AMENDMENT 0004

View the file

Other files for this federal contract opportunity

Other files attached to BULKHEAD REPLACEMENT AT U. S. COAST GUARD BASE MIAMI BEACH, FL, newest first.
File Type Posted
Abstract_of_Offers_-_HSCG82-15-B-PMV226_Bulkhead_Replacement_at_USCG_Base_Miami_Beach _FL.pdf PDF
A003_(PMV223).pdf PDF
AMENDMENT_NO_0002__-_HSCG82-15-B-PMV223.pdf PDF
REVISED_SPECIFICATIONS_5061233_AMENDMENT_0001.pdf PDF
AMENDMENT_NO_0001_-_HSCG82-15-B-PMV223.pdf PDF
5061233_Spec_Appendix.pdf PDF
IFB_Construction_HSCG-15-B-PMV223.pdf PDF
DRAWINGS_M2018-0.pdf PDF
5061233_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

08/05/2015 4. REQUISITION/PURCHASE REQ. NO.

21-15-825PMV223

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

CONTRACTING OFFICER

USCG, CIVIL ENGINEERING UNIT MIAMI

15608 SW 117TH AVENUE

MIAMI, FL 33177-1630

SAME AS BLOCK 6.

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

PROSPECTIVE BIDDERS

9A. AMENDMENT OF SOLICITATION NO.

HSCG82-15-B-PMV223

9B. DATED (SEE ITEM 11)

07/02/2015

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (ORGANIZED BY UCF SECTION HEADINGS, INCLUDING SOLICITATION/CONTRACT SUBJECT MATTER WHERE FEASIBLE.)

AMENDMENT REASON: ADDITIONAL CLARIFICATIONS

A. ADDITIONAL CLARIFICATIONS IS BEING PROVIDED. SEE PAGE 2 OF THIS AMENDMENT.

B. THE BID OPENING DATE OF AUGUST 11, 2015 AT 2:00 pm (EST) REMAINS UNCHANGED.

C. PLEASE RETURN A SIGNED COPY OF THIS AMENDMENT WITH YOUR BID

15A. NAME AND TITLE OF SIGNER (Type or Print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

ADA HOGGARD, CONTRACTING OFFICER, USCG

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.243

Amendment #3 PROJECT: Replace Base Miami Beach Bulkhead (Zone 5) 5061233 PMV223

Response/Change Log LOCATION: Miami Beach, FL August 3, 2015

CEU Miami

PM: Hall KO: McGee

DESIGN PHASE:

100%

DISCIPLINE:

Construction

REVIEW ACTION:

I - Incorporated into Amendment N - Not Incorporated C - Clarification

CHANGES TO DOCUMENTS:

Changes to the documents as part of this amendment are highlighted in yellow and/or shown as comments in the document.

Back Check by:

(Init.)

ITEM

NO.

DWG / SPEC.

SECTION RFI COMMENTS/QUESTIONS RECIEVED ACTION Explanation. Changes to the construction specifications are highlighted here and shown in red in the revised file.

BACK

CHECK

41. 01 57 20

Is there any permits that the Contractor needs to obtain for this project (e.g. Building, DERM, Army Corps, etc.)? If so, would the contractor be reimbursed for the permit costs? Sometimes we are told that we will be reimbursed or that we include a fix amount within our bid in order to not to have the permits section affect the base bid. Thanks in advance.

C

Per paragraph 1.7.3 of Section 01 57 20, these permits will be provided by the Government. This is with the exception of permits for solid waste disposal sites not commercial operating facilities, which will be the contractor’s responsibility, if applicable (see follow on discussion in this section.)