

SECTION 03 20 01

CONCRETE REINFORCEMENT

The publications listed below form a part of this specification to the extent referenced. The publications

AMERICAN CONCRETE INSTITUTE (ACI)

ACI 301-10 (2010) Specifications for Structural Concrete

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

ASTM A 1064/A1064M (2015) Standard Specification for Carbon-Steel Wire and

Welded Wire Reinforcement, Plain and Deformed, for Concrete

ASTM A 615/A 615M (2015) Standard Specification for Deformed and Plain

Carbon-Steel Bars for Concrete Reinforcement

1.2 DELIVERY, STORAGE, AND HANDLING

Store reinforcement of different sizes and shapes in separate piles or racks raised above the ground to avoid excessive rusting. Protect from contaminants such as grease, oil, and dirt. Ensure bar sizes can be accurately identified after bundles are broken and tags removed.

2.1 REINFORCEMENT

2.1.1 Reinforcing Bars

ACI 301 unless otherwise specified. ASTM A 615/A 615M with the bars marked S, Grade 60;

2.1.2 Welded Wire Fabric

ASTM A 1064/A1064M. Provide flat sheets of welded wire fabric for slabs and toppings.

2.1.3 Wire

ASTM A 1064/A1064M.

2.1.4 Reinforcing Bar Supports

Provide bar ties and supports of coated or noncorrodible material.

3.1 PLACING REINFORCEMENT AND MISCELLANEOUS MATERIALS

ACI 301. Provide bars, wire fabric, wire ties, supports, and other devices necessary to install and secure reinforcement. Reinforcement shall not have rust, scale, oil, grease, clay, or foreign substances that would reduce the bond. Rusting of reinforcement is a basis of rejection if the effective cross-

SECTION 03 20 01 - Page 2 sectional area or the nominal weight per unit length has been reduced. Remove loose rust prior to placing steel. Tack welding is prohibited.

3.1.1 Reinforcement Supports

ACI 301. Place reinforcement and secure with galvanized or noncorrodible chairs, spacers, or metal hangers. For supporting reinforcement on the ground, use concrete or other noncorrodible material, having a compressive strength equal to or greater than the concrete being placed.

3.1.2 Cover

ACI 301 for minimum coverage, unless otherwise indicated.

Section 03 33 00 - Page 1

SECTION 03 33 00

CAST-IN-PLACE CONCRETE

The publications listed below form a part of this specification to the extent referenced. The publications

AMERICAN CONCRETE INSTITUTE (ACI)

ACI 117-10 (2010) Specification for Tolerances for Concrete Construction and Materials

ACI 301-10 (2010) Specifications for Structural Concrete

ACI 302.1R (2015) Guide to Concrete Floor and Slab Construction

ACI 304R (2000) Guide for Measuring, Mixing, Transporting, and Placing Concrete

ACI 347R (2014) Guide to Formwork for Concrete

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

ASTM C 31/ C 31M (2015) Standard Practice for Making and Curing Concrete

Test Specimens in the Field

ASTM C 33/C 33M (2013) Standard Specification for Concrete Aggregates

ASTM C 39/C 39M (2015) Standard Test Method for Compressive Strength of

Cylindrical Concrete Specimens

ASTM C 42/C 42M (2013) Standard Test Method for Obtaining and Testing

Drilled Cores and Sawed Beams of Concrete

ASTM C 94/ C 94M (2015) Standard Specification for Ready-Mixed Concrete

ASTM C 143/ C 143M (2015) Standard Test Method for Slump of Hydraulic Cement

ASTM C 150/ C 150M (2015) Standard Specification for Portland Cement

ASTM C 172/ C 172M (2014) Standard Practice for Sampling Freshly Mixed

ASTM C 494/C 494M (2015) Standard Specification for Chemical Admixtures for

ASTM C 618 (2015) Standard Specification for Coal Fly Ash and Raw or

Calcined Natural Pozzolan for Use in Concrete

ASTM C 989/ C 989M (2014) Standard Specification for Slag Cement for Use in Concrete and Mortars

Section 03 33 00 - Page 2

ASTM C 1107/ C 1107M (2014) Standard Specification for Packaged Dry, Hydraulic- Cement Grout (Nonshrink)

ASTM D 1752 (2013) Standard Specification for Preformed Sponge Rubber and Cork and Recycled PVC Expansion Joint Fillers for Concrete Paving and Structural Construction

1.2 DEFINITIONS

a. "Cementitious material" as used herein shall include all portland cement, pozzolan, fly ash, ground iron blast-furnace slag, and silica fume.

b. "Exposed to public view" means situated so that it can be seen from eye level from a public location after completion of the building. A public location is accessible to persons not responsible for operation or maintenance of the building.

Submit the following in accordance with Section 01 33 00, "Submittal."

1.3.1 Concrete Mix Design

Submit copies of test reports showing that the mix has been successfully tested to produce concrete with the properties specified and that mix will be suitable for the job conditions. Test reports shall be submitted along with the concrete mix design. Obtain approval before concrete placement.

1.3.2 Field Test Reports

a. Compressive strength tests

1.4 MODIFICATION OF REFERENCES

Accomplish work in accordance with ACI publications except as modified herein. Consider the advisory or recommended provisions to be mandatory, as though the word "shall" had been substituted for the words "should" or "could" or "may," wherever they appear. Interpret reference to the "Building Official," the "Structural Engineer," and the "Architect/Engineer" to mean the Contracting Officer.

1.5 DELIVERY, STORAGE, AND HANDLING

Do not deliver concrete until forms, reinforcement, embedded items, and chamfer strips are in place and ready for concrete placement. ACI 301 for job site storage of materials. Protect materials from contaminants such as grease, oil, and dirt. Ensure materials can be accurately identified after bundles are broken and tags removed.

2.1 CONCRETE

2.1.1 Contractor-Furnished Mix Design

ACI 301 except as otherwise specified. The compressive strength (f'c) of the concrete shall be as follows:

For all parts of the concrete approach slab, concrete pile caps and concrete curbs shall be f’c = 5,000 psi and as specified below.

Section 03 33 00 - Page 3

2.1.1.1 Required Average Strength of Mix Design

The selected mixture shall produce an average compressive strength exceeding the specified strength by the amount indicated in ACI 301. When a concrete production facility has a record of at least 15 consecutive tests, the standard deviation shall be calculated and the required average compressive strength shall be determined in accordance with ACI 301. When a concrete production facility does not have a suitable record of tests to establish a standard deviation, the required average strength shall be as follows:

a. f'c > 5000 psi for all parts of the concrete approach slab, concrete pile caps and concrete curbs.

2.2 MATERIALS

2.2.1 Cement

ASTM C 150, Type I blended cement except as modified herein. The blended cement shall consist of a mixture of ASTM C 150 cement and one of the following materials: ASTM C 618 pozzolan or fly ash, ASTM C 989 ground iron blast-furnace slag. The pozzolan or fly ash content shall not exceed 25 percent by weight of the total cementitious material. The ground iron blast-furnace slag shall not exceed 50 percent by weight of total cementitious material. For exposed concrete, use one manufacturer for each type of cement, ground slag, fly ash, and pozzolan.

2.2.1.1 Fly Ash and Pozzolan

ASTM C 618, Type N, F, or C, except that the maximum allowable loss on ignition shall be 6 percent for Types N and F. Add with cement.

2.2.1.2 Ground Iron Blast-Furnace Slag

ASTM C 989, Grade 120.

2.2.2 Water

Water shall be fresh, clean, and potable; free from injurious amounts of oils, acids, alkalis, salts, organic materials, or other substances deleterious to concrete.

2.2.3 Aggregates

ASTM C 33, except as modified herein. Furnish aggregates for exposed concrete surfaces from one source. Aggregates shall not contain any substance which may be deleteriously reactive with the alkalies in the cement. Aggregates shall show expansions less than 0.10 percent at 6 months when tested in accordance with ASTM C 227 using a cement with an alkali content above 0.8 percent (expressed as sodium oxide), and shall not possess properties or constituents that are known to have specific unfavorable effects in concrete when tested in accordance with ASTM C 295.

2.2.4 Non-shrink Grout

ASTM C 1107.

2.2.5 Admixtures

Do not use calcium chloride admixtures.

Section 03 33 00 - Page 4

3.1 PLACING MISCELLANEOUS MATERIALS

3.1.1 Setting Miscellaneous Material

Place and secure anchors and bolts, pipe sleeves, conduits, and other such items in position before concrete placement. Plumb anchor bolts and check location and elevation. Temporarily fill voids in sleeves with readily removable material to prevent the entry of concrete.

3.1.2 Construction Joints

Locate joints to least impair strength. Continue reinforcement across joints unless otherwise indicated.

3.2 PLACING CONCRETE

Notify COR and inspector seven (7) days prior to placing any concrete. Inspector required to be on-site during the placement and testing of the concrete. Place concrete as soon as practicable after the forms and the reinforcement have been inspected and approved. Do not place concrete when weather conditions prevent proper placement and consolidation; in uncovered areas during periods of precipitation; or in standing water. Prior to placing concrete, remove dirt, construction debris, water, snow, and ice from within the forms. Deposit concrete as close as practicable to the final position in the forms. Do not exceed a free vertical drop of 3 feet from the point of discharge. Place concrete in one continuous operation from one end of the structure towards the other. Position grade stakes on 10 foot centers maximum in each direction when pouring interior slabs and on 20 foot centers maximum for exterior slabs.

3.2.1 Footing Placement

Concrete for footings may be placed in excavations without forms upon inspection and approval by the COR. Excavation width shall be a minimum of 4 inches greater than indicated.

3.3 SURFACE FINISHES EXCEPT FLOOR, SLAB, AND PAVEMENT FINISHES

3.3.1 Defects

Repair formed surfaces by removing minor honeycombs, pits greater than 1 square inch surface area or 0.25 inch maximum depth, or otherwise defective areas. Provide edges perpendicular to the surface and patch with non-shrink grout. Patch tie holes and defects when the forms are removed. Concrete with extensive honeycomb including exposed steel reinforcement, cold joints, entrapped debris, separated aggregate, or other defects which affect the serviceability or structural strength will be rejected, unless correction of defects is approved. Obtain approval of corrective action prior to repair.

The surface of the concrete shall not vary more than the allowable tolerances of ACI 347R. Exposed surfaces shall be uniform in appearance and finished to a smooth form finish unless otherwise specified.

3.3.2 Formed Surfaces

3.3.2.1 Tolerances

ACI 117 and as indicated.

3.3.2.2 As-Cast Rough Form

Provide for surfaces not exposed to public view. Patch this holes and defects and level abrupt irregularities. Remove or rub off fins and other projections exceeding 0.25 inch in height.

Section 03 33 00 - Page 5

3.4 FLOOR, SLAB, AND PAVEMENT FINISHES AND MISCELLANEOUS CONSTRUCTION

ACI 302.1R, unless otherwise specified. Slope floors uniformly to drains where drains are provided.

Where straight edge measurements are specified, Contractor shall provide straight edge.

3.4.1 Finish

Place, consolidate, and immediately strike off concrete to obtain proper contour, grade, and elevation before bleedwater appears. Permit concrete to attain a set sufficient for floating and supporting the weight of the finisher and equipment. If bleedwater is present prior to floating the surface, drag the excess water off or remove by absorption with porous materials. Do not use dry cement to absorb bleedwater.

3.5 FIELD QUALITY CONTROL

3.5.1 Sampling

ASTM C 172. Collect samples of fresh concrete to perform tests specified. ASTM C 31/C 31M for making test specimens.

3.5.2 Testing

3.5.2.1 Slump Tests

ASTM C 143. Inspector shall be on-site to take pictures of test. Take concrete samples during concrete placement. The maximum slump may be increased as specified with the addition of an approved admixture provided that the water-cement ratio is not exceeded. Perform tests at commencement of concrete placement, when test cylinders are made, and for each batch (minimum) or every 10 cubic yards (maximum) of concrete.

3.5.2.2 Compressive Strength Tests

ASTM C 39. Make five test cylinders for each set of tests in accordance with ASTM C 31/C 31M.

Precautions shall be taken to prevent evaporation and loss of water from the specimen. Test two cylinders at 7 days, two cylinders at 28 days, and hold one cylinder in reserve. Samples for strength tests of each mix design of concrete placed each day shall be taken not less than once a day, nor less than once for each 50 cubic yards of concrete, nor less than once for each 500 square feet of surface area for slabs or walls. For the entire project, take no less than five sets of samples and perform strength tests for each mix design of concrete placed. Each strength test result shall be the average of two cylinders from the same concrete sample tested at 28 days. If the average of any three consecutive strength test results is less than f'c or if any strength test result falls below f'c by more than 500 psi, take a minimum of three ASTM C 42 core samples from the in-place work represented by the low test cylinder results and test.