Text version
HSCG82-12-B-PMV340
AMENDMENT 002
QUESTION: (Refer to Draw. A-07- Door Schedule) Exterior Mechanical Room Door #16 & Entrance Door to Corridor #15 call for fiberglass reinforced doors. The provided specifications (Sect. 08 16 13) are typical for only one (1) manufacturer in the USA (CHEM-PRUF Door Co.). These doors are extremely expensive (pure cost without installation or hardware), and have an 8-10 weeks fabrication time plus 2 weeks of in-land freight for a 10- 12 week delivery schedule (refer to attached quote for specifics). Will the government provide any option or will sustain its spec?
ANSWER: The government wants the doors to meet the saline features of the fiberglass reinforced doors (FRP) doors as indicated in the specifications.
QUESTION: (Refer to Draw. A-07- Door Schedule) schedule calls for metal frame for door #15. Fiberglass Reinforced Doors are not compatible with metal frames. Can we presume it should be a Fiberglass compatible frame?
ANSWER: Yes, the FRP doors shall have a solid FRP door frame.
QUESTION: (Refer to Draw. A-07), the head jamb & sills detail should be revised. Most do not match the doors presented on the Door Schedule.
ANSWER: Drawings (M1821-D) A-07, sheet 10 has been revised and attached.
QUESTION: (Section 26 20 00), this specification establishes that all conductors #10 AWG and smaller shall be solid. It is our understanding that this building will not have radio communication equipment or cause any interference. Could stranded #12 & #10 THHN wire be utilized for receptacles and lighting? Solid wiring is very difficult to obtain and costly. Installation of solid wiring is also costly. Could this be considered for government revision?
ANSWER: No, Please bid in accordance with the specifications.
QUESTION: (Section 08 16 13, “Fiberglass Reinforced Door & Door Frame Systems”). Under this title there are two specs: Sub-paragraph 2.1.1 mention Non-rated Fiberglass Reinforced Plastic and the sub-paragraph 2.2.2 Fire- Rated Fiberglass Reinforced Plastic. Which of the two will govern for the Fiberglass Door system?
ANSWER: The FRP Doors are Non-rated
QUESTION: (Section 08 71 00 “Door Hardware”) Sub-paragraph 3.5 there is not a hardware description for the door Mkd 11, type “E” for room 114.
ANSWER: The door Marked 11 is a wood bi-fold door which usually comes pre-packaged with all of the hardware needed for installation (see door schedule).
QUESTION: Construction Drawing A-05, sheet 8 of 26, the section illustrated at the far right instruct to Remove Plaster Ceiling. Does this instruction apply to the entire building ceiling?
ANSWER: The entire existing plaster ceiling shall be removed and disposed of.
QUESTION: (Sheet E-01 Note 10) Is the existing 37.5 KVA transformer to be removed and disposed a dry type transformer?
ANSWER: Yes, the existing 37.5 KVA transformer is a Dry Type Transformer.
QUESTION: (Sheet E-02) Shows (21) light fixtures for circuit A-31 and (24) light fixtures for A-29. This is (45) fixtures on two (2) circuits. We understand that they should be distributed in 4-5 circuits instead of 2. Please confirm.
ANSWER: Yes, Circuit A-31 has 21 light fixtures connected to it, (65W x 21 = 1365W on a 20 Amp Circuit.
OK). Circuit A-29 has 24 light fixture connected to it, (65W x 24 = 1536W on a 20 Amp Circuit. OK). T-8 bulbs are 32W ea. This is not a residential application where you have 1 point for every light fixture for a total of 12 points per circuit.
QUESTION: Please confirm the use of 35w LPS wall packs Type A as described on E-06 (Sheet 27 of 27) Light Fixture schedule in the three closets indicated on the Lighting Plan E-02 (Sheet 23 of 26). This type of lighting luminary is usually specified for exterior use for general illumination.
ANSWER: The light specified for the closet is a Type "C" (not a Type "A" as asked), the answer is yes, and is a 35W LPS Fixture with the saline features specified on Drawing E-06.
QUESTION: Description of surgical lamp on sheet E-02 with reference on note 4 to sheet A-06 not specified on Lamps schedule please clarify?
ANSWER: The Surgical light and track shall be provided by dental supplier. Contractor is responsible for providing the supports up to and including a 2x6-20 gage metal sub- tracks or channel as per detail 3 on sheet A-06.
QUESTION: In the drawings everything that it is exposed is nema 3r and as I know it should be nema 4x s.s.
because is less than a mile from the coast as PR regulations and nec. including, the transformer because on the site visit we notice that the existing one doesn't have at least the 3r covers. Please clarify.
ANSWER: Keynotes 6, 7 and 8 on Sheet E-3 shall read as follows:
6. New 37.5 KVA, 3 phase, 480V primary, 208/120V Secondary, Delta-Y, Dry type transformer in Nema 4X and S.S. enclosure.
7. New 2P, 60A Nema 4X Disconnect Switch in S.S. enclosure, with 60A fuse (see riser diagram).
8. New 2P, 200A Nema 4X Disconnect Switch in S.S. enclosure, with 200A fuse (see riser diagram).
QUESTION: In difference of other plans these doesn't specify if the circuits and receptacles show on drawing E-03, if all the receptacles on this page are going to be new and if the conduits are going to be installed on the surface or inside the concrete. Please clarify.
ANSWER: All electrical equipments (receptacle, light switches etc) will be new. Conduits and junction boxes for receptacles are going to be installed between the drywall and the concrete walls.
QUESTION: The floor box mentioned on the drawing, is going to be any type and/or model that the contractor chose?
ANSWER: The floor box mentioned on the drawing is not specified and can be any type and/or model that the contractor chose?
NEW DENTAL CLINIC 07-M01050
AT U.S.COAST GUARD BASE SAN JUAN
Section 09 68 00 Page 1
SECTION 09 68 00
CARPET
01/07
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF TEXTILE CHEMISTS AND COLORISTS (AATCC)
AATCC 107 (2002; E 2008) Colorfastness to Water
AATCC 134 (2006; E 2008) Standard Test Method for Electrostatic
Propensity of Carpets
AATCC 16 (2004; E 2008) Colorfastness to Light
AATCC 165 (1999; E 2008) Colorfastness to Crocking: Textile Floor
Coverings - AATCC Crockmeter Method
AATCC 174 (1998; R 2007) Antimicrobial Activity Assessment of Carpets
ASTM INTERNATIONAL (ASTM)
ASTM D 3278 (1996; R 2004e1) Flash Point of Liquids by Small Scale
Closed-Cup Apparatus
ASTM D 5252 (2005) Operation of the Hexapod Drum Tester
ASTM D 5417 (2005) Operation of the Vettermann Drum Tester
ASTM D 5793 (2005) Binding Sites Per Unit Length or Width of Pile Yarn
Floor Coverings
ASTM D 5848 (2007) Mass Per Unit Area of Pile Yarn Floor Coverings
ASTM E 648 (2009a) Standard Test Method for Critical Radiant Flux of
Floor-Covering Systems Using a Radiant Heat Energy Source
CARPET AND RUG INSTITUTE (CRI)
CRI 104 (2002) Standard for Installation Specification of Commercial
Carpet
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 2551 (1981) Machine-made Textile Floor Coverings -
Determination of Dimensional Changes Due to the Effects of Varied Water and Heat Conditions
NEW DENTAL CLINIC 07-M01050
Section 09 68 00 Page 2
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
16 CFR 1630 Standard for the Surface Flammability of Carpets and Rugs
(FF 1-70)
40 CFR 247 Comprehensive Procurement Guideline for Products
Containing Recovered Materials
1.2 SUBMITTALS
United States Coast Guard written approval is required for submittals listed below. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
1.2.1 Product Data
Manufacturer's catalog data and printed documentation stating physical characteristics, durability, resistance to fading, and flame resistance characteristics for each type of carpet material and installation accessory. Submit manufacturer's catalog data for the following items:
1) Carpet Moldings
2) Base
Surface Preparation
Installation
Three copies of the manufacturer's printed installation instructions for the carpet, including preparation of substrate, seaming techniques, and recommended adhesives and tapes.
Regulatory Requirements
Three copies of report stating that carpet and carpet components contain recycled materials and/or involvement in a recycling or reuse program. Include in the report percentage of post-industrial and post-consumer recycled material and relative dollar value of recycled content products to total dollar value of products included in project. Include manufacturer's certification of compliance with Carpet and Rug Institute's Green Label Indoor Air Quality program
Physical Characteristics
Documentation indicating type of biobased material in product and biobased content.
Indicate relative dollar value of biobased content products to total dollar value of products included in project. Documentation indicating relative dollar value of rapidly renewable materials to total dollar value of products included in project.
1.2.2 Samples
Molding file:///D:/0000%20Jobs/1191-M%20USCG%20(NAVSEA%20Renovation%20Memphis)/Project%20Submittals/Final/Specifications/Word/01%2033%2000.doc
NEW DENTAL CLINIC 07-M01050
Section 09 68 00 Page 3
a. Carpet: Two "Production Quality" samples 18 by 18 inches of each carpet proposed for use, showing quality, pattern, and color specified.
b. Vinyl or Aluminum Moldings: Two pieces of each type at least 12 inches long.
c. Special Treatment Materials: Two samples showing system and installation method.
1.2.3 Certificates
Certificates of compliance from a laboratory accredited by the National Laboratory Accreditation Program of the National Institute of Standards and Technology attesting that each type of carpet and carpet with cushion material conforms to the standards specified.
Regulatory Requirements
Report stating that the carpet contains recycled materials and indicating the actual percentage of recycled material. Certificates, showing conformance with the referenced standards contained in this section, for the following:
1) Carpet Moldings
2) Base
1.2.4 Operation and Maintenance Data
Cleaning and Protection
Three copies of carpet manufacturer's maintenance instructions describing recommended type of cleaning equipment and material, spotting and cleaning methods, and cleaning cycles.
1.2.5 Closeout Submittals
Adhesives and Concrete Primer
1.3 QUALITY ASSURANCE
Provide the Carpet and Rug Institute (CRI) Indoor Air Quality (IAQ) label for carpet, carpet cushion, and adhesives or demonstrate compliance with testing criteria and frequencies through independent laboratory test results. Carpet, carpet cushion, and adhesives bearing the label will indicate that the carpet has been tested and meets the Regulatory Requirements and criteria of the CRI IAQ Carpet Testing Program, and minimizes the impact on indoor air quality. Procure carpet in accordance with 40 CFR 247, and where possible, purchased locally to reduce emissions of fossil fuels from transporting.
1.4 DELIVERY, STORAGE, AND HANDLING
Deliver materials to the site in the manufacturer's original wrappings and packages clearly labeled with the manufacturer's name, brand name, size, dye lot number, and related information. Remove materials from packaging and store them in a clean, dry, well ventilated area (100 percent outside air supply, minimum of 1.5 air changes per hour, and no recirculation),protected from damage, soiling, and
NEW DENTAL CLINIC 07-M01050
Section 09 68 00 Page 4 moisture, and strong contaminant sources and residues, and maintain at a temperature above 60 degrees F for 2 days prior to installation. Carpet or carpet tiles shall not be stored with materials which have high emissions of volatile organic compounds (VOCs) or other contaminants. Do not store carpet near materials that may offgas or emit harmful fumes, such as kerosene heaters, fresh paint, or adhesives.
1.5 ENVIRONMENTAL REQUIREMENTS
Maintain areas in which carpeting is to be installed at a temperature above 60 degrees F and below 90 degrees F for 2 days before installation, during installation, and for 2 days after installation. Provide temporary ventilation during work of this section. Maintain a minimum temperature of 55 degrees F thereafter for the duration of the contract. Do not permit traffic or movement of furniture or equipment in carpeted area for 24 hours after installation. Complete other work which would damage the carpet prior to installation of carpet.
1.6 SCHEDULING
Install carpet systems after the installation and ventilation period of materials or finishes which have high short-term emissions of VOCs, formaldehyde, particulates, or other air-borne compounds which may be absorbed by or settle on the carpet tiles.
1.7 WARRANTY
Provide manufacturer's standard performance guarantees or warranties including minimum ten (10) year wear warranty, two (2) year material and workmanship and ten (10) year tuft bind and delamination.
1.8 MAINTENANCE
1.8.1 Extra Materials
Provide extra material from same dye lot consisting of uncut carpet tiles for future maintenance.
Provide a minimum of 20 percent of total square yards of each carpet type, pattern, and color.
PART 2 PRODUCTS
2.1 CARPET
Furnish first quality carpet; free of visual blemishes, streaks, poorly dyed areas, fuzzing of pile yarn, spots or stains, and other physical and manufacturing defects. Provide carpet materials and treatments as reasonably nonallergenic and free of other recognized health hazards. Provide a static control construction on all grade carpets which gives adequate durability and performance. Provide the Carpet and Rug Institute (CRI) Indoor Air Quality (IAQ) Label. Carpet type bearing the label will indicate that carpet has been tested and meets the criteria of the CRI Green Label Requirements for Indoor Air Quality Test Criteria.
2.1.1 Polyester Carpet Face Fibers
For informational purposes, a list of sources known to recycle polyester carpet face fibers is provided below. Note that the Contractor is not limited to these sources. An approved product from other sources may be submitted for the Government's approval during construction. Acceptable manufacturer's include, but are not limited to:
Bretlin, Inc.
LaFayette, Georgia
NEW DENTAL CLINIC 07-M01050
Section 09 68 00 Page 5
Central Vermont Carpet Barre, Vermont
Environmental Building Supplies Portland, Oregon
Image Industries Armuchee, Georgia
Martin Color-FI Edgefield, South Carolina
Talisman Mills, Inc.
Mequon, Wisconsin
2.1.2 Physical Characteristics
2.1.2.1 Modular Tile Carpet
Carpet shall comply with the following:
a. Carpet Construction: Tufted.
b. Type: Modular tile 24 by 24 inch square with 0.15 percent growth/shrink rate in accordance with ISO 2551.
c. Pile Type: Level-loop.
d. Pile Fiber: Commercial 100 percent branded (federally registered trademark) nylon staple, minimum 10 percent post-consumer or 40 percent post-industrial recycled content with 25 percent minimum total combined recycled content.
e. Yarn Ply: Minimum 2.
f. Gauge or Pitch: Minimum 1/10 inch in accordance with ASTM D 5793.
g. Stitches or Rows/Wires: Minimum 10 per square inch.
h. Finished Pile Yarn Weight: Minimum 28 ounces per square yard. This does not include weight of backings. Determine weight in accordance with ASTM D 5848.
i. Pile Density: Minimum 7932 oz/cu. yd.
j. Dye Method: Solution dyed.
k. Backing Materials: Provide primary backing materials like those customarily used and accepted by the trade for each type of carpet. Provide secondary backing to suit project requirements of those customarily used and accepted by the trade for each type of carpet, except when a special unitary back designed for gluedown is needed. Backing system shall contain an overall minimum of 85 percent natural latex, jute, or cotton, and contain a minimum of 10 percent post-consumer recycled content, or minimum 40 percent post-industrial recycled content.
2.2 PERFORMANCE REQUIREMENTS
NEW DENTAL CLINIC 07-M01050
Section 09 68 00 Page 6
a. ARR (Appearance Retention Rating): Test carpet with the minimum 3.5-4.0 (Severe) ARR in accordance with either the ASTM D 5252(Hexapod) or ASTM D 5417 (Vettermann) test methods using the number of cycles for short and long term tests as specified.
b. Static Control: Provide static control to permanently regulate static buildup to less than 3.5 kV when tested at 20 percent relative humidity and 70 degrees F in accordance with AATCC 134.
c. Flammability and Critical Radiant Flux Requirements: Comply carpet with 16 CFR 1630.
Provide carpet in corridors and exits with a minimum average critical radiant flux of 0.22 watts per square centimeter when tested in accordance with ASTM E 648.
d. Tuft Bind: Provide tuft bind force required to pull a tuft or loop free from carpet backing with a minimum 10 pound average force for loop pile.
e. Colorfastness to Crocking: Comply dry and wet crocking with AATCC 165 and with a Class 4 minimum rating on the AATCC Color Transference Chart for all colors.
f. Colorfastness to Light: Comply colorfastness to light with AATCC 16, Test Option E "Water- Cooled Xenon-Arc Lamp, Continuous Light" and with a minimum 4 grey scale rating after 40 hours.
g. Colorfastness to Water: Comply colorfastness to water with AATCC 107 and with a minimum
4.0 gray scale rating and a minimum 4.0 transfer scale rating.
h. Delamination Strength: Provide delamination strength for tufted carpet with a secondary back of minimum 2.5 lbs/inch.
i. Antimicrobial: Nontoxic antimicrobial treatment in accordance with AATCC 174 Part I (qualitative), guaranteed by the carpet manufacturer to last the life of the carpet.
2.3 ADHESIVES AND CONCRETE PRIMER
Adhesives and concrete primers shall comply with applicable regulations regarding toxic and hazardous materials. Use wet adhesive with a maximum VOC content of 50 grams/liter. Provide waterproof, nonflammable, and nonstaining adhesives and concrete primers for carpet installation to meet local air-quality standards, and as required by the carpet manufacturer. Provide release adhesive for modular tile carpet as recommended by the carpet manufacturer. Provide adhesives flashpoint of minimum 140 degrees F in accordance with ASTM D 3278.
2.4 MOLDING
Provide a heavy-duty vinyl molding designed for the type of carpet being installed. Provide floor flange of a minimum 2 inches wide. Provide color as selected from manufacturer's full range by Contracting Officer's Technical Representative.
2.5 TAPE
Provide tape for seams as recommended by the carpet manufacturer for the type of seam used in installation. Any seam sealant shall have a maximum VOC content of 50 grams/liter. Do not use sealants that contain 1,1,1-trichloroethane or toluene.
2.6 COLOR, TEXTURE, AND PATTERN
Provide color, texture, and pattern as selected by Contracting Officer's Technical Representative from manufacturer's full range.
NEW DENTAL CLINIC 07-M01050
Section 09 68 00 Page 7
PART 3 EXECUTION
3.1 SURFACE PREPARATION
Do not install carpet on surfaces that are unsuitable and will prevent a proper installation. Repair holes, cracks, depressions, or rough areas using material recommended by the carpet or adhesive manufacturer. Free floor of any foreign materials and sweep clean.
3.2 PREPARATION OF CONCRETE SUBFLOOR
Do not commence installation of the carpeting until concrete substrate is at least 90 days old. Prepare the concrete surfaces in accordance with instructions of the carpet manufacturer. Match carpet, when required, and adhesives to prevent off-gassing to a type of curing compounds, leveling agents, and concrete sealer.
3.3 INSTALLATION
Perform all work by installers who are CFI certified (International Certified Floor covering Installer Association), or manufacturer's approved installers. Conduct installation in accordance with the manufacturer's printed instructions and CRI 104. Protect edges of carpet meeting hard surface flooring with molding and install in accordance with the molding manufacturer's printed instructions. Follow ventilation, personal protection, and other safety precautions recommended by the adhesive manufacturer. Continue ventilation during installation and for at least 72 hours following installation.
3.3.1 Modular Tile Installation
Install modular tiles with release adhesive and snugly jointed together. Lay tiles in an alternating pattern with accessibility to the subfloor where required.
3.4 CLEANING AND PROTECTION
3.4.1 Cleaning
After installation of the carpet, remove debris, scraps, and other foreign matter. Remove soiled spots and adhesive from the face of the carpet with appropriate spot remover. Cut off and remove protruding face yarn. Vacuum carpet clean with a high-efficiency particulate air (HEPA) filtration vacuum.
3.4.2 Protection
Protect the installed carpet from soiling and damage with heavy, reinforced, nonstaining kraft paper, plywood, or hardboard sheets. Lap and secure edges of kraft paper protection to provide a continuous cover. Restrict traffic for at least 48 hours. Remove protective covering when directed by the Contracting Officer.
-- End of Section --