About this file

Amendment 001

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

08/3/2017

4. REQUISITION/PURCHASE REQ. NO.

21-17-827PMV229

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

CONTRACTING OFFICER

USCG, CIVIL ENGINEERING UNIT MIAMI

15608 SW 117th AVENUE

MIAMI, FL 33177-1630

CONTRACTING OFFICER

USCG, CIVIL ENGINEERING UNIT MIAMI

15608 SW 117TH AVENUE

MIAMI, FL 33177-1630

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

PROSPECTIVE CONTRACTORS

9A. AMENDMENT OF SOLICITATION NO.

HSCG82-17-B-PMV229

9B. DATED (SEE ITEM 11)

7/14/2017

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET

FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (ORGANIZED BY UCF SECTION HEADINGS, INCLUDING SOLICITATION/CONTRACT SUBJECT MATTER WHERE FEASIBLE.)

SOLICITATION NUMBER: HSCG82-17-B-PMV229 – MAJOR M & R ALL PURPOSE AND FE MAINTENANCE SHOP STATION

SOUTH PADRE ISLAND, TX IS AMENDED AS FOLLOWS:

A. THIS AMENDMENT PROVIDES ANSWERS TO CONTRACTOR’S REQUEST FOR INFORMATION ON ATTACHED PAGES.

B. BID DUE DATE REMAINS UNCHANGED OF AUGUST 16, 2017 AT 2:00P.M. EASTERN TIME.

C. PLEASE RETURN A SIGNED COPY OF THIS AMENDMENT WITH YOUR BID.

D. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.

15A. NAME AND TITLE OF SIGNER (Type or Print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

ADA HOGGARD, CONTRACT SPECIALIST, USCG

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16B UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.243

HSCG82-17-B-PMV229

AMENDMENT 001

REQUEST FOR INFORMATION

Q1. Will the Coast Guard provide storage containers for the building furniture during construction?

A1. Refer Section 01 11 00 1.1.4. General Contractor is responsible for providing storage containers.

Q2. Will the Coast Guard move and store equipment such as computer, printers, radios, etc.?

A2. Coast Guard IT personnel will be moving all IT computer and communication equipments. See Appendix "C".

Q3. Who will be responsible for moving building furniture to storage containers?

A3. Refer Section 01 11 00 1.1.4 and 1.2.1 #36, 37, 38, 39. General Contractor is responsible for moving building furniture.

Q4. Who will be responsible for moving furniture and equipment back into the after construction is complete?

A4. Refer Section 01 11 00 - 1.1.4 and 1.2.1 #36, 37, 38, 39. General Contractor is responsible for moving furniture and equipment back into the buildings after construction is complete.

Q5. Is there an asbestos/lead/mold report available? This information will be necessary in order to accurately bid the abatement work.

A5. Asbestos and LBP reports are in the specs. See Appendix "B".

Q6. Is the existing roof currently under warranty? If so what company is the warranty under?

A6. FE Maintenance roof is a new roof. The existing roof on the All Purpose building does not have a roof warranty.