A002_with_Q A.pdf

PDF 42 KB Posted

Attached to
REPLACMENT OF MK SHOP AT U. S. COAST GUARD HARBOR FACILITY, CORPUS CHRISTI, TEXAS
Solicitation number
HSCG82-15-B-PMV166
Issued by

About this file

AMENDMENT 0002 WITH QUESTIONS AND ANSWERS

View the file

Other files

File Type Posted
ABSTRACT.pdf PDF
A003.pdf PDF
A001_with_Q A.pdf PDF
IFB_Construction_-_15-PMV166.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO.

07/15/2015 4. REQUISITION/PURCHASE REQ. NO.

21-15-825PMV166

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

CONTRACTING OFFICER

USCG, CIVIL ENGINEERING UNIT MIAMI

15608 SW 117TH AVENUE

MIAMI, FL 33177-1630

SAME AS BLOCK 6.

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

Prospective Contractors

9A. AMENDMENT OF SOLICITATION NO.

HSCG82-15-B-PMV166

9B. DATED (SEE ITEM 11)

6/18/2015

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (ORGANIZED BY UCF SECTION HEADINGS, INCLUDING SOLICITATION/CONTRACT SUBJECT MATTER WHERE FEASIBLE.)

SOLICITATION NUMBER: HSCG82-15-B-PMV166 –REPLACEMENT OF MK SHOP AT U.S. COAST GUARD HARBOR

FACILITIES, CORPUS CHRISTI, TX IS AMENDED AS FOLLOWS:

A. THIS AMENDMENT PROVIDES ANSWERS FROM CONTRACTOR’S REQUEST FOR INFORMATION ON ATTACHED

PAGE.

B. BID DUE DATE OF JULY 21, 2015 REMAINS UNCHANGED.

C. PLEASE RETURN A SIGNED COPY OF THIS AMENDMENT WITH YOUR BID.

15A. NAME AND TITLE OF SIGNER (Type or Print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

ADA HOGGARD, CONTRACT SPECIALIST, USCG

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.243

HSCG82-15-B-PMV166

AMENDMENT 002

QUESTION: I have found no indication that Builder’s Risk insurance will be required to be provided on this project by the general contractor. Is this correct?

ANSWER: Builder's Risk is not required for this project.

QUESTION: No specifications for the following items are included in the bid package: Metal Studs and Drywall; 1” closed cell rigid insulation; Toilet Accessories.

ANSWER: Metal Studs and Drywall; 1” closed cell rigid insulation; Toilet Accessories are all indicated on the drawings.

QUESTION: There are no soap dispensers paper towel dispensers shown at the toilet or kitchenette?

ANSWER: None is required.

QUESTION: Is there no requirement for the building to be compliant with ADA guidelines?

ANSWER: ADA compliance is not required for this project.

QUESTION: The painting schedule in the specifications calls for the aluminum railings to be painted with latex gloss, while plan sheet A-04 and A-08 call for powder coated aluminum railings. Which is correct?

ANSWER: Powder coat aluminum railing and canopy frames as indicated on the drawings. Delete the word Aluminum railing in paragraph 2.4.C., Section 09 90 00.

QUESTION: Section 1/A-09 of the aluminum entrance canopy also calls for powder coated finish of the aluminum frame…is this correct?

ANSWER:

QUESTION: Please verify that no City of Corpus Christi building permits will be required for the project?

ANSWER: City of Corpus Christi does not have jurisdiction over federal projects and therefore will not be issuing a building permit.

File details come from the government source that posted it. Updated .